Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹10.8 L
EMD Value
₹26,924
Closing Date
29 Dec 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Assistant Execuitve Engineer
PH Subdivision, Kottarakkara
OandM_ Water Supply Schemes-BAWSS to Kundara and adjoining Panchayaths _ AMC for East kallada Gramapanchayath 2025_26_Annual maintenance of various distribution lines in East kallada Gramapanchayath for 12 months_Pipeline Work
2025_KWA_822226_1
CE(SR)/TR/22962/2025_26_1_1/1
Open Tender
Civil Works - Water Works
Item Rate
365 days
East Kallada
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,760
Yes
₹26,924
Yes
18 Dec 2025
18 Dec 2025
31 Dec 2025
18 Dec 2025
29 Dec 2025
18 Dec 2025
Work Name:O&M - Water Supply Schemes-BAWSS to Kundara and adjoining Panchayaths :- AMC for East kallada Gramapanchayath 2025-26-Annual maintenance of various distribution lines in East kallada Gramapanchayath for 12 months-Pipeline Work
ding detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or any available joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers including the cost of pipe and uPVC specials; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing.x100.47.1.5:Leak rectification work in 75mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or any available joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers including the cost of pipe and uPVC specials; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing.x100.47.1.6:Leak rectification work in 90mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the remain
楴湯楤浳湡汴湩湡楬瑦湩桴楰数映潲牴湥档獥浳潯桴湥湩桴畣⁴湥獤潣癮祥湩桴敮⁷楰数琠桴楳整畣瑴湩湡潬敷楲杮渠睥瀠灩湩潴琠敨琠敲据敨ⱳ瀠慬楣杮椠潰楳楴湯污杩楮杮琠敨瀠灩潴氠湩湡敬敶湡潪湩楴杮琠敨渠睥瀠灩楷桴琠敨攠楸瑳湩楰数眠瑩潳癬湥⁴散敭瑮漠湡⁹癡楡慬汢潪湩⁴湡整瑳湩桴楰数楬敮戠⁹灯牥瑡湩桴慶癬獥挠湯散湲摥湡敲瑣晩楹杮琠敨搠晥捥獴椠潮楴散湡楷桴畯⁴慣獵湩湡⁹慤慭敧潴琠敨攠楸瑳湩瑵汩瑩敩湡敲楦汬湩桴牴湥档獥甠楳杮攠捸癡瑡摥攠牡桴椠慬敹獲渠瑯攠捸敥楤杮㈠挰敤瑰湩汣摵湩潣獮汯摩瑡湩慥档氠祡牥祢爠浡業杮慷整楲杮档牡敧潦敲潭楶杮猠牵汰獵猠楯牦浯眠牯楳整湩汣摵湩楨敲映牯琠潯獬愠摮瀠慬瑮潣癮祥湡散漠潴汯湡慭整楲污ⱳ戠楡楬杮漠瑵眠瑡牥牰癯摩湩慣瑵潩潢牡獤楬桧楴杮慷捴楨杮楲扢湯映湥楣杮牴晡楦潣瑮潲汬湩瑥潣灭敬整愠数桴楤敲瑣潩景䐠灥牡浴湥慴景楦散獲椠据畬楤杮琠敨挠獯⁴景瀠灩湡偵䍖猠数楣污㭳甠噐⁃楐数湡灳捥慩獬猠慨汬戠景朠潯畱污瑩⁹湡潣普牯業杮琠敲敬慶瑮猠慴摮牡獤›汁潓正瑥摥䨠楯瑮湩ե〰㐮⸷⸳㨱敌歡爠捥楴楦慣楴湯眠牯湩㤠洰偵䍖⠠汃獡′潴㘠 楰数楬敮椠据畬楤杮搠瑥捥楴杮愠摮氠捯瑡湩敬歡慥瑲睨牯硥慣慶楴湯椠污楫摮景猠楯潦硥潰楳杮氠慥潰瑲潩景琠敨瀠灩湩汣摵湩慴畣瑴湩 潣据敲整挠瑵楴杮畣瑴湩桴楰数搠慩敭牴捩污祬瀠牥数摮捩汵牡琠桴硡獩漠楰数楬敮眠瑩潨瑵挠畡楳杮愠祮搠浡条獥琠桴慢慬据潰瑲潩Ɱ搠獩慭瑮楬杮愠摮氠晩楴杮琠敨瀠灩牦浯琠敲据敨ⱳ猠潭瑯敨楮杮琠敨挠瑵攠摮ⱳ挠湯敶楹杮琠敨渠睥瀠灩ⱥ挠瑵楴杮愠摮氠睯牥湩敮⁷楰数椠瑮桴牴湥档獥汰捡湩湩瀠獯瑩潩Ɱ愠楬湧湩桴楰数琠楬敮愠摮氠癥汥愠摮樠楯瑮湩桴敮⁷楰数眠瑩桴硥獩楴杮瀠灩楷桴猠汯敶瑮挠浥湥⁴牯爠灥楡慲汢潪湩⁴湡整瑳湩桴楰数楬敮戠⁹灯牥瑡湩桴慶癬獥挠湯散湲摥湡敲瑣晩楹杮琠敨搠晥捥獴椠潮楴散湡敲楦汬湩桴牴湥档獥椠慬敹獲渠瑯攠捸敥楤杮㈠挰敤瑰湩汣摵湩潣獮汯摩瑡湩慥档氠祡牥祢爠浡業杮慷整楲杮档牡敧潦敲潭楶杮猠牵汰獵猠楯牦浯眠牯楳整楷桴畯⁴慣獵湩湡⁹慤慭敧琠桴硥獩楴杮甠楴楬楴獥湩汣摵湩楨敲映牯琠潯獬愠摮瀠慬瑮潣癮祥湡散漠潴汯湡慭整楲污ⱳ戠楡楬杮漠瑵眠瑡牥牰癯摩湩慣瑵潩潢牡獤楲扢湯映湥楣杮楬桧楴杮慷捴楨杮牴晡楦潣瑮潲瑥潣灭敬整愠数桴楤敲瑣潩景䐠灥牡浴湥慴景楦散獲湩汣摵湩桴潣瑳漠楰数☠猠数楣污畢⁴硥汣摵湩桴潣瑳漠⹃⹉⹒䨠楯瑮㭳甠噐⁃楐数湡灳捥慩獬猠慨汬戠景朠潯畱污瑩⁹湡潣普牯業杮琠敲敬慶瑮猠慴摮牡獤›⹃⹉⹒䨠楯瑮湩ձ〰㐮⸷⸲㨲敌歡爠捥楴楦慣楴湯眠牯湩ㄠ〱浭甠噐⁃䌨慬獳㈠琠⤶瀠灩汥湩湩汣摵湩敤整瑣湩湡潬慣楴杮氠慥Ⱬ攠牡桴眠牯硥慣慶楴湯椠污楫摮景猠楯潦硥潰楳杮氠慥潰瑲潩景琠敨瀠灩湩汣摵湩慴畣瑴湩 潣据敲整挠瑵楴杮畣瑴湩桴楰数搠慩敭牴捩污祬瀠牥数摮捩汵牡琠桴硡獩漠楰数楬敮眠瑩潨瑵挠畡楳杮愠祮搠浡条獥琠桴慢慬据潰瑲潩Ɱ搠獩慭瑮楬杮愠摮氠晩楴杮琠敨瀠灩牦浯琠敲据敨ⱳ猠潭瑯敨楮杮琠敨挠瑵攠摮ⱳ挠湯敶楹杮琠敨渠睥瀠灩ⱥ挠瑵楴杮愠摮氠睯牥湩敮⁷楰数椠瑮桴牴湥档獥汰捡湩湩瀠獯瑩潩Ɱ愠楬湧湩桴楰数琠楬敮愠摮氠癥汥愠摮樠楯瑮湩桴敮⁷楰数眠瑩桴硥獩楴杮瀠灩楷桴猠汯敶瑮挠浥湥⁴牯爠灥楡慲汢潪湩⁴湡整瑳湩桴楰数楬敮戠⁹灯牥瑡湩桴慶癬獥挠湯散湲摥湡敲瑣晩楹杮琠敨搠晥捥獴椠潮楴散湡敲楦汬湩桴牴湥档獥椠慬敹獲渠瑯攠捸敥楤杮㈠挰敤瑰湩汣摵湩潣獮汯摩瑡湩慥档氠祡牥祢爠浡業杮慷整楲杮档牡敧潦敲潭楶杮猠牵汰獵猠楯牦浯眠牯楳整楷桴畯⁴慣獵湩湡⁹慤慭敧潴琠敨攠楸瑳湩瑵汩瑩敩ⱳ椠据畬楤杮栠物潦潴汯湡汰湡ⱴ挠湯敶慹据景琠潯獬愠摮洠瑡牥慩獬慢汩湩畯⁴慷整Ⱳ瀠潲楶楤杮挠畡楴湯戠慯摲ⱳ氠杩瑨湩Ⱨ爠扩潢敦据湩Ⱨ眠瑡档湩Ⱨ琠慲晦捩挠湯牴汯攠捴Ⱞ挠浯汰瑥獡瀠牥琠敨搠物捥楴湯漠敄慰瑲敭瑮污漠晦捩牥ⱳ椠据畬楤杮琠敨挠獯⁴景瀠灩…灳捥慩獬戠瑵攠捸畬楤杮琠敨挠獯⁴景䌠䤮刮潊湩獴※偵䍖倠灩獥愠摮猠数楣污桳污敢漠潧摯焠慵楬祴愠摮挠湯潦浲湩潴爠汥癥湡⁴瑳湡慤摲㩳匠捯敫⁴…⹃⹉⹒䨠楯瑮湩ձ〰㐮⸷⸲㨳敌歡爠捥楴楦慣楴湯眠牯湩ㄠ〴浭甠噐⁃䌨慬獳㈠琠⤶瀠灩汥湩湩汣摵湩敤整瑣湩湡潬慣楴杮氠慥Ⱬ攠牡桴眠牯硥慣慶楴湯椠污楫摮景猠楯潦硥潰楳杮氠慥潰瑲潩景琠敨瀠灩湩汣摵湩慴畣瑴湩 潣据敲整挠瑵楴杮畣瑴湩桴楰数搠慩敭牴捩污祬瀠牥数摮捩汵牡琠桴硡獩漠楰数楬敮眠瑩潨瑵挠畡楳杮愠祮搠浡条獥琠桴慢慬据潰瑲潩Ɱ搠獩慭瑮楬杮愠摮氠晩楴杮琠敨瀠灩牦浯琠敲据敨ⱳ猠潭瑯敨楮杮琠敨挠瑵攠摮ⱳ挠湯敶楹杮琠敨渠睥瀠灩ⱥ挠瑵楴杮愠摮氠睯牥湩敮⁷楰数椠瑮桴牴湥档獥汰捡湩湩瀠獯瑩潩Ɱ愠楬湧湩桴楰数琠楬敮愠摮氠癥汥愠摮樠楯瑮湩桴敮⁷楰数眠瑩桴硥獩楴杮瀠灩楷桴猠汯敶瑮挠浥湥⁴牯爠灥楡慲汢潪湩⁴湡整瑳湩桴楰数楬敮戠⁹灯牥瑡湩桴慶癬獥挠湯散湲摥湡敲瑣晩楹杮琠敨搠晥捥獴椠潮楴散湡敲楦汬湩桴牴湥档獥椠慬敹獲渠瑯攠捸敥楤杮㈠挰敤瑰湩汣摵湩潣獮汯摩瑡湩慥档氠祡牥祢爠浡業杮慷整楲杮档牡敧潦敲潭楶杮猠牵汰獵猠楯牦浯眠牯楳整楷桴畯⁴慣獵湩湡⁹慤慭敧潴琠敨攠楸瑳湩瑵汩瑩敩ⱳ椠据畬楤杮栠物潦潴汯湡汰湡ⱴ挠湯敶慹据景琠潯獬愠摮洠瑡牥慩獬慢汩湩畯⁴慷整Ⱳ瀠潲楶楤杮挠畡楴湯戠慯摲ⱳ氠杩瑨湩Ⱨ爠扩潢敦据湩Ⱨ眠瑡档湩Ⱨ琠慲晦捩挠湯牴汯攠捴Ⱞ挠浯汰瑥獡瀠牥琠敨搠物捥楴湯漠敄慰瑲敭瑮污漠晦捩牥ⱳ椠据畬楤杮琠敨挠獯⁴景瀠灩…灳捥慩獬戠瑵攠捸畬楤杮琠敨挠獯⁴景䌠䤮刮潊湩獴※偵䍖倠灩獥愠摮猠数楣污桳污
be of good quality and conforming to relevant standards: Socket & C.I.R. Jointing.q100.47.3.3.a:Leak rectification work in 140 mm PVC (Class 2 to 6) pipe line including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, without causing any damage to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, ribbon fencing, lighting, watching, traffic control etc., complete as per the direction of Departmental officers, including the cost of pipe & specials but excluding the cost of C.I.R. Joints; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: C.I.R. Jointing.q100.47.2.4:Leak rectification work in 160mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earth work excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, without causing any damages to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, ribbon fencing, watching, traffic control etc., complete as per the direction of Departmental officers, including the cost of pipe & specials but excluding the cost of C.I.R. Joints; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: Socket & C.I.R. Jointing.f100.47.3.4:Leak rectification work in 160mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, without causing any damage to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, ribbon fencing, lighting, watching, traffic control etc., complete as per the direction of Departmental officers, including the cost of pipe & specials but excluding the cost of C.I.R. Joints; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: C.I.R. Jointing.OD160585/2025-2026:Leak rectification work of PVC end cap in 32/40/50/63/75 mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut end, conveying suitable size end cap, placing in position and jointing the PVC end cap with solvent cement or any available joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers including the cost of uPVC specials; uPVC specials shall be of good quality and conforming to relevant standards:OD160584/2025-2026:Leak rectification work of PVC end cap in 90/110/140/160 mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut end, conveying suitable size end cap, placing in position and jointing the PVC end cap with solvent cement or any available joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers including the cost of uPVC specials; uPVC specials shall be of good quality and conforming to relevant standards:ÖOD168676/2025-2026:Leak rectification work of PVC end cap in 50/65/80 mm GI pipeline including detecting and locating leak, including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the remaining portion, dismantling and lifting the pipe and smoothening the cut end, conveying suitable size end cap, placing in position and jointing the PVC end cap with solvent cement or any available joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers including the cost of uPVC specials; uPVC specials shall be of good quality and conforming to relevant standards:Leak rectification -AC pipes 100.46.1.6:Repairing leakage/breakage of 200mm A.C. pipeline by cutting and dismantling the damaged pipe portion (up to 1.5m) including charges for earthwork excavation in all kinds of soil including tar / concrete cutting for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new A.C. pipe to the required length, re-j
ointing the pipeline using C.I.D. Joints, testing the pipeline by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers excluding the cost of pipe and C.I.D. Joints.100.46.2.6:Repairing leakage/breakage of 200mm A.C. pipeline by cutting and dismantling the damaged pipe portion (above 1.5m up to 3.0m) including charges for earthwork excavation in all kinds of soil including tar / concrete cutting for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new A.C. pipe to the required length, re-jointing the pipeline using C.I.D. Joints, testing the pipeline by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers excluding the cost of pipe and C.I.D. Joints. 100.46.1.8:Repairing leakage/breakage of 250mm A.C. pipeline by cutting and dismantling the damaged pipe portion (up to 1.5m) including charges for earthwork excavation in all kinds of soil including tar / concrete cutting for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new A.C. pipe to the required length, re-jointing the pipeline using C.I.D. Joints, testing the pipeline by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers excluding the cost of pipe and C.I.D. Joints. 100.46.1.9:Repairing leakage/breakage of 300mm A.C. pipeline by cutting and dismantling the damaged pipe portion (up to 1.5m) including charges for earthwork excavation in all kinds of soil including tar / concrete cutting for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new A.C. pipe to the required length, re-jointing the pipeline using C.I.D. Joints, testing the pipeline by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers excluding the cost of pipe and C.I.D. Joints.Leak rectification -GI pipeslOD160586/2025-2026:Rectification of leakages of G.I. Pipes up to 40 mm size in exposed portions by replacing lengths up to 1.0m by cutting, removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with G.I. Pipes of suitable size and jointing by three run welding to make a water tight joint, painting the welded portion, testing the line to the required pressure, rectifying any defects noticed, without causing any damages to any other utilities, including the charges hire and conveyance of tools, plant and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, necessary scaffolding including the cost of specials but excluding cost of pipe and as per the direction of departmental officers etc., complete.X100.50.3.1:Rectification of leakages of 50mm G.I. Pipes in exposed portions by replacing lengths up to 1.0m by cutting, removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with G.I. Pipes of suitable size and jointing by three run welding to make a water tight joint, painting the welded portion, testing the line to the required pressure, rectifying any defects noticed, without causing any damages to any other utilities, including the charges hire and conveyance of tools, plant and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, necessary scaffolding including the cost of specials but excluding cost of pipe and as per the direction of departmental officers etc., complete.100.50.1.2:Rectification of leakages of 65mm G.I. Pipes by replacing lengths up to 1.0m including earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar / concrete cutting, by cutting, removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with G.I. Pipes of suitable size and jointing by thraded coupler and union of suitable size including threading, alignment, laying and jointing to make a water tight joint, testing the line to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges hire and conveyance of tools, plant and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, including the cost of specials but excluding cost of pipe and as per the direction of departmental officers etc., complete.X100.50.3.2:Rectification of leakages of 65mm G.I. Pipes in exposed portions by replacing lengths up to 1.0m by cutting, removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with G.I. Pipes of suitable size and jointing by three run welding to make a water tight joint, painting the welded portion, testing the line to the required pressure, rectifying any defects noticed, without causing any damages to any other utilities, including the charges hire and conveyance of tools, plant and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, necessary scaffolding including the cost of specials but excluding cost of pipe and as per the direction of departmental officers etc., complete.X100.50.3.3:Rectification of leakages of 80mm G.I. Pipes in exposed portions by replacing lengths up to 1.0m by cutting, removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with G.I. Pipes of suitable size and jointing by three run welding to make a water tight joint, painting the welded portion, testing the line to the required pressure, rectifying any defects noticed, without causing any damages to any other utilities, including the charges hire and conveyance of tools, plant and materials to the leak site, ba
iling out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, necessary scaffolding including the cost of specials but excluding cost of pipe and as per the direction of departmental officers etc., complete.100.50.1.3:Rectification of leakages of 80mm G.I. Pipes by replacing lengths up to 1.0m including earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar / concrete cutting, by cutting, removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with G.I. Pipes of suitable size and jointing by thraded coupler and union of suitable size including threading, alignment, laying and jointing to make a water tight joint, testing the line to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges hire and conveyance of tools, plant and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, including the cost of specials but excluding cost of pipe and as per the direction of departmental officers etc., complete.Leak rectification -DI pipesy100.49.1.5:Rectification of joint leakages in 300mm D.I. Pipe (cutting, removing and laying back a length of 1.0m from one side of the joint) including earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, by cutting and removing a portion of pipe from the damaged joint without causing any damages to the remaining portion of the line and specials and replacing the pipe with mechanical and tyton joint after cleaning the ends, centering the pipe, providing the joints, testing the line to the required test pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of hire and conveyance of tools, plants and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion but excluding cost of mechanical joint and as per the direction of departmental officers etc., complete.Miscellaneous itemsÉ100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil.cum100.41.40:Supply, stacking, spreading and consolidating of Red earth in the trench of pipe line for cushion including carriage, loading, unloading & stacking up to any lead.100.51.3:Disconnecting water connection from service mains along Asphalt road without causing any damage to the existing line including charges of earth work excavation in all kinds of soil for exposing connection point including tar cutting / conrete cutting, making the disconnection point water tight charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other existing utilities, including the charges of hire for tools and plant, conveyance of tools and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion but excluding cost of materials and as per the direction of departmental officers etc. complete. Disconnection 100.51.1: Disconnecting water connection from service mains along earthern road without causing any damage to the existing line including charges of earth work excavation in all kinds of soil for exposing connection point including tar cutting / conrete cutting if any, making the disconnection point water tight charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other existing utilities, including the charges of hire for tools and plant, conveyance of tools and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion but excluding cost of materials and as per the direction of departmental officers etc. complete.OD176693/2025-2026:Permanent Disconnection of 25/20 mm water connection (Where boring point disconnection is not possible due to requirement of tar/concrete cutting permission) including earth work excavation in all kinds of soil for exposing the service line, making the disconnection point water tight, charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other existing utilities, including the charges of hire for tools and plant, conveyance of tools and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, cost of materials and as per the direction of departmental officers etc. complete.?100.60.5.1:Labour charges for attending boring point leakage / checking in the existing mains, including charges for earth work excavation in all kinds of soil, exposing the main, dismantling damaged pipe and specials as the case may be refilling the trenches with proper consolidation etc. complete as per the approved standards including charges for lighting, watching, providing caution boards, traffic control etc. complete but excluding cost of materials and cost of cutting of concrete / tarred / bituminous roads and as per the directions of the departmental officers.ò100.60.7.1:Repair work for 1m to 2m length in 15 mm (1/2 inch) house connections, using 20mm Indian Standard Class 6 uPVC pipe and specials, including trenching and refilling in all kinds of soil, hire for tools, cost of consumables and labour charges, cost of materials, including charges for lighting, watching, providing caution boards, traffic control etc. complete, but excluding the cost of cutting of concrete / tarred / bituminous roads and as per the directions of the department officers.ò100.60.7.2:Repair work for 1m to 2m length in 20 mm (3/4 inch) house connections, using 25mm Indian Standard Class 6 uPVC pipe and specials, including trenching and refilling in all kinds of soil, hire for tools, cost of consumables and labour charges, cost of materials, including charges for lighting, watching, providing caution boards, traffic control etc. complete, but excluding the cost of cutting of concrete / tarred / bituminous roads and as per the directions of the department officers.Û100.56.1:Supplying and fixing 15 / 20 mm PVC public tap after dismantling the damaged tap including all cost of materials, labour charges, hire for tools and as per the direction of the department officers etc complete.ú100.57.1:Rectifying the leakages in boring point of public tap connection including earth work excavation in all kinds of soil for exposing the boring point including concrete / tar cutting, dismantling the damaged saddle piece,cutting and removing damaged portion of pipe line,fixing new saddle piece,laying 20/25 mm PVC 10Kg/cm2 pipe in place of damaged portion of pipe and connecting
with existing pipe line,testing the line to the required test pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of hire and conveyance of tools, plants and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, including cost of pipe and saddle piece and as per the direction of departmental officers etc. complete.Leakµ100.58.1:Rectifying the leakages in vertical pipe of public tap connection including earth work excavation in all kinds of soil for exposing the pipeline including concrete / tar cutting, cutting and removing damaged portion of pipe, fixing new 20/25 mm GI pipe and specials in place of damaged portion of pipe and connecting with existing pipe line, testing the line to the required
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
KWAGeneralConditionsforeTenderingV5.pdf
PDF • 0.69 MB
Tendernotice_1.pdf
PDF • 0.06 MB
form83_84.pdf
Tender Documents • 0.60 MB
BOQ_1378046.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .