Tender Value
₹24.3 L
EMD Value
₹25,000
Closing Date
15 Apr 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
S.K. Panchayat Irrigation Division Himatnagar
Constructing of F.P. wall (1)Near Desair Faliyu At Village Simliya(2) Near Overhead Water Tank At Village Jorajina MuvadaTa. Talod, Dist. Sabarkantha.
292334
30 of 2025-2026
Open
Civil Works
Sabarkantha
17 documents required · 15 mandatory · 2 optional
₹900
Executive Engineer S.K. Panchayat Irrigation Division Himatnagar
₹25,000
1 Apr 2026
1 Apr 2026
1 Apr 2026
15 Apr 2026
1 Apr 2026
Name of Work:-Constructing of F.P. wall (1)Near Desair Faliyu At Village
Simliya(2) Near Overhead Water Tank At Village Jorajina
MuvadaTa. Talod, Dist. Sabarkantha.
Estimated Cost Put to Tender:-
a. DATE FOR DOWN LOADING TENDER DOCUMENT : UP TO 15/04/2026 upto 18.00 hrs
b. DATE OF ON LINE SUBMISSION : UP TO 15/04/2026 upto 18.00 hrs
DATE FOR SUBMISSION OF TEDNDER FEE, : FROM 15/04/2026 TO 21/04/2026 upto
EMD & OTHER DOCUMENT (BY RPAD/SPEED POST ONLY)
DATE OF OPENING : DT. 22/04/2026 at 12.00 Hrs.
Office of The Office of The
Superintending Engineer, Executive Engineer,
Ghandhinagar Panchayat Irrigation Circle, S.K. Panchayat Irrigation Division,
Patnagar Yojana Bhavan, Block-C, Himatnagar-383
2nd Floor, Sector-16, Dist. Himatnagar,
Gandhinagar-382016 Phone No(o) : (02772)
Sr No Section Description PageNo
1 Invitation for Bid(IFB)
2 Section-1 Instructions toBidders
3 Section-2 QualificationInformation
4 Section-3 Conditions ofContract
5 Section-4 ContractData
6 Section-5 Technical Specification
7 Section-6 Form ofBid
8 Section-7 Bill ofQuantities
9 Section-8 Securities and OtherForms
10 Section-9 Drawings
11 Section-10 Documents to be furnished byBidder
INVITATION FORBID
NATIONAL COMPETITIVEBIDDING
1. TheExecutive Engineer, S.K. Panchayat Irrigation Division,
Sabarkanthainvitesbidsfortheconstructionofworksdetailedinthetable.
Thebiddersmaysubmitbidsforanyorallthefollowingworks.
Cost ofRegistration
Approximatevalu Bidsecurity(Rs. ofdocument /Category
ageN Nameofwork ofcompl
eofworks(Rs.) )/EMD (Rs) /Tender Fee ofcontractorif
Constructing of F.P. wall
(1) Near Desair Faliyu At
Village Simliya (2) Near
03 “ E-1” Class
Overhead Water Tank At 2434509.00 25000.00 900.00/-
Village Jorajina Muvada
Ta. Talod, Dist.
2. Prospective / Interested bidder may download the Bid Documents fromwebsite
https://www.nprocure.comfreeofcosttilltheTimeandDateasmentionedononline NIT at
websitehttps://www.nprocure.com.
3. However,BidderwhoissubmittingtheBidOnlinewillhavetopaytheBid Document Fee / Tender
Fee through Demand Draft only of any Schedule Bank payableat Sabarkantha Panchayat
Irrigation Division, Himatnagar and in favour of ‘Executive Engineer, S.K. Panchayat
Irrigation Division, Himatnagar.Once
theBidisreceivedonline,BidDocument/TenderFeewillnotberefundable.AsPerGoG R&B
Department’s Circular No.PARACH/102/000/IB/221/(59)/CDated.24/01/2007
The Demand Draft for Bid Document / Tender fee and FDR / Bank Guarantee
againstBidSecurity / EMD shall be submitted in electronic format through online
whileuploadingthebid,thissubmissionshallmeanthatbiddocument/tenderfeeandBid Security /
EMD has been received. Accordingly, the offer of only those shall beopened whose Bid
Document / Tender Fee and Bid Security / EMD have beenreceived
electronically.However,forthepurposeofrealizationofDemandDraft,andFDR/Bank
Guarantee bidder shall send the same in original through R.P.A.D. so as to reach to
#‘Executive Engineer, S.K. Panchayat Irrigation Division, Himatnagar within 7 Days from
the last day of bid submission.
PenetrativeactionfornotsubmittingDemandDraft/FDR/BankGuaranteein original to
Executive Engineer / Tender Inviting Authority by bidder shall beinitiated. WRD GR No.
PRC-102014-1-MICell-K.1 Dated:29/10/2014
4. Bids received online, will be opened on the time, date and place as specified in theonline NIT
at website https://www.nprocure.com in the presence of the bidders ortheir authorized
representatives, who wish to remainpresent.
Iftheofficehappenstobeclosedonthedayofopeningofthebidsasspecified,thebids will be
opened on the next working day at the same time andvenue.
5. A pre bid meeting will be held on_______at 12:00 PM hrs. at the office of Executive
Engineer, S.K. Panchayat Irrigation Division, Himatnagar to clarify the issues and to answer
question on any matter that may be raised at that stage as stated in clause 9.2 of ‘instruction
to bidders’ of the bidding documents.
6. Bid Security (EMD) is equal 1% of Estimated Amount put to bid /tender and should be
rounded off to the next thosands rupees.
7. Other Information is asunder:
A. Agenciescanprepareandedittheiroffersanumberoftimesbeforetheendofthetendersubmissio
ndateandtime.Afterthetendersubmissiondateandtime,the bidder cannot modify / edit /
withdraw their submitted offer in any case. Nowrittenor online request in this regard
shall begranted.
B. Offersinphysicalformwillnotbeacceptedinanycase.
C. DemandDraftpurchasedbytheotherthenbidderandissuedafterthelastdateof submission of
Bids, will not be considered oraccepted.
D. The cost incurred by the contractor for this offer for clarification orattending discussion,
conferences or site visits will not be reimbursed by the Employeror Engineer-in-Charge.
E. Conditional tender shall not beaccepted.
F. Any changes, addition, alternation made in the prescribed form attached withtender are
liable to berejected.
G. Any change in format or conditional Bank Guarantee will not be accepted andthebidder
will be considerednon-responsive.
H. All the bidders are instructed to fill in information strictly in accordance with the format
given in the checklist /qualification document / tenderdocument.
I. It is mandatory for the bidders to supply each and every information as askedstrictlyin
electronic format at appropriate placesonly.
J. Blank / insufficient information shall be treated as nil information and shall resultin
disqualification.
K. Even if the bidder has been qualified in a similar or larger size of project in thepast,it
shall not be deemed to be a ground / reason for not giving required informationfor this
L. Information supplied for earlier projects shall not be considered while evaluationof
thisbid.TheGovernmentwillnotaskforanyotherinformation,unlessitisfoundnecessary by
the competentauthority.
M. Iffoundnecessary,thecontractorwillbeintimatedfornegotiation,
# For the works costing up to Rs. 7.5 crore (WRD Works), Rs . 7.0 Crore(ROAD/
BRIDGE/BUILDINGWORKS),Rs.0.5Crore(ElectricalWorks)kindlyrefertoGoGNWRWS
& K Department’s Circular No.Paracha/1097/1397(11)/pa.fa. / MICELL(k-1) dated
FortheworkscostingunderRs.7.5croreforConstructionworkofWaterResources Department, Rs.
7.0 crore for Roads, Bridges and Building and Rs. 050 crore forElectrical
workfollowingdocumentsshallbesubmittedinelectronicformatonlythroughonline by scanning
and the (i) Bid Document Fee / Tender Fee (ii) Bid Security / EMD shouldbe sent in original to
the Tender opening authority through RPAD, so as to reachtheExecutive Engineer within 7 days
from last day of submission ofBid.
Sr. No. Name of Documents. Reference Clause. Format
1 Bid Document Fee/Tender Fee As per NIT -
Bid Security / EMD or Valid EMD
As per Table of IFB
Exemption Certificate or in terms of Bank
Refer clause no. 16 for
2 guarantee (valid 180 days from the date of bid -
provision of Bank
submission) of Appropriate Class of
Registration of Approved Contractors
3 Registration Certificate of Appropriate Class As per NIT -
4 GST Number and Pan card As per NIT -
Undertaking for Engaging Technical Staff & 95 (Section
Machineries 10)
Information regarding any litigation in which 96 (Section
the applicant is involved 10)
Last 5-Years Turn Over (year wise) for Civil
Engineering Works certified by CA (for Bid
Capacity Evaluation) (Section 10)
Details of civil engineering works completed
in last 5 financial year
Details of “works on hand” and “works
tendered by bidder, found lowest (l1) & works 99 (Section
likely to be awarded (for Bid Capacity 10)
Affidavit (Notarized on Rs. 300 Stamp paper) -
The Applicant should give undertaking that he
has access to, or has available, liquid assets
10 and / or credit facilities up to 25 percent of the As per NIT
value of the contract/ contracts applied. As per
Prescribed Proforma.
Section 1: Instructions toBidders
Table ofClauses
PageNo. PageNo.
A. General D. Submission ofBids
1. Scope ofBid 8 19. Sealing & Marking ofBids
2. Source ofFunds 8 20. Deadline for
SubmissionofBids
3. EligibleBidders 8 21. Late Bids
4. Qualification 8 22. Modificationand
oftheBidder Withdrawal ofBids
5. One Bid perBidder
6. Cost of Bidding 12 E. Bid Opening andEvaluation
7. SiteVisit 12 23. BidOpening
B. BiddingDocuments 25. Clarification ofFinancial
8. Content ofBidding 13 26. Examination of
Documents BidsandDeterminationof
9. Clarification 13 27. Correction ofErrors
ofBiddingDocuments
10. Amendment 14 28. Deleted
ofBiddingDocuments
29. Evaluation andComparison
of Financial Bids
C. Preparation ofBids 30. Deleted
11. Language ofBid
12. DocumentsComprising 15 F. Award ofContract
13. BidPrices 15 31. Award Criteria
14. CurrenciesofBidandP 16 32. Employer’s Right toAccept
ayment anyBidandtoRejectanyor
15. BidValidity 16 33. Notification of
AwardandSigning
16. Bid Security 16 34. PerformanceSecurity
17. Alternative 17 35. Advance
ProposalsbyBidders PaymentandSecurity
18. Format and Signing ofBid 17 36. Dispute ReviewExpert
orFraudulentPractices
1.1 The Employer (Named in Appendix to ITB) invites bids for the Construction
ofworks(asdefinedinthesedocumentsandreferredtoas‘theworks”)detailedinthetable
giveninIFB.Thebiddersmaysubmitbidsforanyoralloftheworksdetailedinthetable given
1.2 The successful bidder will be expected to complete the works by theintendedcompletion
date specified in the Contractdata.
1.3 Throughout these bidding documents, the terms ‘bid’ and ‘tender’ and their derivatives
(bidder/ tenderer, bid / tender, bidding/ tendering, etc.) aresynonymous.
2. Source of Funds
2.1 TheexpenditureonthisprojectwillbemetfromthebudgetofGovt.ofGujarat/ Govt. of India for
centrally sponsoredprojects.
3. EligibleBidders
3.1 This Invitation for Bids is open to all eligiblebidders.
3.2 AllbiddersshallprovideinSection2,FormsofBidandQualificationInformation,a
statementthattheBidderisneitherassociated,norhasbeenassociated,directlyorindirectly, with
the consultant or any other entity that has prepared
thedesign,specifications,andotherdocumentsfortheProjectorbeingproposedasProject
ManagerfortheContract.AfirmthathasbeenengagedbytheEmployertoprovideconsultingservi
cesforthepreparationorsupervisionoftheworks,andanyofitsaffiliates, shall not be eligible
4. Qualification of theBidder
4.1 AllbiddersshallprovideinSection2,FormsofBidandQualificationInformation,a preliminary
description of the proposed work method and schedule,including drawings and charts, as
necessary. The proposed methodology should includea program of construction backed
with equipment planning and deploymentdulysupported with broad calculations and
quality assurance procedures proposed tobeadopted justifying their capability of execution
and completion of work aspertechnical specifications, within stipulated period
(i) 4.5 QUALIFICATIONCRITERIA:
(ApplicablefortheworkswhichrequirePre-
Qualification)AsPerGoGNWRWS&KDepartment’s Circular No.
Paracha/1097/1397(11)/pa.fa./MICELL(k-1)Dated18/01/2018
4.5.1 QualificationwillbebasedonApplicant’smeetingallthefollowingminimumpass/failcriteriareg
ardingtheApplicant’sgeneralandparticularexperience,personnel and equipment capabilities
and financial positions, as demonstrated bytheapplicant’s responses in the forms attached
to the letter of application (specifiedrequirement for joint ventures are given under para
4.6 below )Subcontractorsexperience and resources shall not be taken in to account in
determiningtheapplicants compliance with the qualifyingcriteria
To qualify for more than one contract, the applicant must demonstratehaving experience
and resources sufficient to meet the aggregate of the qualificationcriteria for each contract
given in paragraphs 4.5.4, 4.5.5 and 4.5.9below
4.5.2 Base year and Escalation
The base year shall be taken as Current financialyear
Following enhancement factors will be used for the costs of works executed
andthefinancial figure to a common base value for works completed inIndia.
Year FinancialYear Multiplyingfactor
Base year of invitingtender 2025– 2026
Applicantshouldindicateactualfiguresofcostsandamountfortheworksexecuted by
them without accounting for the above-mentionedfactors.
In case the financial figures and value of completed works are inforeign
currencytheaboveenhancedmultiplyingfactorswillnotbeapplied.Instead,thecurrent market
exchange rate (State Bank of India BC Selling rate as on the lastdateof submission of the
bid) will be applied for the purpose of conversion of theamountin foreign currency into
4.5.3. GeneralExperience.
The Applicant shall meet with the following minimumcriteria:
(a) Achieved a minimum annual financial turnover of Rs.----Crore for worksin progress
and completed in all classes of civil engineering construction worksin any one year,
over the last five financialyears.
(b) Experienceinsuccessfullycompletingorsubstantiallycompletingatleastonecontractofsi
milarwork(Irrigation works or Canal Linning
works)ofatleast40percentofthevalueofproposed contract within the last five
financialyears.
The works may have been executed by the applicant as prime contractor or asa
member of a joint venture or as a nominated sub-contractor. Assubcontractor, he
should have acquired the experience of execution of all major items
ofworksundertheproposedcontract.Incaseaprojecthasbeenexecutedbyajoint venture,
weight towards experience of the project would be given to eachjoint venture in
proportion to their financial participation in the joint venture ifwork
executedjointlyotherwiseasperthescopeofworkdefineinJointVentureagreement.
Substantially completed works means those works which are at least 90%completed
as on the date of submission (i.e. gross value of work done up
tothelastdateofsubmissionis90%ormoreoftheoriginalcontractprice)andcontinuingsatis
Forthese,acertificatefromtheemployersshallbesubmittedalongwiththeapplicationincor
poratingclearlythenameofthework,contractvalue,billingamount, date of
commencement of works, satisfactory performance ofthecontractor and any other
relevantinformation.
(the experience certificate should be signed by the officer not below the rankofEE)
(c) Contractor should have completed 60% of quantity of principal items of worklike
concrete,earthwork,pipeline,pumpingstationetc.withinlastfivefinicalyears. Certificate of
competent authority of work done with detail shall beproduced.
4.5.4. PersonnelCapabilities.
Availabilityforhisworkofpersonnelwithadequateexperienceasrequired;asper
4.5.5. Equipment Capabilities
Based on the studies carried out by the Engineer, the minimum suggestedmajorequipment
to attain the completion of works in accordance with theprescribedconstruction schedule
are shown in theAppendix.
Thebiddersshould,however,undertaketheirownstudiesandfurnishwiththeirbid,adetai
ledconstructionplanningandmethodologysupportedwithlayoutand necessary drawings and
calculations to allow the employer to reviewtheirproposals. The numbers, types and
capacities of each plant/equipment
shallbeshownintheproposalsalongwiththecycletimeforeachoperationforthegivenproduction
capacity to match therequirements.
4.5.6. FinancialPosition
TheApplicantshouldgiveundertakingthathehasaccessto,orhasavailable,liquidassets
(aggregateofworkingcapital,cashinhandanduncommittedbankguarantees)and/or credit facilities
up to 25 percent of the value of the contract / contractsapplied.
4.5.7. The audited balance sheets for the last five years should be submitted, whichmust
demonstratethesoundnessoftheapplicant’sfinancialposition,showinglong–term profitability
including an estimated financial projection for the next two years,ifnecessary, the employer
will make inquiries with the applicant’sbankers.
4.5.8. LitigationHistory
TheApplicantshouldprovideaccurateinformationonanylitigationorarbitrationresulting
fromcontractscompletedorunderexecutionbyhimoverthelastfivefinancialyears.A
consistenthistoryofawardsagainsttheApplicantoranypartnerofajointventuremay result in failure
of theapplicant.
4.5.9. Disqualification
Even though the applicants meet the above criteria, they are subject tobedisqualified if
Made misleading or false representation in the forms, statements submitted, and /orRecord
of poor performance such as abandoning the work, rescinding of contractforwhich the
reasons are attributable to the non – performance of thecontractor;consistent history of
litigation awarded against the applicant or financial
failureduetobankruptcy.Therescindingofcontractofajointventureonaccountofreasonsotherth
annon–performance,suchasMostExperiencedpartnerofjointventurepulling out, court
directions leading to breaking up of a joint venture before thestart
ofwork,whicharenotattributabletothepoorperformanceofthecontractorwill, however, not
affect the qualification of the individualpartners.
4.5.10.ThebidderwhohaveappliedforcorporateDebtRestructuring(CDR)/facingrecoveryproceedingsfro
mfinancialinstitutions/facingwindingupprocessing/thoseunderBIFR in the last 5 financial year
shall be considered for bid qualification. However, if the bank/ financial institution has
accepted the proposal of debt restructuring on or before thelast
dateofonlinesubmission,thesameshallbeconsideredforfurtherevaluation.Anaffidavit
bybidderalongwithcertificatefrombankmustbeproducedinsuchcases.IncaseofJoint
Ventureagreement,thisprovisionshallbeapplicableforbothleadpartnerandJVpartner.
(iii) #4.6 JOINT VENTURE: (Maximum 3 Members i.e.
Lead & 2Others)
(Applicableonlyforestimatedprojectcostof50Croreandabove)
4.6.1. Joint ventures must comply with the followingrequirement:
(a) Following are the minimum qualificationrequirements:
(i) Theleadpartnershallmeetnotlessthan50percentofallcriteriagiveninpara
4.5.3&4.5.6above.Thejointventuremustcollectivelysatisfythecriteriaofpara
4.5.3&4.5.6above.Theexperienceoftheotherjointventurepartnersshallbeconsidered if
it is not less than 30 percent of the qualifying criteria in para 4.5.3 &
(ii) Individually each member must satisfy the requirements of para 4.5.7
(b) Bid shall be signed so as to legally bind all partners, jointly and severally, andshall
besubmittedwithacopyofthejointventureagreementprovidingthejointandseveral
liabilities with respect to thecontract.
4.6.2.Qualificationofajointventuredoesnotnecessarilyqualifyanyofitspartnersindividuallyoras
apartnerinanyotherjointventure.Incasedissolutionofajointventure,eachoneoftheconstit
uentfirmsmayqualifyiftheymeetallthequalification requirements, subject to the
written approval of theEmployer.
4.7 Bid Capacity.
Applicants who meet the minimum qualification criteria will be qualified only if their available
bid capacity at the expected time of bidding is more than the total estimated cost of the works.
The available bid capacity will be calculated as under:
(iv) Assessed Available Bid Capacity + (A*N*2-B),where
A = Maximum value of work executed in any one year during the last five years
(update to the price level of the year indicated in appendix ) taking into account the
completed as well as works in progress.
B = Value at current price level of the existing commitments and ongoing works to be
completed as well as works in progress.
N= Number of years prescribed for completion of the works for which the bids are
(v) Notes:- In Case of joint venture, the available bid capacity will be applied for
each partner to the extent of his proposed participation in execution of the
4.8 Even though the bidders meet the above qualifying criteria, they are subjectto
be disqualified if theyhave:
- Made misleading or false representation in the forms, statements
and Attachmentsthesubmittedinproofthequalificationrequirements;and/or
- Record of poor performance such as abandoning the works, notproperlycompleting the
contract, inordinate delay in completion, litigation history,orfinancial failures etc.;
- Participated in the previous bidding for the same work and hadquotedunreasonably
high bid prices and could not furnish rational justification totheemployer.
5 One bid perbidder
5.1 Each bidder shall submit only one bid for one package. A bidder who
submitsorparticipates in more than one bid (other than as a subcontractor or in
casesofalternatives that have been permitted or requested) will cause all the
proposalswiththe bidder’s participation to bedisqualified.
6 Cost ofBidding
6.1 The bidder shall bear all costs associated with the preparation and submission ofhisBid,
and the Employer will in no case be responsible and liable for thosecosts.
7.1 The Bidder, at the Bidder’s own responsibility and risk is encouraged to visitand
examine the Site of work and its surrounding and obtain all information that
maybenecessaryforpreparingtheBidandenteringintoacontractforconstructionoftheWorks
ThecostsofvisitingthesiteshallbeattheBidder’sown expense.
B. BIDDINGDOCUMENTS
8 Content of BiddingDocuments
8.1 The set ofbiddingdocumentscomprisesthedocumentslisted below andaddenda issued in
accordance with Clause10:
Section Particulars VolumeNo.
- Invitation forbids
1 Instructions toBidders I
2 Qualification Information, and otherforms
3 Conditions ofContract
5 TechnicalSpecifications II
6 Form ofBid III
7 Bill ofQuantities
8 Securities and otherforms
10 Documents to be furnished bybidder V
8.2 Volumes I, II, III and IV are available online and documents to be furnished bythebidder
in compliance to section 2 will be prepared by him and furnished asVolume- V in two
parts (refer clause12).
8.3 Thebidderisexpectedtoexaminecarefullyallinstructions,conditionsofcontract, contract
data, forms, terms, technical specifications, bill of quantities,
forms,AnnexesanddrawingsintheBidDocument.FailuretocomplywiththerequirementsofBi
dDocumentsshallbeatthebidder’sownrisk.Pursuanttoclause26hereof,bidswhicharenotsu
bstantiallyresponsivetotherequirementsoftheBidDocumentsshall berejected.
9 Clarification BiddingDocuments
9.1 A prospective bidder requiring any clarification of the bidding documents m a y notify the
Employer in writing or through E-mail at the Employer’saddress
indicatedintheinvitationtobid.TheEmployerwillrespondtoanyrequestforclarification which he
received earlier than 15 days prior to the
deadlineforsubmissionofbids.Employer’sresponsewillbepublishedonwebsiteincludinga
description of the enquiry but without identifying itssource.
9.2 Pre-Bid meeting
9.2.1. The Bidder or official representative is invited to attend a pre-bid meeting which will take
place at the address, venue, time and date as indicated in the appendix.
9.2.2. The purpose of the meeting will be to clarify issues and to answer question on any matter
that may be raised at that stage.
9.2.3. The bidder shall be required to submit any questions in writing or e-mail to reach the
Employer not later than 03 days before the meeting.
9.2.4. Minutes of the meeting, including the question raised (Without identifying the source of
enquiry) and the responses given will be published without delay on the tender website i.e.
www.nprocure.com. Any modification of the bidding documents listed in sub-Clause
which may become necessary as a result of the pre-bid meeting shall be made by the
Employer exclusively through the issue of an Addendum pursuant to Clause 10 and not
through the minutes of the pre-bid meeting.
9.2.5. Non-attendance at the pre-bid meeting will not be a cause for disqualification of a bidder.
10 Amendment of BiddingDocuments
10.1 Beforethedeadlineforsubmissionofbids,theEmployermaymodifythebidding documents
by issuingaddenda.
10.2. Anyaddendumthusissuedshallbepartofthebiddingdocuments.TheEmployerwill assume
no responsibility for thesame.
10.3. Togiveprospectivebiddersreasonabletimeinwhichtotakeanaddendumintoaccountinprepari
ngtheirbids,theEmployermay,athisdiscretion,extendasnecessary the deadline for
submission of bids, in accordance with Sub-Clause20.2below.
C. PREPARATION OFBIDS
11 Language of theBid
11.1 Alldocumentsrelatingtothe bid shall be in theEnglishlanguage.
12 Documents Comprising theBid
12.1 ThebidbesubmittedbythebidderasVolumeVofthebiddocument(referClause8.1) shall be in
two separateparts:
Part I shall be named “Technical Bid” and shallcomprise
12.1.1 Bid Security in the form specified in Section8
12.1.2 QualificationInformationandsupportingdocumentsasspecifiedinSection2
12.1.3 Certificates, undertakings, affidavits as specified in Section2
12.1.4 Any other information pursuant to Clause 4.5 of theseinstructions
12.1.5 Undertaking that the bid shall remain valid for the period specified inClause15.1
Part II shall be named “Financial Bid” and shallcomprise
(i) Form of Bid as specified in Section6
(ii) Priced Bill of Quantities for items specified in Section7
12.2 The Bidder shall submit the details / information pertaining to eachparti.e.technical as well
as financial and must be submitted onlineonly.
12.3 Following documents will be deemed to be part of thebid.
Section Particulars VolumeNo.
Invitation for Bids(IFB)
1 Instruction toBidders VolumeI
3 Conditions ofContract
5 Specifications VolumeII
9 Drawings VolumeIV
13.1 TheContractshallbeforthewholeworksasdescribedinSub-Clause1.1,basedon the priced Bill
of Quantities submitted by theBidder.
13.2 The bidder shall fill in rates and prices and line-item total (both in figures andwords)for all
items of the Works described in the Bill of Quantities along with total bidprice
(Both in figures and words). Items for which no rate or price is entered by thebidderwill
not be paid for by the Bill ofQuantities.
13.3 Allduties,taxes,andotherleviesexceptGSTpayablebythecontractorunderthecontract,orforan
yothercauseshallbeincludedintherates,pricesandtotalBidPrice submitted by the Bidder.
(GST will be paidextra)
13.5 The rates and prices quoted by the bidder are subject to adjustment
duringtheperformanceoftheContractinaccordancewiththeprovisionsofClause47oftheCondit
ion of Contract (Irrespective of the time limit and BidAmount)
14. Currencies of Bid andPayment
14.1 The unit rates and the prices quoted by the bidder shall be entirely in IndianRupees.All
payments shall be made in IndianRupees.
15. BidValidity
15.1 Bids shall remain valid for a period of not less than 120 days after the deadlinedateforbid
submission specified in Clause20.
15.2 In exceptional circumstances, prior to expiry of the original time limit, theEmployermay
request that the bidders may extend the period of validity for a specifiedperiod. A bidder
may refuse the request without forfeiting his bid security. A bidderagreeing to the request
will not be required or permitted to modify his bid, but willberequired to extend the
validity of his security for a period of the extension, andin compliance with Clause 16 in
16. Bid Security
16.1. The Bidder shall furnish, as part of his Bid, a Bid security in the amount as shownin
column 4 of the table of IFB for this particular work. This Bid security shall bein Favor of
Employer as named in Appendix and may be in one of the followingforms;
a. Bank Guarantee from any scheduled Indian bank, in the format givenin Volume
III. (Bank Guarantee is applicable only for Bid Estimated Amount of01 Crore and
above) and Bank Guarantee of Schedule and Private Banks shallbe considered as per
GoG Finance Department’s Circular No.FD/MSM/e- file/4/2023/0057/D.M.O. Date
21/04/2023 or as per their latestamendment.
b. Fixed Deposit Receipt issued by any Scheduled Indian Bank or a foreignBank
approved by the Reserve Bank ofIndia.
#AValidBidSecurity/EMDExemptionCertificateissuedby(1)Road&Building Department
or (2) Narmada Water Resources, Water Supply and KalpsarDepartment of Govt. of
Gujarat. Exemption Certificate is applicable onlywhen Registration Certificate of
Appropriate Class and Category ofApproved Contractors is required as eligible
criteria ofbidder.
16.2. Bank guarantees (and other instruments having fixed validity) issued as
suretyforthebidshallbevalidfor45daysbeyondthevalidityofthebidi.e.totalvalidityof 120+45 =
16.3. Any bid not accompanied by an acceptable Bid Security and not securedasindicated in
Sub-Clauses 16.1 and 16.2 above shall be rejected by the Employer asnon-responsive.
16.4. The Bid Security of unsuccessful bidders will be returned within 28 days of theendof the
bid validity period specified in Sub-Clause15.1
16.5 The Bid Security of the successful bidder will be discharged when the bidderhassigned the
Agreement and furnished the required PerformanceSecurity.
16.6. The bid Security may beforfeited
(a) IftheBidderwithdrawsthebidafterBidopeningduringtheperiodofBidvalidity.
(b) Ifthe BidderdoesnotacceptthecorrectionoftheBidPrice, ifany or
(c) In the case of a successful Bidders, if the Bidder fails the specified time limitto
(i) Sign the Agreement;or
(ii) Furnish the requirement PerformanceSecurity.
(d) #If found necessary, the bidder will be intimated for negotiation, He will be
intimatedmaximumthreetimeswithinthevalidityperiodfornegotiation,if contractor does not
respond in time, his Bid Security (EMD) will be forfeited andhis tender will be rejected.
Punitive action will be taken on such contractors. (As perGoG R&B Dept’s Gr. No.
17. Alternative Proposals byBidders.
17.1. Biddersshallsubmitoffersthatfullycomplywiththerequirementsofthebidding
documents,includingtheconditionsofcontract(includingmobilizationadvanceortime for
completion), basic technical design as indicated in the drawingandspecifications.
Conditional offers or alternative offers will not be considered furtherin the process of
tenderevaluation.
18. Format and Signing ofBid
18.1. The Bidder shall prepare documents comprising the bid as described in Clause
12oftheseInstructionstobidderasthe“TechnicalBid“and“FinancialBid”inseparate parts to
D. SUBMISSION OFBIDS
20. Deadline for Submission of theBids
20.1. Complete Bids must be received online by the Employer at the tenderwebsitespecified
above not later than the date indicated inappendix.
20.2. TheEmployermayextendthedeadlineforsubmissionofbidsbyissuinganamendmentinaccorda
ncewithClause10,inwhichcaseallrightandobligationofthe Employer and the bidders
previously subject to the original deadline will thenbesubject to the newdeadline.
22. Modification and Withdrawal ofBids
22.1. Bidders may modify or withdraw their bids online before the deadline prescribedinClause
20 or pursuant to Clause23.
22.3. NobidshallbemodifiedorwithdrawnafterthedeadlineforsubmissionofBid.
22.4. Withdrawal or modification of a bid between the deadline for submission of
bidsandtheexpirationoftheoriginalperiodofbidvalidityspecifiedin Clause15.1above or as
extended pursuant to Clause 15.2 may result in the forfeiture of theBidsecurity pursuant
E. BID OPENING ANDEVALUATION
23.1The Employer will open all the Bids received including modifications made pursuant
toClause22,inthepresenceoftheBiddersortheirrepresentativeswhochoosetoattendattime,date
andtheplacespecifiedinAppendixinthemannerspecifiedin Clauses 20 and 23.3, In the event
of the specified date of Bid opening being declareda holiday for the Employer, the Bids
will be opened at the appointed timeandlocation on the next workingday.
23.3. The “Technical Bid” shall be opened. The amount, form and validity of thebid security
furnished with each bid will be announced. If the bid security
furnisheddoesnotconformtotheamountandvalidityperiodasspecifiedintheinvitationforbid(re
f. Column 4 and paragraph 3), and has not been furnished in the form specifiedin Clause
16, the technical bid will not beopened.
23.4. (i) Subject to confirmation of the bid security by the issuing Bank,
thebidsaccompanied with valid bid security will be taken up for
evaluationwithrespecttotheQualificationinformationandotherinformationfurnishedi
n part I of the bid pursuant to Clause12.1.
(ii) If required, the bidder will be asked in writing to clarify
hisQualificationDocuments with respect to any requiredclarification.
(iii) Thebidderswillrespondinnotmorethan7daysofissueoftheclarificationletter.
(iv) Immediately (usually within 3 or 4 days), on receipt of these
clarificationtheEvaluation Committee will finalize the list of responsive
bidderswhosefinancial bids are eligible forconsideration.
23.6 At the time of opening of “Financial Bid”, the names of the bidders werefound
responsiveinaccordancewithClause23.4(iv)willbeannounced.Thebidsofonly these bidders
will be opened. The responsive Bidders’ names, the Bid prices,the
totalamountofeachbid,anydiscountandsuchotherdetailsastheEmployermay consider
appropriate, will be announced by the Employer at theopening.
23.7 the time of opening of “Financial Bid”, the names of the bidders werefound
responsiveinaccordancewithClause23.4(iv)willbeannounced.Thebidsofonly these bidders
will be opened. The responsive Bidders’ names, the Bid prices,the
totalamountofeachbid,anydiscount,andsuchotherdetailsastheEmployermay consider
appropriate, will be announced by the Employer at theopening.
23.8 In case bids are invited for more than one package, the order for opening ofthe“Financial
Bid” shall be in order of Estimated amount of Bids from highest tolowest.
23.9 TheEmployershallprepareminutesoftheBidopening,includingtheinformationdisclosed to
those present in accordance with Sub-Clause23.6.
24.1 Information relating to the examination, clarification, evaluation, and comparisonofBids
and recommendations for the award of a contract shall not be disclosedtoBidders or any
other persons not officially concerned with such process untiltheaward to the successful
Bidder has been announced. Any effort by Bidder
t o influencetheEmployer’sprocessingofBidsorawarddecisionsmayresultinthe rejection of
25. Clarification of FinancialBids
25.1. To assist in the examination, evaluation, and comparison of Bids, the Employermay, at his
discretion, ask any Bidder for clarification of his Bid, including
breakdownsofunitrates.Therequestforclarificationandtheresponseshallbeinwritingorbye-
mail,butnochangeinthepriceorsubstancesoftheBidshallbesought,offered,orpermitted except
as required to confirm the correction of arithmeticerrorsdiscovered by the Employer in the
evaluation of theBids.
25.2 Subject to sub-clause 25.1, no Bidder shall contact the Employer on any
m a t t e r relatingtohisBidopeningtothecontractisawarded.IftheBidderwishestobring
additional information to the notice of the Employer, it should do so inwriting.
25.3. AnyeffortbytheBiddertoinfluencetheEmployerintheEmployer'sbidevaluation,bid
comparison or contract award decision may result in the rejection of theBidders’ bid.
26. Examinations of Bids and Determination ofResponsiveness
26.1 During the detail evaluation of "Technical Bid", the Employer will
determinewhethereachBid(a)meetstheeligibilitycriteriadefinedinClause3and4;(b)hasbeen
properly signed; (c) is accompanied by the required securities and;
(d)issubstantiallyresponsivetotherequirementsoftheBiddingdocument.Duringthedetailed
evaluation of the “Financial Bid”, the responsiveness of the bids willbe
furtherdeterminedwithrespecttotheremainingbidconditions,i.e.,pricedbillofquantities,
technical specifications, anddrawings.
26.2 A substantially responsive “Financial Bid” is one which confirms all theterms, conditions
and specifications of bidding documents, without material deviationorreservation. A
material deviation or reservation is one (a) which affects inanysubstantial way the scope,
quality, or performance of the Works; (b) which limitsin any substantial way, inconsistent
with the Bidding documents, the Employer’srights or the Bidder’s obligations under the
Contract; or (c) whose rectification wouldaffect unfairly the competitive position of other
Bidders presentingsubstantiallyresponsiveBids.
26.3 Ifa“FinancialBid”isnotsubstantiallyresponsive,itwillberejectedbythe Employer, and may
not subsequently be made responsive by correctionorwithdrawal of the non-conforming
deviation orreservation.
29. Evaluation and Comparison of FinancialBids
29.1. The Employer will evaluate and compare only the Bids determined tobesubstantially
responsive in accordance with Sub-Clause26.2.
29.3. The Employer reserves the right to accept or reject any variation
ordeviation.Variationanddeviationsandotherfactors,whichareinexcessoftherequirementsoft
heBiddingdocumentsorotherwiseresultinunsolicitedbenefitsfortheEmployer, shall not be
taken in to account in Bidevaluation.
29.4. The estimated effect of the price adjustment conditions under Clause
oftheConditionsofContact,duringtheperiodofimplementationoftheContract,willnot be taken
in to account in Bidevaluation.
29.5. IftheBidofthesuccessfulBidderisseriouslyunbalancedinrelationtotheEngineer’s estimate of
the cost of work to be performed under the contractthe Employer may require the Bidder
to produce detailed consistency of thosepriceswith the construction methods and schedule
proposed. After evaluation of thepriceanalyses, the Employer may require that the amount
of the performance
securitysetforthinClause34beincreasedattheexpenseofthesuccessful/biddertoalevel
sufficient to protect the Employer against financial loss in the event of default
ofthesuccessful Bidder under theContract.
29.6. AbidwhichcontainsseveralitemsinthebillofQuantitieswhichareunrealistically
pricedlowandwhichcannotbesubstantiatedsatisfactorilybythebiddermayberejected asnon-
F. AWARD OFCONTRACT
31. Award Criteria
31.1. Subject to Clause 32, the Employer will award the contract to the Bidder whoseBidhas
beendetermined.
(i) to be substantially responsive to the Bidding documents and who hasofferedthe
lowest evaluated Bid Price;and
(ii) tobewithintheavailablebidcapacityadjustedtoaccountforhisbidpricewhich is the
lowest evaluation in any of the packages opened earlier thantheoneconsideration.
Innocase,thecontractshallbeawardedtoanybidderwhoseavailablebidcapacity is less
than the evaluated bid price, even if the said bid is
thelowestevaluatedbid.Thecontractwillinsuchcasesbeawardedtothenextlowestbidderat his
evaluation bidprice.
32. Employer’s Right to Accept any Bid and to Reject any or allBids
32.1. NotwithstandingClause31,theEmployerreservestherighttoacceptorrejectanyBid,andtocance
ltheBiddingprocessandrejectallBids,atanytimepriortotheaward of contract, without thereby
incurring any liability to the affected bidder orBidder or any obligation to inform the
affected Bidder or Bidders of the groundsforthe Employer’s action.
33. Notification of Award and Signing ofAgreement
33.1. The Bidder whose Bid has been accepted will be notified of the award
bytheEmployerpriortoexpirationoftheBidvalidityperiodbycable,telexorfacsimileconfirmed
by registered letter. This letter (hereinafter and in the
conditionofcontractcalledthe“LetterofAcceptance”)willstatethesumthattheEmployerwill
pay the Contractor in consideration of the execution, completion, and
maintenanceoftheWorksbytheContractorasprescribedbytheContract(hereinafterandintheCo
ntract called the “ContractPrice”).
33.2 The notification of award will constitute the formation of the contract, subject onlytothe
furnishing of a performance security in accordance with the provisions ofClause.
33.3. The Agreement will incorporate all agreements between the Employer
andthesuccessfulBidder.ItwillbesignedbytheEmployerandtothesuccessfulBidder,within28d
aysfollowingthenotificationofawardalongwiththeLetterofAcceptance. Within 21 days of
receipt, the successful Bidder will sign theAgreement and deliver it to theEmployer.
33.4. Upon the furnishing by the successful Bidder of the Performance Security,theEmployer
will promptly notify the other Bidders that their Bids havebeen unsuccessful.
34. PerformanceSecurity
34.1. (A)Within10(Ten)daysofreceiptofLetterofAcceptance,thesuccessfulBiddershall furnish to
the Employer an irrevocable and unconditional guarantee froma Bank in the form set
forth in Section 8 (the “Performance Security”) foran
amountequalto5%(fivepercent)ofitsContractPrice.Incaseofbidsmentioned below, the
successful Bidder, along with the
PerformanceSecurity,shallalsofurnishtotheAuthorityanirrevocableandunconditionalgu
aranteefrom a Bank in the same form given at Section 8 towards anAdditional
PerformanceSecurity(The“AdditionalPerformanceSecurity”)foranamount calculated
(a) If the Contract Price offered by the Selected Bidder is lower than 10%butup
to20% of the Estimated Project Cost, then the AdditionalPerformance
Securityshallbecalculated@20%ofthedifferenceinthe(i)EstimatedProject Cost
(as mentioned in Bid Document) - Minus 10% oftheEstimated Project Cost
and (ii) Contract Price offered by theselectedBidder.
(b) If the Contract Price offered by the Selected Bidder is lower than 20%ofthe
Estimated Project Cost, then the Additional PerformanceSecurityshall be
calculated @ 30% of the difference in the (i) EstimatedProject Cost (as
mentioned in Bid Document) - Minus 10% of theEstimatedProject Cost and
(ii) Contract Price offered by the selectedBidder.
(c) This Additional Performance Security shall be treated as part
ofthePerformanceSecurity.
(B) The Performance Security shall be valid beyond 60(sixty) days of theDefectsLiability
Period and the Additional Performance Security shall be v a l i d beyond
(twenty-eight) days of Project CompletionDate.
34.2. IftheperformancesecurityisprovidedbythesuccessfulBidderintheformofa Bank Guarantee,
it shall be issued either (a) at the Bidder’s option, bya
Nationalized/ScheduledIndianbankor(b)byaforeignbanklocatedinIndiaandacceptabletoth
eEmployer.AsperGoGFinanceDepartment’sCircularNo. FD/MSM/e-
file/4/2023/0057/D.M.O. Date 21/04/2023 or as per theirlatestamendment.
34.3. Failure of the successful Bidder to comply with the requirement of Sub-
Clause34.1shallconstitutesufficientgroundsforcancellationoftheawardandforfeitureofthe
(vi) 35AdvancePaymentandSecurity
35.1 The Employer will provide an Advance payment on the Contract Price asstipulatedin the
Conditions of Contract, subject to maximum amount, as stated in theContractData.
37. Corrupt of FraudulentPractices
37.1 TheEmployerwillrejectaproposalifitdeterminesthattheBidderrecommendedfor award has
engaged in corrupt or fraudulent practices in completing
forthecontractinquestionandwilldeclarethefirmineligible,eitherindefinitelyorfora stated
period of time, to be awarded a contract with National Highways
AuthorityofIndia/StatePWDandanyotheragencies,ifitatanytimedeterminesthatthefirm
hasengagedincorruptorfraudulentpracticesincompletingforthecontractor,orin execution.
37.2 Furthermore,BiddersshallbeawareoftheprovisionstatedinSub-Clause59.2ofthe Conditions
ClauseReference
respecttoSection–I
1. The Name of the Employer isExecutiveEngineerS.K. Panchayat Irrigation [Cl.1.1]
Division,Himatnagar
2. The last five financialyears.
3. This Annual Financial Turnover Amount isRs.---Not Applicable--- [Cl.4.5.3(a)]
4. Value of Work is Rs.24,34,509.00
6. The cost of electric work isRs. 0.00/-
7. The cost of water supply / sanitary works isRs. 0.00/-
8. Liquidassetsand/oravailabilityofcredit facilities is Rs.---Not Applicable- [Cl.4.5.6]
9. Price level of the financial year 2025-26 [Cl. 4.5.2]
10. Deleted [Cl. 9.2.1]
11. ThetechnicalBidwillbeopenedattheofficeofthe : Executive Engineer, S.K.
Panchayat Irrigation Division, Jilla Panchayat, Himatnagardt _____
12. Address of the Employer:Executive Engineer, S.K. Panchayat Irrigation
Division, Jilla Panchayat, Himatnagar
14. Thebidshouldbesubmittedlatestbyas stated on onlineNIT [Cl. 20.1&20.2]
15. Thebidwillbeopenedatas stated on onlineNIT at website https:// [Cl. 23.1]
www.nprocure.com
16. The Bank Draft in favourof “ExecutiveEngineer, S.K. Panchayat Irrigation
Division, Himatnagar”
Escalation factors (for the cost of works executed and financial figure to a
common base value) for works completed
Year Financial Year Multiplying factor
Base year of inviting tender 2025-2026
(2) #LISTOFKEYPLANT&EQUIPMENTTOBEDEPLOYEDONCONTRA
[Reference CL.4.5.5]
(i) Thecontractorsshallalsogivealistofmachineriesinhispossessionandwhichtheypro
pose to use on thework.
Sr. PlantorM Location AgeofMach Make Capacity Approximate Remark
No. achinery inery(maxi Value
ListofKeyPersonneltobedeployedonContractWork(Reference
# Employment of a qualified site Engineer by theContractor.
The Contractor shall employ full-time technically qualified staff during the execution ofthiswork
1. Two graduate Civil Engineers and three diploma Civil Engineers when cost of thework to be
executed is more than Rs.50lakhs.
2. One graduate & two Diploma, Civil Engineers when the cost of the work to beexecuted is
more than Rs.15 lakhs but less than Rs.50lakhs.
3. MinimumTwoDiplomaCivilEngineerwhenthecostofworkislessthanRs.15lakhsbut more than
4. Minimum One Diploma Civil Engineers for the work when the cost of work tobeexecuted is
less than Rs. 5 lakhs. The Engineer so employed for the Governmentwork
musthavesufficientexperiencetohandletheworkindependently.SuchanEngineershall have to
stay at the site of work and he shall not be entrusted with otherdutyexcept thiswork.
In case the contractor or partner of the contractor firm is a Civil
GraduateEngineer,EmploymentofaseparateEngineerwillnotbenecessaryprovidedthattheEngi
neerpartner himself attends the execution of the work on thesite.
Within 15 days of issue of work-order the Contractor will have to furnish to t h e Deputy
Executive Engineer-in-charge of the work the Name, Qualifications, copyofmarksheet,
Colour Photograph and the appointment order issued
suchengineersengagedforthiscontractwork.If15daysafterissueofworkordersuchdesignatedSite
Engineers do not resume or do not remain present on site of work, the recoveryatthe rate of
Rs.15,000-00 per month per Engineer will be made fromthebills/deposit/dues of the
contractor. Such recovery shall benon-refundable.
QUALIFICATION INFORMATION
(ii) QUALIFICATIONINFORMATION
TheinformationtobefilledinbytheBidderinthefollowingpageswillbeusedforthepurposeofpos
tqualificationasprovidedforinClause4oftheInstructiontoBidders.This information will not be
incorporated in theContract.
1. For IndividualBidders
1.1 Constitution or legal status
ofBidder(AttachCopy)
Place ofregistration
Principal place ofbusiness
Power of attorney of signatory ofBid(Attach)
1.2 Total value of Civil engineering constructions 2 023-
2024Workperformed in thelastfiveyears 2022-2023
in Rs.Lakhs 2021-2022
15.2.1Workperformedasprimecontractor,workperformedinthepastasanominatedsub-contractor will
also be considered the sub-contract involved execution
ofallmainitemsofworkdescribedinthebiddocuments,providedfurtherthatallotherqualificatio
ncriteriaaresatisfied(inthesamename)onworksofasimilarnatureover the last five years**
and in current year before the submission of thebid.
Project Nameofth Description Contract Valueof Dateo Stipulatedp Actualdateof Remarkexp
Name eEmploye ofwork No. contract( fissue eriod completion* lainingreas
r Rs. ofwor of onsfordelay
Crore) korde completion &workCom
*Attachcertificate(s)fromtheEngineer(s)in-charge
**Immediatelyprecedingthefinancialyearinwhichbidsare received.
#1.3.2Quantitiesofworkexecutedasprimecontractor,workperformed,inthepastasa nominated sub-
contractor, will also be considered provided thesub-contract involved execution of all
main items of work described in the bid document, provided, further that all other
qualification criteria are called (in the same nameandstyle) in the last five years** and in
current year before the submission of thebid.
*To be modified as per the nature and scope ofwork
Year Nameo Nameof Quantity of work performed(Cum/MT) Remarks*
fthe theEmplo Cement Rubble Earth (indicate
work yer Concrete(In Pitching Works contractR
cluding ITEM 2 ITEM 3 ef)contrac
1.4 InformationonBidCapacity(worksforwhichbidshavebeensubmittedandworkswhich are yet
to be completed) as on the date of thisbid.
(A) Existing commitments and on-goingworks:
Description Place Contract Name&A ValueCo Stipulated Valueof Anticipated
ofworks &Sta No. ddressof ntract Period of Works* of
te Employer (Rs.Cr) Completion remaining completion
*Attachcertificate(s)fromtheEngineer(s)in-charge
**Immediatelyprecedingthefinancialyearinwhichbidsarereceived.
1.5 AvailabilityofkeyitemsofContractorsEquipmentforcarryingouttheworks(Ref.Clause 4.5.5).
The Bidder should list all the information requestedbelow.
ItemofEqui Requirement AvailabilityProposals Remarks(f
pment NO Capacity Owned/Leas Nos/.Ca Age/Condit romwhomt
ed pacity ions obe
tobeprocured purchased
1.6 Qualifications and experience of key personnel required for administrationandexecution of
the contract. Attach biographical data. Refer also to Sub Clause 9.1ofthe Conditions
Position Name Qualification YearofExp Yearofexperi
erience(Ge encein
neral) theproposedp
Senior Engineer BE-Civil
Site Engineer BE-Civil
1.7 Proposed sub-contract and firmsinvolved
Sections Value ofSub- Sub- Experiencein
oftheworks Contractor Contractor( similarwork
Attach copies of certificates on possession of valid license for executingwatersupply/
sanitary work/ building electrificationworks.
1.8 Financialreportsforthelastfiveyears:balancesheets,profitandlossstatements, auditors’
reports (in case of companies/corporations), etc. List them belowand attachcopies.
1.9 Evidence of access to financial resources to meet the qualificationrequirements:cash in
hand, lines of credit, etc. List them below and attach copieddocuments.
1.10 Name,address,andtelephone,telex,andfaxnumbersoftheBiddersbankerswhomay provide
references if contacted by theEmployer.
1.11 Information on Litigation history in which the Bidder isinvolved.
OtherParty( Employer Causeof Amount Remarksshowi
ies) Dispute Involved ng
1.12. Statement of compliance under the requirements of Sub Clause 3.2 of the instruction to
Bidders. (Name of Consultant engaged for project preparations is
1.13 Proposed work method and schedule. The Bidder should attachdescriptions,
drawingsandchartsasnecessarytocomplywiththerequirementsoftheBidding documents.
(Refer ITB Clause4.1)
3. Additional Requirements
3.1 Bidders should provide any additional informationrequired to fulfil
s of Clause 4 of the Instructions to the Bidders, ifapplicable.
(ii) Undertaking
* Fill the name ofconsultant
SAMPLEFORMATFOREVIDENCEOFACCESSTOORAVAILABILITY OF
CREDITFACILITIES
(CLAUSE4.5.6OFITB)BAN
This is to certify thatM/s. is a reputed companywith
a good financialstanding.
If the contract for the work,namely is awarded to
theabove firm, we shall be able to provide overdraft/credit facilities to the extentof
Rs. to meet theirworking capital requirementsfor executing
theaboveduring the contractperiod.
(Signature)Name
BankManagerAddressoftheB
1. I, the undersigned, do hereby certify that all the statements made in
therequiredattachments are true andcorrect.
2. TheundersignedalsoherebycertifiesthatneitherourfirmM/s.
have not abandoned any
workofGovernment of Gujarat/Government of India/any Board or
CorporationunderGovernment of Gujarat/Government of India nor any contract
usforsuchworkshavebeenrescinded,duringlastfiveyearspriortothedateofthisbid.
3. Theundersignedherebyauthorize(s)andrequest(s)anybank,person,firmorcorporation to
furnish pertinent information deemed necessary and
requestedbytheDepartmenttoverifythisstatementorregardingany(our)competenceandge
neralreputation.
4. The Undersigned understands and agrees that further qualifying
i n f o r m a t i o n mayberequested,andagreestofurnishanysuchinformationattherequestofth
e Department/ Project implementingagency.
(SignedbyanAuthorizedOfficeroftheFirm)
Title ofOfficer
Note: Affidavit should be submitted on Rs. 300 stamp paper duly notarized
I, the undersigned do hereby undertake......... that our firm
up to 25% of the value of the work during implementation of thecontract.
(Signed by an Authorized officer of thefirm)
Title ofofficer
CONDITIONS OFCONTRACT
Conditions ofContract
Table ofContents
A General Page D. CostControl
1 Definitions 37 37 Bill ofQuantities
2 Interpretation 38 38 Changes in theQuantities
3 Language andLaw 39 39 Variations
4 Engineer’sDecisions 39 40 Payments for Variations
5 Delegations 39 41 Cash FlowForecasts
6 Communications 39 42 PaymentCertificates
7 Sub-Contractors 39 43 Payments
8 OtherContractors 39 44 CompensationsEvents
9 Personnel 40 45 Tax
10 Employer’s & ContractorRisk 40 46 Currencies
11 EmployersRisks 40 47 PriceAdjustment
12 Contractor’sRisk 40 48 Retention
13 Insurance 40 49 Liquidateddamages
14 Site InvestigationsReports 41 50 Bonus
15 Queries about theContract 41 51 AdvancePayment
16 ContractorstoConstructthewo 41 52 Securities
17 The Works to be 41 53 Deleted
Completedbythe Intended
18 CompletionDate
Approval by theEngineer 41 54 Cost ofRepair
20 Discoveries 42 E. Finishing theContract
21 Possession of theSite 42 55 Completion
22 Access to theSite 42 56 TakingOver
23 Instructions 42 57 FinalAccount
24 Disputes 42 58 Operating
andMaintenancemanuals
25 Procedure forDisputes
26 Deleted 43 59 Terminations
60 Payment uponTerminations
B. Time Control 61 Property
27 Programme 44 62 Release fromPerformance
28 ExtensionsoftheIntendedco
29 Deleted 44 F. Special Conditionsof
30 Delays Ordered bythe 44 63 Labour
Engineer 64 Compliance
withlabourregulations
31 ManagementMeetings 45 65 Arbitration
32 EarlyWarning
C. QualityControl
33 IdentifyingDefects
35 Correction ofDefects
36 UncorrectedDefects
CONDITIONSOFCONTRACT
1.1 Termswhichare defined in theContract Data arenotalsodefined in theConditionsof
Contract but keep their definedmeaning.
Bill of Quantities means the priced and completed Bill ofQuantitiesforming part
CompensationEventsarethosedefinedinClause44hereunder
The Completion Date is the date of completion of the Works as certifiedbythe
Engineer in accordance with Sub Clause55.1
The Contract is the contract between the Employer and Contractortoexecute,
complete and maintain the Works till the completion ofDefectsLiability Period. It
consists of the documents listed in Clause 2.3below.
The Contract data defines the documents and other informationwhichcomprise
TheContractorisapersonorcorporatebodywhoseBidtocarryouttheWork has been
accepted by theEmployer.
The Contractor’s Bid is the completed Bidding document submitted
bytheContractor to the Employer and includes Technical and FinancialBids.
The Contract Price is the price stated in the Letter of Acceptanceandthereafter
as adjusted in accordance with the provisions of theContract.
Daysarecalendardays:monthsarecalendarmonths.
The Defects Liability Period is the period named in the Contract
Dataandcalculated from the CompletionDate.
The Employer is the party who will employ the Contractor to carry out the
The Engineer is the person named in the Contract Data (or anyothercompetent
person appointed and notified to the contractor to act in replacementofthe Engineer) who
is responsible for supervising the Contractor, administeringtheContract, certifying
payments due to the Contractor, issuing and valuingVariationsto the Contract, awarding
extensions of time, and valuing theCompensationsEvents.
Equipment is Contractor’s machinery and vehicles brought temporarilyto the
site to construct theWorks.
The Initial Contract Price is the Contract Price listed in theEmployer’s Letter
TheIntendedCompletionDateisthedateonwhichitisintendedthattheContractorshall
completetheWorks.TheIntendedCompletionDateisspecifiedin the Contract Data. The
Intended Completion Date may be revised only bytheEngineer by issuing an extension
Materials are all supplies, including consumables, used by the
contractorforincorporation in theworks.
Plant is any integral part of the work which is to have mechanical,electrical,
electronic or chemical or biologicalfunctions.
TheSiteistheareadefinedassuchintheContractData.
Site Investigation Reports are those which were included in theBidding
documentsandarefactualinterpretivereportsaboutthesurfaceandsubsurfaceconditions at
Specifications means the Specifications of the works included in theContract and
any modification or addition made or approved by theEngineer.
TheStartDateisgivenintheContractData.ItisthedatewhentheContractorshallcommen
ceexecutionoftheworks.Itdoesnotnecessarilycoincidewith any of the Site PossessionDates.
ASubcontractorisapersonorcorporatebodywhohasaContractwiththeContractor to
carry out a part of the work in the Contract which includes work ontheSite.
Temporary Works are works designed, constructed, installed, andremovedby the
Contractor which are needed for construction or installation of theWorks.
A Variation is an instruction given by the Engineer, which varies
theWorks.TheWorksarewhattheContractrequirestheContractortoconstruct,install,
andturnovertotheEmployer,asdefinedintheContractData.
2. Interpretation
2.1 In interpreting these Conditions of Contract, singular also means
plural,malealsomeansfemaleorneuterandtheotherwayaround.Headinghavenosignifi
cance. Words have their normal meaning under the language
oftheContractunlessspecificallydefined.TheEngineerwillprovideinstructionsclarifyi
ng queries about Conditions ofContract.
2.2 If sectional completion is specified in the Contract Data, references
intheConditions of Contract to the Works, the Completion date,
andIntendedCompletion Date apply to any Section of the Works (other than
referencestothe Completion Date and Intended Completion date for the
2.3 The documents forming the Contract shall be interpreted in thefollowing order
(2) Letter of Acceptance, notice to proceed withworks
(3) Contractor’sBid
(4) ContractData
(5) Conditions of Contract including Conditions ofContract
(6) Specifications
(8) Bills of quantitiesand
(9) AnyotherdocumentlistedintheContractDataasformingpartoftheContract.
3. Language andLaw
3.1 The language of the Contract and the law governing the Contract are statedin the
4. EngineersDecisions
4.1 Except where otherwise specifically stated, the Engineer willdecidecontractual
matters between the Employer and the Contractor in therole representing
5.1 The Engineer may delegate any of his duties and responsibilities tootherpeople
after notifying the Contractor and may cancel any delegationafternotifying
6. Communications
6.1 Communications between parties which are referred to in the
conditionsareeffective only when in writing. A notice shall be effective only when
itisdelivered (in terms of Indian ContractAct).
7. Sub-Contracting
7.1 The Contractor may subcontract any portion of work, up to a limit specifiedin
contract data, with the approval of the engineer but may not assigntheContract
without the approval of the Employer in writing.Subcontractingshall not alter the
Contractor’s obligations. Sub-contracting of supplyorspecific items of work is
7.2 Thesub-contractormustberegisteredinappropriateclassandcategoryforthe part of
work to besubcontracted.
8. Other Contractors
8.1 The Contractor shall cooperate and share the Site with
othercontractors,publicauthorities,utilitiesandtheEmployerbetweenthedatesgivenint
heSchedule of other Contractor. The Contractors shall as refer to in theContract
Data, also provide facilities and services for them as described in theSchedule. The
employer may modify the schedule of other contractorsandshall notify the
contractor of any suchmodifications.
9.1 The Contractor shall employ the key personnel named in the Schedule
ofKeyPersonnel as referred to in the Contract Data to carry out the
functionsstatedintheScheduleorotherpersonnelapprovedbytheEngineer.TheEnginee
rwill approve any proposed replacement of key personnel only
iftheirqualifications, abilities, and relevant experience are substantially equal
toorbetter than those of the personnel listed in theSchedule.
9.2 IftheengineeraskstheContractortoremoveapersonwhoisamemberofthe Contractor
Staff or his work force stating the reasons the Contractorshall
ensurethatthepersonleavestheSitewithinsevendaysandhasnofurtherconnection with
the work in theContract.
10. Employer’s and ContractorsRisks
10.1 The Employer carries the risk which these Contract states areEmployer’s
risks,andtheContractorcarriestheriskswhichtheseContractsstatesareContractor’srisk
11. Employer’sRisks
11.1 Theemployerisresponsiblefortheexceptedriskswhichare(a)insofarastheydirectlyaffe
cttheexecutionoftheWorks,therisksofwar,hostilities, invasion, act of foreign
enemies, rebellion, revolution, insurrection ormilitaryor usurped power, civil war,
riot commotion or disorder (unless restrictedtothe Contractor’s employees), and
contamination from any nuclear fuelornuclear waste or radioactive toxicexplosive.
12. Contractor’sRisks
12.1 All risks of loss of or damages to physical property and of personal injuryanddeath
which arise during and in consequence of the performance oftheContract other
than the excepted risks are the responsibilityof theContractor.
13.1 The Contractor shall provide, in the joint names of the Employer
andtheContractor, insurance cover from the Start date to the end of
theDefectsLiabilityPeriod,intheamountsanddeductiblesstatedintheContractdata for
the following events which are due to the Contractor’srisks:
(a) Loss of or damage to the works, Plant andmaterials,
(b) Loss of or damage toEquipment
(c) Loss of or damages of property (expect the Works, Plant,
MaterialsandEquipment) in connection with the Contract;and
(d) Personal injury ordeath.
13.2 Policies and certificates for insurance shall be delivered by the Contractortothe
Engineer for the Engineer’s approval before the Start Date. Allsuchinsurance shall
provide for compensation to be payable in the typesandproportions of currencies
required to rectify the loss or damageincurred.
13.3 If the Contractor does not provide any of the policies and certificatesrequired, the
Employer may affect the insurance which the Contractorshouldhave provided and
recover the premiums the Employer has paidfrompayments otherwise due to the
Contractor or, if no payment is due,thepayment of the premiums shall be a
13.4 Alterations to the terms of an insurance shall not be made withouttheapproval of
13.5 Bothpartiesshallcomplywithanyconditionsoftheinsurancepolicies.
14. Site InvestigationReport
14.1 The Contractor in preparing the Bid shall rely on any site Investigationreports
referred to in the Contract Data, supplemented by anyinformationavailable to
15. Queries about the Contractdata
15.1 The engineer will clarify queries on the ContractData
16. Contractor to Construct theWorks
16.1 The Contractor shall construct and install the works in accordance
withthespecification andDrawings.
17. The Works to be completed by the Intended CompletionDate
17.1 The Contractor may commence execution of the Works on the Start Dateandshall
carry out the Works in accordance with the programme submitted
bytheContractor,asupdatedwiththeapprovaloftheEngineer,andcompletethem by the
Intended Completiondate
18. Approval by theEngineer
18.1 The Contractor shall submit Specifications and Drawings
showingtheproposedTemporaryworkstotheEngineer,whoistoapprovethemiftheyco
mply with the Specifications anddrawings.
18.2 The Contractor shall be responsible for design of temporaryworks.
18.3 The Engineer’s approval shall not alter the contractor responsibility for design of
the Temporaryworks.
18.4 The Contractor shall obtain approval of third parties to the design oftheTemporary
works whererequired.
18.5 All Drawings prepared by the Contractors for the execution of thetemporaryor
permanent work are subject to prior approval by the Engineer beforetheiruse.
19.1 TheContractorshallbe responsibleforthesafetyofallactivitiesontheSite.
20. Discoveries
20.1 Anythingofhistoricalorotherinterestorofsignificantvalueunexpectedlydiscoveredont
hesiteisthepropertyoftheEmployer.Thecontractoristonotify the engineer of such
discoveries and carry out theEngineer’s instructions for dealing with them.
21. Possession of theSite
21.1 The Employer shall give possession of all parts of the site to the
Contractor.IfpossessionofapartisnotgivenbythedatestatedintheContractDatatheEmp
loyerisdeemedtohavedelayedthestartoftherelevantactivitiesandthis will be a
CompensationEvent.
21.2 Ifwithin25%ofthetimelimitoftheproject,80%ofpossessionofthesiteisnot handed over
to the Contractor, then contractor/ Employer mayfore-closethe contract.
Contractor/Employer has to foreclose the work within 30daysafter lapse of 25%-
time limit and after 30 days foreclosure option willbeclosed.
22. Access to theSite
22.1 The Contractor shall allow the Engineer and any person authorized
bytheEngineeraccesstotheSite,toanyplacewhereworkinconnectionwiththeContract
is being carried out or is intended to be carried out and to anyplacewhere materials
or plants are being manufactured/ fabricated/ assembledfortheworks.
23. Instructions
23.1 TheContractorshallcarryoutallinstructionsoftheEngineerpertainingtoworks which
comply with the applicable laws where the site islocated.
23.2 The Contractor shall permit the Employer to inspectthe Contractor’s accounts and
records relating to the performance of the Contractor
andtohavethemauditedbyauditorsappointedbytheEmployer,ifso,requiredbythe
24.1 IftheContractorisoftheviewthatadecisiontakenbytheEngineerwaseither outside the
authority given to the Engineer by the Contract or thatthedecision was wrongly
taken, the decision shall be referredtoSuperintending Engineer (Panchayat
Irrigation Circle, Gandhinagar) within 14 days of the notification of the Engineer's
decision. If the issue is not resolved, any party can refer the matter for conciliation
within 15 days from thedecisiongivenby the Superintending Engineer (Panchayat
Irrigation Circle, Gandhinagar).
(a) FortheworkuptoRs.100Cr.,ifanyofthepartiesisnotsatisfiedwiththe decision of
the #Superintending Engineer (Panchayat Irrigation Circle, Gandhinagar),
boththeparties have to refer to the Chief Engineer concern for
theconciliationprocess.
(b) FortheworkmorethanRs.100Cr.,ifanyofthepartiesisnotsatisfiedwiththedecision
ofthe#SuperintendingEngineer(Panchayat Irrigation Circle,
Gandhinagar),boththe parties have to refer to the
#Secretary,WaterResourcesDepartment, Government of Gujarat for the
conciliationprocess.
If the dispute is not resolved through the conciliation process, he mayreferthe
dispute to Gujarat Public Works Contract Dispute Arbitration
Tribunal.IftheContractorfailstoreferaclaim/disputetotheHigherAuthoritywithin14
days of the notification of the Engineer's decision, the Contractor
shallnotbeentitledtoanyadditionalpayment/claimifhedoesn’tfollowtheabove
sequence in stipulated time and he should not stop thework.
25. Procedure forDisputers
25.1 The arbitration shall be conducted in accordance with thearbitration procedure
stated in the Special Conditions ofContract.
27.1 Within the time stated in the Contract Data the Contractor shall submit
totheEngineer for approval a Programme showing the
generalmethods,arrangements orders, and timing for all the activities in the works
along withmonthly cash flowforecast.
27.2 An update of the Programme shall be a programme showing theactualprogress
achieved on each activity and the effect of the progress
achievedonthetimingoftheremainingworkincludinganychangestothesequenceofthea
27.3 TheContractorshallsubmittotheEngineer,forapprovalanupdatedprogramme at
intervals no longer than the period stated in the Contractdata.If the Contractor does
not submit an updated programme within thisperiod,
theEngineermaywithholdtheamountstatedintheContractdatafromthenext payment
after the date on which the overdue programme hasbeen submitted.
27.4 TheEngineer’sapprovaloftheprogrammeshallnotaltertheContractor’s
obligations.TheContractormayrevisetheprogrammeandsubmitittotheEngineeragain
atanytime.ArevisedprogrammeistoshowtheeffectofVariations and
Compensationsevents.
28. Extension of the Intended CompletionDate
28.1 TheEngineershallextendtheIntendedCompletionDateifacompensationEvent occurs
or a Variation is issued which makes it impossibleforcompletion to be achieved by
the Intended Completion Date withouttheContractor taking steps to accelerate the
remaining work and whichwouldcause the Contractor to incur additionalcost.
28.2 The Engineer shall decide whether and by how much to extend
theIntendedCompletionDatewithin35daysoftheContractoraskingtheEngineerfora
decision upon the effect of a compensation event or Variation andsubmitting full
supporting information. If the Contractor has failed to give earlywarning
ofadelayorhasfailedtocooperateindealingwithadelay,thedelaybythisfailure shall not
be considered in assessing the new IntendedCompletionDate.
28.3 The Engineer shall within 14 days of receiving full justification
fromthecontractorforextensionofIntendedCompletionDaterefertotheEmployerhis
decision. The employer shall in not more than 21 days communicate totheengineer
the acceptance or otherwise of the Engineer’s decision. Ifthe employer fails to give
his acceptance, the Engineer shall not granttheextension and the contractor may
refer the matter under Clause24.1
30. Delays Ordered by theEngineer
30.1 The Engineer may instruct the Contractor to delay the start or progress
ofanyactivity within theworks.
31. Management Meetings
31.1 Either the Engineer or the Contractor may require the other to attenda management
meeting. The business of a management meeting shall betoreview the plans for
remaining work and to deal with matters raisedin accordance with the early
warningprocedure.
31.2 TheEngineershallrecordthebusinessofmanagementmeetingsandistoprovide copies
of his record to those attending the meeting and
totheEmployer.Theresponsibilityofthepartiesforactionstobetakenistobedecided by
the Engineer either at the management meeting or afterthemanagement meeting
and stated in writing to all who attended themeeting.
32. Early Warning
32.1 TheContractoristowarntheEngineerattheearliestopportunityofspecificlikely future
events or circumstances that may adversely affect the qualityofthe work, increase
the Contract price or delay the execution of
works.TheEngineermayrequirethecontractortoprovideanestimateoftheexpectedeffe
ct of the future event or circumstance on the contract
priceandcompletiondate.TheestimateistobeprovidedbytheContractorassoonasreason
32.2 The Contractor shall cooperate with the Engineer in making andconsidering
proposals for how the effect of such an event or circumstance can
beavoidedorreducedbyanyoneinvolvedintheworkandincarryingoutanyresultinginstr
uction of theEngineer.
C. QUALITY CONTROL
33. Identifying Defects/ Defect liabilityperiod
33.1 :Defectliabilityperiod:Thecontractorshallberesponsibletomakegoodandremedyathiso
wnexpenseanydefectwhichmaydevelopormaybenoticedbefore the period
mentioned hereunder from the certified date ofcompletion.The Engineer in charge
shall give the contractor a notice in writing aboutthedefects and the contractor shall
make good the same within 15 days ofreceipt of the notice. In the case of failure on
the part of the contractor, theEngineer- in-chargemayrectifyorremoveorre-
executetheworkattherisk&costofthe contractor. The Engineer-in-charge shall be
appropriatethewholeoranypartoftheamountofsecuritydeposittowardstheexpenses,ifa
ny, Incurred by him in rectification, removal or re-execution. TheDefectsLiability
period shall be asunder….
A. For works of WRD ExceptBuilding
(a) (1)ForallworkscostinguptoRs.50,000(amountputtotender),theperiodshall be
Months from the certified date ofcompletion.
(b) (1) For WRD works likes Check Dam/ Canal / Drainage /
RoadStructuretenderamountfromRS.50,000to10,00,000,thedefectliabilityperiodsha
ll be 12 months from the certified date ofcompletion.
(2)ForWRDworkexceptlikesCheckDam/Canal/Drainage/RoadStructuretenderamou
ntfromRS.50,000to10,00,000,thedefectliabilityperiod shall be 6 months from the
certified date ofcompletion.
(c) (1) For WRD works likes Check Dam/ Canal / Drainage /
RoadStructuretenderamountmorethanRS.10,00,000,thedefectliabilityperiodshallbe
3Years from the certified date ofcompletion.
(2)ForWRDworkexceptlikesCheckDam/Canal/Drainage/RoadStructuretenderamou
ntfromRS.10,00,000to1Crore,thedefectliabilityperiod shall be 12 months from the
certified date ofcompletion.
(d) (1)ForallWRDworksoftenderamountmorethanRS.1Crore,thedefectliability period
shall be three Years from the certified date ofcompletion
B. For Building works ofWRD:-
For Building works of WRD, Follow the R&B Circulardated.03/12/2009
For original building works the defect liability period will be 4 years
orelapseof4monsoonperiodfollowingdateofpossessionofbuildingtakenoverbyuser
agency following the certified date of completion, whichever islater.
For the purpose of deciding the monsoon period, the 30th September shallbetreated
as the lastdate.
WRD Circular No. Matas/102013/MICELL(K-1) Dated13/12/2013
33.2 For Road works:
FreemaintenanceguaranteeperiodforworksofRoad/Bridgeconstruction
(a) For resurfacing work of road free maintenance guarantee period oneyearfrom
the date ofcompletion.
(b) In case of widening of the road/strengthening of the road/bridge,thecontractor
shall have to give four years free maintenance
guaranteefromthecertifieddateofcompletion.Duringthisperiodthecontractorshall
visitthesiteeverysixmonthsalongwiththeconcernedSectionOfficer/ Deputy
Executive Engineer and will examine the work already carriedout in this
contract like road work, jungle cutting, side shoulders, sidegutter, road
furniture, patta etc. and will prepare Km. wise inspection
reportdulysignedbyallconcernedandanydefectobservedshallbedonewithin15day
s by the contractor at his risk and cost as per the direction ofEngineerin charge.
The contractor needs to do videography of these visits
andrequiretosubmitatthetimeofreleaseofFMG.IfB.T.thesurfaceduring
themaintenanceperiodof4yearsiswornoutthenagencyshallhavetoprovide renewal
coating as per tender item as directed by theEngineer-in- charge. The amount
equivalent to 5% of each running bill shall bewithheld and will be released
after the free maintenance guaranteeperiod(i.e. 4 years) isover.
However,thisamountshallbereleasedagainstfixeddepositorbank guarantee
pledged in the name of Executive Engineer aftercompletioncertificate of work
(1) The flakiness and elongation index (combined) for coarseaggregatesunder no
circumstances shall exceed the allowable limit set forth intherelevant clause for
the material inquestion.
(2) 2%oftheamounteligibleforthepaymentofbituminousitemsshallbewithheld till
the miscellaneous items like earthwork in embankment/ cutting for side
shoulders, side gutters, kilometer / indicator
/guardstones,signboardsetc.arecompletedinallrespectbythecontractor.
Aftercompletionofthemiscellaneousitems,theabovesaid2%withheldamount
shall bereleased.
(Govt.ofGujarat'sG.R.No.:TNC-10-2013-3(Part-3)/C,Dtd.13/12/2013).
(3) Videography for the surface under Maintenance Guarantee is to be
doneasperGovt.letterNo.:SSR/10/2015-16/26/C,Dtd.26/11/15forthework
costing more than Rs. 5.00Crore.
(4) Setting up of adequate laboratory & deployment of qualityengineers.
The contractor shall have to set up the laboratory withadequateequipment. Till
the setting up of adequate laboratory is
completed&reportedofthistotheengineer(subjecttodueverificationbyengineer’s
representative) by contractor in writing, Rs.2,00,000/- shall bewithheld. The
qualified quality Engineer shall be deployed exclusively
forthiscontractbythecontractors.IfqualityEngineerisnotdeployedbycontractor
within one month after the date of work order, theamountequivalent to
Rs.20,000 per month shall be recovered till theactualdeployment of quality
engineer. The amount so recovered towardsthedeployment of quality engineers
shall not berefunded.
(5) Asphalt work will have to be cross checked as per
G.R.No.:RGN/60/2006/35/C, dtd.31/05/07 before final bill ispaid.
(6) Maintenance during ConstructionPeriod
During the Construction Period, the Contractor shall maintain, at hisown risk
and cost, the existing lane(s) of the road so that the trafficworthinessand safety
thereof are at no time materially inferior as compared totheircondition 10 (ten)
days prior to the date of the Agreement, andshall undertake the necessary
repair and maintenance works for thispurpose;provided that the Contractor
may, at his cost, interrupt and divert theflow
oftrafficifsuchinterruptionanddiversionisnecessaryfortheefficientprogress of
works and conforms to Good Industry Practice; provided
furtherthatsuchinterruptionanddiversionshallbeundertakenbytheContractor only
with the prior written approval of the
ExecutiveEngineerwhichapprovalshallnotbeunreasonablywithheld.Fortheavoid
anceofdoubt, it is agreed that the Contractor shall at all times be
responsibleforensuring safe operation of theroad.
33.3 TheEngineershallchecktheContractor’sworkandnotifytheContractorof any defects
that are found. Such checking shall not affect theContractor’s responsibilities the
Engineer may instruct the Contractor to search fora
DefectandtouncoverandtestanyworkthattheEngineerconsidersmay have aDefect.
34.1 If the engineer instructs the Contractor to carry out a test not specified
intheSpecification to check whether any work has a Defect and the test
showsthatitdoes,theContractorshallpayforthetestandanysamples.Ifthereisnodefect
the test shall be a CompensationEvent.
34.2 1% of the amount of work done for works up to Rs. 10 crore of estimatecost
shouldbedeductedfromR.A.Billofthecontractorfortestingthequalityofmaterialwork
manship.Whereasforestimatedcostofworksmorethan10crore, the charges for testing
of quality of material workmanship shallbededucted from R.A. bill of contractor as
per actual charges. As PerGoGNWRWS & K Department’s Circular No.
PARCH/132023/401/MICELLDated:05/10/2023
34.3 Agencyhastoestablishtestinglaboratoryonsiteforthevarioustesttobecarried out in the
work for this purpose agency shall construct a pukka laboratory building with all
facility on site at location specified bytheengineer incharge.
35. Correction ofdefects
35.1 The engineer shall give notice to the Contractor of any defects before
theendofthedefectsLiabilityPeriod,whichbeginsatCompletionandisdefinedin the
contract data. The Defects Liability Period shall be extended for as longasDefects
remain to becorrected.
35.2 Every time notice of a Defect is given, the Contractor shall correct the
notifieddefect within the length of time specified by the Engineer’snotice.
36. UncorrectedDefects
36.1 IftheContractorhasnotcorrectedadefectwithinthetimespecifiedintheEngineer’s
notice, the Engineer will assess the cost of having theDefect corrected, and the
Contractor will pay thisamount.
D. COST CONTROL
37. Bill ofQuantities
37.1 The bill of Quantities shall contain items for the
constructions,installation,testing and commissioning work to be done by
37.2 The bill of Quantities is used to calculate the Contract price. The
ContractorispaidforthequantityoftheworkdoneattherateintheBillofQuantitiesforeach
38. Change in theQuantities
38.1 TheEngineershallhavepowertomakeanyalterationsinoradditiontotheoriginal
specifications , drawings, designs and instructions that may
appeartohimtobenecessaryoradvisableduringtheprogressoftheworkandthecontractor
shall be bound to carry out the work in accordance withanyinstruction in this
connection which may be given to him in writing
signedbytheEngineerandsuchalterationshallnotinvalidatethecontractandanyaddition
al work which the contractor may be directed to do in
themannerabovespecifiedaspartoftheworkshallbecarriedoutbythecontractoronthesa
meconditionsinallrespectsonwhichheagreedtodothemainwork and at the same rate
as are specified in the tender for the mainwork.
Except that when the quantity of any item exceeds the quantity as inthetender by
more than 130%, the contractor will be paid for the quantityin
excessof130%,attherateenteredintheSORoftheyearduringwhichtheexcess in
quantity is firstexecuted.
39.1 All Variations shall be included in updated programmes produced bytheContractor.
40. Payments forVariations
40.1 If the additional or altered work includes any class of work for which norateis
specified in this contract, then such class of work shall be carried outasunder.
(i) At the rate derived from the item within the contract which is
comparabletotheoneinvolvingadditionaloralteredclassofwork;wheretherearemoreth
an one comparableitems, the item of the contract which is nearestin comparison
with regard to class or classes of the work involved
shallbeselectedandthedecisionoftheSuperintendingEngineerastothenearestcompara
ble item shall be final and binding on thecontractor.
(ii)Iftheratecannotbederivedinaccordancewith(i)above,suchclassofworksshall be carried
out at the rate entered in the Schedule of Rates of thedivision
fortheyearinwhichthetenderwasreceived,increasedordecreasedbythepercentagebyw
hichthetenderamountismoreorlessascomparedtotheamountarrivedattheratesinthe“S
cheduleofRates”oftheDivisioninthe year in which the tender was received. If the
Schedule of rates of
theDivisiondoesnotcontainalltheitems,thepercentageincreaseordecreaseofthetender
shall be calculated considering such items which were included inthe“Scheduled
Rates” of the division for the year and for materials
consumedonsuchitemtheratetobechargedwouldbethebasicratetakenintoaccountfor
fixing the rate in S.O.R. referred toabove.
(iii) Ifitisnotpossibletoarriveattheratefrom(i)and(ii)above,suchclassofwork shall be
carried out at the rate decided by the competent authoritieson the basis of detailed
rate analysis after hearing the contractor beforea Committee of two Superintending
Engineers stationed at the same placeorthe nearestplace.
40.2 If the additional or altered work, for which no rate is entered in the“Schedule of
Rates” of the Division is ordered to be carried out before the rate isagreed upon,
then the contractor shall within seven days of the date of receipt byhimof the order
to carry out the work, inform the Engineer-in-charge of therate,which it is his
intention to charge for such class of work and if the Engineerin charge does not
agree to this rates, he shall by notice in writing be at
libertytocancelhisordertocarryoutsuchclassofworkandarrangetocarryitout
insuchmannerashemayconsideritadvisable,providedalwaysthatifthecontractorshallc
ommenceworkorincuranyexpenditureinregardthereofbefore the rates shall have
been determined as lastly herein beforementioned, then in such cases he shall only
be entitled to be paid in
respectoftheworkcarriedoutorexpenditureincurredbyhimpriortothedateofthedetermi
nation of the rate as aforesaid according to such rate or rates asshall be fixed by the
Engineer-in-charge. In the event of the dispute, the decisionofthe Superintending
Engineer of the Circle shall befinal.
Where,however,theworkistobeexecutedaccordingtothedesigns,drawings and
specifications recommended by the contractor and acceptedbythe competent
authority, the alternation above referred to shall be withinthescope of such designs,
drawings and specifications appended to thetenders.
The time limit for the completion of the work shall be extended
intheproportion that the increase in the cost occasioned by alterations bears
tothecost of the original work and the certificate of the Engineer-in-charge
astosuch proportion shall be final andconclusive.
41. Cash FlowForecasts
41.1 When the programme is updated, the contractor is to provide theengineerwith an
updated cash flowforecast.
42. Paymentcertificates.
42.1 The Contractor shall submit to the Engineer monthly statements
oftheestimatedvalueoftheworkcompletedlessthecumulativeamountcertifiedprevious
42.2 The Engineer shall check the Contractor’s monthly statement within 14days and
certify the amount to be paid to the Contractor after taking in
toaccountanycreditordebitforthemonthinquestioninrespectofmaterialsfortheworksin
therelevantamountsandunderconditionssetforthinsub-clause
32.3 of the Contract Data (securedAdvance).
42.3 The value of work executed shall be determined by theEngineer.
42.4 Thevalueofworkexecutedshallcomprisethevalueofthequantitiesoftheitems in the
Bill of Quantitiescompleted.
42.5 The value of work executed shall include the valuation of
variationsandcompensationevents.
42.6 The Engineer may exclude any item certified in a previous certificateorreduce the
proportion of any item previously certified in any certificate inthelight of
laterinformation
43.1 Payments shall be adjusted for deductions for advance payments,retention,
otherrecoveriesintermsofthecontractandtaxesatsource,asapplicableunderthelaw.The
EmployershallpaytheContractortheamountscertifiedby the Engineer within 28 days
of the date of eachcertificate.
43.2 Payment of GST (prevailing rates) on the amount payable under thecontract to the
Contractor will be made by the Employer. Hence, it is theresponsibilityof the
contractor to pay the GST to the concernedAuthority.
43.3 Itemsoftheworksforwhichnorateorpricehasbeenenteredinwillnotbepaid by the
Employer and shall be deemed covered by other rates and pricesin theContract.
44. Compensationevents
44.1 The following are compensation Events unless they are caused bytheContractor:
(a) TheEmployerdoesnotgiveaccesstoapartoftheSitebythesitePossession date
stated in Contract data to theContractor
44.2 In case of compensation event occurs and it prevents the workbeingcompleted
beyond the Intended Completion Date then Authority willapproveEOT with
eligible contractual priceescalation.
45.1 The rates quoted by the Contractor must be inclusive of all taxes prevailingondue
date of bid submission except GST. However, any subsequent changesin
thetaxstructurebyGovernmentafterduedateofbidsubmissionwillbecompensated (+/-)
on availability or submission of actualdocumentation. Contractor will have to
intimate Engineer regarding changes occurred inthetax structure after bid
submission. If the contractor fails to
providesuchinformationandifanyfinancialobligationmayariseduetochangeintax
structure, same will be recovered from thecontractor.
45.2 GSTwill bepaidseparatelyonthebills.Hence,itistheresponsibilityofthecontractor to
pay the GST to the concernedAuthority.
46. Currencies.
46.1 All payment shall be made in IndianRupees.
47. Price Adjustment
47.1 Contract price shall be adjusted for increase or decrease in ates and price of labour,
materials, fuels and lubricants in accordance with following principles and
procedures and as per formula given in the contract data:
(a) The price adjustment shall apply for the work done from the start date given in
the contract data up to end of the initial intended completion date or extensions
granted by the Engineer and shall not apply to the work carried out beyond the
stipulated time for reasons attributable to the contractor.
(b) The price adjustment shall be determined during each month from the formula
given in the contract data.
(c)Following expressions and meanings during to the work done during each month
R = Total value of work done during the month. It would include the amount of
secured advance granted, if any, during the month less the amount of secured
advance recovered, if any during the month. It will exclude value for works
executed under variations for which price adjustment will be worked separately
based on the terms mutually agreed.
48.1 The Employer shall retain from each payment due to
ContractortheproportionstatedintheContractDatauntilCompletionofthewholeofthe
48.2 On Completion of the whole of the Works half the total amount retainedisrepaid to
48.2 On Completion of the whole of the Works half the total amount retainedisrepaid to
the Contractor and half when the Defects Liability Period haspassedand the
Engineer has certified that all Defects notified by the Engineer totheContractor
before the end of this period have beencorrected.
48.3 On completion of the whole works, the contractor may substituteretentionmoney
with an “on demand” Bankguarantee.
In case, Contractor requests for refund of the RetentionMoneydeducted by
the Employer under the provision of this clause, Employershall consider the said
request of the Contractor provided that therefundhereunder shall be made in
tranches of not less than 1% (One Percent) oftheContract Price and Contractor
furnishes an irrevocable andunconditional Bank guarantee for an equal amount
substantially in the format ofBank
GuaranteeforPerformanceGuaranteeenclosedwithSBDandvalidupto60day beyond
the scheduled / extended Defects Liability Period.
Oncompletionofthewholeworks,thecontractorhashoweveranoptiontosubmitafreshirr
evocable and unconditional Bank Guarantee for an amount equal to 5%ofthe total
value of work executed substantially in the format of BankGuaranteefor
Performance Guarantee enclosed with SBD and valid up to 60 daysbeyondthe
Defect Liability Period and yet refund the Retention MoneyBank Guarantee
submitted for refund of RetentionMoney.
49. LiquidatedDamages
49.1 TheContractorshallpayliquidateddamagestotheEmployerattherateperday stated in
the Contract Data for each day that the Completion Date islaterthan the Intended
Completion Date (for the whole works or the milestoneasstated in the contract
data). The total amount of liquidated damages
shallnotexceedtheamountdefinedintheContractData.TheEmployermaydeduct
liquidated damages from payment due to the Contractor. Paymentofliquidated
damages does not affect the Contractor’sliabilities.
49.2 IftheIntendedCompletionDateisextendedafterliquidateddamageshavebeen paid, the
Engineer shall correct any overpayment of
liquidateddamagesbytheContractorbyadjustingthenextpaymentcertificate.TheContr
actorshall not be entitled for any interest on the over payment calculated
fromthedate of payment to the date ofrepayment.
49.3 Ifthecontractorfailstocomplywiththetimeforcompletionasstipulatedin
thetender,thenthecontractorshallpaytotheemployertherelevantsum stated in the
Contract Data as Liquidated damages for such default and notaspenalty for
everyday or part of day which shall elapse between
relevanttimeforcompletionandthedatestatedinthetakingovercertificateofthewholeof
the works on the relevant section, subject to the limit stated in the contract data.
The employer may, without prejudice to any other method
ofrecoverydeduct the amount of such damages from any monies due or to become
duetothecontractor.Thepaymentordeductionofsuchdamagesshallnotrelieve
the contractor from his obligation to complete the works on from any otherofhis
obligations and liabilities under thecontract.
49.4 If, before the Time for Completion of the whole of the Works or, ifapplicableany
Section, a Taking Over Certificate has been issued for any part
oftheWorksorofaSection,theliquidateddamagesfordelayincompletionoftheremainde
roftheWorksorofthatSectionshall,foranyperiodofdelayafterthe date stated in such
Taking-Over-Certificate, and in the absenceofalternative provisions in the
Contract, be reduced in the proportion
whichthevalueofthepartsocertifiedbearstothevalueofthewholeoftheWorksorSection,
as applicable. The provisions of this Sub-clause shall only apply totherate of
liquidated damages and shall not affect the limitthereof.
50.1 Ifthecontractorachievescompletionofthewholeoftheworkspriortotheintended
Completion Date prescribed in Contract Data the Employer shallpayto the
contractor a sum stated in Contract Data as bonus for everycompletedmonth but
subjected to maximum amount as stated in
ContractData;whichshallelapsebetweenthedateofcompletionofallitemsofworksasst
ipulated in the contract, including variations ordered by the Engineerandthe time
prescribed in Clause17.
50.2 Bonus shall be paid only to works amounting to above INR 5 crore
withtimelimitoftheworksisequalormorethan6months.Thebonuswouldbepaidasunder
% of TimeSaved %ofInitialContractPriceent
Less than10% 0%
51. AdvancePayment.
51.1 TheEmployershallmakeadvancepayment(nottobepaidlessthantwoinstallments
except in special circumstances for which the reason
tobeRecordedinwriting)totheContractoroftheamountsstatedintheContract Date by
the date stated in the Contract Date, against provision bytheContactor of an
Unconditional Bank Guarantee in a form and by abank
acceptabletotheEmployerinamountsandcurrenciesequaltobeatleast 110% of the
advance payment. The guarantee shall remain effective untilthe
advancepaymenthasbeenrepaid,buttheamountoftheguaranteeshallbeprogressively
reduced by the amounts repaid by the Contractor.TheMobilization advance would
be deemed as interest bearing advance ataninterest rate of 10 % to be
compounded,quarterly.
51.2 The Contractor is to use the advance payment only to pay forEquipment, plant and
Mobilization expenses required specifically for execution oftheWorks. The
Contractor shall demonstrate that advance payment hasbeen
usedinthiswaybysupplyingcopiesofinvoicesorotherdocumentstotheengineer.
51.3 The advance payment shall be repaid by deduction proportionateamountfrom
payments otherwise due to the Contractor, following the scheduleofcompleted
percentages of the Works on a payment basis. No account
shallbetakenoftheadvancepaymentoritsrepaymentinassessingvaluationsofwork
done, variations, price adjustments, Compensation Events,orLiquidateddamages.
52.1 The performance Security (including additional security for unbalancedbids)shall
be provided to the Employer no later than the date specified intheLetter of
Acceptance and shall be issued in an amount and form and by abankor surety
acceptable to the Employer, and denominated in Indian Rupees.Theperformance
Security shall be valid until a date 60 days from the
dateofexpiryofDefectsLiabilityPeriodandtheadditionalsecurityforunbalancedbids
shall be valid until a date 28 days from the date of issue of the
certificateofcompletion.
54. Cost ofRepairs.
54.1 LossordamagetotheWorksorMaterialstobeincorporatedintheWorksbetween the
Start date and the end of Defects Correction periods
shallberemediedbytheContractorattheContractor’scostifthelossordamages arises
from the Contractor’s acts oromissions.
E. FINISHING THECONTRACT
55.1 The Contractor shall request the Engineer to issue a Certificate ofCompletion of
the works and the Engineer will do so upon deciding that the workiscompleted.
56.1 The Employer shall take over the Site and the Works within seven days
oftheEngineer issuing a certificate ofCompletion.
57. FinalAccount
57.1 The Contractor shall supply to the Engineer a detailed final account of thetotal
amount that the Contractor considers payable as full and finalsettlement of all
claims under the Contract for items before the end of theDefectsLiability Period.
The Engineer shall issue a Defect Liability Certificateandcertify any final payment
that is due to the Contractor within 56 daysofreceiving the Contractor's account if
it is correct and complete. If it is
not,theEngineershallissuewithin56daysaschedulethatstatesthescopeofthecorrections
or additions that are necessary. If the Final Account isstill unsatisfactory after it
has been resubmitted, the Engineer shall decide
ontheamountpayabletotheContractorandissueapaymentcertificate,within56days of
receiving the Contractor’s revisedaccount.
57.2 If reversal in characteristic of tender (L1 becoming L2) on account
ofexcessesandsavingsinfinalaccountisobserved,theEngineer/Employershallbeat
liberty to restrict the final payment of BOQ items to the
lowestamountevaluatedofthebidsconsideringthefinalquantitiesandtheratesquotedinc
luding the rebates if any. Payment of variation items shall howeverbemade at the
rates approved by the Employer, within 90 days fromthephysical completion
58. Operating and MaintenanceManuals
58.1 If “as built” drawings and/or operating and maintenance manualsarerequired, the
Contractor shall supply them by the dates stated in theContract data.
58.2 IftheContractordoesnotsupplytheDrawingsand/ormanualsbythedatesstated in the
Contract data, or they do not receive the Engineer’s approval,theEngineer shall
withhold the amount stated in the Contract Datafrompayments due to
59. Termination
59.1 The Employer or the Contractor may terminate the Contract if the otherpartycauses
a fundamental breach of theContract.
59.2 Fundamental breaches of Contract include, but shall not be limited tothefollowing:
1. The contractor stops work for 28 days when no stoppage of work isshown on
the current programme and the stoppage has notbeen authorized by
2. The Engineer instructs the Contractor to delay the progress of theWorksand the
instructions is not withdrawn within 28days;
3. The Employer or the Contractor is made bankrupt or goes intoliquidation other
than for a reconstructions oramalgamation
4. A payment certified by the Engineer is not paid by the Employer
totheContractor within 56 days of the date of the Engineer’scertificate
5. The Engineer gives Notice that failure to correct a particular Defect isa
fundamental breach of Contract and the Contractor fails to correct it within a
reasonable period of time determined by theEngineer;
6. The Contractor does not maintain a security which isrequired;
7. TheContractorhasdelayedthecompletionofworksbythenumberofdays for which
the maximum amount of liquidated damages can be paidasdefined in the
Contract data;and
8. If the Contractor, in the judgment of the Employer has engaged incorruptor
fraudulent practices in competing for or in executing theContract.
For the purpose of this paragraph: “corrupt practice” meanstheoffering,
giving, receiving or soliciting of anything of value to influencetheaction of a public
official in the procurement process or in contractexecution.“Fraudulent practice”
means a misrepresentation of facts in order
toinfluenceaprocurementprocessortheexecutionofacontracttothedetrimentoftheborr
ower, and includes collusive practice among Bidders (prior to or
afterbidsubmission) designed to establish bid prices at artificialnon-
competitivelevels and to deprive the Borrower of the benefits of free andopen
59.3 WheneitherpartytotheContractgivesnoticeofabreachofcontracttotheEngineer for a
cause other than those listed under Sub Clause 59.2 above,theEngineer shall decide
whether the breach is fundamental ornot.
59.4 Notwithstanding the above, the employer may terminate the
Contractforconvenience.
60. Payment uponTermination
60.1 If the Contract is terminated because of a fundamental breach of Contractbythe
Contractor, the Engineer shall issue a Certificate for the value of thework done less
advance payments received up to the date of the issue ofthecertificate, less other
recoveries due in terms of the contract, less taxes
duetodeductedatsourceasperapplicablelawandlessthepercentagetoapplytothe work
not completed as indicated in the Contract data.Additional
LiquidatedDamagesshallnotapply.IfthetotalamountduetotheEmployerexceedsanypa
ymentduetotheContractorthedifferenceshallbeadebt payable to theEmployer.
60.2 IftheContractisterminatedattheEmployer’sconvenienceorbecauseofa fundamental
breach of Contract by the Employer, the Engineer shall issuea certificate for the
value of the work done, the cost of balance materialbrought by the contractor and
available at site, the reasonable cost of removalofequipment, repatriation of the
Contractor’s personnel employed solely onthe
works,andtheContractor’scostofprotectingandsecuringtheWorksand less advance
payment received up to the date of the certificate,
lessotherrecoveriesdueintermsofthecontractandlesstaxesduetodeductedatsource as
per applicablelaw.
61.1 All materials on the Site, Plant Equipment’s, Temporary Works and
Worksaredeemed to be property of the Employer, if the Contract is
terminatedbecauseof a Contractor’sdefault.
62. Release fromPerformance
62.1 IftheContractisfrustratedbytheoutbreakofwarofbyanyotherevent entirely outside the
control of either the Employer or the
ContractortheEngineershallcertifythattheContracthasbeenfrustrated.TheContractors
hallmaketheSitesafeandstopworkasquicklyaspossibleafterreceiving
thiscertificateandshallbepaidforallworkcarriedoutbeforereceivingit and for any
work carried out afterwards to which commitment wasmade.
F.SPECIALCONDITIONS OFCONTRACT
The Contractor shall, unless otherwise provided in the
Contract,makehisownarrangementsfortheengagementofallstaffandlabour,localoroth
er, and for their payment of housing, feeding andtransport.
The Contractor shall, if required by the Engineer, deliver totheEngineer a
return in detail, in such form and at such intervals as
theEngineermayprescribe,showingthestaffandthenumbersoftheseveralclassesoflabo
urfromtimetotimeemployedbytheContractoronthesiteandsuchother information as
the Engineer mayrequire.
64. COMPLIANCE WITH LABOURREGULATIONS
During continuance of the contact, the Contractor and hissub- contractor
shall abide at all times by all existing labour enactments andrulesmade thereunder,
regulations, notification and bye laws of the State or
centralGovernmentorlocalauthorityandanyotherlabourlaw(includingrules),
regulations,byelawsthatmaybepassedornotificationsthatmaybeissuedunder any
labour law in future either by the State or the
CentralGovernmentorthelocalauthority.Salientfeaturesofsomeofthemajorlabourlaw
sthatareapplicabletotheconstructionindustryaregivenbelow.TheContractorshallkeep
theEmployerindemnifiedincaseanyactionistakenagainsttheEmployerbythecompeten
tauthorityonaccountofcontraventionofanyofthe provisions of any Act or rules made
thereunder, regulationsornotifications including amendments. If the Employer is
payorreimburse,suchamountsasmaybenecessarytocauseorobserve,orforobservance
of the provisions stipulated in thenotifications/byelaws/Acts/Rules/regulations
including amendments, if any, on the part oftheContractor, the Engineer/employer
shall have the right to deduct anymoneydue to the Contractor including his amount
security.TheEmployer/EngineershallalsohavetherighttorecoverfromtheContractora
nysumrequiredorestimatedtoberequiredformakinggoodthelossordamage suffered by
The employees of the Contractor and the Sub-Contractor in no case
shallbetreated as the employees of the Employer at any point totime.
SALIENT FEATURES OF SOME MAJOR LABOUR AND OTHER LAWS
APPLICABLETO ESTABLISHMENTS ENGAGED IN BUILDING AND OTHER
CONSTRUCTIONSWORK
A) Workmen Compensation Act 1923: - The Act provides for compensationin case of
injury by accident arising out of and during the course ofemployment.
B) Payment of Gratuity Act. 1972: - Gratuity is payable to an employee undertheAct on
satisfaction of certain conditions on separation if an employeehascompleted5years’
serviceormoreondeath,therateof15dayswagesforeverycompletedyearofservice.TheActi
sapplicabletoallestablishmentsemploying 10 or moreemployees.
C) Employees P.F. and Miscellaneous Provision Act 1952: -The Act
Providesformonthly contributions by the employer plus workers @ 10% or
8.33%Thebenefits payable under the Act are:
1. Pension or family pension on retirement or death, as the case maybe.
2. Deposit linked insurance on the death in harness of theworker.
3. Payment of P.F. accumulation on retirement/deathetc.
D) Maternity Benefit Act 1951: -The Act provides for leave and someotherbenefits to
women employees in case of confinement or miscarriageetc.
E) ContractLabour(Regulation&Abolition)Act1970: - TheActprovidesforcertain
welfare measures to be provided by the Contractor to contract
labourandincasetheContractorfailstoprovide,thesamearerequiredtobeprovided,bythe
Principal Employer by Law. The principal Employer is required totakeCertificate of
Registration and the Contractor is required to take license
fromthedesignatedOfficer.TheActisapplicabletotheestablishmentsorContractorofPrinci
pal Employer, if they employ 20 or more contractlabour.
F) Minimum Wages Act 1948: -The Employer is supposed to pay not less
thantheMinimum Wages fixed by appropriate Government as per provisions of the
Act,ifthe employment is a scheduled employment. Construction of
Building,Roads,Runways are scheduledemployment.
G) Payments of wages Act 1936: -It lays down as to by what date the wages
aretobepaid,whenitwillbepaidandwhatdeductionscanbemadefromthewagesof
H) Equal remunerations Act 1979: - The Act provides for payment of equalwages for
work of equal nature to Male and Female workers and for notmaking discrimination
against female employees in the matter of transfer, trainingandpromotions etc.
I) Payments of Bonus Act 1965: - The Act is applicable to allestablishmentsemploying
20 or more employees. The Act provides for payments ofannualbonus subject to a
minimum of 8.33% of wages and maximum of 20 %
ofwagestoemployeesdrawingRs.3500/-permonthorless.Thebonustobepaidtoemployees
getting Rs, 2500/- per month or above Rs. 3500/- per month
shallbeworkedoutbytakingwagesasRs.2500/-permonthonly.TheActdoesnot
apply to certain establishments. The newly set-up establishments areexemptedfor five
years in certain circumstances. Some of the State
Governmentshavereducedtheemploymentsizefrom20to10forthepurposeofapplicability
J) Industrial Disputes Act 1947: -The Act lays down the machineryandprocedure for
resolutions of Industrial disputes, in what situations a strikeorlock-out becomes illegal
and what are the requirements for laying offorretrenching the employees or closing
down theestablishment.
K) Industrialemployment(standingOrders)Act1946: -
Itisapplicabletoallestablishments employing 100 or more workmen (employment size
reducedbysomeoftheStateandCentralGovernmentto50).TheActprovidesforlaying
down rules governing the conditions of employment by the Employer onmatters
provided in the Act and get the same certified by thedesignatedAuthority.
L) Trade Unions Act 1926: -The Act lays the procedure for registration
oftradeunionsofworkmenandemployers.TheTradeUnionsregisteredundertheAct have
given certain immunities from civil and criminalliabilities.
M) Child Labour (Prohibition & Regulation Act 1986: -The Actprohibitsemployment
of children below 14 years of age in certain occupationsandprocess and provides for
regulation of employment of children in allotheroccupations and processes.
Employment of Child labour is prohibited inBuilding and ConstructionIndustry.
N) Inter–StateMigrantworkmen’s(RegulationofEmployment &Conditionsof
service) Act 1979:- The Act is applicable to an establishment whichemploys5 or
more inter-state migrant workmen through an intermediary (whohasrecruited
workmen in one state for employment in the establishment situatedin another
state).The inter-state migrant workmen, is an establishment towhichthis Act becomes
applicable, are required to be provided certain facilities suchashousing, medical aid,
traveling expenses from home up to the establishmentandback, etc.
O) The Building and Other Construction workers (Regulation ofemploymentand
Conditions of Service) Act 1996 and the Cess Act of 1996: -Alltheestablishments
who carry on any building or other constructions workandemploy 10 or more workers
are covered under thisAct.
All such establishments are required to pay cess at the rate not exceeding 2%ofthe
cost of construction as may be modified by the government. The Employerofthe
establishment is required to provide safety measures at thebuildingorconstruction
work and other welfare measures, such as canteens, FirstAidfacilities, Ambulance,
Housing accommodations for workers near theworkplaceetc. The Employer to whom
the Act applies has to obtain a registrationcertificate from the Registering Officers
appointed by theGovernment.
P) FactoriesAct1948: -TheActlaysdowntheprocedureforapprovalofplansbefore setting
up a factory, health and safety provisions, welfareprovisions, working hours, annual
earned leave and rendering informationregarding accidents or dangerous occurrences
to designated authorities. It is applicabletopremises employing 10 persons or more
with aid of power or 20 ormorepersons without the aid of power engaged in the
manufacturingprocess.
Q) Royalty charges-The contractor shall pay the royalty to thecompetentauthority
as per rule. The royalty charges paid shall be borne bythecontractor and shall
not be reimbursed by theEmployer.
R) Following Pollution control Acts and amendments made thereoffrom time
to time shall beapplicable.
1. Water(PreservationandcontrolofPollution)Act,1974
2. Air(PreventionandControlofPollutionAct1981
3. Environmental (Protection) Act1986
The contractor must commit to adopting Environmentalmanagement plan
for best energy use, waste management, the
reductionofpollutionasinEMS(EnvironmentalManagementsystem) ISO-14001-
65. ARBITRATION (GCC Clause24)
Theprocedureforarbitrationwillbeasfollows:-
24.1 If the Contractor is of the view that a decision taken by the Engineer was
eitheroutside the authority given to the Engineer by the Contract or that
thedecisionwas wrongly taken, the decision shall be referred toSuperintending
Engineer (Higher Authority) (Panchayat Irrigation Circle, Gandhinagar) within
days of the notificationofthe Engineer's decision. If the issue is not resolved, any
party can referthematter for conciliation within 15 days from the decision given
#Superintending Engineer.
(a) For the work up to Rs.100 Cr., if any of the parties is not satisfied
withthedecision of the #Superintending Engineer (Panchayat Irrigation Circle,
Gandhinagar), both thepartieshave to refer to the #Chief Engineer concerned
for theconciliationprocess.
(b) FortheworkmorethanRs.100Cr.,ifanyofthepartiesisnotsatisfiedwiththedecisiono
ftheSuperintendingEngineer,bothpartieshavetorefer to the #Secretary, Water
Resources Department, GovernmentofGujarat for the conciliationprocess.
If the dispute is not resolved through the conciliationprocess,contractor
may refer the dispute to Gujarat Public Works ContractDisputeArbitration
Tribunal. If the Contractor fails to refer a claim / dispute totheHigher Authority
within 14 days of the notification of theEngineer'sdecision, the Contractor shall
not be entitled to anyadditional payment/claim if he doesn’t follow the above
sequence in stipulatedtime. However, during such period, he would not stop the
work in anycase.
ReferenceWithrespect
Item marked “N/A” do not apply to thisContract. To section3
1. The Employersis [CL.1.1]
Name:ExecutiveEngineer, S.K. Panchayat Irrigation Division, Himatnagar
Address:Jilla Panchayat, Himatnagar, Dist. Sabarkantha383001.
Name of authorized Representative (will be intimated later)
2. The Engineer isExecutiveEngineer, S.K. Panchayat Irrigation Division,
Name of Authorized Representative:Executive Engineer
3. The Defects Liability Period is 12 Monthfrom the dateofcompletion. [CL.1.1&33.1-C-2]
4. The Start Date shall be 1 days for the date of issue of theNoticeto [CL.1.1]
proceed with thework.
5. The Intended Completion Date for the whole of the works is [CL.1.1,17&2]
03 (Three) Monthsafterstartofworkwiththefollowingmilestones:
Milestonedates: [CL.2.2&49.1]
PhysicalworkstobecompletedPeriodfromthestartdate
Project Mile Cumulative Time Cumulative Percentage of Contract
Stone Limit (In Day) Value (Financial)
Milestone 1 30 Days 30 %
Milestone 2 60 Days 60 %
Milestone 3 90 Days 100 %
6. The Site is locatedatNava Simliya & KabodaraVillage, Taluka- Talod, [CL.1.1]
Dist. Sabarkantha
7. ThenameandidentificationnumberoftheContractis: [CL.1.1]
8. The works consist ofConstructing ofF.P. wall (1) Near Desai Faliyu At [CL.1.1]
Village Simliya(2) Near Overhead Water TankAt Village Jorajina
MuvadaTa. Talod, Dist :- S.K.with items as perB.O.Q. The works shall,
inter alia, include the following, as Specified or as directed:
Site clearance; setting – out and layout; Construction andMaintenanceof all types of dams
and its component, earthen dam;spillway; installation of gate; excavation and earth work,
approachroad, Inspection Bungalows, check dams, bandhara, T.R., weir, barrages,Flood
Protection & Anti Sea Erosion work, canal lining and structures, ,CD
Works,structurerepairing,Junglecutting,Desilting,etc.otherWRDworks.
(B) Road Works:
Site clearance; setting out and layout widening of existingcarriageway and strengthening
including camber corrections; construction ofnew road/ Parallel service road;
bituminouspavements remodeling/construction of Junctions, intersections, bus bays,lay-bays;
supplying and placing of drainage Channels, flumes, guard posts andguard other related
items; construction/extension of cross drainageworks, bridge, approaches and other related
stones; protective worksfor roads/bridge;allaspectsofqualityassuranceofvariouscomponentsof
the works; rectification of The defects in the completed works duringthe Defects Liability
Period; submission of “As- built’’ drawings and anyother related documents; and other item
of work as may be required tobe carriedoutforcompletingtheworkinaccordancewiththe
drawings and the provisions of the contractand to ensuresafety.
( C ) BridgeWorks
provision of foundations, piers abutments andbearing; prestressed/reinforced
cement concrete superstructure; wearingcoat, hand railings, expansion joints,
approach slabs, drainagesspouts/ down take pipes, arrangements for fixing light
posts, watermains, utilities etc; provision of suitably designed protective
works;providing wing/return walls; provision of road markings, road signs
etc.;all aspects of quality assurance; clearing the site and handing overthe works
on completion; rectification of the defects during theDefects Liability Period and
submission of “As-built” drawings andother
relateddocuments;andotheritemsofworkasmayberequiredtobe
carriedoutforcompletingtheworksinaccordancewiththedrawings and the
provisions of the contract and to Insuresafety
(D) OtherItems [CL.1.1]
AnyOtherItemsasrequiredtofulfilallcontractualobligationsaspertheBid documents.
10. ThefollowingdocumentsalsoformpartoftheContract:
As per clause2-3 [CL.2.3(9)]
11. ThelawwhichappliestotheContractisthelawofUnionofIndia [CL.3.1]
12. ThelanguageoftheContractdocumentsisEnglish [CL.3.1]
13. Limit ofsubcontracting 25% of the Initial ContractPrice [CL.7.1]
14. The Schedule of OtherContractors [CL.8]
15. The Schedule of KeyPersonnel As per Annex – II to SectionI [CL.9]
16. The minimum insurance cover for physical property, injury [CL13]
anddeathisRs.5lakhsperoccurrencewiththenumberofoccurrenceslimitedtofour.Aft
ereachoccurrence,thecontractorwillpayanadditional premium necessary to make
insurance valid for fouroccurrencesalways.
17. Site Investigationreport [CL.14]
18. The Site Possession dates shall beFrom the Date Work order issue. [CL.21]
19. The period for submission of programme for approval of theengineershall [CL. 27.1]
be 21 days from the issue of Letter ofAcceptance.
20. The period between program updates will be 45 days. [CL.27.3]
21. The amount to be withheld for late submission of anupdatedprogramme [CL. 27.3]
shall be Rs 0.50lakhs
22. The following events shall also be CompensationEvents [CL.44]
Substantially adverse ground conditions encountered duringthecourse of
execution of work not provided for in the biddingdocument.
(i) Removal of underground utilities detectedsubsequently
(ii) Significant changes in classification of soilrequiring
additional mobilization by the contractor, e.g. ordinarysoilto
rockexcavation,
(iii) Removal of unsuitable material like marsh, debris dumps etc.
not cause by the Contractor.
(iv) Artesianconditions
(v) Seepage, erosionlandslide
(vi) River training requiring protection of permanentwork
(vii) Presenceofhistorical,archaeologicalorreligiousstructures,monuments
interfering with theworks
(viii) Restrictionofaccesstogroundimposedbycivil,judicial,ormilitaryauthorit
23. The currency of the Contract is IndianRupees [CL.46]
24. The formula (e) for adjustment of prices isas under: [CL.47]
• IfanyofthecommoditieslikeCement,SteelorBitumenarenot found applicable in
a work, the weight component ofthatcommodities {i.e. ‘Cement’ (Pc), ‘Steel’
(Ps) or ‘Bitumen' (Pb)as indicated in SBD for the purpose of Price
Adjustment} shallbeclubbed with the weight component of ‘Other Material’
(Pm),such that the gross % weight of the components shall remain as 100%.
R = value of work as defined in Clause 47.1 of Conditions ofContract
Adjustment for labourcomponent
(i) Priceadjustmentforincreaseordecreaseinthecostduetolabour shall be paid
in accordance with the followingformula:
VL = Increase or decrease in thecost of work during themonth under
consideration due to changes in ratesforlocallabour
L0=TheconsumerpriceindexforindustrialworkersfortheState on 28 days
preceding the scheduled dateofopening of technical Bids as
published byLabourBureau, Ministry of Labour, Government
Li = The consumer price index for industrial workers fortheState for the
month under consideration as publishedbythe Labour Bureau,
Ministry of Labour, GovernmentofIndia.
Pl = Percentage of labour component of thework.
Adjustment for cementcomponent.
(ii) Prices adjustment for increase or decrease in the costofcement
procured by thecontractor
Vc=Increaseordecreaseinthecostofworkduringthemonth under
consideration due to changes inratesforcement.
C0 = The allIndia wholesale price index forOrdinaryPortland Cement on
28 days precedingthescheduled date of opening of technical
bidaspublished by the Office of the EconomicAdviser,
Department for Promotion of Industry and Internal Trade,
Ministry of Commerce &Industry.
Ci = The all India average wholesale price index forOrdinaryPortland
Cement for the month under considerationaspublished by
Office of the EconomicAdviser, Department for Promotion
of Industry andInternal Trade, Ministry of Commerce
Pc = Percentage of cement component of thework
(iii) Adjustment for steelcomponent
(iii) Priceadjustmentforincreaseordecreaseinthecostofsteelprocuredbythecontractor shall
be paid in accordance with the followingformula
Vs= Increase or decrease in the cost of work during the monthunderconsideration due
to changes in the rates forsteel
So= The all India wholesale price index for steel (Mild Steel - Long Products
Rebars)on28daysprecedingthedateofopeningofBidsaspublishedbytheOffice of the
Economic Adviser, Department for Promotion of IndustryandInternal Trade,
Ministry of Commerce &Industry.
Si= The all India average wholesale price index for steel (Mild Steel -Long Products
Rebars) for the month under consideration as publishedbyOffice of the
Economic Adviser, Department for Promotion of IndustryandInternal Trade,
Ministry of Commerce &Industry.
Ps = Percentage of steel component of thework
Note : For the application of this clause, the index of Mild Steel-Long
products Rebars has been chosen to represent the steelgroup.
(iv) Adjustments of bitumencomponent
(iv) Priceadjustmentforincreaseinthecostofbitumenshallbepaidin accordance
with the followingformula
Vb = Increase or decrease in the cost of work during the
monthunderconsideration due to changes in rates forbitumen.
Bo = The official retail price of bitumen at the IOC depot at
thenearestcentreontheday28dayspriortothescheduleddateofopeningoftechni
Bi = The official retail price of bitumen of IOC depot at thenearestcentre
for the 15th day of the month underconsideration.
Pb = Percentage of bitumen component of thework
(v) Adjustment of POL (fuel and lubricant)component
(v) Price adjustment for increase or decrease in cost of POL (fuel
andlubricant) shall be paid in accordance with the followingformula
Vf= Increase or decrease in the cost of work during the
monthunderconsideration due to changes in rates for fuel andlubricants.
Fo= The official retail price of High-Speed Diesel (HSD) at
theexistingconsumerpumpsofIOCatthenearestcentreontheday28priortothe
date of opening ofBids.
Fi = The official retail price of HSD at the existing consumer pumpsofIOC
at the nearest centre for the 15th day of the month of theunderconsideration.
Pf = Percentage of fuel and lubricants component of thework
Note: For the application of this clause, the price of High-Speed diesel Oilhasbeen
chosen to represent the fuel and lubricantsgroup.
(vi) Adjustment for ConstructionMachinery
(vi) Price adjustment for increase or decrease in the cost of plantandMachinery
spare procured by the Contractor shall be paidin accordance with the
followingformula
Vp= Increase or decrease in the cost of work during the
monthunderconsiderationduetochangesinratesforplantandmachineryspares
P0 = The allIndia wholesale price index for manufacturerofmachinery for
mining, quarrying and Construction for themonthunder consideration as
published Office of the EconomicAdviser, Department for Promotion of
Industry and InternalTrade,Ministry of Commerce &Industry.
Pi = The all India average wholesale price index for manufacturerof
machinery for mining, quarrying and Construction for themonthunder
consideration as published Office of the EconomicAdviser, Department
for Promotion of Industry and InternalTrade,Ministry of Commerce
Pp= Percentage of plant and machinery spares component of thework.
Note: For the application of this clause, index of Heavy Machinery andpartshas
been chosen to represent the Plant and Machinery Sparesgroup
(vii) Adjustment of another materialsComponent
(vii) Price adjustment for increase or decrease in cost of localmaterialsother than
cement, steel, bitumen and POL procured by thecontractor shall be paid in
accordance with the followingformula
Vm = Increase or decrease in the cost of work during the
monthunderconsideration due to change in rates for local materials
otherthancement, steel, bitumen andPOL.
M0=TheAllIndianwholesalepriceindex(allcommodities)on28days preceding
the scheduled date of opening of technical
Bids,aspublishedbytheOfficeoftheEconomicAdviser,DepartmentforPro
motion of Industry and Internal Trade, Ministry of Commerce
(viii) &Industry.
Mi= The All India wholesale price index (all commodities) forthemonth
under consideration as published by the Office oftheEconomic Adviser,
Department for Promotion of Industryand Internal Trade, Ministry of
Commerce &Industry.
Pm = Percentage of local material components (other thancement, steel,
bitumen and POL) of thework.
The following percentage will govern the price adjustment
fortheentirecontract:
1 Labour(PL) 27.11 %
2 Cement(Pc) 11.73 %
3 Steel(PS) 05.26 %
5 Plant & Machinery(PP) 07.04 %
6 Other Material(PM) 28.09 %
Note: -The price adjustment as per clause-47 will be decided at the time of
estimation of actual work.
25. The proportion of payments retained (retention money) shall be 6% {CL.48}
from each bill subject to a maximum of 5% of final contractprice.
26. Amount of Liquidated damagesfor For Whole of work{CL.49} delay
in completion ofworks (1/2000)th of the Initialcontract
price, rounded off to
thenearestThousand, per day.
Forsectional Completion (wherever
item6ofContractdata)(1/2000)thofinitial
contract price for #5km Section,
rounded off to thenearestthousand
27. Maximum limit of liquidateddamages 10 percent of theInitial {CL. 49}
For delay in completionwork Contract Price rounded offto
the nearestthousand
28. Amount of Bonus for earlycompletion Amount of bonus forearly
completionofworkshallbegivenas
per CL.50 ofSection-3
29. Maximum limit of bonus forearly 5percentoftheContract{CL.50}
Completion ofwork Price
30. The amount of the advance payment are: {CL. 51 &52}
(ix) #Nature ofAdvances
Amount(Rs.)Conditionsto
i Mobilization 10% of thecontract Onsubmissionofunconditional
Price Bank Guarantee. (to bedrawn
before the end of 20% ofthecontract
period). Thecontractor
mayfurnishfourbankguaranteesof
% of each valid for thefullperiod.
ii Equipment 90% for new and After equipment is brought
50%ofdepreciated value tosite(provided the
forold equipment. Engineerissatisfied That the
Totalamountwill be subject equipmentisrequired for
toa maximum of 5% performance ofthecontract) and on
oftheContractPrice submissionofunconditional Bank
Guaranteeforamount ofadvance
iii Secured Deleted
(TheadvancepaymentwillbepaidtotheContractornolaterthan28daysafterfulfilment of the
aboveconditions).
31. Repayment of advance payment for mobilization and equipment {CL.51.3}
Theadvanceloanshallberepaidwithpercentagedeductionfromtheinterimpayments
certified by the Engineer under the Contract. Deductionshall commence in the next
Interim Payment Certificate following that in whichthe
total of all such payments to the Contractor has reached not less than 20percent of the
Contract Price or 6 (six) months from the date of payment offirst installment of
advance, whichever period concludes earlier, and shall be madeatthe rate of 20 percent
(collectively for both Mobilization AdvanceandEquipment Advance) of the
amounts of all Interim Payment Certificateuntil
suchtimeastheloanhasbeenrepaid,alwaysprovidedthattheloanshallbecompletely repaid
prior to the expiry of the original time for completionpursuant to Clause 17 and28.
33. The securities shall be for the following minimum amounts equivalent {CL.52} As
a percentage of the ContractPrice:
Performance Security for 5 percent of contract price plus Rs. …………….. (tobe
decidedafterevaluationofthebid)asadditionalsecurityintermsofITBClause29.5
ThestandardformofPerformancesecurityacceptabletotheEmployershallbeanuncondition
alBankGuaranteeofthetypeaspresentedinSection8oftheBiddingDocuments.
34. The Schedule of Operating and maintenanceManuals…. N/A. {CL. 58}
35. The date by which “as– built” drawings (in scale as directed) in 2 sets{CL. 58} are
required within 28 days of the issue of certificate of completion of thewholeor section
of the work, as the case maybe.
36. Theamounttobewithheldforfailingtosupply“asbuilt”drawings{CL.58}by the Date
requiredis Rs 0.50Lakhs.
37. The following events shall also be fundamentals breach of contract:
{CL.59.2} “The Contractor has contravened Sub- clause 7.1 and Clause 9 ofGCC”
38. The percentage to apply the value of the work not completed representing {Cl60} the
Employer’s additional cost for completing the Works shall be 20 percent.
TECHNICALSPECIFICATION
(Attached SeparatelyInAnnexure - 1)
Description of theWorks:
1. WeoffertoexecutetheWorksdescribedaboveandremedyanydefectsthereinin conformity
with the conditions of Contract, specification, drawings, Bill ofQuantitiesand Addenda
for the sum (s)of
2. We undertake, if our Bid is accepted, to commence the Works as soon
asisreasonablypossibleafterthereceiptoftheEngineer’snoticetocommence,andto complete
the whole of the Works in the Contact within the time stated inthedocument.
3. WeagreetoabidebythisBidfortheperiodof120Daysfromthedatefixedforreceivingthesame,an
ditshallremainbindinguponitandmaybeacceptedatanytime before the expiration of
4. UnlessanduntilaformalAgreementispreparedandexecutedthisBid,togetherwithyourwrittena
cceptancethereof,shallconstituteabindingcontractbetweenus.
5. Weunderstandthatyouarenotboundtoacceptthelowestoranytenderyoumay receive.
-------dulyauthorizedtosignbidsforandonbehalfof-----------------------------------
(in block capitals ortyped)
BILL OFQUANTITIES
BILL OFQUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions
toBidder,Conditions of Contract, Technical Specifications andDrawings.
2. ThequantitiesgivenintheBillofQuantitiesareestimatedandprovisional,andare given to
provide a common basis for bidding. The basis of payment will betheactual quantities
of work ordered and carried out, as measured by
theContractorandverifiedbytheEngineerandvaluedattheratesandpricestenderedinthepric
ed Bill of Quantities, where applicable, and otherwise at such rates andpricesas the
Engineer may fix within the terms of theContract.
3. TheratesandpricestenderedinthepricedBillofQuantitiesshall,exceptinsofar as it is
otherwise provided under the Contract, include all c o n s t r u c t i o n a l plant, layout,
supervision, materials, erection, maintenance, insurance,profit, taxes and duties,
together with all general risks, liabilities and obligations setout or implied in
4. The rates and prices shall be quoted entirely in IndianCurrency.
5. A rate or prices shall be entered against each item in the Bill
Quantities,whetherquantities are stated or not. The cost of Items against which
hasfailedtoenterarateorpriceshallbedeemedtobecoveredbyotherratesandpricesentered in
the Bill of Quantities (in case of Item ratecontract).
6. The whole cost of complying with the provisions of the Contract shall beincludedin
the items provided in the priced Bill of Quantities, and where no
Itemsareprovidedthecostshallbedeemedtobedistributedamongtheratesandpricesentered
for the related items ofWork.
7. General direction and descriptions of work and materials are notnecessarilyrepeated or
summarized in the Bill of Quantities. References to therelevant
sectionsofthecontractdocumentationshallbemadebeforeenteringratesorprices against
each item in the Bill ofQuantities.
8. The method of completed work of payment shall be in accordance
withthespecification for Road and Bridge works. For building works
specificationsforbuilding are to befollowed.
9. ErrorswillbecorrectedbytheEmployerforanyarithmeticerrorspursuantto
Clause 29 of the Instructions toBidder.
10. Rockisdefinedasallmaterialswhich,intheopinionoftheEngineer,requiredblasting, or the
use of metal wedges and sledgehammers, or the useofcompressed air drilling for its
removal, and which cannot be extracted byripping with a tractor of at least 150 kw
with a single rear mounted heavy dutyripper.
(A) Percentage Rate Tender (Up to INR 50 Cr.)
DescriptionofItem(withbriefspe
cification and referenceto book Quantity Unit Amount
ofspecifications)
Attached Separately inAnnexure -
I/We am/are willingtocarryout theworkat…......................%above/below percent
(Shouldbewritteninfiguresandwords)oftheestimatedratementionedabove. Amountofmy/ourtender
works out asunder.
Estimated amount put totender Estimated amount put totender
Deduct………%below Add………%Above
Inwords Inwords
(B) For Item Rate Tender (For above INR 50Cr.):
Item Description ofItem(with Quantity Unit Rate Amount
No briefspecificationandrefe
rencetobookof Infigur InWor
specifications) es ds
(A) Total TenderedAmount
(B)Rebateonabovetenderedamount(ifany)%(infigure)………………………………
(C)NetTenderedAmount(A-B)(infigure)………………………………
1 The Contractor shall exhibit a board with brief details of work as directed bytheEngineer-In-
Charge for which no extra payment shall bemade.
2 Thelabourcesswillbedeductedasperprevailingrulesi.e. 1%oftheworkdone.
3 GSTandIncometaxTDSwillbedeductedatasourcewhilemakingpaymentsofbills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken
asperGovt. G.R. NO.: MIS102010/17/K1 Dated:30/07/2018 as stated in S.O.R. therefore
R.C.C. items where there is a change as per actual mix design the cost of
differenceofcementconsumptionhavebeendeductedfromtherateoforiginalitemattherateofinput
rate mentioned in all thetender.
SECURITIES AND OTHERFORMS
BID SECURITY (BANKGUARANTEE)
WHEREAS, ---------------------------------------- (name of Bidder) (hereinafter
calledthe“The Bidder”) has submitted his bid Dated ------------------------ (Date)
fortheconstruction of ------------- (Name of Contractor hereinafter called “the Bid”)
KNOWALLPEOPLEbythesepresentsthatWe-------------------------------------------------
(name of Bank) of-----------------------------------------------(name of country) having us
registeredoffice at -------------------------------------------------------(hereinaftercalled
“Thebank”)areboundunto--------------------------------------------(nameofEmployer)
(hereinafter called “The Employer”) in the sum of ------------------------------------------*
forwhichpaymentwellandtrulytobemadetothesaidEmployertheBankitself,hissuccessors and
assigns by thesepresents.
SEALEDwiththeCommonSealofthesaidBankthis----------------------day of ------------------20
THE CONDITIONS of these obligationsare:
(1) If after Bid opening the Bidder withdraws his bid during the period of
Bidvalidityspecified in the Form ofBid;
(2) If the Bidder has been notified of the acceptance of his bid by theEmployerduring
the period of BidValidity:
A Fails or refuses to execute the Form of Agreement in accordance
withtheInstructions to Bidders, if required;or
B. FailsorrefusetofurnishthePerformanceSecurity,inaccordancewiththeInstructions to
C. does not accept the correction of the Bid Price pursuant to Clause27(Correction
WeundertaketopaytotheEmployeruptotheaboveamountuponreceipt of his
first written demand, without the employer having tosubstantiatehis demand,
provided that in his demand the Employer will note that
theamountclaimedbyhimisduetohimowingtotheoccurrenceofoneoranyofthe three
conditions, specifying the occurred conditions orconditions.
This Guarantee will remain in force up to and including the date -------------------**
days after the deadline for submission of Bids as such the deadline is stated
intheInstructions to Bidders or as it may be extended by the Employer, notice
ofwhichextension (s) to the Bank is hereby waived. Any demand in respect
ofthisguarantee should reach the Bank not later than the abovedate
(Signature, name andaddress)
*TheBiddershouldinserttheamountoftheguaranteeinwordsandfiguresdenominatedinIndi
anRupees.Thisfigureshouldbethesameasshownin Clause 16.1(Bid Security) of the
Instructions toBidders.
**45 days after the end of the validity period of the Bid. Date should beinserted by
the Employer before the Bidding documents areissued.
PERFORMANCESECURITY
contractor) (hereafter called “the Contractor”) has undertaken, in pursuanceofContracts
---------(nameofContractandbriefdescriptionofWorks)(hereinaftercalled“The Contract”)
AND WHEREAS it has been stipulated by you in the said Contract
thattheContractor shall furnish you with a Bank Guarantee by a recognized bank for
thesum specified therein as security for compliance with his obligation in
accordancewiththeContract.
ANDWHEREASwehaveagreedtogivetheContractorssuchabankGuarantee:
NOWTHEREFOREweherebyaffirmthatwearetheGuarantorandresponsibletoyouonbehalfof
theContractor, uptoatotalof------------------------------------------
(amount of guarantee)* ----------------------------- (in words), such sum being payablein
typesandproportionsofcurrenciesinwhichtheContractpricesispayable,andweundertaketopay
you,uponyourfirstwrittendemandandwithoutcavilorargument, any sum or sums within the
limits of---------------------------------------- (amount of guarantee) as aforesaid without your
needing to prove or toshow grounds or reasons for your demand for the sum
specifiedtherein.
We hereby waive the necessity of your demanding the said debt from thecontractorbefore
presenting is with thedemand.
We further agree that no change or addition to or other modification of the
termsoftheContracttooftheWorkstobeperformedthereunderorofanyoftheContract
documentswhichmaybemadebetweenyourandtheContractorshallinanywayrelease us from
any liability under this guarantee, and we hereby waive notice ofanysuch charge, addition
ormodifications.
Thisguaranteeshallbevaliduntil60daysfromthedateofexpiringoftheDefect
Liabilitiesperiod.
SignatureandSealoftheguarantor----------------------------- Name
*An amount shall be inserted by the Guarantor, representing the percentagetheContract
price specified in the Contract denominated in IndianRupees.
(xi) ADDITIONAL PERFORMANCESECURITY
[Clause 34.1.(A)]
contractor) (hereafter called “The Contractor”) has undertaken, in pursuanceofContracts
--------- (Name of Contract and brief description of Works) (hereinafter called“The
AND WHEREAS it has been stipulated by you in the said Contract
thattheContractor shall furnish you with a Bank Guarantee by a recognized bank for the
sum specified therein as security for compliance with his obligation in
accordancewiththeContract.
ANDWHEREASwehaveagreedtogivetheContractorssuchabankGuarantee:
NOWTHEREFOREweherebyaffirmthatwearetheGuarantorandresponsibletoyouonbehalfof
theContractor,uptoatotalof------------------------------------------
(amount of guarantee) ----------------------------- (in words), such sum being payablein
typesandproportionsofcurrenciesinwhichtheContractpricesispayable,andweundertaketopay
you,uponyourfirstwrittendemandandwithoutcavilorargument, any sum or sums within the
limits of---------------------------------------- (amount of guarantee) as aforesaid without your
needing to prove or toshow grounds or reasons for your demand for the sum
specifiedtherein.
We hereby waive the necessity of your demanding the said debt from thecontractor before
presenting is with thedemand
We further agree that no change or addition to or other modification of the
termsoftheContracttooftheWorkstobeperformedthereunderorofanyoftheContract
documentswhichmaybemadebetweenyourandtheContractorshallinanywayrelease us from
any liability under this guarantee, and we hereby waive notice ofanysuch charge, addition
ormodifications.
Thisguaranteeshallbevaliduntil28daysfromthe project ompletiondate.
SignatureandSealoftheguarantor----------------------------- Name of
BANK GUARANTEE FOR ADVANCEPAYMENT
InaccordancewiththeprovisionsoftheConditionsofContract,sub-clause
51.1 (“Advance Payment”) of the above-mentioned Contract,-------------------------------
------------------- (name and address of Contractor) (hereinafter called “the
(nameofEmployer) a bank guarantee his proper and faithful performance under
thesaidClauseoftheContractinanamountof---------------------------(amountofGuarantee)*-
We, the---------------------------------- (bank of financial institution), asinstructedby
the Contractor, agree unconditionally and irrevocably to guarantee
asprimaryobligatorandnotasSuretymerely,thepaymentto----------------------------------------
(nameofEmployer)onhisfirstdemandwithoutwhatsoeverrightofobligationonourpartandwith
outhisfirstclaimtotheContractor,intheamountnotexceeding---
We further agree that no change or addition to or other modifications of the termsofthe
Contractor or Works to be performed thereunder or of any of theContract documents
which may be made between ---------------------------------
(nameofEmployer)andtheContractor,shallinanywayreleaseusfromanyliabilityunderthisguar
antee,andweherebywaivenoticeofanysuchchange,additionormodifications.
This guarantee shall remain valid and in full effect from the date
oftheadvancepaymentundertheContractuntil--------------------------------------
(nameofemployer) receives full repayment of the same amount from thecontractor.
Signature andSeal
Name of Bank/ FinancialInstitution
*AnamountshallbeinsertedbythatBankorFinancialInstitutionrepresentingtheamount of the
Advance Payment, and denominated in IndianRupees.
Letter ofAcceptance
(Letter head paper of theEmployer)
(Name and address of theContractor)
This is to notify you that your Biddated for
executionofthe (Name of the
contract and identification number, as given in the Instructions to Bidders) for the Contract
Price ofRupees ( ) (amount in
words and figures) as corrected and modified in accordance with the Instructions
to Bidders* is hereby accepted by ouragency.
Youarerequestedtofurnishperformancesecurity,intheformdetailedinpara 34.1 of
ITB for an amount equivalent toRs. within10 days of thereceipt
ofthisletterofacceptanceuptobeyond60daysfromthedateofexpiryofdefectsLiability period
i.e. upto and the Additional Performance Security
foranamount equivalent toRs. shall be valid beyond 28 (twenty-eight)daysofProject
Completion Date i.e. upto and sign the contract, failing
whichaction as stated in Para 34.3 of ITB will betaken.
YoursFaithfully
AuthorizedSignatureNamea
ndtitleofSignatoryName
*Delete“Correctedand”orandmodifiedifonlyoneoftheseactionsapplies.Deleteascorrected and
modified in accordance with the Instructions to Bidders, if correctionsormodifications have
not beenaffected.
Issue of Notice to proceed with thework
(Letterhead of theEmployer)
(Name and address of theContractor)
Pursuant to your furnishing the requisite security in ITB Clause
34.1andsigning of the Contract for the constructionof
at a bid Price ofRs.
Youareherebyinstructedtoproceedwiththeexecutionofthesaidworksin accordance with the
contractdocuments.
Yoursfaithfully
(Signature,nameandtitleofsignatoryauthorizedTo sign
on behalf ofEmployer)
This agreement, made on the day of between
(nameandaddressofEmployer) (Hereinafter called “the Employer)
and (name and address
ofcontractor) hereinafter called “the Contractor” of theother part.
Whereas the Employer is desirous that the Contractorexecute
Name and identification number of contract (hereinafter called “the works”) andthe
employer has accepted the Bid by the Contractor for the execution and completionofsuch
works and the remedying of any defects therein, at a cost ofRs.
NOW THIS AGREEMENT WITNESSETH ASFOLLOWS
1. In this Agreement, words and expression shall have the same meanings
asarerespectively assigned to them in the conditions of contract hereinafter
referredtoandtheyshallbedeemedtoformandbereadconstruedaspartofthisAgreement.
2. In Consideration of the payment to be made by the Employer to the
contractorashereinafter mentioned, the Contractor hereby covenants with the
Employertoexecutive and complete the works and remedy any defects therein in
conformity in all aspects with the provisions of thecontracts.
3. TheemployerherebycovenantstopaytheContractorinconsiderationoftheexecutionandco
mpletionoftheworksandtheremedyingthedefectswherein contract price or such other
sum as may become payable under the provisionsofthe Contract at the times and in the
manner prescribed by thecontract.
4. The Following documents shall be deemed to form and be ready and construedaspart
of this Agreementviz
i) letter ofAcceptance
ii) Notice to proceed with theworks:
iii) Contractor’sBid
iv) Conditions of contract: General andSpecial
v) ContractData
vi) Additionalconditions
viii) Bill of Quantitiesand
ix) Any other documents listed in theContract
data as forming part of theContract.
In witness whereof the parties there to have caused this Agreement tobeexecuted the
day and year first beforewritten
The Common sealof
Was hereunto affixed in the presence of:
Signed, sealed and Delivered by thesaid
In the presenceof
Binding signature ofEmployer
Binding Signature ofContractor
SAMPLEFORMATFOREVIDENCEOFACCESSTOORAVAILABI
LITY OF CREDITFACILITIES
(CLAUSE4.5.6OFITB)BA
This is to certify thatM/s. is a reputed companywith a
good financialstanding.
If the contract for the work,namely is awarded to theabove
firm, we shall be able to provide overdraft/credit facilities to the extentof
Rs. to meet theirworking capital requirementsfor executing theaboveduring the
contractperiod.
Name ofBankSenior BankManager
AddressoftheBank
(For Investment)
I, the undersigned do hereby undertake that our firm M/s
minimum cashupto 25% of the value of the work during implementation of thecontract.
(Signed by an Authorized officer of thefirm)
Title ofofficer
I,theundersigneddoherebyundertakethatourfirmM/s……………………………………
……………..……………………………….. agree to abide by this bid for a
period165daysfordatefixedforreceivingthesameanditshallbebindingonusandmaybeacceptedat any
time before the expiration of thatperiod.
(SignedbyanAuthorizedofficerofthefirm)
Title ofofficer
(Attached Separately In Annexure - 3)
DOCUMENTS TO BE FURNISHED
64Documents Submit By Bidder along with tender documents
(Also Upload along online during Bid Submission)
Sr. No. Name of Documents. Reference Clause. Format
1 Bid Document Fee/Tender Fee As per NIT -
Bid Security / EMD or Valid EMD
As per Table of IFB
Exemption Certificate or in terms of Bank
Refer clause no. 16 for
2 guarantee (valid 180 days from the date of bid -
provision of Bank
submission) of Appropriate Class of
Registration of Approved Contractors
3 Registration Certificate of Appropriate Class As per NIT -
4 GST Number and Pan card As per NIT -
Undertaking for Engaging Technical Staff & 95 (Section
Machineries 10)
Information regarding any litigation in which 96 (Section
the applicant is involved 10)
Last 5-Years Turn Over (year wise) for Civil
Engineering Works certified by CA (for Bid
Capacity Evaluation) (Section 10)
Details of civil engineering works completed
in last 5 financial year
Details of “works on hand” and “works
tendered by bidder, found lowest (l1) & works 99 (Section
likely to be awarded (for Bid Capacity 10)
Affidavit (Notarized on Rs. 300 Stamp paper) -
The Applicant should give undertaking that he
has access to, or has available, liquid assets
10 and / or credit facilities up to 25 percent of the As per NIT
value of the contract/ contracts applied. As per
Prescribed Proforma.
UNDERTAKING FOR ENGAGING TECHNICAL STAFF &
Business (Name of Firm)
Hereby declare, that if our offer for the work of
would accepted by the competent authority &Awarded to us, I/We will engage & employ
the technical staff and machineries on site of work, required to complete the work
successfully within time limit.
Signature of Bidder
Place:-………………………
INFORMATION ON LITIGATION HISTORY
OtherParty(i Employer Causeof Amount Remarksshowing
es) Dispute Involved PresentStatus
1. Describe Company’s history of litigation or arbitration from contract executed in the
last ten years or currently under execution. Please indicate for each case the year, name
of employer, cause of litigation, matter in dispute, disputed amount, and whether the
award was for or against the company.
2. Please add any further information that you may consider to be relevant to the
evaluation of your application. If you wish to attach other documents, please list
DETAILS OF LAST FIVE YEAR’S CIVIL ENGINEERING WORKS
2 Name of Partner/ Director
3 Turnover for the Last Five Years,
the Contract Receipts of Civil
Engineering works.
Sr. Year Multiplying Annual Turnover (Rs in Lakhs)
(Stamp of Charted Accountant)
Unique Document Identification
DETAILS OF CIVIL ENGINEERING WORKS COMPLETED IN LAST 5 FINANCIAL YEAR
Project Name Name of the Description of work Contract Value of Date of Stipulated Actual Remark
Employer No. contract (Rs. issue of period of date of explaining
Crore) work completion completi reasons for
order on* delay &
DATE: SIGNATUREOFBIDDER
1. Bidder shall also attach completion certificate (preferably in form-3A) for all the works listed in above table.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQ Simliya and Jorajina Muvada FP.pdf
Simliya and Jorajina Muvada FP SBD -.pdf
Tender Notice No 30.pdf
Download all tender documents and submit your bid