Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹21.3 CrAccepted-AOC | ₹21.3 Cr | 1 | Accepted-AOC 1st lowest |
| 2 | 2₹21.4 CrRejected-AOC | ₹21.4 Cr | 2 | Rejected-AOC 2nd lowest |
| 3 | 3₹22.8 CrRejected-AOC | ₹22.8 Cr | 3 | Rejected-AOC 3rd lowest |
Tender Value
₹21.4 Cr
EMD Value
₹5 L
Closing Date
24 Dec 2019, 3:00 pmClosed
Superintending Engineer
Superintending Engineer, KWA, P.H Circle, Malappuram
KIIFB Budget 2017 18 WSS to Ramanchadi Aligarh in Malappuram District Package II Laying Distribution main
2019_KWA_324319_1
SE/PHC/MPM/11/2019-20
Open Tender
Civil Works - Water Works
365 days
perinthalmanna in Malappuram District
refer NIT
8 documents required · 8 mandatory
₹16,800
online
₹5 L
KWA, P.H Circle, Malappuram
7 Apr 2020
23 Nov 2019
28 Dec 2019
23 Nov 2019
24 Dec 2019
4 Dec 2019
24 Nov 2019 - 2 Dec 2019
3 Dec 2019
Amount
Distribution System
Supplying, laying and testing Distribution main for WSS to Ramanchadi - Aligarh in Malappuram District- Package II. The details of works mentioned in NIT Vol.II (Scope of work) It is th responsibility of the Contractor to complete all the works as per scope of work, succesfully trial run and commisioning and maintain the entire work by him for the maintanance period of 12 months after thecommisioning and handing over the scheme to KWA. The defect liability period (Guarantee period) is 24 months from the date of commisioning. So the quoted amount shall be inclusive of all incidental charges, taxes but excluding GST for the completion of all works in the scope of work as per the site condition.
Bidder Name
Amount
M V VISWANATHAN
ZUBAIR
George Mathew
George Mathew
M V VISWANATHAN
M V VISWANATHAN
ZUBAIR
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid