Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 01₹6.3 LAccepted-Finance ASSISTANT ENGINEER CIVIL OFFICE OF THE EXECUTIVE ENGINEER SOUTH DEPARTMENT OF AGRICULTURE FARMERS WELFARE UDAIPUR GOMATI TRIPURA | ₹6.3 L | 01 | Accepted-Finance 1st lowest |
| 2 | 02₹6.6 L+₹23,703.31 (3.75%)Accepted-Finance | ₹6.6 L+₹23,703.31 (3.75%) | 02 | Accepted-Finance 2nd Lowest |
| 3 | 03₹6.6 L+₹25,390.38 (4.01%)Rejected-Finance GIRIDHARY PALLI UDAIPUR GOMATI DISTRICT TRIPURA | ₹6.6 L+₹25,390.38 (4.01%) | 03 | Rejected-Finance Higher bid |
| 4 | 04₹6.7 L+₹40,574 (6.41%)Rejected-Finance CANARA BANK RAJARBAG UMC UDAIPUR GOMATI TRIPURA PIN 799120 | GOMATI | TRIPURA | 799120 | ₹6.7 L+₹40,574 (6.41%) | 04 | Rejected-Finance higher bid |
Tender Value
₹8.4 L
EMD Value
₹16,871
Closing Date
15 Sept 2026, 5:00 pmClosed
SP GOMATI
O/o, the SP(Gomati), Udaipur
Construction of 01 (one) TTS Barrack at M T Section Dhajanagar Police line under Gomati District Tripura
2026_SPG_76567_1
F.11(8)/SP(GD)/DNIT/15/26
Open Tender
Civil Works
Percentage
90 days
Dhajanagar Udaipur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Yes
₹16,871
17 Sept 2026
2 Sept 2026
16 Sept 2026
2 Sept 2026
15 Sept 2026
2 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto1.5m, disposed earth to be levelled and neatly dressed. (All kinds of soil ) | 6 | cum | 179.9 | ₹1,079.4 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. (All kinds of soil ) | 1 | cum | 231.6 | ₹231.37 |
| 3 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete | 15.5 | cum | 1,177.3 | ₹18,248.15 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering -All work upto plinth level : 1:2:4 ( 1 Cement: 2 fine sand : 4 graded well burnt brick aggregate 20 mm nominal size) | - | cum | 10,742.6 | - |
| 4.1 | 1:4:8 ( 1 Cement: 4 fine sand : 8 graded well burnt brick aggregate 40 mm nominal size) | - | cum | 8,980 | - |
| 5 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. (All kinds of soil) | 6.5 | cum | 161.3 | ₹1,048.45 |
| 6 | Centering shuttering including struttings, propping etc. and removal of form work for : Columns, Pillars, Piers, Abutments, Posts and Struts with wooden plank | 10 | sqm | 570 | ₹5,700 |
| 7 | First class brick work in foundation and plinth including cost of all materials as required complete:- (1) In cement mortar 1:4 ( 1 cement : 4 fine sand ) | 12.37 | cum | 9,845.2 | ₹1,21,785.12 |
| 8 | Half brick masonry work with first class bricks in superstructure upto floor five level including cost of all materials as required complete:-a) In cement mortar 1:4 ( 1 cement : 4 fine sand ) | 32 | sqm | 1,533.5 | ₹49,072 |
| 9 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. a) Hot finished welded type tubes | 1,238 | kg | 146.2 | ₹1,80,995.6 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 18.41 MB
BOQ_77944.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .