| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC | ₹1.2 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.2 Cr+₹3.9 L (3.34%)Rejected-AOC | ₹1.2 Cr+₹3.9 L (3.34%) | L2 | Rejected-AOC L1 |
| Sl No | Description | Qty | Unit | Manikandan K L1 | SEBASTIAN V.J. L2 |
|---|---|---|---|---|---|
| 1.00Appendix-A-Civil works | |||||
| 1.00 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 0.21 | cum | 2,980 ₹616.86 Lowest | 3,000 ₹621 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 83.13 | cum | 275 ₹22,861.58 Lowest | 300 ₹24,939.9 |
| 1.00 | 2.9.1:Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.Ordinary rock | 333.51 | cum | 500 ₹1,66,757.5 Lowest | 600 ₹2,00,109 |
| 1.00 | 2.26.2:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.Ordinary or hard rock | 80.78 | cum | 180 ₹14,540.94 Lowest | 200 ₹16,156.6 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 58.49 | cum | 6,600 ₹3,86,040.6 Lowest | 7,000 ₹4,09,437 |
| 1.01 | OD261244/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site(Modified from Irrigation OD 60.7.1) | 29.83 | cum | 6,500 ₹1,93,908 | 3,600 ₹1,07,395.2 Lowest |
| 1.01 | OD253039/2025-2026:Providing and laying in position machine batched and machine mixed design mix M-30 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge-All work up to plinth level. Note:- Cement content considered in this item is @ 340 kg/ cum. Excess or less cement content as per design mix is not payable or recoverable separately. Details of cost for 1.00m3. | 155.84 | cum | 8,450 ₹13,16,805.75 Lowest | 9,000 ₹14,02,515 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 15,583.5 | kilogram | 91.5 ₹14,25,890.25 Lowest | 95 ₹14,80,432.5 |
| 1.01 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 331.28 | cum | 230 ₹76,193.71 Lowest | 290 ₹96,070.33 |
Tender Value
₹1.3 Cr
EMD Value
₹50,000
Closing Date
16 Mar 2026, 4:00 pmClosed
Superintending Engineer
SE, Judicial Building circle, Edappally
framed structure
2026_PWD_843946_1
PWD/BLDG/TR/23282/2025_5_1_1/1
Open Tender
Civil Works - Buildings
Item Rate
545 days
Malappuram
Please refer Tender documents
9 documents required · 9 mandatory
₹5,515
₹50,000
Yes
18 Sept 2026
9 Mar 2026
18 Mar 2026
9 Mar 2026
16 Mar 2026
9 Mar 2026
9 Mar 2026 - 16 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Appendix-A-Civil works | |||||
| 1.001 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 0.21 | cum | - | - |
| 1.002 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 83.13 | cum | - | - |
| 1.003 | 2.9.1:Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.Ordinary rock | 333.52 | cum | - | - |
| 1.004 | 2.26.2:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.Ordinary or hard rock | 80.78 | cum | - | - |
| 1.005 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 58.49 | cum | - | - |
| 1.006 | OD261244/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site(Modified from Irrigation OD 60.7.1) | 29.83 | cum | - | - |
| 1.007 | OD253039/2025-2026:Providing and laying in position machine batched and machine mixed design mix M-30 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge-All work up to plinth level. Note:- Cement content considered in this item is @ 340 kg/ cum. Excess or less cement content as per design mix is not payable or recoverable separately. Details of cost for 1.00m3. | 155.84 | cum | - | - |
| 1.008 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 15,583.5 | kilogram | - | - |
| 1.009 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 331.28 | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BID.pdf
Tender Documents • 3.41 MB
NIT.pdf
Other Document • 0.03 MB
BOQ_1424772.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .