Loading…
Loading…
Tender Value
₹14.9 L
EMD Value
Exempted
Closing Date
4 Sept 2026, 4:00 pm7d left
cutting
joints
bends
drilling and alignment (SERVICE); Consumables to be provided by service provider (inclusive in contract cost)
Facility Management Services - LumpSum Based - Goverment office; Drawing
dressing & termination of FR PVC copper wires for complete lighting
fan and socket circuits (SERVICE); Consumables to be provided by service provider (inclusive in contract co..
Facility Management Services - LumpSum Based - Goverment office; Installation of LED tube lights
ceiling roses
switches
sockets
regulators
modular plates and PVC boxes(SERVICE); Consumables to be provided by service provider (inclusive in contra..
Facility Management Services - LumpSum Based - Goverment office; Installation of MCBs
circuit connection
termination and electrical dressing (SERVICE); Consumables to be provided by service provider (inclusive in contract cost)
Facility Management Services - LumpSum Based - Goverment office; Continuity
polarity
circuit checking
fault rectification
testing & commissioning (SERVICE); Consumables to be provided by service provider (inclusive in contract cost)
Facility Management Services - LumpSum Based - Goverment office; Transportation
loading/unloading
drilling
tools
ladders and minor consumables (SERVICE); Consumables to be provided by service provider (inclusive in contract cost)
Facility Management Services - LumpSum Based - Goverment office; Final wiring dressing
finishing
waste removal
cleaning & handing over (SERVICE); Consumables to be provided by service provider (inclusive in contract cost)
Facility Management Services - LumpSum Based - Goverment office; Surface Preparation Scraping removal of loose or flaking existing paint
dust and dirt from walls & ceiling including rubbing
sanding and cleaning (553
83 Sq
m
); Consumables to be p..
Facility Management Services - LumpSum Based - Goverment office; Minor Surface Repair
Filling minor cracks
nail holes
damaged patches and uneven surfaces with suitable repair filler material including levelling (553
); Consumables to be pr..
Facility Management Services - LumpSum Based - Goverment office; Wall Putty
Providing applying good quality white cement polymer based wall putty in minimum 2 coats
including rubbing sanding to obtain smooth and even finish (553
); Consum..
Facility Management Services - LumpSum Based - Goverment office; Interior Primer
Providing applying one uniform coat of acrylic water based interior primer over properly prepared putty surface (553
); Consumables to be provided by service pro..
Facility Management Services - LumpSum Based - Goverment office; Interior Emulsion Paint Providing applying minimum 2 coats of washable acrylic plastic emulsion paint of approved colourshade using roller brush (553
); Consumables to be provid..
Facility Management Services - LumpSum Based - Goverment office; Masking
protection of flooring
aluminium work
windows
electrical fittings and minor consumables (SERVICE); Consumables to be provided by service provider (inclusive in contract cost..
Facility Management Services - LumpSum Based - Goverment office; final touch-up
debris removal and complete cleaning (SERVICE); Consumables to be provided by service provider (inclusive in contract cost)
Facility Management Services - LumpSum Based - Goverment office; Supply of Commercial
Institutional Grade Floor Carpet
4 5 mm overall thickness
polypropylene
synthetic fibre
loop-pile
tufted construction with durable backing
suitable for school
li..
Facility Management Services - LumpSum Based -
jointing compound and necessary fixing consumables (54
44 Sq
); Consumables to be provided by service provider (inclusive in contract cost)
Facility Management Services - LumpSum Based - Goverment office; Preparation of existing floor surface including cleaning
scraping of loose deposits
dust removal and preparation of base before laying (54
); Consumables to be provided by ser..
Facility Management Services - LumpSum Based - Goverment office; Complete laying and fitting of carpet including measurement
joint matching
adhesive application
pressing
rolling
trimming and edge finishing (54
); Consumables to b..
Facility Management Services - LumpSum Based - Goverment office; Edge
junction finishing around walls
doors and other fixed portions including necessary minor accessories (SERVICE); Consumables to be provided by service provider (inclusive in contra..
loading
unloading
shifting of material
minor consumables
removal of waste and final cleaning (SERVICE); Consumables to be provided by service provider (inclusi..
Facility Management Services - LumpSum Based - Goverment office; Powder-coated aluminium supporting framework for ACP-packed window openings (83
84 Kg); Consumables to be provided by service provider (inclusive in contract cost)
Facility Management Services - LumpSum Based - Goverment office; Providing & fixing minimum 3 mm thick ACP Sheet including cutting and finishing (8
154 Sq
Facility Management Services - LumpSum Based - Goverment office; Powder-coated aluminium fixed outer frame for sliding windows (41
92 Kg); Consumables to be provided by service provider (inclusive in contract cost)
Facility Management Services - LumpSum Based - Goverment office; Powder-coated aluminium sliding shutter sections (7
87 Kg); Consumables to be provided by service provider (inclusive in contract cost)
Facility Management Services - LumpSum Based - Goverment office; Providing & fixing 5 mm clear float glass in sliding windows (7
865 Sq
Facility Management Services - LumpSum Based - Goverment office; Powder-coated aluminium fixed framework for ventilators (22
67 Kg); Consumables to be provided by service provider (inclusive in contract cost)
Facility Management Services - LumpSum Based - Goverment office; Powder-coated aluminium shutter/openable sections for ventilators (28
44 Kg); Consumables to be provided by service provider (inclusive in contract cost)
Facility Management Services - LumpSum Based - Goverment office; Providing & fixing 5 mm clear float glass in ventilators (3
705 Sq
Facility Management Services - LumpSum Based - Goverment office; Powder-coated aluminium framework for complete L- shaped partition (165
83 Kg); Consumables to be provided by service provider (inclusive in contract cost)
Facility Management Services - LumpSum Based - Goverment office; 12 mm pre-laminated board for approximately lower 50% portion of partition (11
845 Sq
Facility Management Services - LumpSum Based - Goverment office; 5 mm clear float glass for approximately
Facility Management Services - LumpSum Based - Goverment office; Heavy-duty sliding rollers
handles
locks
stoppers and necessary hardware for 3 sliding windows (SERVICE); Consumables to be provided by service provider (inclusive in contract cost)
Facility Management Services - LumpSum Based - Goverment office; Complete ventilator hardware including hinges
opening arrangement
stoppers
locks and fittings for7 ventilators(SERVICE); Consumables to be provided by service provider (inclus..
Facility Management Services - LumpSum Based - Goverment office; EPDM
PVC gaskets
glazing beads
weather strips
neutral-cure silicone
SS screws
rivets and anchor fasteners (SERVICE); Consumables to be provided by service provider (inclusive in co..
Facility Management Services - LumpSum Based - Goverment office; Detailed site measurement
fabrication adjustment
machining
final alignment & setting of all units (SERVICE); Consumables to be provided by service provider (inclusive in con..
safe handling and shifting of fabricated material to installation location (SERVICE); Consumables to be provided by service provider (inclusive in con..
Facility Management Services - LumpSum Based - Goverment office; Installation finishing
perimeter sealing
minor making-good
removal of fabrication waste and final cleaning (SERVICE); Consumables to be provided by service provider (inclusive in con..
9805070
GEM/2026/B/7960169
Two Packet Bid
Facility Management Services - LumpSum Based - Goverment Office; Study Desk area with three-side pr
Raipur, Chhattisgarh
Total value wise evaluation
SERVICE
7 documents required · 7 mandatory
| Item | Delivery Location | Qty | Delivery |
|---|---|---|---|
| cutting | - | - | - |
| joints | - | - | - |
| bends | - | - | - |
| drilling and alignment (SERVICE); Consumables to be provided by service provider (inclusive in contract cost) | - | - | - |
| Facility Management Services - LumpSum Based - Goverment office; Drawing | - | - | - |
| dressing & termination of FR PVC copper wires for complete lighting | - | - | - |
| fan and socket circuits (SERVICE); Consumables to be provided by service provider (inclusive in contract co.. | - | - | - |
| Facility Management Services - LumpSum Based - Goverment office; Installation of LED tube lights | - | - | - |
| ceiling roses | - | - | - |
| switches | - | - | - |
| sockets | - | - | - |
| regulators | - | - | - |
| modular plates and PVC boxes(SERVICE); Consumables to be provided by service provider (inclusive in contra.. | - | - | - |
| Facility Management Services - LumpSum Based - Goverment office; Installation of MCBs | - | - | - |
| circuit connection | - | - | - |
| termination and electrical dressing (SERVICE); Consumables to be provided by service provider (inclusive in contract cost) | - | - | - |
| Facility Management Services - LumpSum Based - Goverment office; Continuity | - | - | - |
| polarity | - | - | - |
| circuit checking | - | - | - |
| fault rectification | - | - | - |
| testing & commissioning (SERVICE); Consumables to be provided by service provider (inclusive in contract cost) | - | - | - |
| Facility Management Services - LumpSum Based - Goverment office; Transportation | - | - | - |
| loading/unloading | - | - | - |
| drilling | - | - | - |
| tools | - | - | - |
| ladders and minor consumables (SERVICE); Consumables to be provided by service provider (inclusive in contract cost) | - | - | - |
| Facility Management Services - LumpSum Based - Goverment office; Final wiring dressing | - | - | - |
| finishing | - | - | - |
| waste removal | - | - | - |
| cleaning & handing over (SERVICE); Consumables to be provided by service provider (inclusive in contract cost) | - | - | - |
| Facility Management Services - LumpSum Based - Goverment office; Surface Preparation Scraping removal of loose or flaking existing paint | - | - | - |
| dust and dirt from walls & ceiling including rubbing | - | - | - |
| sanding and cleaning (553 | - | - | - |
| 83 Sq | - | - | - |
| m | - | - | - |
| ); Consumables to be p.. | - | - | - |
| Facility Management Services - LumpSum Based - Goverment office; Minor Surface Repair | - | - | - |
| Filling minor cracks | - | - | - |
| nail holes | - | - | - |
| damaged patches and uneven surfaces with suitable repair filler material including levelling (553 | - | - | - |
| ); Consumables to be pr.. | - | - | - |
| Facility Management Services - LumpSum Based - Goverment office; Wall Putty | - | - | - |
| Providing applying good quality white cement polymer based wall putty in minimum 2 coats | - | - | - |
| including rubbing sanding to obtain smooth and even finish (553 | - | - | - |
| ); Consum.. | - | - | - |
| Facility Management Services - LumpSum Based - Goverment office; Interior Primer | - | - | - |
| Providing applying one uniform coat of acrylic water based interior primer over properly prepared putty surface (553 | - | - | - |
| ); Consumables to be provided by service pro.. | - | - | - |
| Facility Management Services - LumpSum Based - Goverment office; Interior Emulsion Paint Providing applying minimum 2 coats of washable acrylic plastic emulsion paint of approved colourshade using roller brush (553 | - | - | - |
| ); Consumables to be provid.. | - | - | - |
| Facility Management Services - LumpSum Based - Goverment office; Masking | - | - | - |
| protection of flooring | - | - | - |
| aluminium work | - | - | - |
| windows | - | - | - |
| electrical fittings and minor consumables (SERVICE); Consumables to be provided by service provider (inclusive in contract cost.. | - | - | - |
| Facility Management Services - LumpSum Based - Goverment office; final touch-up | - | - | - |
| debris removal and complete cleaning (SERVICE); Consumables to be provided by service provider (inclusive in contract cost) | - | - | - |
| Facility Management Services - LumpSum Based - Goverment office; Supply of Commercial | - | - | - |
| Institutional Grade Floor Carpet | - | - | - |
| 4 5 mm overall thickness | - | - | - |
| polypropylene | - | - | - |
| synthetic fibre | - | - | - |
| loop-pile | - | - | - |
| tufted construction with durable backing | - | - | - |
| suitable for school | - | - | - |
| li.. | - | - | - |
| Facility Management Services - LumpSum Based | - | - | - |
| jointing compound and necessary fixing consumables (54 | - | - | - |
| 44 Sq | - | - | - |
| ); Consumables to be provided by service provider (inclusive in contract cost) | - | - | - |
| Facility Management Services - LumpSum Based - Goverment office; Preparation of existing floor surface including cleaning | - | - | - |
| scraping of loose deposits | - | - | - |
| dust removal and preparation of base before laying (54 | - | - | - |
| ); Consumables to be provided by ser.. | - | - | - |
| Facility Management Services - LumpSum Based - Goverment office; Complete laying and fitting of carpet including measurement | - | - | - |
| joint matching | - | - | - |
| adhesive application | - | - | - |
| pressing | - | - | - |
| rolling | - | - | - |
| trimming and edge finishing (54 | - | - | - |
| ); Consumables to b.. | - | - | - |
| Facility Management Services - LumpSum Based - Goverment office; Edge | - | - | - |
| junction finishing around walls | - | - | - |
| doors and other fixed portions including necessary minor accessories (SERVICE); Consumables to be provided by service provider (inclusive in contra.. | - | - | - |
| loading | - | - | - |
| unloading | - | - | - |
| shifting of material | - | - | - |
| minor consumables | - | - | - |
| removal of waste and final cleaning (SERVICE); Consumables to be provided by service provider (inclusi.. | - | - | - |
| Facility Management Services - LumpSum Based - Goverment office; Powder-coated aluminium supporting framework for ACP-packed window openings (83 | - | - | - |
| 84 Kg); Consumables to be provided by service provider (inclusive in contract cost) | - | - | - |
| Facility Management Services - LumpSum Based - Goverment office; Providing & fixing minimum 3 mm thick ACP Sheet including cutting and finishing (8 | - | - | - |
| 154 Sq | - | - | - |
| Facility Management Services - LumpSum Based - Goverment office; Powder-coated aluminium fixed outer frame for sliding windows (41 | - | - | - |
| 92 Kg); Consumables to be provided by service provider (inclusive in contract cost) | - | - | - |
| Facility Management Services - LumpSum Based - Goverment office; Powder-coated aluminium sliding shutter sections (7 | - | - | - |
| 87 Kg); Consumables to be provided by service provider (inclusive in contract cost) | - | - | - |
| Facility Management Services - LumpSum Based - Goverment office; Providing & fixing 5 mm clear float glass in sliding windows (7 | - | - | - |
| 865 Sq | - | - | - |
| Facility Management Services - LumpSum Based - Goverment office; Powder-coated aluminium fixed framework for ventilators (22 | - | - | - |
| 67 Kg); Consumables to be provided by service provider (inclusive in contract cost) | - | - | - |
| Facility Management Services - LumpSum Based - Goverment office; Powder-coated aluminium shutter/openable sections for ventilators (28 | - | - | - |
| 44 Kg); Consumables to be provided by service provider (inclusive in contract cost) | - | - | - |
| Facility Management Services - LumpSum Based - Goverment office; Providing & fixing 5 mm clear float glass in ventilators (3 | - | - | - |
| 705 Sq | - | - | - |
| Facility Management Services - LumpSum Based - Goverment office; Powder-coated aluminium framework for complete L- shaped partition (165 | - | - | - |
| 83 Kg); Consumables to be provided by service provider (inclusive in contract cost) | - | - | - |
| Facility Management Services - LumpSum Based - Goverment office; 12 mm pre-laminated board for approximately lower 50% portion of partition (11 | - | - | - |
| 845 Sq | - | - | - |
| Facility Management Services - LumpSum Based - Goverment office; 5 mm clear float glass for approximately | - | - | - |
| Facility Management Services - LumpSum Based - Goverment office; Heavy-duty sliding rollers | - | - | - |
| handles | - | - | - |
| locks | - | - | - |
| stoppers and necessary hardware for 3 sliding windows (SERVICE); Consumables to be provided by service provider (inclusive in contract cost) | - | - | - |
| Facility Management Services - LumpSum Based - Goverment office; Complete ventilator hardware including hinges | - | - | - |
| opening arrangement | - | - | - |
| stoppers | - | - | - |
| locks and fittings for7 ventilators(SERVICE); Consumables to be provided by service provider (inclus.. | - | - | - |
| Facility Management Services - LumpSum Based - Goverment office; EPDM | - | - | - |
| PVC gaskets | - | - | - |
| glazing beads | - | - | - |
| weather strips | - | - | - |
| neutral-cure silicone | - | - | - |
| SS screws | - | - | - |
| rivets and anchor fasteners (SERVICE); Consumables to be provided by service provider (inclusive in co.. | - | - | - |
| Facility Management Services - LumpSum Based - Goverment office; Detailed site measurement | - | - | - |
| fabrication adjustment | - | - | - |
| machining | - | - | - |
| final alignment & setting of all units (SERVICE); Consumables to be provided by service provider (inclusive in con.. | - | - | - |
| safe handling and shifting of fabricated material to installation location (SERVICE); Consumables to be provided by service provider (inclusive in con.. | - | - | - |
| Facility Management Services - LumpSum Based - Goverment office; Installation finishing | - | - | - |
| perimeter sealing | - | - | - |
| minor making-good | - | - | - |
| removal of fabrication waste and final cleaning (SERVICE); Consumables to be provided by service provider (inclusive in con.. | - | - | - |
Exempted
Yes
25 Aug 2026
25 Aug 2026
4 Sept 2026
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_9805070.pdf
GEM_BID • 0.46 MB
1787651736.pdf
GEM_OTHER • 3.04 MB
1787651741.pdf
GEM_OTHER • 3.04 MB
GEM_OTHER • 3.96 MB
gtc.pdf
GEM_OTHER • 0.71 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].