Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.0 L
EMD Value
₹4,916
Closing Date
25 May 2026, 11:00 amClosed
Assistant Executive Engineer
Assistant Executive Engineer MI Subdivision Pala,Mini civil station Fourth floor
Annual Maintenance of Vadakara LI Scheme
2026_Irrig_849548_1
RE-2 4113/AEE/MI/SUBDN/PALA/2025-26
Open Tender
Civil Works - Lift Irrigation Schemes
Item Rate
300 days
Vadakara
Please refer tender documents
10 documents required · 10 mandatory
₹555
₹4,916
26 May 2026
16 May 2026
26 May 2026
16 May 2026
25 May 2026
16 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1APPENDIX A- VADAKARA LI SCHEME | |||||
| 1.001 | 2.1.1:Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil | - | sqm | - | - |
| 1.002 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | - | sqm | - | - |
| 1.003 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | - | cum | - | - |
| 1.004 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 1 | sqm | - | - |
| 1.005 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.006 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.007 | 13.7.1:12 mm cement plaster finished with a floating coat of neat cement of mix:1:3 ( 1 cement : 3 fine sand) | 1 | sqm | - | - |
| 1.008 | OD13630/2025-2026:Overhauling 40 HP motor after dismantling the electric connection of the motor,
lifting the motor from position using chain block, conveying the same to the workshop ,
varnishing the starter and rotor, conveying back to the pumphouse, refitting and connecting the
electric connections, bolt,
washer etc, complete. | - | each | - | - |
| 1.009 | OD13629/2025-2026:Repairing and maintenance of Oil starter of 40 HP motor including replacing of brass
stud, end clip, Transformer oil including all labour charges etc complete | - | each | - | - |
stage.html
html • 0.01 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1435509.xls
BOQ • 0.30 MB
SBD.pdf
Tender Documents • 3.96 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .