Tender Value
₹25.0 L
EMD Value
₹25,000
Closing Date
17 Jul 2026, 6:00 pmClosed
Dy.Minicipal Commissioner - West Zone
Providing,supply & laying wetmix over Drainage & water pipeline Excavation of various location in Ranip ward West zone(ARC)
323078
1/26-27 (T.N.41)
Open
Civil Works - Others
Works
Ahmedabad
4 documents required · 0 mandatory · 4 optional
₹900
Municipal Commissioner, Ahmedabad
₹25,000
13 Jul 2026
13 Jul 2026
13 Jul 2026
17 Jul 2026
13 Jul 2026
Name of Work :- Providing,supply & laying wetmix over Drainage & water pipeline Excavation of
various location in Ranip ward West zone(ARC)
Sr. No. Description Qty Rate Per Amount
Providing & Supplying JCB Machine on rental
basis in case of emergency situation and
break down type work & also during
unavoidable condition as per instruction of
engg.incharge , rate includes all nece. shifting,
1 fuel and operating charges and stacking of 24 535.71 Hr
useful & non-useful materials separately up to
store. (No payment should be allowed for non
working condition of machinery and for pipe
line excavation and laying work) ( Based on
Previously approved rate by C E sir )
Hiring of tractor with trolley considering
2 Hrs. as working day hours incl.Driver (GWSSB 200 2,110.50 Day
Providing & Supplying Road Roller (8-10 ton)
on rental basis in case of hand lying work of
Hot mix / cold mix material work during
day/night for 8 Hrs. Shift, as per instruction of
engg.incharge , rate includes all nece. shifting,
fuel and operating charges etc. (No payment
should be allowed for non working condition
Supplying Surace Vibrator / Plat compactor
for compaction. The cost of Surace Vibrator
4 includes , driver, fuel charges etc. complete 2 327.87 Day
for day or night as directed by engineer in
Hiring of Three wheeler carrier
5 (Chakado/Rixa) considering 10 Hrs. as working 50 1,156.76 Day
day hours incl.Driver (GWSSB SOR 2021-22)
Supplying Electric Breaker Machine for RCC
Slab or Asphalt Demolishing Work on site by
using Operator, fuel, power Supply etc.
Complete as Directed. (No paymentshould be
allowed for non working condition of
machinery and for pipe line excavation and
M.H. work. Allowed only for break down
Supplying Pneumatic Breaker Machine for
RCC Slab or Asphalt Demolishing Work on site
by using Operator, fuel, power Supply etc.
Complete as Directed. (No payment should be
7 allowed for non working condition of 24 535.71 Hr
machinery and for pipe line excavation and
M.H. work. Allowed only for break down
work) ( Based on Previously approved rate by
Providing and operation dewatering Pump
including fuel charges & operator Charges etc.
as directed etc. comp. (Shift for Eight Hour)
8 (For Each Pump Set, No payment should be 5 535.71 Shift
allowed for non working condition of
machinery ) ( Based on Previously approved
rate by C E sir )
Supplying labours and masons for
reinstatement of stone paving, block paving at
excavation of drainage pipe line, water pipe
line, excavation for cable laying and supply -
labour at road store to shfit the hot mix and
to lay the hot mix as directed (Approved rate)
(a) Mason 140 400 No
(b) Mazdoor 984.00 328 No
(c) Makadam/ Supervision At Day / Night 295 425 No
Providing & Supplying Hitachi Machine-110
capacity on rental basis in case of
emergency situation and break down type
work & also during unavoidable condition as
10 per instruction of engg.incharge , rate 2 1,785.71 Hr
includes all nece. shifting, fuel and operating
charges . (No payment should be allowed for
non working condition of machinery )(Based
on central work shop rate)
Hiring and operating Mud Pumps incl. Cost of
fuel and operator including the cost of to and
fro transportation, laying of the delivery hoses
as required, lowering and lifting the pumps as
and when required etc. complete. Set Do As
Directed. (No payment should be allowed for
non working condition of machinery ) ( Based
on Previously approved rate by C E sir )
Box cutting the road surface to proper slope
and camber for making a base for road work
12 including removing the excavated stuff and 75 205.35 Cmt
depositing on the road side slope as directed
upto 200 Mt.lead
Conveyance charge of earth, lime, murrum,
building rubbish, manure, garbage, sludge,
excavated rock, fly ash, aggregates of any kind
13 executed outside the road site. Rate also
includes spreading & levelling etc complete.
Internal conveyance above 50 mt done within
the work site is not payable.
f) Lead From 5 Km to 10 Km. 99.0 78.54 Cmt
g) Lead From 10 Km to 15 Km. 50 104.65 Cmt
Providing, laying, spreading and compacting
graded stone aggregate to wet mix macadam
specification including premixing the Material
with water at OMC in mechanical mix plant
14 carriage of mixed Material by tipper to site,
laying in uniform layers in sub- base / base
course on well prepared surface and
compacting with vibratory roller to achieve
the desired density as per Codal Provision.
(A) Supply of WMM 700 1,975.00 cmt
(B) Laying of WMM 700 35 Cmt
Providing and laying in position Ready Mixed
M-200 grade concrete for reinforced cement
conctere work , using cement content as per
approved Design Mix manufactured in fully
automatic batching plant and transported to
siteof work in transit mixer for a lead up to
kms having continuous agitated mixer,
manufactured as per mix design of specified
grade for reinforced cement concrete work
including pumping of R.M.C. from transit
mixer to site of laying, excluding the cost of
centering shuttering finishing and
reinforcement including cost of admixtures in
recommended proportions as per IS: 9103 to
accelerate/ retard setting of concrete,
improve workability withoutimpairing
strength and durability as per direction of the
Engineer - in - charge. Without Fly Ash (Min
cement level as per latest IS 456 shall be
Contractor'sSign Addl.C.E.
MobilNo:- (westzone)
As per account department(A.M.C.) circular no. 10 Dt.05/08/2024 Bank guarantee of said
work must be of Ahmedabad city branch, which mentioned as bellow.
(A) Guarantee issued by following bankswill be accepted as SD/EMD on permanentbasis.
(1) All Nationalized Banks including the Public Sector Bank-IDBI LYF.
(2) Private Sector Banks authorized by RBI to undertake State Government
Business (at present : AXIS Bank, ICICI Bank, HDFC Bank)
(B) Guarantees issued by following Banks will be accepted as SD/EMD for the period up to.
(1) Commercial Banks :
1) A U SMALL FINANCE BANK
3) BANDHAN BANK
4) CITY UNION BANK
6) DBS BANK INDIA LIMITED
8) EQUITAS SMALL FINANCE BANK
9) FEDERAL BANK
15) IDFC FIRST BANK
16) INDUSLND BANK
17) JANA SMALL FINANCE BANK
18) KARNATAKA BANK
19) KARUR VYSYA BANK
20) KOTAK MAHINDRA BANK
21) SOUTH INDIAN BANK
22) TAMILNADU MERCANTILE BANK
23) UTKARSH SMALL FINANCE BANK
(2) Co-Operative Banks of Gujarat
1) The Ahmedabad Mercantile Co –Oparative bank limited
2) Kalupur commercial Co-operative Bank limited
3) Nutan Nagrik Sahakari Bank limited
4) Saraswt Co-operative Bank
5) SVC Co-operative Bank
6) THE Cosmos Co-operative Bank
7) Baroda Gramin Bank
8) Saurashtra Gramin Bank
9) THE Gujarat State Co-operative Bank
10) The Mehsana Urban Co-Operative Bank Ltd.
11) The surat district Co-operative Bank
12) The surat peoples Co-operative Bank
AHMEDABADMUNICIPALCORPORATIONENGINEERDEPARTMENT
TECHNICALSPECIFICATION
Nameof Work :- Providing,supply & laying wetmix over Drainage & water pipeline
Excavation of various location in Ranip ward West zone(ARC)
GeneralTechnicalSpecificationSection
FollowingtechnicalspecificationsshallbeapplicabletotherelevantitemsofBOQ
Providing & Supplying JCB Machine on rental basis in case of emergency situation and break down type work & also during
unavoidable condition as per instruction of engg.incharge , rate includes all nece. shifting, fuel and operating charges and
stacking of useful & non-useful materials separately up to store. (No payment should be allowed for non working condition of
machinery and for pipe line excavation and laying work) ( Based on Previously approved rate by C E sir )
Themodeofpaymentforthisitem shall be on hr. Basis.
Hiring of tractor with trolley considering 8 Hrs. as working day hours incl.Driver (GWSSB SOR 2021-22)
Themodeofpaymentforthisitemshall beon Day. Basis.
Providing & Supplying Road Roller (8-10 ton) on rental basis in case of hand lying work of Hot mix / cold mix material work during
day/night for 8 Hrs. Shift, as per instruction of engg.incharge , rate includes all nece. shifting, fuel and operating charges etc. (No
payment should be allowed for non working condition of machinery)
Themodeofpaymentforthisitem shall be on Day. Basis.
Supplying Surace Vibrator / Plat compactor for compaction. The cost of Surace Vibrator includes , driver, fuel charges etc.
complete for day or night as directed by engineer in charge
Work shall be carried out manually or by Machinery as per site
requirements.The mode of payment for this item shall be on Day. Basis.
Hiring of Three wheeler carrier (Chakado/Rixa) considering 10 Hrs. as working day hours incl.Driver (GWSSB SOR 2021-22)
Work shall be carried out manually or by Machinery as per site
requirements.The mode of payment for this item shall be on Day. Basis.
Supplying Electric Breaker Machine for RCC Slab or Asphalt Demolishing Work on site by using Operator, fuel, power Supply etc.
Complete as Directed. (No paymentshould be allowed for non working condition of machinery and for pipe line excavation and
M.H. work. Allowed only for break down work)
The mode of payment for this item shall be on shift. Basis.
Supplying Pneumatic Breaker Machine for RCC Slab or Asphalt Demolishing Work on site by using Operator, fuel, power Supply
etc. Complete as Directed. (No payment should be allowed for non working condition of machinery and for pipe line excavation
and M.H. work. Allowed only for break down work) ( Based on Previously approved rate by C E sir )
The mode of payment for this item shall be on Hr. Basis.
Providing and operation dewatering Pump including fuel charges & operator Charges etc. as directed etc. comp. (Shift for Eight
Hour) (For Each Pump Set, No payment should be allowed for non working condition of machinery ) ( Based on Previously
approved rate by C E sir )
The mode of payment for this item shall be on Shift. Basis.
Supplying labours and masons for reinstatement of stone paving, block paving at excavation of drainage pipe line, water pipe line,
excavation for cable laying and supply labour at road store to shfit the hot mix and to lay the hot mix as directed (Approved rate)
(c) Makadam/ Supervision At Day / Night
The mode of payment for this item shall be on No. Basis.
Providing & Supplying Hitachi Machine-110 capacity on rental basis in case of emergency situation and break down type work &
also during unavoidable condition as per instruction of engg.incharge , rate includes all nece. shifting, fuel and operating charges .
(No payment should be allowed for non working condition of machinery )(Based on central work shop rate)
The measurements shall be on Hr.basis.
Hiring and operating Mud Pumps incl. Cost of fuel and operator including the cost of to and fro transportation, laying of the
delivery hoses as required, lowering and lifting the pumps as and when required etc. complete. Set Do As Directed. (No payment
should be allowed for non working condition of machinery ) ( Based on Previously approved rate by C E sir )
The rate shall be for a unit of Hr
Box cutting the road surface to proper slope and camber for making a base for road work including removing the excavated stuff
and depositing on the road side slope as directed upto 200 Mt.lead
The rate shall be for a unit of CMT
Conveyance charge of earth, lime, murrum, building rubbish, manure, garbage, sludge, excavated rock, fly ash, aggregates of any
kind executed outside the road site. Rate also includes spreading & levelling etc complete. Internal conveyance above 50 mt done
within the work site is not payable.
f) Lead From 5 Km to 10 Km.
g) Lead From 10 Km to 15 Km.
The rate shall be for a unit of CMT.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the
Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers in sub-
base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per Codal
(A) Supply of WMM
(B) Laying of WMM
This work shall consist of laying and compacting clean, crushed, graded aggregate and granular material, premixed with water, to a
dense mass on a prepared sub-grade/sub- base/ base or existing pavement as the case may be in accordance with the requirements
of these Specifications. The material shall be laid in one or more layers as necessary to lines, grades and cross-sections shown on the
approved drawings or as directed by the Engineer.
The thickness of a single compacted Wet Mix Macadam layer shall not be less than 75 mm. When vibrating or other approved types
of compacting equipment are used, the compacted depth of a single layer of the sub-base course may be upto 200 mm with the
approval of the Engineer.
Physical Requirements
Coarse aggregates shall be crushed stone. The aggregates shall conform to the physical requirements set forth in Table 19-1.
Sevaliya/Timba/Ankodiya special aggregate is only acceptable.
If the water absorption value of the coarse aggregate is greater than 2 percent, the soundness test shall be carried out on the
material delivered to site as per IS:2386 (Part-5).
Table 19-1 : Physical Requirements of Coarse Aggregates for Wet Mix Macadam for Sub-base/Base Courses
S. No. Test Test Method Requirements
1. Los Angeles Abrasion value or IS:2386 (Part-4) 40 percent (Max.)
Aggregate Impact value
IS:2386 (Part-4) or 30 percent (Max.)
2. Combined Flakiness and Elongation indices IS:2386(Part-1) 35 percent (Max.)*
* To determine this combined proportion, the flaky stone from a representative sample should first be separated out. Flakiness index is weight of flaky stone
metal divided by weight of stone sample. Only the elongated particles be separated out from the remaining (non-flaky) stone metal. Elongation index is weight of
elongated particles divided by total non-flaky particles. The values of flakiness index and elongation index so found are added up
Grading Requirements
The aggregates shall conform to the grading given in Table 19-2.
Table 19-2 : Grading Requirements of Aggregates for Wet Mix Macadam
IS Sieve Designation Percent by weight passing the IS Sieve
600 micron 8-22
Material finer than 425 micron shall have Plasticity Index (PI) not exceeding
The final gradation approved within these limits shall be graded from coarse to fine and shall not vary from the low limit on one sieve to
the high limit on the adjacent sieve or vice versa.
Construction Operations:-
Preparation of Base
The surface of the sub-grade/sub-base/base to receive the Wet mix macadam course shall be prepared to the specified grade and
camber and cleaned of dust, dirt and other extraneous material. Any ruts or soft yielding places shall be corrected in an approved
manner and rolled until firm surface is obtained.
Where the Wet mix macadam is to be laid on an existing metalled road, damaged area including depressions and potholes shall be
repaired and made good with the suitable material. The existing surface shall be scarified and re-shaped to the required grade and
camber before spreading the coarse aggregate for Wet mix macadam.
Preparation of Mix
Wet Mix Macadam should be prepared in an approved mixing plant of suitable capacity having provision for controlled addition of
water and forced/positive mixing arrangement like pugmill or pan type mixer of concrete batching plant. For small quantity of wet mix
work, the Engineer may permit the mixing to be done in concrete mixers.
Quantity of water should not vary from OMC determined as per IS : 2720 (part VIII) by more than agreed limit. The mixed material
should be uniformly wet and no segregation should be permitted.
Spreading of mix
Immediately after mixing, the aggregates shall be spread uniformly and evenly upon the prepared subgrade/sub-base/base in required
quantities. In no case should these be dumped in heaps directly on the area where these are to be laid nor shall their hauling over a
partly completed stretch be permitted.
The mix may be spread either by a paver finisher or motor grader or as per instruction of Engineer-in-Charge and/or his authorized
representative. For portions where mechanical means cannot be used, manual means as approved by the Engineer shall be used. The
motor grader shall be capable of spreading the material uniformly all over the surface. Its blade shall have hydraulic control suitable for
initial adjustments and maintaining the same so as to achieve the specified slope and grade.
The paver finisher shall be self-propelled, having the following features:
(i) Loading hoppers and suitable distribution mechanism
(ii) The screed shall have tamping and vibrating arrangement for initial compaction to the layer as it is spread without rutting or
otherwise marring the surface profile.
(iii) The paver shall be equipped with necessary control mechanism so as to ensure that the finished surface is free from surface
The surface of the aggregate shall be carefully checked with templates and all high or low sports remedied by removing or adding
aggregate as may be required. The layer may be tested by depth blocks during construction. No segregation of layer and fine particles
should be allowed. The aggregates as spread should be of uniform gradation with no pockets of fine materials.
After the mix has been laid to the required thickness, grade and crossfall/camber the same shall be uniformly compacted, to the full
depth with suitable roller. If the thickness of single compacted layer does not exceed 100 mm, smooth wheel roller of 80 to 100 kN
weight may be used. For a compacted single layer upto 200 mm, the compaction shall be done with the help of vibratory roller of
minimum static weight of 80 to 100 kN or equivalent capacity roller. The speed of the roller shall not exceed 5 km/h.
In portions having unidirectional cross fall/superelevation, rolling shall commence from the lower edge and progress gradually towards
the upper edge. Thereafter, roller should progress parallel to the centre line of the road, uniformly over-lapping each preceding track by
at least one third width until the entire surface has been rolled. Alternate trips of the roller shall be terminated in stops at least 1 m
away from any preceding stop.
In portions in camber, rolling should begin at the edge with the roller running forward and backward until the edges have been firmly
compacted. The roller shall then progress gradually towards the centre parallel to the centre line of the road uniformly overlapping
each of the preceding track by at least one-third width until the entire surface has been rolled.
Any displacement occurring as a result of reversing of the direction of a roller or from any other cause shall be corrected at once as
specified and/or removed and made good.
Along forms, kerbs, walls or other places not accessible to the roller, the mixture shall be thoroughly compacted with mechanical
tampers or a plate compactor. Skin patching of an area without scarifying the surface to permit proper bonding of the added material
shall not be permitted.
Rolling should not be done when the subgrade is soft or yielding or when it causes a wave-like motion in the sub-base/base course or
subgrade. If irregularities develop during rolling which exceed 12 mm when tested with a 3 metre straight edge, the surface should be
loosened and premixed material added or removed as required before rolling again so as to achieve a uniform surface conforming to
the desired grade and crossfall. In no case should the use of unmixed material be permitted to make up the depressions. Rolling shall
be continued till the density achieved is at least 98 per cent of the maximum dry density for the material as determined by the method
outlined in IS : 2720 (Part-8).
After completion, the surface of any finished layer shall be well-closed, free from movement under compaction equipment or any
compaction planes, ridges, cracks and loose material. All loose, segregated or otherwise defective areas shall be made good to the full
thickness of the layer and recompacted.
Setting and drying:
After final compaction of wet mix macadam course, the road shall be allowed to dry for 24 hours.
Opening to Traffic
Preferably no vehicular traffic of any kind should be allowed on the finished wet mix macadam surface till it has dried and the wearing
Surface Finish and Quality Control of Work
Surface evenness:
The surface finish of construction shall conform to the requirements of Clause in Item No. 16&17&18.
Quality control:
Control on the quality of materials and works shall be exercised by the Engineer as per Table 19-3.
Table 19-3 : Test and Frequency for Materials for Wet Mix Macadam
Type of Test Frequency IS Code
Construction (As per Circular No. 66)
Wet Mix Gradation One test per 200 Cu.m. IS:2386, Part-I-1963
Macadam Aggregate Impact Value One test per 1000 Cu.m. IS:2386, Part-IV
Combined Flakiness and One test per 500 Cu.m. IS:2386, Part-I
Elongation Indices
Atterberg Limits of portion of One test per 200 Cu.m. IS:2720, Part-V
aggregates passing
425 micron sieve
Density of compacted layer One set of three tests per IS:2720, Part-VIII
Rectification of Surface Irregularity
Where the surface irregularity of the wet mix macadam course exceeds the permissible tolerances or where the course is otherwise
defective due to subgrade soil getting mixed with the aggregates, the full thickness of the layer shall be scarified over the affected area,
reshaped with added premixed material or removed and replaced with fresh premixed material as applicable and recompacted. The
area treated in the aforesaid manner shall not be less than 5 m long and 2 m wide. In no case shall depressions be filled up with
unmixed and ungraded material or fines.
Arrangement for Traffic
During the period of construction, arrangements for the traffic shall be provided. The Contractor shall take all necessary measures for
the safety of traffic during construction and provide, erect and maintain such barricades, including signs, marking, flags, lights and
flagmen as per instruction of the Engineer-in-charge.
Measurements for Payment
The rate shall be for a unit of one cubic meter.
Providing and laying in position Ready Mixed M-200 grade concrete for reinforced cement conctere work , using cement
content as per approved Design Mix manufactured in fully automatic batching plant and transported to siteof work in transit
mixer for a lead up to 10 kms having continuous agitated mixer, manufactured as per mix design of specified grade for
reinforced cement concrete work including pumping of R.M.C. from transit mixer to site of laying, excluding the cost of
centering shuttering finishing and reinforcement including cost of admixtures in recommended proportions as per IS: 9103 to
accelerate/ retard setting of concrete, improve workability withoutimpairing strength and durability as per direction of the
Engineer - in - charge. Without Fly Ash (Min cement level as per latest IS 456 shall be maintained).
Mode of measurements shall be on CMT.basis.
I HAVE ALSO GONE THROUGH TECHNICAL SPECIFICATIONS FOR THE ITEMS (AS PER STANDARD P.W.D. TECHNICAL
SPECIFICATION FOR THE ITEMS AND ALSO I HAVE THE BOOK OF THE SAME) AND AGREE TO ABIDE BY THEM.
IN CASE OF WHERE IS NO TECHNICAL SPECIFICATION FOR THE ANY ITEMS AVAILABLE, SPECIFICATION GIVEN BY THE
ENGINEER-IN-CHARGE SHALL BE FOLLOWED AND FOR THE SAME I AGREE TO ABIDE BY THEM.
SealandSignatureoftheBidder Add.CityEngineer(WestZone)
AmdavadMunicipalCorporation
ybœtJtœBgwÂlÂmvjftuvtuohuNl
bntldhmuJtmœl–vrùbÍtul
vrùbÍtul Ítulj ytuVem,
1. Wvhtuf<xuLzhtusu<u JdobtkbtLghSMx[uNl ^htJ<t ftuLx[tfxh©eytuyuChJt.
2. xuLzhlerlg<xuLzh Ve <&t R.yub.ze. ck^ fJhbtkkWvhltmhltbuÁcÁ / hSMxhyu.ze./MvezvtuMx/ fwhegh&erlg<mbgbtkbtufjJtlthnuNu.
3. ftuLx[tfxh©eytuyuxuLzhlemt&uBGþrlrmvjbtLghSMx[uNlle/ dJobuLxhSMx[uNlleftuve, (xuLzhftuve<&t yLgvwhtJtmt&u)
yawfmtbujfhJtlehnuNuylufJhWvhxuLzhlkch<&t ftuLxufxlkchsYhMvМNtoJJtltu hnuNu.ck^ fhJhWvhxuLzhltuxemlkch, xuLzhlkch,
ftblwkltb<&t, ftuLx[[tfxhlemkM&tlwkltb<&t ftuLxufxlkchyJ~gœNtoJJtlthnuNu. ftuLx[tfxhtuyuxuLzhbtcukflwltb, Ft<t lkch,
btRfhlkchylumhltbwMvÐyûthtubtkjFJw.
4. xuLzh Ve vu ytuzoh / zebtLzz[tVx&eaqfJJtlehnuNu. œhufxuLzhœeXyjdxuLzhxuLzhVeChJtlehnuNu.
5. ytuAehfblexuLzh Ve, R.yub.ze. fu xuLzh Ve, R.yub.ze. ÂJltltxuLzhtuhœct<j (fuLmj) dKtNu.
6. xuLzhmt&uBþfJtbtkytJ<e yluoMxble, xuLzhlehfblt 1% «btKucukfduhLxe / zebtLzz[tVx / vu ytuzoh / jtufjbtRfhauf&e s MJefthJtbtkytJNu.
œhufxuLzhœeXyjdR.yub.ze. ChJtlehnuNu. R.yub.ze. hfbYt. yuffhtuzmwDeleykœtS<hfbltftbbtxujtufjbtRfh auf, rzbtLzz[tVx, vu ytuzoh fu
cukfduhkxeltMJYvbtk<&t Yt. yuffhtuz&eWvhleykœtS<hfbltftbbtxuR.yub.ze.lehfbbtºtrzbtLzz[tVx, vu ytuzoh fu
ckufduhkxeltMJYvbtkytvJtlehnuNu.
7. cukfduhuLxebtºtybœtJtœNnuhle s MJefthJtbtkytJNu.
8. xuLzh Ve <&t R.yub.ze.lehfbltze.ze./auflevtA¤ ftuLx[tfxh©eyuvtu<tlemkM&tlwkltb<&t btuctRjlkchyJ~gjFJtltuhnuNu. ftuLx[t¾xhu
vtu<tlemkkM&tlt auf <&t ze.ze. xuLzhR~gw><theFctœlt s ytvJt.
9. Nh<e xuLzhtuhœct<j dKtNu.
10. stuxuLzhbtkMvÐWÕjuFfhtgujntug<tuatubtmtlufthKu Ft<tfegMËaltyLJgußgthußgthuftb ck^ htFJtLþk&tg<u
mbgluftbleBþÆ<btkbshuytvJtbtkytJNu. vhkðþytyLJguftuECtJJ^thtuytvJtbtkytJNulne. suleltuk^ >hufxuLzhhujuJe.
11. xuuLzhtuftuEvKfthKytÃgtrmJtgMJefthJt fu lrnkMJefthJt<ule mkÃËKom•ttBGþrlrmvjfrbNlh©elehnuNu.
12. xuLzhbtkstuftuRmwDthtJDthtntug<tu<u ykdxuLzh Ch<t vnujtAuÕjuœJmurlg<JucmtRxy&JtfauheyusYhe<vtmfhelu s xuLzhbtufjJw.
13. mefgtuhexezevtuÍex/ vVtuboLmduhuLxelehfbYt. yuffhtuzmwDeleykœtS<hfbltftbbtxujtufjbtRfh auf, rzbtLzz[tVx, vu ytuzoh fu
cukfduhkxeltMJYvbtk<&t Yt. yuffhtuz&eWvhleykœtS<hfbltftbbtxumefgtuhexezevtuÍex/ vhVtuboLmduhkxelehfbbtºtrzbtLzz[tVx, vu ytuzoh fu
ckufduhkxeltMJYvbtkytvJtlehnuNu.
14. ytuljtRlyul-«tufgwhJucmtRxvh&eChJtlt&<t xuLzhbtkftuLx[tfxh/
yusLmeyuxuLzhlentzoftuvebtkCtJCgtoJdhlemnemefftfhemcbexfhJtlehnuNu. stu<ubtkCtJChujnNu<tu<uJtxuLzhhœfhJtbtkytJNu.
15. dwsht<mhfth ©b,ftuiNÕgyluhtusdthrJCtdîthtXhtJ ¢btf:LED/WRT/e-file/11/2024/0293/M2 mraJtjg
,dtk^eldh<t.15.02.24 ltXhtJv{btKuyusLme/¢tuLx[fxhtuluîtht ©bgtudeftgœtlestudJtRvhevqKo&tg<u mwrlµ<fhJtlwkhnNu.
16. mœh xuLzhbtk ” GST rl<e rlgb bwsc jtdw vzNu ” <u bwsc dK<he fhe xuLzhtu ChJtlt hnuNu.
zebtLzz[tVx / auf “BgwÂlÂmvjfÂb§h©e, ybœtJtœ” ltltbltufZtJJtu.
17. vhevºt 92 <t 20/01/2025 ltuawM<vKuybjfhJtltuhnuNu.
ybœtJtœBgwÂlÂmvjftuvtuohuNl
yu.yth.me. xuLzh- Nh<tu
1. yu.yth.me. xuLzhbtkJfoytuzhytÃgtctœftb NY fhJtlembgbgtoœtbtkftuLx[tfxhîthtftb NY fhJtleòKfgtoctœ
fjtfltftb NY lrnfhJtbtkytJu<tuyLgftuLx[tfxhvtmubtfuoxhux&eftuLx[tfxhltFaouylustuFbuftbdehefhtJJtbtkytJNu.
2. ftuLx[tfxhluJfoytuzohytÃgtctœ yu.yth.me. «fthlkwxuLzhntuRftblesYhegt<bwscxujeVtulefòKfhesu<u ftb NY
fhJtfnuJtbtkytJNuylusuftbleòKfgtolt 24 fjtfbtk NY
fhJtbtklrnytJuylurlg<mbgbgtoœtbtkvwKofhJtbtklrnytJu<tusu<u ytRxbltSOR CtJ&e
dKevulÕxeJmwjjuJtbtkytJNu.
3. ºtK fu J^wJthWvhbwscleyLgftuLx[tfxhvtmu&eftbdehefhtJJtleVhsvzNuylu/y&Jt ºtK fu
J^wJthvulÕxefhJtleVhsvzNu<tu<u mkstudtubtkftuLx[tfxhluçjufjeMxfhJtbtkytJNusuleykr<b m•tt Bgw.frb¹lh©elu hnuNu.
4. The contractor shall adhere to the maintenance schedule outlined in the tender
documents and comply with the prevailing AMC circulars issued from time to time.
AHMEDABAD MUNICLPAL CORPORATION
MAHANAGAR SEVA SADAN
Clause : 1 Contractor shall not employ any child having age 5 to 15 years as it is prohibited by Child Labour Prohibition and Regulation
Act 1986. Hon'ble Supreme Court has given certain guide lines and as per the guide lines. If child labour is employed on the site work,
the contractor shall have to deposit Rs. 20,000.00 (Rupees Tw enty thousand only) in the child labour welfare fund. If the employer
refuses to deposit then action will be taken for contempt of Supreme Court Judgement and also will be prosecuted by concerned
authority. Because of the breach of any provision of child labour prohibition and regulation Act 1986 by the Contractor & Municipal
Corporation becomes liable to pay any amount then the Municipal Corporation shall recover the said amount from the contractor.
Clause : 2 The Standing Committee has decided to deduct 1/2% amount from each running bill as per its Reso. No. 1783 Date 06--02-
97, but the Municipal Corporation Board has recently decided that the actual testing charge is taken and the remaining amount is
refundable at the time of final bill (As per Muni. Board Reso. No. 123 dated 25-02-97)
Clause : 3 Contractor has to follow prevailing Labour act and has to maintain labour register acordingly,and has to follow other
Clause : 4 Quantity taken in tender are tentative and may differ as per execution of work. No claim shall be entertain regarding
* MODIFICATION OF DOCUMENTS
Modification of specifications and correction/corrigendum in respect of the work if required will be made by A.M.C. The same shall
be placed on A.M.C website which may be downloaded by the tendrers enclosed along with the tender duly signed. These shall form
a part of tender. The tenderer shall not add or amend the text of any of the documents except in so far as may be necessary to
comply with any addendum.
* ADDENDAUM/CORRIGENDUM .
Addendum or corrigendum conveying any change or correction in respect of the work shall form the part of the contract documents.
The full consideration shall be given to such addendum or corrigendum or correction before submission tender duly filled in by the
contractor. Therefore, the contractor shall have to watch such addendum or corrigendum or correction published by A.M.C through
its website www.egovamc.com. Tenderes shall verify the number of addendum issued and enclose the same with the tender
documents,failing which the tender shall be liable for rejection and no any complaint in respect to this shall be entertained under any
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
& STAMP ( West Zone)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender No. 41.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .