Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.7 LAdmitted-Finance | -52.77% | ₹5.7 L | L1 | Admitted-Finance |
| 2 | L2₹6.5 LAdmitted-Finance | -45.88% | ₹6.5 L | L2 | Admitted-Finance |
| 3 | L3₹6.9 LAdmitted-Finance | -42.20% | ₹6.9 L | L3 | Admitted-Finance |
| 4 | L4₹7.6 LAdmitted-Finance | -37.00% | ₹7.6 L | L4 | Admitted-Finance |
| 5 | L5₹7.9 LAdmitted-Finance | -34.00% | ₹7.9 L | L5 | Admitted-Finance |
Tender Value
₹12 L
EMD Value
₹24,000
Closing Date
27 Aug 2026, 6:00 pmClosed
xen
kalakote
Restoration of teryath sarooti road damaged due to laying of optical fibre by JIO digital fibre pvt. ltd
2026_PWDJK_320982_2
eNIT No 49 of 2026/27 Dated 13/08/2026
Open Tender
Civil Works
Percentage
60 days
kalakote
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
xen
₹24,000
3 Sept 2026
14 Aug 2026
28 Aug 2026
14 Aug 2026
27 Aug 2026
14 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: 2.9.1 All kinds of soil : 60% OR 40% | 125 | Cum | 351.51 | ₹43,938.75 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 7 | cum | 4,826.5 | ₹33,785.5 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 140 | cum | 5,733.6 | ₹8,02,704 |
| 4 | Providing and laying non-pressure of specified class R.C.C. pipes
including collars/spigot jointed with stiff mixture of cement mortar in the
proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc.
complete.
.1 Non-pressure NP-3 class (Medium duty) R.C.C. pipes 1.2600 mm dia. R.C.C. pipe | 30 | rmt | 2,640 | ₹79,200 |
| 5 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of
foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 18 | Cum | 218.4 | ₹3,931.2 |
| 6 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone
aggregate) finished with a floating coat of neat cement including cement
slurry and curing complete, but excluding the cost of nosing of steps etc. complete.
11.3.3 50 mm thick with 20mm nominal size stone aggregate. | 10 | cum | 562.15 | ₹5,621.5 |
| 7 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering,
finishing and reinforcement with 5.3.1 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 1 | cum | 9,821.85 | ₹9,821.85 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing inposition and binding all complete upto plinth level | 113 | kg | 123.2 | ₹13,921.6 |
| 10Centering and shuttering including strutting, propping etc. and removal of form for: | |||||
| 10.1 | Foundations, footings, bases of columns etc. for mass concrete | 280 | Sqm | 286.35 | ₹80,178 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
BOQ_1069158.xls
BOQ • 1.78 MB
corrigendum49.pdf
PDF • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].