| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 LAccepted-AOC | ₹2.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹2.6 LRejected-AOC | ₹2.6 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | SHEJI KT L1 | KUNJUMOITHEEN P M L2 |
|---|---|---|---|---|---|
| 1.00Sluice | |||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 9.92 | cum | 355.76 ₹3,529.14 | 371.23 ₹3,682.6 |
| 1.00 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 18 | hour | 341.74 ₹6,151.32 | 356.6 ₹6,418.8 |
| 1.00 | OD181916/2025-2026:Ring Bund Type II putting up ring bund with earth fille gunny bags of top width 1.0 m bottom width 2.0 m height 2.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work etc complete | 6 | metre | 1,402.49 ₹8,414.94 | 1,463.47 ₹8,780.82 |
| 1.00 | OD181912/2025-2026:D R mpacking under foundation - Dry stone packing under foundatioln with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site (modified 60.7.2) | 9.48 | cum | 2,934.55 ₹27,819.53 | 3,062.14 ₹29,029.09 |
| 1.00 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.96 | cum | 8,474.88 ₹8,135.88 | 8,843.35 ₹8,489.62 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 552.76 | kilogram | 111.19 ₹61,461.38 | 116.03 ₹64,136.74 |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 43.92 | sqm | 381.91 ₹16,773.49 | 398.52 ₹17,503 |
| 1.01 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 13.08 | sqm | 997.46 ₹13,046.78 | 1,040.82 ₹13,613.93 |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 11.38 | cum | 9,134.37 ₹1,03,912.59 | 9,531.52 ₹1,08,430.57 |
Tender Value
₹2.5 L
EMD Value
₹6,350
Closing Date
28 Feb 2026, 6:00 pmClosed
Assistant Engineer,LSGD SEction varandarappilly Gp
O/O Assistant Engineer ,LSGD Section varandarappilly GP Thrissur (dist)
Annual Plan-2025-26 Pr no 465/25 Varandarappilly GPConstruction of Sluice and side protedtion of Karuvanthodu -In Warrd 11-General Civil Work
2026_LSGD_837793_1
TN9-03/2025-26/AELSGD/VPLY
Open Tender
Civil Works - Others
180 days
Varandarappilly Gp
Please refer Tender documents.
10 documents required · 10 mandatory
₹560
Yes
₹6,350
Yes
23 Jun 2026
20 Feb 2026
2 Mar 2026
20 Feb 2026
28 Feb 2026
20 Feb 2026
Sluice
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete
OD181916/2025-2026:Ring Bund Type II putting up ring bund with earth fille gunny bags of top width 1.0 m bottom width 2.0 m height 2.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work etc complete
OD181912/2025-2026:D R mpacking under foundation - Dry stone packing under foundatioln with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site (modified 60.7.2)
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
OD418546/2025-2026:Supplying and fixing MS Name board with 1.2m length post from ground level, having board dimension 80 x 45 c.m, lettering done with black enamel Paint on yellow back ground, including the cost of all materials , labour and conveyance charges etc complete.
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1411095.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
sbd.pdf
Tender Documents • 1.74 MB
BOQ_1411095.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid