Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹28.2 L
EMD Value
₹23,900
Closing Date
5 Nov 2026, 5:30 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Chief General Manager (Thermal)
Painting of quarters & infrastructure buildings incl. doors and windows in SLPP- Colony for one year of contract period (2026-27)
355346
SLPP/Civil/Colony/Painting/2026
Open
Civil Works
Fixed-rate
Surat
₹2,950
Gujarat Industries Power Company Limited.
₹23,900
16 Oct 2026
16 Oct 2026
16 Oct 2026
5 Nov 2026
16 Oct 2026
Estimated cost of work Rs. 28,19,173.99 (including 18% GST) as per SoR (Section-
GIPCL-SLPP Township, Surat Lignite Power Plant, Village:
Nani Naroli, Taluka: Mangrol, Dist.: Surat - 394110 (Gujarat).
The successful Bidder will be awarded this contract involving
total quantities of various items as mentioned against item
descriptions in BOQ/Price Bid (Section-E).
Contract period 01 year from the date as mentioned in order (Mobilization
period will be 15 days from the date of issue of LoI or Work
Order whichever earlier)
EMD Rs. 23,900/- (Rupees Twenty three thousand nine hundred
only) by Demand Draft payable at Mosali-Surat/Nani
Naroli/Surat or irrevocable Bank Guarantee in favor of GIPCL
from approved Banks mentioned in this tender or through
RTGS/NEFT or through online payment gateway of company’s
website: www.gipcl.com (online Payment Form) as per details
mentioned herein under clause no. 07 of Instructions to
Rs.2,950/- (Rupees Two Thousand Nine Hundred fifty only)
Cost of tender document /
Non refundable, inclusive of applicable GST through RTGS or
through online payment gateway from website: www.gipcl.com
as per details mentioned herein under clause no. 07 of
Instructions to Bidders.
Site visit Site visit before submission of bid as per clause no. 4 (Section-
A: Instructions to Bidders) at GIPCL (Surat Lignite Power Plant)
Colony, Village: Nani Naroli, Ta. Mangrol, Dist. Surat.
Availability of online e-Tender On website: https://tender.nprocure.com or
document https://gipcltender.nprocure.com
Last date of online 05.11.2026 up to 17:30 hrs. on website:
submission of offer https://tender.nprocure.com or
https://gipcltender.nprocure.com.
On or before 05.11.2026, 17:30 hrs. during working days at
Submission of EMD either in
office of Surat Lignite Power Plant, Nani Naroli, Dist. Surat.
physical form by way of
Bidder can submit EMD through RTGS or through online
DD/BG or payment receipts of
payment gateway of company’s website:www.gipcl.com
online EMD payment and
(online Payment form)
online Tender fee payment
along with supporting
documents for techno-
commercial bid in physical
E-Reverse Auction E-Reverse Auction will be executed through website: https://e-
auction.nprocure.com (Schedule will be intimated later on to
eligible bidders).
Tender for “Painting of Quarters and Infrastructure Building Doors and Windows at Colony for one year (2026-27)”
Bid No. SLPP/Civil/Colony/Painting/2026
1. Amendment / corrigendum of the tender document, forms, schedules, etc... may be
done any time by the GIPCL during the period of publication of tender in the website.
The Bidders are required to visit the website regularly till the last date & time of Bid
2. GIPCL reserves the right to reject any or all the tenders without assigning any
reason thereof.
3. The Bidders are required to quote the rate strictly as per the terms and conditions
mentioned in the tender document, adhering to technical specifications as well.
4. The Bidders are required to submit their Bids online only through the website
https://tender.nprocure.com or https://gipcltender.nprocure.com (E-Tender No.:
5. EMD either in physical form by way of DD/BG or copies of payment receipts of EMD
and Tender fee paid through RTGS/online along with other supporting documents
are to be submitted in physical form in sealed cover/envelop at the following address
on or before date & time mentioned above in NIT. At the top of envelop, tender
notice no.: SLPP/Civil/colony/Painting/2026 should be mentioned.
6. Bidders are advised to upload the tender well in advance to avoid delay in
submission of tenders due to web site related issues. In case of any issues
/difficulties cropping up during on line uploading / submission of documents, bidders
are requested to inform these well in advance (at least two days before closing of
tender) to GIPCL mail to [email protected]
Chief General Manager (Thermal)
Gujarat Industries Power Company Limited
Surat Lignite Power Plant
At Village: Nani Naroli,
Taluka: Mangrol,
Dist.:Surat-394 110, Gujarat.
Phone: (02629) 261063-72. E-Mail: [email protected] & [email protected]
Tender for “Painting of Quarters and Infrastructure Building Doors and Windows at Colony for one year (2026-27)”
Bid No. SLPP/Civil/Colony/Painting/2026
INSTRUCTIONS TO BIDDERS
1. PLANT SYNOPSIS
Gujarat Industries Power Company Limited (GIPCL) (henceforth be named
Company/GIPCL), is a Premier Power Utility in the State of Gujarat with an installed
capacity of 1859.40 MW comprising of various conventional and renewable projects.
GIPCL commissioned its first power project; a 145 MW gas based combined cycle power
plant in year 1992 at Vadodara. It expanded its capacity 165 MW Naptha & gas based
Combined Cycle Power Plant at Vadodara in year 1997. GIPCL has commissioned 1MWp
Distributed Solar Power Projects at two locations in Gujarat viz. at Village: Amrol, Dist.:
Anand and at Village: Vastan, Taluka Mangrol, Dist.: Surat.
Surat Lignite Power Plant (SLPP) with four units of 125 MW installed capacity each is
located at Village: Nani Naroli, Taluka: Mangrol, District: Surat in Gujarat. GIPCL has also
operating its own captive Lignite and Lime Stone Mines close to the Power Plant. The
Power Plant is based on Circulating Fluidized Bed Combustion (CFBC) technology for the
Boilers, where Lignite is burnt along with Lime Stone in the Combustor of the Boiler. It also
commissioned 5 MW solar power station at SLPP in year
GIPCL has successfully commissioned 937 MW Solar Generating Capacity spread
across various locations in Gujarat and 112.40 MW Wind Generating Capacity in the
Saurashtra & Kutch region of Gujarat
Surat Lignite Power Plant (SLPP) is accessible by road from Kim and Kosamba, which are
on Mumbai-Ahmadabad highway. From Kosamba, SLPP is around 32 KM, out of which
KM is part of the National & State Highway and balance 5 KM is District Road. From Kim,
SLPP is around 18 KM, out of which 13 KM is the State Highway and balance 5 KM is
District Road. The nearest Broad-Gauge Railway Line is at Kim, which is around 21 KM
from the SLPP. Surat is approximately 50 KM from the SLPP. Location Map for SLPP is as
Tender for “Painting of Quarters and Infrastructure Building Doors and Windows at Colony for one year (2026-27)”
Bid No. SLPP/Civil/Colony/Painting/2026
The Company intends to award contract for Painting work at SLPP-Colony and is
therefore inviting open tenders online through (through https://tender.nprocure.com)
from experienced & resourceful contractors.
2. SCOPE OF WORK
2.1 The scope of work covers painting of colony quarters and infrastructure
building etc. including manpower, approved quality materials, tools, tackles,
equipments, safety at work site.
2.2 The detail scope of work is mentioned in clause no. 1 of enclosed Section-D
(Special Conditions of Contract).
2.3 The technical activity estimate sheet (Schedule of Rates) is given in enclosed
2.4 The bid submitted by the bidder not covering the total scope of work and
services as detailed out in the tender document shall be liable for rejection.
2.5 Quantum of job mentioned against all items in the Schedule of Rate are
indicative only & may vary as per site requirement & not to be construed as
maximum or guaranteed quantity. The quantities shown in the Schedule of
Rate are approximate quantities.
3. GENERAL INSTRUCTIONS
3.1 The Bidders who are interested in participating in the tender must read and
comply with the instructions and the Terms & Conditions contained in the
tender documents.
3.2 The Bids shall be filled in by the Bidders clearly, neatly and accurately. Any
alteration, erasures or overwriting shall be liable to make the tender invalid
unless the same is neatly carried out and attested over the full signature of
Bidder. The decision of the Company to interpret the information and rates
filled in by the Bidder shall be final and binding on the Bidder.
3.3 The Bidders are requested to make themselves fully conversant with the
General Conditions of Contract, Special Conditions of Contract, Technical
Specifications, Site conditions, Quantity specified for each individual
structures, Safety & Health Aspects and Norms to be observed etc. before
submitting their bids so that no ambiguity arises in these respects subsequent
to submission of the Bids.
3.4 Before quoting the % above, equal or below SoR, the Bidder should go
through the rate inclusions, specifications, scope of work etc. and get himself
fully conversant with them. The quoted price/rate should be including cost of
labour, materials, supervision, taxes & duties, mobilization, legal compliances
and cost to adhere to all Safety Norms as described in the tender. No
relaxation or request for revision of quoted/accepted rates shall be entertained
subsequent to the opening of Bid.
3.5 Bidder has to submit all the information as per required Bid document. Failure
to furnish all the information as per required Bid documents or submission of
a Bid containing deviations from the contractual terms and conditions,
specifications and requirements, shall be rejected.
3.6 The Bids shall be submitted within the time frames set out in the Notice Inviting
Tender (‘NIT’) and Bids submitted thereafter shall not be accepted and
3.7 The tender documents shall not be transferable.
3.8 The Bidders are expected to examine all instructions, forms, terms &
specifications in the Bid documents and to get fully acquainted themselves
with all the conditions and matters which may affect the subject matter of the
Tender for “Painting of Quarters and Infrastructure Building Doors and Windows at Colony for one year (2026-27)”
Bid No. SLPP/Civil/Colony/Painting/2026
work/tender or the cost thereof. If any Bidder finds any discrepancies or
omissions in the specifications and documents or any doubt in true meaning
or interpretation of any part, he shall seek necessary clarifications in writing or
during Pre-Bid meeting if required.
3.9 Conditional offers shall not be considered and liable to be rejected.
3.10 The Company reserves the right to extend the deadlines for submission of the
Bids by giving amendments.
3.11 During evaluation of Bids the Company may, at its discretion ask the Bidder
(s) for clarification of their Bid. The request for clarification and the response
shall be in writing and no change in prices or substance of the Bid shall be
sought, offered or permitted.
3.12 The Company reserves the right to amend/ modify the Bidding documents at
any time prior to the deadline for submission of Bids, either at its own
discretion or in response to the clarification requested by a prospective Bidder.
In such case, the Company may in its discretion extend the deadline for
submission of Bids in order to facilitate the prospective Bidders for
incorporating the effect of the amendment in their Bids
3.13 The Bidders shall bear all costs and expenses associated with the preparation
and submission of their respective Bids, to attend meetings or conferences, if
any, including any pre award discussion with the successful Bidder, technical
and other presentations etc. and the Company shall not be liable for any
expense thereof.
3.14 If the successful Bidder is a joint venture, formed of two or more companies,
the Bidder along with the partners shall accept joint and several
responsibilities and liabilities for all obligations under the Contract.
3.15 Timely and satisfactory completion of the work and strict adherence to the
allotted time frames for jobs shall be the essence of the contract.
3.16 The Company reserves the right to qualify/disqualify any applicant without
assigning any reason.
3.17 The Bidder shall be disqualified if any untrue statement or misrepresentation
is made in the Bid forms, attachments and other supporting documents
submitted by the Bidder.
It is prerequisite and necessary for all interested bidders to visit the Surat Lignite
Power Plant –Colony (SLPP-Colony) after downloading the tender copy from
website: https://tender.nprocure.com or https://gipcltender.nprocure.com. or
www.gipcl.com to understand the actual working conditions, compliance related to
labour, safety etc… before submitting their offer. Failing which, any consequential
liabilities arising will be to bidder’s account.
The Bidders shall examine the site of works and its surroundings at his/her own
responsibility. The bidders shall collect information that may be necessary for
preparing the Bid and entering into a contract. All costs and liabilities arising out of
the site visit shall be at Bidder’s account.
The Bidder is deemed to have examined and understood the tender document,
obtained his/her own information in all matters whatsoever that might affect the
carrying out the works expressly mentioned or works which may have to be carried
out to fulfill his/her contractual obligation within the scheduled rates and to have
satisfied himself/herself to the sufficiency for his/her offer.
Tender for “Painting of Quarters and Infrastructure Building Doors and Windows at Colony for one year (2026-27)”
Bid No. SLPP/Civil/Colony/Painting/2026
The submission of tender by a contractor implies that he/she has read these
instructions, conditions of the contract etc. and has him/herself aware of the scope,
nature of works & specifications of the works to be done. GIPCL will not, therefore
after acceptance of contractor’s rate, pay any extra charges for any other reason in
case the contractor is found later on to have misjudged the site conditions.
Any error in description or quantity or omission in the contract document shall not
vitiate the contract or release the contractor from executing the work comprised in
the contract according to scope of works, magnitude of the works, requirement of
materials, equipment, tools & tackles, labour, etc. Contractor has to complete the
work in accordance with the contract documents irrespective of any defects,
omissions or errors that may be found in the contract documents.
BIDDER shall inspect the site, examine and obtain all information required and
satisfy himself regarding matters such as access to site, communication, transport,
working condition including constraint of work place, height of structure, quantity
assessment of individual buildings/structures, temperature, confined area, quantum
of dusting, importance of work, round the clock working conditions, safety
requirements, right of way, the type and number of equipment, scaffolding materials
and facilities required for the satisfactory completion of work, the quantity of various
items of the work, the availability of local labour, availability and rates of material,
local working conditions, uncertainties of weather, obstructions and hindrances that
may arise, etc which may affect the work or cost thereof, before submission of his
Bid. Ignorance of site conditions shall not be accepted by the GIPCL as basis for
any claim for compensation. The submission of a Bid by the BIDDER will be
construed as evidence that such an examination was made. Any later claims /
disputes in regard to rates quoted shall not be entertained or considered by the
The rates quoted by BIDDER shall be based on his own knowledge and judgment
of the conditions and hazards involved and shall not be based on any
representations of the Engineer.
5. ELIGIBILITY CRITERIA
The following criteria will be adopted for qualifying the Bidders for consideration of
the Bid for the further proceeding.
5.1 Bidder should possess minimum Three years of experience out of last five years
(as per following Cl. No.5.2) in similar nature of painting jobs in Power Plants /
Process Industries / Corporation / Corporate Sectors / Institutes / Townships and should
enclose proof of the same. Bidder shall submit necessary evidence for the same
like attested copies of work orders along with work completion certificates from
clients. The work completion certificate shall comprise of order value and executed
value. Bidders should have executed the work directly. The work executed as a
sub-contractor or subletting agency shall not be taken in to consideration.
5.2 Bidder should produce evidence of having successfully completed similar works (as
per above clause no. 5.1) as defined hereunder during last five years ending last
day of the month previous to the one in which tender is invited, of satisfactory
progress of ongoing works etc. secured from clients by way of certified copies of
documentary evidence preferably photo copies of work experience. The experience
should be either of the following:
Tender for “Painting of Quarters and Infrastructure Building Doors and Windows at Colony for one year (2026-27)”
Bid No. SLPP/Civil/Colony/Painting/2026
a) One similar completed work each costing not less than the amount equal to Rs.
b) Two similar completed works each costing not less than the amount equal to
Rs. 14.10 Lakhs.
c) Three similar completed works each costing not less than the amount equal to
Rs. 11.28 Lakhs.
Bidder should specifically mention fulfilling of above criteria in his offer along with
details of work orders & work completion certificates issued by clients.
5.3 Tender fee: The tender fee of Rs. 2,950/- (Rupees Two Thousand Nine Hundred
and Fifty only), including applicable GST (non refundable) shall be submitted
through RTGS or through online payment as per details provided in clause no.
5.4 EMD: The EMD of Rs. 23,900/- (Rupees Twenty three thousand nine hundred only),
shall be accompanied in the form of DD/RTGS/online or irrevocable Bank
Guarantee given by Bank as described in subsequent clause no.
5.5 Bidder should have separate Employees Provident Fund code number towards
registration of firm with RPF commissioner.
5.6 Attested copies of relevant documents duly signed & seal on each & every page shall
be submitted. The above documents will be analyzed and after satisfaction, the
Price Bid will be open. GIPCL may verify the documents, experience certificates
issued by concern authority. After opening of technical Bid, if any required attested
documents found missing in the Technical Bid submitted by the Bidder, the tender
inviting authority may inform to that Bidder only once by E-mail to submit the missing
required documents within stipulated time limit. If Bidder/Bidders fail to submit within
stipulated time, their Bid will be declared technically disqualified and no further
correspondence will be entertained.
5.7 Bidder should have minimum average annual turnover of Rs.8.46 Lakhs
during last three financial years (average of financial years of 2023-24, 2024-
25 & 2025-26). Bidder shall furnish annual audited financial statement duly certified
by Chartered Accountant for the last three financial years to demonstrate the
financial healthiness of the company. The balance Sheet must be in the name of
the company. Any type of MOU for this purpose will not be entertained.
Note: In case, the annual turnover is less than the statutory guideline which does
not require audit, the bidder shall submit the turnover certificate from Chartered
5.8 The Bidder has to submit INCOME TAX Permanent Account Number (PAN) & GST
registration number. Copies of the same shall be submitted.
5.9 The Net worth of the bidder should be positive as evidenced from audited accounts
of last financial year i.e. FY-2025-26, audited (or whereas per extant laws of the land
audit is not applicable, certified) by a qualified Chartered Accountant who should be
a member of the Institute of Chartered Accountants of India
5.10 In case Bidder is Consortium/Joint deed of under taking of company, the above
requirements/credential of consortium leader/bidder shall be considered unless
otherwise specifically mentioned in the tender.
5.11 If Bidder or its Partner(s) or Director(s) is /are/was Black Listed / Deregistered /
Stopped or banned from dealing in the past by any Govt, of Gujarat Undertakings /
Depts. / Authorities and Govt. of Gujarat supported companies / undertakings /
organizations, Bid of that party may be liable to be rejected. Bidder agrees and
undertakes to accept decision of GIPCL in this regards as final and binding on the
Bidder without any demur and that no further correspondence shall be done in this
Tender for “Painting of Quarters and Infrastructure Building Doors and Windows at Colony for one year (2026-27)”
Bid No. SLPP/Civil/Colony/Painting/2026
regard at any stage. Bidder shall have to submit “Declaration for Contractual
Litigations” as amended in Annexure / Form attached.
5.12 Bidder shall have to submit the “Declaration-cum-Undertaking for Compliance of
Safety Laws and Regulations” as amended in Annexure / Form attached.
• If any Major Violation of any safety law(s) / Rule(s) is / are found during the
preceding Three (3) years, Bid of that party will be liable to be rejected. Bidder
agrees and undertakes to accept decision of GIPCL in this regards as final
and binding on the Bidder without any demur and that no further
correspondence shall be done in this regard at any stage.
• If any of the details submitted in the prescribed Annexure / Form to the Bid
is/are found to be false, incorrect at any time in future, then the Contract
awarded to that Bidder / Contractor shall be liable to be terminated forthwith
without any notice / correspondence and Bidder agrees and undertakes to
accept decision of GIPCL in this regards as final and binding on the Bidder
without any demur and that no further correspondence shall be done in this
regard at any stage. Further, Performance / Security Deposit will also be
liable to be forfeited. Any dues to GIPCL from the Bidder / Contractor shall
be recovered from the pending bills or any other dues payable to the Bidder
/ Contractor, if any or otherwise through any other recourse available under
The Bidder shall submit all the evidences, documents, attested copies of work
orders & work completion certificates etc… as a proof with EMD &Tender Fee
and also provide the requisite details online for meeting the prequalification
requirements. GIPCL will verify the experience, performance, capability &
strength of Bidders, independently for executing the job. GIPCL may visit the
site & consult the owner of the industry/property where similar job is executed
by the Bidder. GIPCL reserves the right to accept/cancel/reject any/all Bids
without assigning any reason thereof. The tenders of qualified Bidder/Bidders
shall only be considered for further evaluation.
5.13 Site Visit is mandatory prior to submission of bid to understand the scope of work,
working conditions, site conditions, equipments, tools & tackles, labor deployment,
associated risk, surrounding etc.
6. LANGUAGE OF BID
The Bid prepared by the Bidder, and all correspondence and documents relating to
the Bid exchanged by the Bidder and the Company, shall be written in the English
language. Any printed literature furnished by the Bidder, written in another language
shall be accompanied by an English translation for the purpose of interpretation of
7. EARNEST MONEY DEPOSIT (EMD) AND TENDER FEE
7.1 An EMD of Rs. 23,900/- (Rupees Twenty three thousand nine hundred only),
only and Non-refundable Tender fee Rs.2,950/- (Rupees Two Thousand
Nine Hundred fifty only) shall accompany with Bid. Tender fee shall be
submitted through RTGS / online mode of payment only.
7.2 The EMD shall be submitted in the form of DD/irrevocable Bank Guarantee
in favor of Gujarat Industries Power Company Limited from any Schedule
Public Sector Bank or Private Sector Bank as per Performa of BG enclosed
with this e-tender.
Tender for “Painting of Quarters and Infrastructure Building Doors and Windows at Colony for one year (2026-27)”
Bid No. SLPP/Civil/Colony/Painting/2026
Bank for EMD DD Payable at :
1. Bank of Baroda Mosali, Dist: Surat
2. State Bank of India Nani Naroli, Branch Code:
3. Any Nationalized banks Surat
Alternatively, The EMD & Tender Fee may also be submitted through
RTGS/NEFT/online mode of payment by the bidders as per the details given
RTGS detail for Tender fee:
1. BANK NAME:- State Bank of India
2. BRANCH:- Nani Naroli
3. IFSC CODE:- SBIN0013423
4. BENEFICIARY NAME: Gujarat Industries Power Company Limited
EMD & Tender fee may also be submitted through online payment
gateway of company’s website:www.gipcl.com (online payment form)
as per detail provided in ANNEXURE- G of Section-F herein under.
7.3 In case EMD is paid in the form of BG, the same shall be valid for a period
of 180 days after the due date for submission of the bid
7.4 The EMD of the successful bidder will be returned after payment of Security
Deposit by successful bidder and after award of LOI/Work Order.
Alternatively EMD will be converted in SD and successful bidder shall submit
SD or performance bank guarantee for balance amount.
7.5 The earnest money deposit will be refunded to the unsuccessful/disqualified
BIDDER after the tender is finalized and after award of LOI/Work Order
7.6 Any bid not accompanied with EMD and Tender fee will be rejected. Detail
of Tender fee & EMD paid by RTGS/online payment should be submitted as
per. Clause 7.9.EMD in physical form, to be submitted directly to GIPCL as
per clause 7.9.
7.7 No interest shall be payable on EMD.
7.8 The EMD will be forfeited if the BIDDER (i) withdraws his tender after
acceptance or (ii) withdraws his tender before the validity date of the tender.
7.9 SCHEDULE OF EMD & TENDER FEES AND OTHER SUPPORTING
Details/receipts of EMD & Tender Address for Submission:
fee paid by RTGS/online or EMD in Chief. General Manager (Thermal)
physical form by way of DD/BG (as GUJARAT INDUSTRIES POWER CO. LTD.,
applicable) with other documents (Surat Lignite Power Plant)
duly signed to be submitted in Village: Nani Naroli, Taluka: Mangrol,
physical form in sealed cover as per District: Surat. PIN: 394 110, Gujarat.
details mentioned in NIT. Bid No. Phone : 02629-261063
shall be mentioned at the top of EMAIL:[email protected] &
cover/envelope. [email protected].
8. SUBMISSION OF BIDS
A: MODE OF SUBMISSION
Tender for “Painting of Quarters and Infrastructure Building Doors and Windows at Colony for one year (2026-27)”
Bid No. SLPP/Civil/Colony/Painting/2026
The bids shall be submitted online at the https://tender.nprocure.com within the
dates specified in the NIT along with the details of tender fees, EMD in two parts as
(a) Pre qualification and Techno-commercial Bid without price.
Note: Tender fee RTGS details and EMD shall be submitted in physical
form as per NIT.
(a) Pre qualification and Techno-commercial Bid without price:
The tender document duly signed in all pages without price bid along with techno-
commercial deviations, if any, shall accompany the bid. The following Information
shall be provided in the techno commercial bid:
1. Qualification and experience of Site-in-charge.
2. Schedule of deviation (Annexure-E of Section-F) Technical as well as
commercial, if any.
The following supporting documents shall also be submitted along with EMD &
Tender Fee in physical form:
1. The tender documents duly signed in all pages without price bid along with
techno-commercial deviations, if any.
2. Proof of experience meeting the minimum eligibility criteria
3. Performance certificate issued by clients.
4. Previous work order copies.
5. Details of present work order (if any)
6. Turn over for the last three years, audited annual accounts/financial
statements i.e. profit and loss account and balance sheet duly certified by a
practicing Chartered Accountant will be required as specified in clause nos.
7. P.F. Number and Allotment Letter.
9. GST certificate copy.
10. Declaration-cum-Undertaking for Compliance of Safety Laws & Regulations
and Contractual Disputes / Litigations as per Performa Annexure-F under
11. E-Reverse Auction User ID on website: https://e-auction.nprocure.com
1. Percentage Rate Price Bid shall be submitted online only.
Note: Estimate includes cost of all manpower, approved quality
materials, equipments, vehicles, consumables, fuel, spares,
maintenance, mobilization-demobilization, tools & tackles, scaffolding
materials, transportation, accommodation, all site safety arrangements
with approved safety equipments, standard safety PPEs, safety &
statutory compliance, all taxes & duties (including GST).
Total Estimated SoR Amount is including GST by considering present
Tender for “Painting of Quarters and Infrastructure Building Doors and Windows at Colony for one year (2026-27)”
Bid No. SLPP/Civil/Colony/Painting/2026
2. Bidder’s % offer will be on Total Estimated Amount (including GST) and in
Invoice/Bill, GST shall be mentioned separately as per extant GST Laws at
actual as per prevailing rates as declared by Central Government on
submission of documentary evidence.
3. Bidder shall have to quote the rates in the form of %age. i.e. “At
Estimated Value OR _____%age below the estimated value OR______%
age above the estimated value”.
4. The quantities shown in the SoR (Section-E) are approximate for the contract
period and may vary as per job requirement.
5. The Bidder shall fill the Bid documents with utmost care in consonance with
the instructions contained in the Bid documents.
6. Rates will remain firm throughout the contract period and any extension
thereof. There will not be any escalation/compensation to the contractor
against any revision and/or change in rate of materials, fuels, MWR (Minimum
Wage Rates), etc… whatsoever.
B: METHOD OF TENDERING/SIGNATURE ON BIDS
(i) The Bid must contain the postal address like name, residence and place of
business of the person or persons submitting the Bid and must be signed and
sealed by the Bidder with his usual signature. The name of all persons signing
the documents shall also be typed or printed below the signature on each page.
(ii) Bid by a joint venture/partnership firm must be furnished with full names of all
partners and be signed with the partnership name, followed by the signature
and designation of one of the authorized partners or other authorized
representative(s). A certified copy of the power of attorney authorizing such
partner or representative shall also be submitted.
(iii) Bids by a Corporation/Company must be signed with the legal name of the
Corporation/Company i.e by the President/Managing Director/Secretary or
other person or persons authorized to Bid on behalf of such
Corporation/Company. A certified copy of the board resolution/power of
attorney authorizing such partner or representative shall also be submitted.
(iv) The Bidder's name stated on the proposal shall be the exact legal name of the
(v) Erasures or other changes in the Bid Documents shall be initialed by the person
signing the Bid.
(vi) Bids not conforming to the above requirements of signing shall be disqualified.
9. MODIFICATION AND WITHDRAWAL OF BIDS
a. The Bidder may modify or withdraw the bid prior to the deadline prescribed for
submission of bids.
b. No Bid shall be modified subsequent to the deadline for submission of Bids.
c. No Bid shall be withdrawn in the interval between the deadline for submission
of Bids and the expiration of the period of bid validity.
10. POLICY FOR BIDS UNDER CONSIDERATION
a. Bid shall be deemed to be under consideration immediately after opening of the
bid and till official intimation of award/rejection made by the Company to the
b. While the Bids are under consideration, Bidders and / or their representative or
other interested parties are advised to refrain from contacting by any means,
Tender for “Painting of Quarters and Infrastructure Building Doors and Windows at Colony for one year (2026-27)”
Bid No. SLPP/Civil/Colony/Painting/2026
the Company. The Engineer, if necessary, will obtain clarifications on the Bids
by requesting for such information from any or all the Bidders, in writing as may
be necessary. The Bidder will not be permitted to change the price or substance
of the Bid after the Bid has been opened.
11. EFFECT AND VALIDITY OF THE BID
a. The Bid should be kept valid for acceptance for a period of one hundred and
eighty (180) calendar days from the last date of submission of Bids.
b. The submission of any Bid along with the required documents and specifications
shall constitute an agreement that the Bidder shall have no cause of action or
claim, against the Company for rejection of his Bid. The Company shall always
be at liberty to reject or accept any Bid or Bids at his sole discretion and any
action will not be called into question and the Bidder shall have no claim in that
regard against the GIPCL.
12. OPENING OF BIDS
12.1 The GIPCL will open the pre-qualification/Technical Bid/price Bid, as the case
may be, in presence of Bidder's representatives whenever such a procedure
has been specified. Otherwise the tender will be opened by the authorized
officers of GIPCL.
12.2 Preliminary Examination:
12.2.1 The Company will examine the Bids for any computational errors, for sureties
furnished by bidder, for authentication of documents submitted and
completeness of the Bids.
12.2.2 Arithmetical errors will be rectified on the following basis:
(a) If there is a discrepancy between the unit price and the total price that is
obtained by multiplying the unit price and quantity, the unit price shall
prevail and the total price will be corrected & will be binding to the
(b) If there is a discrepancy between the Total Bid Amount and the sum of
total prices, the sum of total prices shall prevail and the Total Bid Amount
will be corrected & will be binding to the bidders.
13. EVALUATION & COMPARISON OF BIDS
13.1 GIPCL shall evaluate the Bids received and accepted by it to ascertain the
lowest evaluated Bid in conformity with the specifications of the tender
13.2 The Technical Bids will be examined for minor matters regarding qualification
of bids. Subsequent to correspondence with the respective bidders, the
decision of Tender Committee will be final.
13.3 All responses to requests for clarifications shall be in writing and shall be
presented to the Company through e-mail or in a sealed envelope on or
before the given date requested by the Company. If the Technical
clarifications sought by the Company do not reach the Company on or before
due date, the Bid will be rejected.
13.4 The comparison of all the Bids shall be carried out with reference to the scope
of work as per the technical specification. Any deviation/omission shall be
evaluated at highest quoted price of the deviation/omission quoted by any of
Tender for “Painting of Quarters and Infrastructure Building Doors and Windows at Colony for one year (2026-27)”
Bid No. SLPP/Civil/Colony/Painting/2026
the Bidder. In case a separate price (for omission) is not given by any other
Bidder, a reasonable price of the same shall be taken & the same shall be
binding to the Bidders.
13.5 The commercial deviation, if any, shall be loaded to bring all the Bids at par.
The loading shall be carried out at an interest rate of 2% above PLR of SBI.
13.6 A Bid to be substantially responsive shall be one which on evaluation
confirms to all the terms, conditions and specifications of the Bid documents
without any material deviation or reservation.
13.7 For the above referred purpose, a ‘material deviation’ shall be one which:
(a) Which affects in any substantial way the scope, quality or performance of
the contract, or
(b) Which limits in any substantial way and in a manner inconsistent with the
Bid documents, GIPCL’s right or the Bidder’s obligations, under the
(c) Whose rectification would affect unfairly the competitive position of other
Bidders presenting substantially responsive Bids.
14. RIGHT OF REJECTION OF TENDERS
14.1 GIPCL reserves the right to accept or reject any Bid or to cancel the
Bidding process and reject all Bids at any time prior to award of contract,
without thereby incurring any liability to the affected Bidder or Bidders or any
obligation to inform the affected Bidder or Bidders regarding the same.
14.2 Any Tender without EMD and Tender fee will be treated as non responsive
and shall be rejected at the outset & no further correspondence shall be
entertained regarding this.
14.3 GIPCL reserves the right to debar any Bidder from participation in future Bids
if such Bidder has quoted an abnormally low rate in the Bid document/price
15. AWARD OF CONTRACT
15.1 GIPCL will award the contract to that bidder whose quotation has been
determined to be substantially responsive and evaluated as the lowest
quotation in conformity with the requirements of the specifications and
documents contained herein, provided further that the bidder is determined
and evaluated to be qualified to perform the contract satisfactorily.
15.2 The successful bidder shall be intimated of his selection through the Letter of
Intent or Letter of Award/ Work Order which shall be sent to him through e-
mail, courier, fax or registered mail.
15.3 GIPCL reserves the right to cancel/short close the contract during the contract
period without assigning any reason.
15.4 GIPCL reserves the right to split the contract quantity between vendors.
16. CONTRACT PERIOD
16.1 Contract period will be one year from the date of commencement
(mobilization period will be 15 days from the date of issue of LoI or Work Order
whichever earlier) or from the date of commencement as mentioned in work
16.2 If given scope of work not completed during contract period due to justifiable
reasons submitted by Contractor seeking time extension and same are
Tender for “Painting of Quarters and Infrastructure Building Doors and Windows at Colony for one year (2026-27)”
Bid No. SLPP/Civil/Colony/Painting/2026
acceptable to GIPCL, in such case, GIPCL reserves the right to only extend
the Contract Period appropriately at the same rates, terms and conditions
without any price escalation and without entering into any new contract on
sole discretion of GIPCL.
16.3 GIPCL reserve the right to short close the contract any time by giving one
month notice period without assigning any reason.
17. ASSIGNMENT AND SUB-LETTING
The Contractor shall not directly or indirectly assign or sub-let total/any part of the
contract to any other party or agency.
18. CONTRACTOR’S OBLIGATIONS
A: DEPLOYMENT & RESPONSIBILITY OF MANPOWER
(i) The Contractor shall deploy suitably qualified and sufficient manpower for timely &
satisfactorily execution of the works under the contract.
(ii) The Contractor shall deploy sufficient skilled, Semi-skilled and Un-skilled manpower
separately to properly complete the job in given/scheduled time.
(iii) The Contractor shall depute its own workmen/labor with proper identification to enter
the plant premises after ensuring that the jobs are scheduled.
(iv) At the time of deploying manpower, the Contractor shall strictly comply all the
applicable labor laws/Acts norms including but not restricted to the age of the workers,
women workers and shall also ensure that a police verification and security check for
all the workmen/labor engaged at the GIPCL site is done and necessary documents
regarding the same shall be submitted to the GIPCL’s authorized
representative/officer-in-charge. Any default in complying with the same or any
misrepresentation regarding compliance of the same shall compel GIPCL to initiate
appropriate civil or criminal proceedings regarding the same.
(v) The Contractor shall also comply with the safety requirements and provide his
workmen/labor with proper healthy safety equipments like but not limited to safety
helmets, masks, gum boots/safety shoes, hand gloves, standard PPE kit for
sanitization and other necessary PPEs as per standard requirement of manufacturer
of material and as per MSDS of material to be used for properly undertaking the
operations involved under this contract. Damaged, unfit and/or deteriorated safety
PPEs shall be replaced immediately with new approved standard PPE. Following are
also to be issued.
a) Safety shoes (standard approved ISI make)
b) Safety helmet (standard approved ISI make in yellow colour only)
c) Safety Goggles / face shield.
d) Ear plug / Ear muff.
e) Hand gloves like electrical hand gloves / cotton hand gloves / Chemical hand
(vi) Contractor shall nominate /authorize senior experienced person in writing as site in
charge to co-ordinate with GIPCL engineer and who shall bear overall responsibility
for performance of the contract. Such person shall remain always available at site or
site office allotted to the contractor at SLPP site. Contractor has to submit the authority
letter and documentary proof for the same.
(vii) The Contractor shall nominate the person/persons in writing who shall co-ordinate
with concern GIPCL’s department Engineer-In-Charge for daily entrusted job. They
have to maintain daily records dully signed for the works carried out and duly certified
by Engineer-In-Charge. The Contractor in co-ordination with the Engineer-In-Charge
shall ensure the availability of adequate manpower to carry out the job satisfactorily
Tender for “Painting of Quarters and Infrastructure Building Doors and Windows at Colony for one year (2026-27)”
Bid No. SLPP/Civil/Colony/Painting/2026
on a daily basis. As per the instruction of Engineer-In-Charge they have to allot the
work and execute the same in specified time limit.
(viii) During execution of the works, one or more jobs may be required to be done
simultaneously and the Contractor shall mobilize additional resources accordingly.
Contractor shall responsible to carry out work as per schedule of work planning to
complete scope of work in given contract period.
(ix) During emergency or similar situations the Contractor shall be required to mobilize
resources as per need within the period of 24 hours as directed by GIPCL. If the
contractor fails to mobilize sufficient manpower to complete the job in time, GIPCL
will execute the job through other agency at the risk and cost of the contractor with
10% supervision charges& the same will be recovered from the Contractor’s bill.
(x) During working in high risk area the workman must wear a suitable safety apron,
safety belt, safety hand gloves and goggles. It is the contractor’s/contractor’s
supervisor’s responsibility to ensure it without fail.
(xi) During emergency for work, the contractor has to enhance the site manpower as per
the requirement to ensure the timely completion of work. For this, enhanced work
shall be completed by deploying additional manpower with separate supervisor.
Payment will be made on item rate basis only. The work during the emergency period
is to be carried out round the clock. Contractor should mobilize sufficient number of
manpower and execute the work in all shifts with independent manpower. Contractor
should not continue the same manpower for more than 12 hours.
B: TOOLS & TACKLES:
(i) All equipments and tools & tackles required to execute the contract are in the
scope of the contractor. The contractor should ensure that equipments and
tools & tackles are in healthy & working condition. All consumable items would
be in the scope of the contractor.
Note: If work is suffered due to want of sufficient manpower,
equipments, tools & tackles, vehicles and/or required consumables
then 25% of the total job cost including applicable GST will be
levied as a penalty for each and every instance.
(ii) For proper execution of the work as per the scope, the contractor is required to
maintain sufficient quantity of tools & tackles, equipments in good working
condition at site as per day to day work load and emergency situations to
complete the work in stipulated time.
(iii) In case of breakdown of equipment, the contractor should work round the clock
for putting back the area in service immediately within minimum time. In case
of any emergency arising during night hours the contractor should be in a
position to mobilize the manpower immediately within minimum time.
(iv) Arrangement for lighting at the work spot has to be made by the contractor. He
has to arrange all lighting equipment such as power cable, hand lamps. The
contractor has to take prior approval for taking electrical power supply. The
contractor should keep hand lamps of 24Volt for confined space and sufficient
quantity of 240 Volt and halogen lamp for other area ensuring safety at work
(v) Pin sockets of IS standards should be used for all connections. For any accident
take place & any damage to the equipment and/or injury to human due to
carelessness in loose connection, contractors will be held responsible & liable
for any recovery/actions.
19. CLARIFICATION OF BIDDING DOCUMENTS
If any Bidder requires any further information or clarification in the Bidding
Documents, may notify the Company before one week of last date of submission
Tender for “Painting of Quarters and Infrastructure Building Doors and Windows at Colony for one year (2026-27)”
Bid No. SLPP/Civil/Colony/Painting/2026
of online Bid, in writing or by E-mail at the GIPCL's mailing address
[email protected], [email protected] as indicated in the 'Invitation to Bids'. The
GIPCL's response (including an explanation of the query) will be sent in writing or
by E-mail to all prospective Bidders who have received the Bidding Documents.
20. TIME SCHEDULE
The basic considerations and the essence of the 'Contract' shall be the strict
adherence to the time schedule for performing the specified 'Works'.
21. UNDERSTANDING AND CLARIFICATION ON DOCUMENTS AND
The Bidder is required to carefully examine the specifications and documents, all
the conditions and matters work wise & cost wise. If any Bidder finds any
discrepancies or omissions in the specifications and documents or is in doubt for
any meaning of any part, he shall request in writing for an interpretation/ clarification
to the GIPCL or during site visit. All such interpretations and clarifications shall form
a part of the Bid documents.
All the payments against the work order shall be in Indian currency and payable
through RTGS (online payment) system only based on submission of required
documents like bank mandate form with cancelled cheque
23. POINTS TO BE CONSIDERED FOR QUOTING ONLINE PRICE BID
a The schedule of rates shall be read in conjunction with Instructions to Bidders,
General conditions of contract, Special conditions of contract and Technical
specifications and as specifically mentioned in item nomenclature.
b The quantities given in the schedule of rates are estimated and payment will be
made as per actual works carried out at respective item rates of work order.
c The method of measurement of completed work for payment shall be in
accordance with the method of measurement specified in the tender.
d No separate amount shall be payable for use of auxiliary equipment incidental
to or in day to day operation in the course of fulfillment of contractual obligation
of the supplier.
Note: It is desirable from interested bidders to submit the online tender
offer at least two days in advance from the due date set for online
submission of bid in order to avoid non-participation of e-tender due to
probable technical problem in e-tender system/server.
The quantities specified are estimated and for tendering purpose only.
Payment will be made, based on actual work done as certified by Engineer-
in-charge of GIPCL.
Quantities of individual items may be revised during the course of contract
period based on site requirement. Contractor shall not be entitled for any
compensation on ground of such alteration in scope of work. GIPCL
reserves the right to operate or increase/decrease quantities in each item
Tender for “Painting of Quarters and Infrastructure Building Doors and Windows at Colony for one year (2026-27)”
Bid No. SLPP/Civil/Colony/Painting/2026
or omit any item included in Schedule of Quantity at his discretion.
Contractor shall have no claim, whatsoever, on grounds of loss of
anticipated profit etc. on account of the same.
After commencement of the work, GIPCL, for any reason may not require
to be carried out the whole/part of the work as specified in the tender, the
ENGINEER-in-charge shall inform the fact for thereof to the
CONTRACTOR and contractor shall have no claim for any payment or
compensation whatsoever on account of any profit or advantage which he
might have derived from the execution of the work in full but which he did
not derive in consequence of the full amount of the work not having been
carried out nor shall he have any claim for compensation by reason of any
change having been made in the original specifications and instructions
which shall involve any curtailment of the work as originally contemplated.
Tender for “Painting of Quarters and Infrastructure Building Doors and Windows at Colony for one year (2026-27)”
Bid No. SLPP/Civil/Colony/Painting/2026
INSTRUCTIONS TO BIDDERS FOR ONLINE TENDERING & E-
REVERSE AUCTION
SR. DESCRIPTION
1. Tender documents are available only in electronic format and same can be
downloaded from the website: https://tender.nprocure.com or
https://gipcltender.nprocure.com and It can also be viewed from Company’s
website www.gipcl.com
2. Price bid should be submitted online through the website
https://tender.nprocure.com or https://gipcltender.nprocure.com only. No
physical submission of price bid will be entertained as it should be furnished
3. Bidders who wish to participate in online tenders will have to procure / should
have legally valid Digital Certificate (Class III) as per Information Technology
Act-2000, using which they can sign their electronic bids. Bidders can
procure the same from any of the license certifying Authority of India or can
contact (n)code solutions- a division of GNFC Limited, who are licensed
Certifying Authority by Government of India
4. All bids should be digitally signed. The bidders are required to contact at the
below mentioned address for detailed training on on-line tendering and also
for requirement.
(n) Code Solutions - A division of GNFC Ltd.
403, GNFC Info tower, S.G Road,
Bodakdev, Ahmedabad – 380054 (Gujarat, India).
E-mail: [email protected], website: https://tender.nprocure.com
Interested bidders are requested to submit the online tender at least two days in
advance from the due date set for online submission of bid in order to avoid non-
participation in case of any technical issues (website and/or network) at last
E-REVERSE AUCTION:
i. GIPCL reserves the right to conduct E-Reverse auction through (n) Procure platform.
ii. E-Reverse auction shall be conducted amongst (a) the lowest 50% eligible bidders
(rounded to the next higher whole number) from the total bids received OR (b) Minimum
three (03) lowest bidders, whichever is higher, shall be invited for participation in e-
Reverse Auction through n-procure platform.
iii. Opening Price (including GST), Decrement value and duration for the e-Reverse Auction
shall be informed to the qualified bidders before start of e-Reverse Auction.
iv. After e-Reverse Auction process, L1 bidder shall be decided on Lowest Total Contract
Price (including GST).
Tender for “Painting of Quarters and Infrastructure Building Doors and Windows at Colony for one year (2026-27)”
Bid No. SLPP/Civil/Colony/Painting/2026
v. To participate in e-Reverse Auction, Bidders have to create e-Auction USER ID on
website: https://e-auction.nprocure.com that the bidder shall be allowed to participate
the e-Reverse Auction.
vi. In case of any further information regarding online bidding or if a Bidder needs any
assistance in accessing/ submission of online bid/ clarification or if training is required
for participating in online e-reverse bidding, then the Bidder can contact the following
office for assistance or training:
(n) Procure Cell, (n) code solutions-A division of GNFC Ltd.,
403, GNFC Info tower, S.G. Road,
Bodakdev Ahmedabad – 380054 (Gujarat)
Fax: 079-26857321 / 40007533, Email: [email protected]
Bidder may visit https://tender.nprocure.com for information regarding e-tendering
registration process.
Tender for “Painting of Quarters and Infrastructure Building Doors and Windows at Colony for one year (2026-27)”
Bid No. SLPP/Civil/Colony/Painting/2026
GENERAL CONDITIONS OF CONTRACT
1. CONTRACT SECURITY DEPOSIT/ PERFORMANCE BANK GUARANTEE
As a Contract Security, the successful Bidder, to whom the work is awarded, shall
be required to furnish a Performance Bank Guarantee (PBG)/Contract security
deposit in favour of Gujarat Industries Power Company Limited for guarantee
amount at ten percent (10%) of the “Contract Price excluding taxes & duties” from
any Nationalized Bank including Public Sector bank-IDBI Ltd or AXIS Bank, HDFC
Bank, ICICI Bank or Kotak Mahindra bank, IndusInd Bank or Federal Bank, Karur
Vysya Bank or Bandhan Bank in the format attached in SECTION-F
(Annexure-B), and it shall guarantee the faithful performance of the 'Contract' in
accordance with the terms and conditions specified in these documents and
specifications. Contract security deposit shall be submitted strictly within twenty-
one days from the date of LoI or work order, whichever is earlier. The guarantee
shall be valid up to guarantee period of twelve months from the contract completion
date. The Guarantee amount shall be payable to the Company in Bidder's home
currency without any condition whatsoever
GIPCL reserves the right to forfeit Performance Bank Guarantee (PBG)/Contract
security deposit.
The Performance Bank Guarantee (initial security deposit) will be returned to the
Vendor/Contractor without any interest at the end of the ‘Guarantee Period' after
completion of contract and on fulfilling contractual obligations throughout the
retention period. However, any delay in submission of initial SD will result in
equivalent late release of entire SD after guarantee period.
Bid security/EMD should be refunded to the successful bidder on receipt of
Performance Security
2. RECOVERY CLAUSE
(i) In case of any damage of equipment/machinery due to negligence of
contractor or any other reasons attributed to contractor the decision of
Engineer-in-charge regarding the amount of recovery shall be final and
binding subject to a maximum of 10% of contract, including GST. Recovery
will be affected from the monthly bills and/or retention money/security
(ii) If the contractor fails to execute the work as per directions of Engineer (I/c)
within the time frame given in work order and as per day to day instructions
by Engineer-in-charge, GIPCL shall get the work done by third party at the
risk & cost of the contractor with 10% additional overhead charges of GIPCL.
3. DEDUCTIONS FROM CONTRACT PRICE
All costs, charges or expenses that GIPCL may have paid, for which, under the
contract the contractor is liable, shall be recovered by the GIPCL. The contractor
shall pay all such claims within 15 days of claim, failing which the same shall be
deducted from the bills of contractor.
Tender for “Painting of Quarters and Infrastructure Building Doors and Windows at Colony for one year (2026-27)”
Bid No. SLPP/Civil/Colony/Painting/2026
4. TERMINATION OF CONTRACT BY GIPCL
Contractor shall be responsible to complete the jobs within agreed time schedule
and in case contractor fail to complete the job, GIPCL shall recover from his bill,
Security Deposit and / or whatsoever for expenses incurred to complete the job with
additional 10% overhead charges.
In case if contractor’s services are not found satisfactory with respect to
mobilization, time bound activities, workmanship & safety (OHSAS policy of GIPCL)
then GIPCL has right to terminate the contract at any time by giving him 15 days
advance notice without assigning any reason and will make the alternate
arrangement at the risk & cost of contractor. GIPCL may terminate the contract
after due recoveries of pending jobs/damages after giving 15 days advance notice
to the contractor if any of the following events occur
i. Contractor is adjudged as insolvent.
ii. Contractor has abandoned the contract.
iii. Contractor fails to proceed with the work with due diligence as per
requirements of the contract.
iv. Contractor has neglected or failed persistently to observe or perform any of
the acts, matters or things, which as per the contract are to be observed and
performed by the contractor.
v. Contractor repetitively violating the safety norms for more than three
vi. Any major contradiction of applicable labour laws.
vii. Any major deviations from contractual terms and conditions including quality
viii. GIPCL reserves the right to terminate the contract without giving any reason
whatsoever and forfeit the PBG.
5. FAILURE & TERMINATION
If the CONTRACTOR after receipt of written notice from the GIPCL/ ENGINEER
requiring compliance, with such further drawings and / or the GIPCL /ENGINEER
instructions fails within seven days to comply with the same, the GIPCL /ENGINEER
may employ and pay other agencies to execute any such work whatsoever as may
be necessary to give effect thereto and all costs incurred in connection therewith
shall be recoverable from the CONTRACTOR by the GIPCL on a certificate by the
GIPCL/ENGINEER as a debt or may be deducted by him from any money due or
to become due to the CONTRACTOR.
If the contractor fails to execute the work or fails to mobilize the resources and
equipments as per directions of GIPCL / ENGINEER within the time frame given
and/or violating the GIPCL’s safety rules & regulations, ENGINEER/ GIPCL shall
get the work done by third party at the risk & cost of the CONTRACTOR with
additional 10% overhead charges of GIPCL and all costs incurred in connection
therewith shall be recoverable from the CONTRACTOR by the GIPCL /ENGINEER
as a debt or may be deducted by him from any money due or to become due to the
6. SETTLEMENT OF DISPUTES
a. Any disputes or difference of opinion between parties arising out of the contract
to the extent possible shall be settled amicably between the parties. If amicable
settlement cannot be reached all the disputed issues shall be resolved through
Tender for “Painting of Quarters and Infrastructure Building Doors and Windows at Colony for one year (2026-27)”
Bid No. SLPP/Civil/Colony/Painting/2026
arbitration before a Sole Arbitrator appointed by Managing Director, GIPCL
according to the provisions of The Arbitration And Conciliation (Amendment)
Act, 2019, as amended from time to time. The place of arbitration shall be at
Vadodara/ Surat or any other place within state of Gujarat
b. Work under the contract shall be continued by the contractor during arbitration
proceedings unless GIPCL shall order suspension thereof or any part thereof in
writing or unless the matter in such work cannot possibly be continued unless
the decision of the Arbitration proceedings is obtained.
7. INTERPRETATION OF CLAUSE
In case of disputes as regards interpretation of any of the clauses or specification,
the decision of Chief General Manager (Thermal) will be final and binding on the
8. EMPLOYEE’S COMPENSATION INSURANCE
Contractor shall take all risk Insurance Policy to cover all his workmen/employees,
staff applicable under the Employee Compensation Act 1923 or any amendment
thereof as also insurance cover for third party liability. The contractor shall keep the
GIPCL indemnified from all liabilities arising out of his action in pursuance of this
contract. The E. C. Policy should be obtained from Surat Jurisdiction and shall be
assigned to GIPCL. EC policy should cover the specified contract period.
9. STATUTORY REQUIREMENTS
a. COMPLIANCE OF LABOUR LAWS
The contractor shall at his own cost comply with the provision of labor laws, rules,
orders and notifications whether central or state or local as applicable to him or to
this contract from time to time. These Acts/Rules include without limitation of the
1. Contractor shall be solely responsible and shall fully comply with all the provisions
of all the labor laws applicable such as but not limited to the Minimum Wages Act,
1948, Contract Labor (Regulation & Abolition) Act 1970, Factories Act,
Industrial Dispute Act 1947, Workmen Compensation Act 1923, Interstate Migrant
Workmen Act 1979, Equal Remuneration Act with Rules, Order and Notifications
issued/made there under from time to time.
2 All other Acts, Rules/Bye-Laws, Orders, Notifications etc. present of future applicable
to the contractor from time to time for performing the contract job.
2.1 The Contractor shall provide and be responsible for payment of Wages,
Salaries, Bonus, Social charges, Insurance, Food, Accommodation,
Transport, Medical and Canteen facilities and other statutory privileges and
facilities to his personnel as per law/rules/regulations and orders of the
Central Government, State Government, Local Authorities or other
authorities as are in force from time to time. All employees of the Contractor
shall be employee of the Contractor.
2.2 The contractor shall have a valid license obtained from Licensing Authority
under the Contract Labor (Regulation & Abolition) Act-1970 at the time of
execution of the contract covering all his employees working at
Colony/SLPP site and furnish the same failing which GIPCL may terminate
the contract at its sole discretion.
Tender for “Painting of Quarters and Infrastructure Building Doors and Windows at Colony for one year (2026-27)”
Bid No. SLPP/Civil/Colony/Painting/2026
2.3 The Contractor shall at the time of execution of the contract have a EPF
Code Number obtained from the Authorities concerned under the
Employees Provident & Miscellaneous Provisions Act, 1972 and remit
contributions in respect of the employees employed by him at Colony/SLPP
Site to the P.F office concerned every month failing which GIPCL will recover
from the outstanding payment to the contractor from GIPCL.PF code of
Gujarat region should be taken.
2.4. The Contractor shall maintain all records/registers required to be maintained
by him under various labor laws mentioned above and produce the same
before the Statutory Authorities whenever required.
2.5 The Contractor shall also submit periodical reports / returns to the various
statutory authorities such as the Contract Labour (Regulation & Abolition)
Act-1970, Employees Provident Fund Act etc. Under intimation to HR&
2.6 The Contractor shall not pay less than the Minimum Wages notified by the
Government from time to time to his employees of corresponding
2.7. The Contractor shall be responsible for payment of overtime wages to his
workmen, if any, in case they are required to work beyond the prescribed
hours under law as per applicable rates.
2.8 The contractor shall take Workmen Compensation Insurance Policy for all
his employees working at Colony/SLPP. The contractor shall indemnify the
company against any liability due to any work injury or accident to any of its
2.9 The Contractor shall in the event any of his workmen / employee sustains
any injury or disablement due to an accident arising out of and in the course
of his employment, provide necessary medical treatment and pay
compensation as applicable, required under the Workmen’s Compensation
2.10 If any of the persons engaged by the Contractor misbehave with any of the
officials or the Company or commit any misconduct with regard to the
property of the Company or suffer from any serious communicable disease,
the Contractor shall replace them immediately.
2.11 The Contractor shall not engage / employ persons below the age of
years. Employment of women shall be strictly according to applicable laws.
2.12 GIPCL will have right to deduct and disburse the claims of the individual /
parties being a principal employer on any account whatsoever in relation to
their employment with the contractor. The Security deposit will be released
to the contractor at the end of the contractual tenure subject to an
undertaking by the contractor that in the event any of his workmen or the
heirs of workmen puts up a claim for recovery of money due to him from the
contractor before the appropriate authority under the I.D.Act 1947 or under
any other labor laws or for compensation under the Workmen’s
Compensation Act, 1923 and the appropriate authority has given a direction
for making payment the contractor will meet the same or indemnify GIPCL
if in the event GIPCL pays it as Principal Employer.
2.13 The contractor shall make payment of wages to his employees on fixed date
within the period specified under the applicable Law, in presence of
representative of the company. He will submit a true copy of wage sheet,
attendance register and P.F. remitted challans on monthly basis to HR&A
dept. for verification and record.
2.14 The Contractor shall provide Safety items / kits to his employees such as
safety shoes, goggles, ear plugs, hand gloves, safety belts etc., if any,
required under the law.
Tender for “Painting of Quarters and Infrastructure Building Doors and Windows at Colony for one year (2026-27)”
Bid No. SLPP/Civil/Colony/Painting/2026
2.15 The contractor shall conduct pre-induction and periodic medical checkup of
his workmen as per applicable laws.
2.16 The contractor shall be solely responsible for any accident caused to his
workers and should adhere to all rules / regulations as per labor laws of
Government and other statutory laws as applicable.
2.17 The contractor should register himself under the Contract Labor Act,
Employee Compensation Act and PF Act (Code no. to be mentioned) and
submit the copy of registration certificate and should possess the same from
the date of commencement of work, failing which the contract is liable to be
cancelled. The E.C. Policy copy should be submitted to the GIPCL before
commencement of the work and Labor License should be obtained within
one week from the date of issue of form-V. Contractor should apply for Form-
V immediately after receipt of LOI. A copy of Labour License shall be
submitted to GIPCL, HR & A Department.
2.18 Contractor shall have to insure his workmen /supervisors etc. under Group
Insurance scheme.
2.19 The Contractor shall be responsible for compliance of all statutory rules,
regulation, act enforced from time framed by the government such as
Factory Act, Employee Compensation Act, payment of ‘Wages Act’,
Minimum Wages Act’, Provident Fund Act, All Labor Laws Act in respect of
employees engaged by him for the work and shall have to maintain
necessary records. In case any amount becomes due to be payable by him
to his employees or to the Government under the above rules, regulation,
Acts, GIPCL reserves the right to recover the same from the running bill of
2.20 Documentary evidence of deposit of PF paid shall have to be produced by
the contractor along with the next bill.
2.21 Records as per the provisions of various statutory Acts will have to be
maintained by the contractor and submitted as and when required.
2.22 All employees of contractor should maintain due discipline and respect local
sentiments. GIPCL reserves the right to direct the contractor to remove any
such person who does not comply with it.
2.23 The list is indicative in nature and not an exhaustive one. Any
amendment/alteration/Notifications or addition to the existing Law or a new
statute shall automatically and immediately become applicable.
2.24 Annual Health Check Up: - As per statutory requirement, Contractor has to
inform workmen deployed at site for annual health check up as per schedule
prepared by HR&A department.
b. LEGAL ASPECTS
1. Contractor shall maintain all register required under the Labour Laws and make the
payment as per the Minimum Wages Act to the workers employed by him.
2. Contractor shall obtain requisite license to carry out this contract under the
provisions of Contract Labour Act, 1970 and maintain necessary records and
registers under the said Act.
3. Contractor shall submit a copy of each of the registration certificates with respect to
Employees Provident Fund and Employee Compensation Act within one week time,
from the date of award of this contract.
4. Contractor’s employees, agent or sub-agent shall not smoke or light anything within
the premises of the GIPCL and carry match box / lighter or any other explosive and
/or inflammable material inside the plant.
5. Contractor shall abide by all the statutory rules and regulations like Labour Laws
Tender for “Painting of Quarters and Infrastructure Building Doors and Windows at Colony for one year (2026-27)”
Bid No. SLPP/Civil/Colony/Painting/2026
6. Contractor shall issue an appointment order to each casual labourer stating therein
the nature of job to be performed by him and fix time for which the concerned
labourers are likely to be deployed. Contractor shall also issue a temporary identity
card specifying the period for which the labourer has been deployed.
7. Contractor is fully liable for the persons engaged by him for above work; however,
GIPCL reserves the right to deduct any amount legally justified towards any liability
8. Contractor shall indemnify GIPCL from any liabilities arising out of the employment
of the manpower.
9. If the contractor fails to complete the allocated job within specified time frame,
GIPCL shall get the work done by third party at the risk and cost of contractor.
10. PAYMENT OF WAGES
Contractor shall be responsible for compliance of all statutory rules, regulation, act
enforced from time framed by the government such as Factory Act, Employee
Compensation Act, payment of ‘Wages Act’, Minimum Wages Act’, etc in respect of
employees engaged by him for the work and shall have to maintain necessary
records. In case any amount becomes due to be payable by him to his employees
or to the Government under the above rules, regulation, Acts.
In case any amount becomes due to be payable by him/her to his employees or to
the Government under the above rules, regulation, Acts, GIPCL reserves the right
to recover the same from the running bill of the contract.
11. ACCIDENT TO WORKMEN
Contractor shall be fully responsible for injury or death of any of your or third party
workmen due to any act omission / indiscretion on your part while undertaking the
work and contractor shall fully abide by the statutory requirements of the employee's
compensation act. GIPCL shall not be liable for any compensation due to accident,
death or injury to any of contractor’s workmen or any third party due to negligence,
act or omission on your part.
Necessary illumination at works area will be provided by GIPCL.
13. NIGHT/SUNDAY/HOLIDAY SHIFT
The contractor shall depute qualified and adequate resources in night
shift/Sunday/holidays for any emergency job, which may come up at
night/Sunday/holiday.
14. SAFETY ASPECT
Contractor shall observe all the safety and security rules and regulation of the
GIPCL which are at present in force and which may come into force during the
pendency of the contract. Any violation of any rules and regulations will entail
immediate termination of the contract.
When contractor moves his lifting tools and tackles to the plant area, required test
certificates as per the Factory Act 1948 and the state factories rules has to be
submitted to safety Deptt. Safety Deptt. will check the certificates and if found okay,
then only materials will be allowed to enter inside the plant. Material inward gate
Tender for “Painting of Quarters and Infrastructure Building Doors and Windows at Colony for one year (2026-27)”
Bid No. SLPP/Civil/Colony/Painting/2026
pass will be made only after certification from Safety Deptt. Security Deptt. will
inform to Safety Deptt., as & when such tools and tackles brought at the gate for
making entry in the maintenance site.
The contractor has to submit the list of required safety gears along with safety
equipments available with him to safety Deptt. Safety Deptt will check for quantity
and quality of the safety gears and then allowed permission of work. Poor quality
material will not be allowed to take inside the Plant. If quantity of required safety
equipments is not satisfactory, contractor will not be allowed to carry out the work
using such safety gears inside the Plant for the work.
15 GENERAL SAFETY CLAUSES
1. The Contractor shall observe and comply, with regard to his workmen working at the
SLPP site, the safety norms as per the safety operating standards.
2. The Contractor shall ensure that his workmen are informed and trained regarding the
safety standards to be adopted while operating within the SLPP Plant & Mines
premises and the Contractor shall brief them regarding the same and use of the
Personal Protective Equipment (‘PPE’).
3. The Contractor shall issue safety shoes and safety helmet of IS standard to all his
workmen immediately on execution of the work and the contractor shall ensure that
his workmen wears the protective equipments at all times during the work operation.
Following brand of the safety shoes and helmet shall be issued to contract workmen.
Contractor shall issue safety shoes every year.
Sr.No Model Company Specifications
01. Tough Hat, HP-TH Sure Safety
02. V-Gard MSA IS : 2925 – 1984, ANSI /
ISEA Z89.1-2009
03. PN 521 - Shelmet Karam
SR. No. Name of Manufacturer Model
1 Acme Fabrik Plast Co. SSTEELE (Strom) – Double Density
2 Acme Fabrik Plast Co. TRIMAX(Adjacent) – Double Density
3 Favourite Safety Products. Waves Nile D/D
4 Favourite Safety Products. FSP Nile DD
4. Other safety gears like ear plug, dust mask, hand gloves, safety goggles, gum boots,
full body safety uniform and belts, safety net etc. shall be issued and used as per
the job requirements. Safety helmet shall be of YELLOW COLOUR ONLY.
Contractor will procure safety shoes & safety helmet from a reputed company with
at least 12 months’ guarantee and shall produce the guarantee certificate and IS
standard certificate to the safety department. Contractor should purchase safety
shoes of reputed brands. Safety shoes will be issued every year. IS certificate and
guarantee certificate must be obtained from the vendor and submitted to the Safety
department. Safety shoes should be heat, water, oil and chemical resistant, having
an anti-slippery sole of 15298- 2002 make.
5. It is the duty of contractor to ensure that his workmen are wearing required PPEs as
per work requirement. Contractor should ensure that their workers are wearing
Safety helmet, safety shoes, dust mask, goggles, ear plug etc. at all times when
they are at work throughout the contract period. The contractor has to maintain the
PPE issue registers with signature of workmen.
Tender for “Painting of Quarters and Infrastructure Building Doors and Windows at Colony for one year (2026-27)”
Bid No. SLPP/Civil/Colony/Painting/2026
6. Contractor will reissue these PPEs in case of damage or misplacement of the same.
Replacement shall be made immediately.
7. The contractor shall be responsible for providing first aid or emergency medical help
and treatment to his workmen in the event of any accident or injury.
8. If it is observed that contractor is not issuing required PPEs timely and that of
required quality, GIPCL will issue the required PPEs to contract workers and back
charge the same with 25% overhead charges of GIPCL, plus applicable GST as per
extant GST Laws.
9. All lifting tools and tackles shall be duly certified by competent person in conformity
with the statutory requirements and certificate in form no. 10 as per rule 60 of
Gujarat Factories Rules, 1963 and section 29 of the Factories Act, 1948 shall be
submitted every year before using such tools and tackles. In case of purchase of
new lifting tools and tackles, form no. 10 as per the said rules shall be submitted
before they are taken into use. All lifting tools and tackles shall be of reputed make
having International manufacturing standard and shall be maintained in proper and
workable condition.
10. The Contractor shall nominate one Safety Officer with required qualification for
supervising the daily job/ shutdown jobs for observing and maintaining the safety
aspects at site. He is solely responsible for any safety measures during
maintenance work. He has to ensure that all the workmen working at site are
equipped with essential PPE’s and proper safety arrangement is made at the SLPP
11. After mobilization of any tools & tackles to site, which includes chain pulley blocks,
D-shackles, wire ropes, winch machines, Mobile crane, Hydra etc. shall be offered
for inspection with all above statutory test certificate before using at site for any
work. They should use all tools and tackles only after certification by GIPCL
representative/safety officer.
12. When working at height, working on ceiling or roof covered with fragile materials,
full body harness safety belt, ladders and crawling boards, fall arrester,etc. shall be
used to prevent accident. Further, during working on height, contractor should
arrange proper scaffolding of still pipes, safety net, full body safety belt, fall arrestor
system etc. Advice and instructions of engineer in charge/ safety in charge shall be
strictly complied with in this regard. All necessary safety precautions shall be taken
by the contractor to prevent accident and personnel injuries while working on height.
13. Flash back arrestors made of reputed manufacturer shall be provided on cutting
torch, on DA cylinders and on O2 cylinder. Cylinder caps also required for handling
the cylinders at the work at height area. Gas cylinders shall be transferred through
gas cylinder trolley only with cylinder cap and stored up right (vertical) position only.
All gas cylinders shall be hydro tested / certified as per gas cylinder rules 2004. Gas
cylinders shall be stored, handled as per gas cylinder rules
14. All vehicles shall be operated by licensed drivers only. All vehicles’ PUC to be tested
as per Government approved RTO guidelines. All Vehicles must be parked in
Parking space designated by GIPCL. If any vehicle is found inside the plant
premises other than the parking area such vehicles shall be handed over to Security
dept. and their entry shall be cancelled for movement inside the plant premises with
immediate effect.
15. All electrical equipment shall be in good condition and free from any defect. Electrical
tools & equipments i.e. welding machine, grinding and drill machine etc. may be
checked by the electrical engineer of the contractors regularly, every six month at
least and report to be submitted to concerned HOD and safety depts.
16. During hot work, contractor will use fire curtains like asbestos sheets or fire blankets
to prevent falling and spreading of sparks and hot material on and around the work
area. Contractor will procure and use such items. ELCB / RCCB shall be provided
with rating of 9-30 milli amperes on welding machine and all portable power tools.
Tender for “Painting of Quarters and Infrastructure Building Doors and Windows at Colony for one year (2026-27)”
Bid No. SLPP/Civil/Colony/Painting/2026
17. The contractor shall fill – up Incident notification form (S-I), Incident Investigation
form (S-II) and near miss report within time limit as specified in forms, if any
accident, Incident, near miss occurred while working at SLPP site.
18. Major AMC / ARC contractor (Where the man power strength is more than 50 and
above) should appoint / nominate one qualified safety officer and he shall be
responsible for addressing all the safety related aspects of execution of contract
jobs and he will in close co ordination with safety officer of SLPP and attend all
safety related meeting such as safety committee, on job safety training etc. Where
the contractual man power is less than 50, the site incharge of the contractor will
act as a safety officer and he will perform all the duties of safety officer as mentioned
19. No loose connection / joints allowed in electrical cables during performance of any
20. Safety shoes to be issued to female employees also.
21. All the vehicles shall be fit as per RTO guidelines and valid fitness certificate is
required as per RTO guidelines.
22. The Contractor’s nominated safety officer shall be imparted regular on-job safety
training like tool-box talk etc. and submit a record of such training in safety dept,
respective dept and HR&A dept.
23. The Contractor shall comply all the new requirements related with safety as
informed by the HOD / Safety department from time to time.
24. Penalty to be imposed for Violation of safety norms is proposed as follows:-
The Contractor & Contract workmen shall strictly adhere to Safety standards /
Guidelines as per practices. The list provided below is an indicative list to explain
the principles behind safety practice. If the contract workmen fail to comply with
safety standards as per category A, B & C below, penalty shall be levied on the
contractor as per the table mentioned below:
Category Classification Examples / Cases Penalty
A PPEs Working without helmet, Rs.100 /- per instant.
Related shoes, safety belt, gloves etc.
B WI Related Failure to adhere to HSE
guidelines/plans, careless • Rs.500 /- per
attitude in material instant.
Machine being used with
damaged machine guard, • After three
unsafe electrical work - incidence,
workout plug top/improper Per incidence
electrical joints/cables lying Rs.2500/-
on ground, electrical
equipment working without
proper earthing, machine • Continuous
being used without unsafe acts
machine guard, Welding will disqualify
machine without ELCB / the contractor
RCCB of proper rating, Gas from further
cylinder without test participation
certificate, Cylinder cap, in tender of
NRV / Flash back arrester, GIPCL-SLPP.
Cylinder trolley etc.
Tender for “Painting of Quarters and Infrastructure Building Doors and Windows at Colony for one year (2026-27)”
Bid No. SLPP/Civil/Colony/Painting/2026
Unsafe working practices at
height more than 3 meters
Working without permit or
non-compliance with permit
conditions like hot work,
height work etc. as
applicable, lifting tools and
tackles being used without
third party inspection
certificates in form no. 9/10
as per Factory Act –
C Unsafe Breach of safe practices by Suspend the entry
Practices a particular person gate pass for one
repeatedly for three times. week.
After two suspensions
his gate pass will be
Penalty so levied against the contractors and company employees will be used during the
observation of National Safety Day.
The contractor, workmen following good safety practices in their work area
continuously will be rewarded / honored on National safety day.
15.1 GENERAL ELECTRICAL SAFETY RULES & REGULATIONS
Electrical safety
a. All the electrical apparatus including welding machine (either 3-phase or single
phase) should be provided with Earth Leakage Circuit Breaker
(ELCB/RCCB/RCBO) of 30mA rating.
b. Bidder/Contractor should ensure periodic checking of ELCB provided in their
electrical apparatus.
c. Bidder/Contractor should ensure that there should not be any joint in the power
supply cable of any machine. All cables should be in good condition with no bare
insulation or frayed wires
d. Any power supply switchboard/extension boards brought by Bidder/Contractor
should have ELCB of 30mA rating and it should have sockets along with 3-pin plug.
e. Any type of cable brought by Bidder/Contractor should not have any joint and should
be of sufficient capacity for the respective job.
f. Bidder/Contractor to bring their own 24V rating portable hand lamps along with
cable of (apparatus should be having 230V / 24V transformer) for the temporary
lighting arrangement required at site for the respective jobs.
g. Bidder/Contractor should bring sufficient quantity no. of temporary light fixtures
(230V or 24 V as per requirement of job/contract), extension boards, cables to draw
supply from nearest power point.
h. Hand-held and portable machines shall be equipped with a built-in switch to switch
off power in case of emergency
i. Bidder/Contractor to ensure healthiness of their electrical equipment whenever
brought to GIPCL site and get them tested / verified by GIPCL Electrical Department
representatives before start using.
Tender for “Painting of Quarters and Infrastructure Building Doors and Windows at Colony for one year (2026-27)”
Bid No. SLPP/Civil/Colony/Painting/2026
j. Bidder/Contractor to ensure - All portable electric apparatus shall be regularly
examined, tested and maintained to ensure that the apparatus and leads are in
k. Only three-core cable shall be used for single phase operated tools with the third
core connected to earth.
l. Ensure that all metallic portable appliances are provided with 3 pin plug and socket
connections with third pin be connected to the ground terminal where ever possible.
Also, the metal work of the apparatus is effectively earthed.
m. All cables and connections should be sound and of adequate capacity and properly
insulated while using any welding machine and other power connections.
n. The earthing arrangements should be properly made with earthing clamps or a
bolted terminal while using any welding machine
o. Electric holders when not in use, should be placed on an insulated hook or the
holders should be fully insulated while using any welding machine
p. Whenever the welder stops or leaves work for any appreciable time, the power
supply to welding machine shall be effectively disconnected while using any welding
q. GIPCL will provide either single phase OR 3-phase 3 wire power supply from the
nearby point at job site. Bidder/Contractor to supply the required cable between
GIPCL power supply point to equipment brought by Bidder/Contractor for the
specified job. Further, if Bidder’s/Contractor’s equipment requires 3-ph 4 wire
supply then they should derive 3-ph 4 wire supply from GIPCL 3-ph 3 wire supply
system by incorporating sufficient capacity transformer. Like for hydro jet cleaning
system, mixer machine, induction heating machine, SR machine etc., GIPCL will
provide 3-ph 3 wire power supply.
r. Cable between welding machine to GIPCL power supply point should have cable
TOP plug towards GIPCL power supply point of Make BALS having rating as
Contractors not following above electrical safety points at any point of time are liable to
penalty and their machine/ apparatus shall be seized by GIPCL.
16. REJECTION OF WORK
If, as a result of inspection, examination or testing, the GIPCL’s
Representative/Engineer decides that any materials, work or workmanship is
defective or otherwise not in accordance with the Contract, the GIPCL/Engineer/
GIPCL’s Representative may reject such plant, materials, work or workmanship and
shall notify the CONTRACTOR promptly, stating his reasons. The CONTRACTOR
shall then promptly make good the defect and ensure that the rejected item
complies with the Contract. If Contractor failed to rectify the rejected work or
workmanship, GIPCL/Engineer reserves the right to deduct or withhold amount
against rejected work or Workmanship. CONTRACTOR shall not entitle for any
claim or release of hold payment until rectify the defect up to satisfactory of GIPCL.
If Contractor failed to rectify any such defective work or workmanship, GIPCL
reserve the right to rectify at risk and cost of the CONTRACTOR and deducted by
the GIPCL from any amount due, or to become due, to the CONTRACTOR’s dues.
If the GIPCL/Engineer/GIPCL’s Representative requires such materials, work or
workmanship to be retested, the tests shall be repeated under the same terms and
conditions. If such rejection and retesting cause the GIPCL additional costs for the
traveling and lodging costs of GIPCL/Engineer’s personal for attending the retest,
such costs shall be recoverable from the CONTRACTOR by the GIPCL and may
Tender for “Painting of Quarters and Infrastructure Building Doors and Windows at Colony for one year (2026-27)”
Bid No. SLPP/Civil/Colony/Painting/2026
be deducted by the GIPCL from any amount due, or to become due, to the
17. GENERAL TERMS AND CONDITIONS:
a. All tools & tackles, labours, equipments, approved quality materials, consumables,
tools & tackles etc… to execute the contract are in the scope of the contractor. The
contractor should ensure that tools & equipments are in healthy condition.
b. The decision of the Engineer-in-charge shall be final and binding on the contractor
for defining the terms and condition included in this contract.
c. If the work is not found satisfactory, Engineer-in-charge reserves the right to take
suitable action.
d. Contractor shall depute full time site experienced supervisor They shall co-ordinate
with GIPCL engineer and shall bear overall responsibility of contract including joint
measurement, billing etc. Such person shall function from site office of contractor at
e. Contractor shall also nominate one safety supervisor at site and shall submit
nomination of safety supervisor in writing before commencement of contract. Safety
supervisor shall arrange small safety talk on every day morning or whenever
required with all workers working under this contract. He shall coordinate with
concern department’s Engineer-in-charge on daily basis and report daily
observations, tool-box talk records etc. The work shall not be allowed without
deploying safety supervisor and a penalty equal to Rs. 1,000/- per day absent of
safety supervisor shall be levied from Contractor.
f. Contractor shall strictly follow the existing work permit system of the GIPCL as
applicable and any future revisions.
g. The contractor has to take EC insurance policy for their workmen. The contractor has
to submit labour license and PF account number to the Engineer-in-charge before
start the work.
h. The contractor has to do the job timely. GIPCL shall not compromise in delay. In case
of delay of work without any valid reason, the GIPCL reserves the rights to carry out
the work by deploying other agencies at the risk & cost of contractor with additional
10% overhead charges.
i. Contractor shall mobilize the resources as per need within the period of four hours. If
the contractor fails to mobilize sufficient resources to complete the job in time, GIPCL
will execute the job through other agency at the risk and cost of the contractor with
additional 10% overhead charges.
j. Contractor should mobilize all resources for efficient & smooth execution of contract
within seven days from the date of issue of Letter of Intent/Work Order.
k. The prices / item rates quoted shall remain firm till completion of the contract and
any agreed extensions thereafter and shall not be subject to any escalation, idle
charges for labour, machinery, overhead expenses etc… due to any reason
whatsoever. No price escalation / idle charges shall be entertained due to delay in
work on unavailability of work front, non-issue of work permit, holding of work
permit for any reason, unavailability of contractor’s supervisor, unavailability of
contractor’s safety supervisor, violation of safety rules, unsafe act by any of
contractor’s worker, negligence & ignorance of safety & quality instructions of
GIPCL Engineer-in-charge or any other reason whatsoever.
l. Contractor must fulfill all the safety regulations and to take safety measures to avoid
hazards. Contractor shall arrange all standard adequate healthy safety PPEs like
but not limited to approved quality safety shoes & safety helmets, standard dust
masks, safety goggles, etc… as required and shall use exclusively under this
contract for all the time during working at specified locations failing which, the
Engineer-in-charge may hold the work and will take necessary action including
Tender for “Painting of Quarters and Infrastructure Building Doors and Windows at Colony for one year (2026-27)”
Bid No. SLPP/Civil/Colony/Painting/2026
penalty as decided. If the contractor repeatedly violates safety rules/regulations
(more than three successive incidents), Engineer-in-charge may take necessary
action against the contractor, including appropriate financial penalty (as per clause
no. 15) and/or termination of contract.
m. One or more jobs may be required to be done simultaneously and contractor shall
mobilize additional resources accordingly.
n. Timely completion of all jobs and works shall be the essence of this Contract.
Contractor should closely monitor each activities and complete the jobs as per the
time given by and under the supervision of the Engineer-In-charge and shall
ensure that sufficient manpower is deployed for the same.
o. The contractor has to complete the works as per the planning schedule and their
respective supervisor has to interact with Engineer In Charge for PTW (Permit to
work), work instruction, Return of permit whichever is required as applicable.
p. The contractor has to submit daily reports showing work carried out with details of
available manpower, tractors etc.
q. Any job other than the listed jobs in work order shall be executed by the contractor
on instruction from GIPCL and payment shall be made to the contractor on
respective item rate only.
r. The Government of India has enacted the Micro, Small and Medium Enterprises
Development Act, 2006 (the “Act”) and the Act has come into force from October
2, 2006. The Bidder shall confirm whether your organization is registered under
the Micro, Small and Medium Enterprises Development Act, 2006. If your
organization is registered under the Act, please specify the category i.e., Micro
Enterprise, Small Enterprise or Medium Enterprise under which it is registered and
kindly attach a copy of your registration certificate.
s. The Bidder shall provide details of registration along with copy of the registration
certificate issued by the District Industries Centre/Department of Industries, etc of
the respective State Government. It is to be noted that large scale industries and
trading firms have been excluded from the purview of the Act.
t. GIPCL is an ISO 9001-2015 (Quality), ISO 14001-2015 (Environment), 45001-2018
(OH&S) and 50001-2018 (EnMS) certified company, and GIPCL gives extreme
importance to maintain these global standards. Contractor shall be required to
observe these standards as amended time to time while working with GIPCL.
Contractor should ensure that his workmen/labour work in accordance with them .
18. CONTRACTOR’S SUPERVISION
The contractor shall, during the whole time the work is in progress, employ a
qualified experienced site-in-charge of the works with adequate experience in
handing of jobs of this nature and with the prior approval of the GIPCL / ENGINEER.
Such in-charge shall be constantly in attendance at the site during working hours.
During CONTRACTOR’S supervisory engineer absence during working hours, if
unavoidable, and also beyond working hours, when it may be necessary to give
directions, orders may be given by the ENGINEER / GIPCL and shall be received
and obeyed by the CONTRACTOR’S superintendent or Foreman who may have
charge of the particular part of the work in reference to which orders are given. If
requested to do so, the ENGINEER /GIPCL shall confirm such orders in writing.
Any directions, instructions or notices given by the ENGINEER / GIPCL to him, shall
be deemed to have been given to the CONTRACTOR. The representative of the
CONTRACTOR shall have all necessary powers to receive materials from the
GIPCL, issue valid receipts for the same, engage labour or purchase materials and
proceed with the work as required for speedy execution.
Tender for “Painting of Quarters and Infrastructure Building Doors and Windows at Colony for one year (2026-27)”
Bid No. SLPP/Civil/Colony/Painting/2026
None of the CONTRACTOR’S Superintendents, engineers, supervisors or labour
should be withdrawn from the work without due notice being given to the GIPCL /
ENGINEER; further no such withdrawals shall be made if in the opinion of the
GIPCL / ENGINEER such withdrawals will jeopardize the required pace of progress
/ successful completion of the work.
The CONTRACTOR shall employ in or about execution of the work only such
persons as area careful, skilled and experienced in their respective trades, and the
GIPCL shall be at liberty to object to and require the CONTRACTOR to remove any
person employed by the CONTRACTOR in or about execution of works who in the
opinion of the ENGINEER misconducts himself or is incompetent or negligent in the
proper performance of his duties and all such persons shall not again be employed
upon the works without the prior permission of the GIPCL.
Neither the CONTRACTOR and the PURCHASER nor the ENGINEER shall hire or
employ any employee of the other party except by mutual consent.
19. CONTRACTOR TO REMOVE ALL OFFENSIVE MATTER IMMEDIATELY AND
All loose materials, wastage, packing materials, cut pieces or other matter of an
offensive nature shall not be deposited on the surface, but shall at once be carted
away by the CONTRACTOR to some pit or place provided by him away from the
site of work and approved by local authorities.
As a part of the work included in this contract, the CONTRACTOR shall completely
remove and satisfactorily dispose of all temporary works to the extent directed. He
shall tear down and dispose of all temporary works, shall remove or grade, to the
extent directed, all plant and equipment, shall satisfactorily dispose off all rubbish
resulting from the operations under this contract and shall do all work necessary to
restore the territory embraced within the site of his operations to at least as good
order and conditions as at the beginning of the work under this contract.
20. FACILITIES TO BE PROVIDED BY GIPCL
A. The Company shall provide the following facilities to the Contractor at the
a. Electricity & water at nearest available one point. Further distribution
to be done by contractor at their cost.
b. Quarter/room & food for supervisors/engineers on chargeable basis
in GIPCL’s township as available. Food on chargeable basis at
GIPCL’s Industrial Canteen as available. If not available, contractor
to make his own arrangement for lodging and boarding locally or as
appropriate at his cost Workshop facility as available at Plant
premises only. However contractor may visit the workshop to ensure
the existing facility. For the facilities other than available, contractor
has to carry out the job outside at their own cost.
c. Workshop facility as available at site only. However, contractor may
visit the workshop to ensure the existing facility. For the facilities other
than available, contractor has to carry out the job outside at their own
d. Space for contractor’s office & store as decided by GIPCL based on
Tender for “Painting of Quarters and Infrastructure Building Doors and Windows at Colony for one year (2026-27)”
Bid No. SLPP/Civil/Colony/Painting/2026
e. First aid facilities as available on chargeable basis. If not available
contractor to make his own arrangement for the same locally or as
appropriate at his cost.
Apart from the above, no other facilities shall be provided by GIPCL.
B. GIPCL shall also conduct an orientation program appraising the workmen
regarding the safety norms and measures to be observed during work
operations at the colony/plant site.
21. WORK MEASUREMENT/CERTIFICATION
a. The work to be performed being a specialized nature, the contractor should be
fully conversant with modern practices and should be able to carry out works
painting work. The contractor shall therefore be required to engage effective
personnel to undertake the work as per specifications and requirement.
b. Contractor should maintain one computer with printer for keeping daily records
and maintain the data.
c. All the work measurements shall be jointly recorded in a measurement
sheet/register/relevant documents by the contractor / authorized representative
of the contractor and the Engineer-in-charge. The measurements shall be
clearly written indicating date of measurement, location, reference to drawings,
if any, and jointly signed.
d. The Contractor shall be required to furnish satisfactory job completion report to
GIPCL. The submission of report should be on daily basis, the bill payment shall
be released based on the certified reports of the works.
e. Inspection of work will be done by Engineer-in-Charge or his authorized
representative. If the work is not found satisfactory Engineer-in-charge reserves
the right to take suitable action and shall be binding to the contractor.
22. FORCE MAJEURE
The performance of the obligations herein contemplated may be suspended without
incurring the penalty in the event of the subsistence of Force Majeure conditions. If a
Force Majeure situation arises, the affected Party shall promptly notify the other Party
in writing of such conditions and the performance shall be suspended as per mutual
agreement. For the purposes of this clause, ‘Force Majeure’ means an event beyond
the control of the Party and not foreseeable by the Party and shall include events of
floods, explosions, riots, wars, hurricane, epidemics, any other Act of God, quarantine
restrictions, terrorism, government actions and provided always that such acts result
in the impossibility of the further performance of the contract.
The Contractor shall indemnify and keep harmless GIPCL from and against all
actions, proceedings, claims, demands, losses, costs, damages and expenses
whatsoever which may be brought against or suffered by GIPCL which it may
sustain, pay or incur as a result of or in connection with the performance/ purported
performance/ non-performance of the contract by the Contractor.
In case, in any litigation pertaining to labour employed through contractor if any
direction or order is issued by court at any point of time the contractor shall comply
with and implement such direction or order whether passed at the time of award of
contract or during the pendency of contract. Further, the Contractor shall indemnify
Tender for “Painting of Quarters and Infrastructure Building Doors and Windows at Colony for one year (2026-27)”
Bid No. SLPP/Civil/Colony/Painting/2026
the GIPCL against all consequences arising and affecting GIPCL owing to the
compliance of the orders by the Contractor.
24. GOVERNING LAW AND JURISDICTION
This tender document and contract shall be governed by the laws of India and the
Courts at Surat shall have jurisdiction regarding the same.
25. Where any portion of the General Condition of Contract is repugnant to or at
variance with any provisions of the Special Condition of Contract, then unless a
different intention appears, the provision of the Special Conditions of Contract shall
prevail to the extent of such repugnancy of variance.
Tender for “Painting of Quarters and Infrastructure Building Doors and Windows at Colony for one year (2026-27)”
Bid No. SLPP/Civil/Colony/Painting/2026
SPECIAL CONDITIONS OF CONTRACT
1. DETAIL SCOPE OF WORK FOR PAINTING WORK AT COLONY
1. Scope of work includes supply of GIPCL approved quality decorative paint
materials & thinner and applying painting (inside & outside) of the various buildings,
sheds, door, windows, hand railing, fencing, ceiling, parking shed, compound wall,
structure in various area of colony etc… as per respective items of SoR.
2. Scope of work also includes supply of GIPCL approved quality paint & thinner and
applying painting on miscellaneous structural etc… as per GIPCL requirement.
3. Scope also includes supply of GIPCL approved quality paints, other materials, like
consumables, equipments with all accessories, safe storage of materials (to not
contaminate the area), etc. Contractor’s offer shall include any wastage of paint
during painting, cost of labour, supervision, cost of safety supervisor, shifting,
transportation, loading, unloading, equipment, all tools & tackles, safety
equipments & PPEs, approved scaffolding, MS ladders etc…
4. Contractor shall deploy separate gangs of manpower with supervisors along with
overall site-in-charge to initiate scope of works at different locations simultaneously
and shall be responsible to ensure timely completion of specific painting as
directed by Engineer-in-charge. Advance work planning schedule for each
locations shall be prepared jointly in concurrence with concern Engineer-in-charge.
1.1 SPECIAL SPECIFICATIONS FOR PAINTING:
Contractor shall carryout the work as given in tender documents within stipulated
time frame for particular painting job and the works shall conform to high standards
of workmanship, quality, proper line, level and as directed by Engineer-in-charge.
Contractor shall nominate supervisors for work supervision to receive day to day
painting work requirements from Engineer-in-charge. Supervisors will co ordinate
with colony residence and site engineer to ascertain their exact requirement and
location of work. They will be responsible for mobilization of manpower, materials,
safety PPEs, safety arrangements at site, tools & tackles and other required
resources to carry out the work as per requirement and also responsible to take field
measurements jointly with GIPCL Engineer by mentioning SoR item no. & exact work
location in measurement register on daily basis and shall submit the register to the
Engineer-in-charge for their verification on every week.
The Scope of work covered by this specification, in general, comprises. scope of
work shall be followed during execution.
1) Painting of Colony qtrs and infrastructure Building.
2) Erection of scaffolding for painting the buildings having different height and
dismantling the same after completion of painting work.
3) Surface preparation for decorative paint includes cleaning of existing
painting surface, removing dirt, dust, loose paint, filling cracks with crack
filler, filling undulation with POP for making uniform surface (at required
places only) etc. complete.
4) Surface preparation for structure paint to be done by cleaning the existing
surface by wire brush/mechanical tools and removing of all loose dust etc
Tender for “Painting of Quarters and Infrastructure Building Doors and Windows at Colony for one year (2026-27)”
Bid No. SLPP/Civil/Colony/Painting/2026
1. One coat of primer of approved manufacturer to be applied on the surface as
per specific item specifications after proper cleaning the surfaces (as per item
specifications).
2. One coat of approved quality & make of paint shall be applied which should
meet the technical specifications of SoR items. All paint materials shall be of
approved quality decorative & industrial paints.
3. After drying the first coat, next coat of same quality and colour shade to be
4. Contractor has to ensure that the primer & different layers of paints are being
applied after being inspected by Engineer-in-charge of GIPCL. After obtaining
stage wise clearance, contractor should proceed for further work.
5. Paint has to be applied uniformly over the surface of building.
6. All the consumables like primer, paint materials, thinner, wire brush, painting
brush, container for handling the paint, cloth if required for cleaning the surface
etc. are to be arranged by the contractor.
7. To paint at different elevations, contractor has to make safe arrangement for
metallic scaffoldings with MS pipes & MS clamps at their own cost. Contactor is
fully responsible for scaffolding work for safe working during working at height.
8. Contractor has to make / construct their sub-store for storing the paint at site.
9. Manpower required for carrying out the entire painting work will be in
contractor’s scope.
10. Contractor has to depute their site-in-charge / site supervisors for work
execution as per specification.
11. Contractor has to take all safety measures during the execution of work.
12. Painting of various buildings/structures has to be carried out even during the
time when building underutilization. Hence, experienced supervisors are to be
deployed for supervision of work.
13. Painting shall be carried out only on thoroughly dry surfaces. Painting shall be
applied by brushing for outside and inside finishing paint by using roller only.
The workmanship shall be of best quality.
14. The optimum thickness shall be applied by brushing with minimum of brush
marks. The coat shall be allowed to hard dry. At least 24 hours shall elapse
between the applications of successive coats.
15. The second finishing coat shall then be applied by brushing for outside and
inside finished paint by using roller only.
16. The rate shall be for good finishing and with approved make, type & shade of
decorative/industrial paint by considering one coat of primer before two coats of
paint (as per individual item specifications). However, if the required quality and
finishing is not achieved, contractor shall apply third coat of paint to get good
finishing without any additional cost to GIPCL.
17. Contractor shall follow the recommendation of manufacturer without any
additional implication to GIPCL.
18. Quality Check: -
Contractor shall maintain each location wise register entry and get the check
from concern GIPCL engineer for cleaning, primer coat, first coat painting &
second coat painting.
19. Contractor shall take care to avoid paint marks on door/window frames, glass,
skirting tiles, electric fixtures, other furniture etc… by covering the same with
sticker, removable adhesive tape, cloth etc… as directed by Engineer-in-
charge. After completion of work, contractor shall responsible for removal of
covers from these locations, remove & clean stains if any and make good the
20. Contractor shall ensure proper utilization of paint and avoid wastage like
spillage. GIPCL right to take an action for such wastage.
Tender for “Painting of Quarters and Infrastructure Building Doors and Windows at Colony for one year (2026-27)”
Bid No. SLPP/Civil/Colony/Painting/2026
21. All painting materials & primer shall be of approved shade & makes only.
22. It shall be the sole responsibility of contractor to provide sample of colour shade
before execution for any specific shade requirement for advance approval.
23. Apart from standard available colour shades, contractor shall also arrange for
specific colour shades for exterior & interior painting in line of existing provided
shades if it is desired by Engineer-in-charge. Sample of shades may be
prepared & applied at designated place for approval from GIPCL. Contractor
shall proceed with the work as per day to day instructions of Engineer-in-charge
for painting at specific locations.
24. In case of any discrepancies, contractor shall proceed with painting work by
providing matching colour shade as per existing painted surface, except any
change in shade is desired & provided by GIPCL for any specific location/area.
However, contractor shall provide sample and get approval well in advance from
GIPCL for existing matching shade also if desired by GIPCL.
25. Surface preparation before applying painting on inside surface of all buildings
shall be as per following specifications.
(a) Proper cleaning of existing painted surface and removing dirt, dust.
(b) Filling of minor cracks at required locations as directed by Engineer-in-
charge with approved crack filler of approved make and quality (Pedilite or
(c) Filling undulation (as required for small undulation only) with Wall Putty
(Birla white or approved equivalent) for making uniform & smooth surface.
Primer shall be applied as specified in item nomenclature.
(d) All furniture, fixtures, belongings of occupier of quarter, electric & lighting
fixtures, equipments, cables, flower pots, plantations, flooring, etc… shall
be protected while carrying out the painting work. Covering with plastic
sheet, paper, temporary shifting of things as directed shall be in the scope
of contractor. Any type of damages shall be recovered at actual cost plus
10% overhead charges (including GST) from contractor’s bills and/or
security deposit/retention money whatsoever.
(e) Proper surrounding affected area housekeeping shall be done after
completing the painting works.
26. Quality Check: -
(a) Contractor shall maintain location wise work done reports in the register
and get the regular signature from concern GIPCL Engineer for cleaning,
applying primer, first coat painting & second coat painting at each stage.
The same shall be enclosed with bill for payment.
(b) Contractor shall ensure proper utilization of paint and avoid wastage like
spillage. Approved paint material received & consumption thereof for
painting the structure/building shall be almost match as per
recommendations given by manufacturer. Contractor shall have to maintain
the register for the receipt of paints and copy of GST bill/manufacturer
challan may also be submitted (for major quantity procurement) for
consumption verification by GIPCL Engineer. Contractor may also require
to submit material test certificate of manufacture whenever required by
GIPCL Engineer.
(c) The paint shall be applied as per guideline & specifications given as above
for good finishing. However, if finishing is not achieved as per requirement,
contractor shall have to apply additional coat of paint to get good finishing
without any additional cost to GIPCL.
(d) Identification & Other marking on the Building / Structure walls: -
All the buildings/structures offered for painting in the scope of work are
clearly identified for the details like building name, numbering & labeling,
Tender for “Painting of Quarters and Infrastructure Building Doors and Windows at Colony for one year (2026-27)”
Bid No. SLPP/Civil/Colony/Painting/2026
instructions, notice, etc. These details form the vital information and same
shall be preserved during painting works by covering the same with suitable
means as directed by Engineer-in-charge.
Contractor shall follow the recommendation of manufacturer without any additional
implication to GIPCL.
STEPS FOR MALAMINE POLISH WORK ON WOOD SURFACE :
1) SANDING: Sand the surface first using and paper 180 and then using and
paper 320 and wipe clean.
2) STAINING - for staining, apply Asian Paints Wood Stains and allow it to dry
for 30min. Do not sand the stained coat.
3) SEALING - Mix Asian Paints Melamine Sealer Base and Hardener in the
ratio 90:10 by volume and thin it with 20-40% of Thinner (T-124) for spraying
or Thinner for brushing (T-2). Allow a maturation time of 30min and use
within 8 hours. Spray or brush 2 coats of sealer. For spraying, give an inter
coat interval of 5-6hours. In case of brushing, the interval should be 8-
10hours. Sand with and paper 320 or 400 between coats.
4) Topcoat - Mix the Melamine Base and hardener in the ratio 9:1 by volume
and thin it with 20-40% T-124 Thinner for spraying or Melamine brushing
Thinner for brushing (T2). Allow a maturation time of 30mins and use within
8hours. Spray or brush 2 coats of Matt or Gloss. For spraying, give an inter
coat interval of 8-10hours. Sand with and paper 320 or 400 between coats.
1.2 GENERAL SPECIFICATIONS FOR PAINTING:
1. Contractor has to ensure that the different layers of paints are being applied
after being inspected by Engineer-in-charge of GIPCL. After obtaining stage
wise clearance including surface preparation, contractor should proceed for
further work. One register shall be maintained by contractor for this purpose and
shall submit the same with bill. Without submission of thickness verification
register with the bill, payment will not be made.
2. Paint has to be applied uniformly over the surface of Steel structures.
3. All the consumables like paint material, wire brush, mechanical tools, emery
papers, painting brush, container for handling the paint, cloth if required for
cleaning the surface, metallic scaffolding, metallic ladders, etc… are to be
arranged by the contractor.
4. To paint at different elevations, contractor has to make arrangement like safety
belt, safety net, fall arrestor, safety life line, helmet etc… for safe working with
preparation of scaffoldings of MS pipes, Metallic jali, H frames etc... at their own
5. Contractor has to make their own sub-store for storing the paint at site with rigid
platform to avoid soil contamination. GIPCL will not be held responsible for any
theft of materials.
6. Contractor shall have to depute their full time experienced supervisor for work
execution as per specification and for day to day work planning & coordination
and submit daily work report to Engineer-in-charged,
7. Contractor shall have to take all safety measures and has to follow safety
clauses during the execution of work including all good quality safety
equipments & safety PPEs like,full body double harness safety belts, safety
helmets, safety shoes, hand gloves, dust masks, ear plugs, safety goggles, etc
to the workers and copy of safety equipments and safety gears issue register &
Tender for “Painting of Quarters and Infrastructure Building Doors and Windows at Colony for one year (2026-27)”
Bid No. SLPP/Civil/Colony/Painting/2026
gate pass are to be submitted to GIPCL for verification before taking up the
8. Further layer of Paint has to be applied after giving sufficient drying time to
previous layer of paint.
9. Quality Check: - Contractor shall maintain location wise work done reports in
the register and get the regular signature from concern GIPCL Engineer for
cleaning, applying primer, first coat painting & second coat painting with
thickness checking at each stage. The same shall be enclosed with bill for
10. The paint shall be applied as per guideline & specifications given as above for
good finishing. However if finishing is not achieved as per requirement,
contractor shall have to apply additional coat of paint to get good finishing
without any additional cost to GIPCL.
11. Bidder shall follow the recommendation of manufacturer without any additional
implication to GIPCL.
The scope of work also includes all works necessary, which are not specifically mentioned
here but required, for effective execution of entire scope of work in all respect within the
scheduled time. All works shall conform to the specifications, safety norms, legal & statutory
1.3 PAINT MATERIAL
Painting material shall be make of Burger or Asian company of Synthetic Enamel
paint, OBD, exterior paint, special paint, Melemine Polish etc..as per respective item
specifications in SoR.. All paint materials shall be of first quality. Contractor has to
maintain record of each and every material brought to site with gate entry.
All painting material & primer shall be of GIPCL’s approved Decorative paints
(approved makes are Berger Paints, Asian Paints, Kansai Nerolac Paints, Jotun
Paints, AkzoNobel Paints and JSW Paints) as per respective item specifications
under SoR. Contractor should submit in advance technical equality certification from
manufacturer / Technical Data sheet with technical comparison to the GIPCL for the
purpose of confirmation of equality of technical specifications of each & every items
of BoQ / SoR (Section-E) and subsequent approval of GIPCL accordingly..
Contractor will also be allowed for other similar equivalent makes of paint materials
from other reputed brands on sole discretion of GIPCL, for which, contractor should
propose equivalent brand along with manufacturer’s credential, client’s
performance certificates, material test reports, technical equality comparisons,
etc… for similar use / in PSUs / Corporates and same should be submitted for
GIPCL’s review to obtain advance approval from GIPCL. GIPCL will review the
credential & client’s performance certificates in similar use for approval purpose.
However, approval or rejection will be at the sole discretion of GIPCL without giving
any reason and will be bound to the contractor. Also, even after approval, in view of
GIPCL, if performance of other brand material not found satisfactory then contractor
shall stop using it and shall continue the scope of work with above specified brands
of materials only.
Contractor has to maintain record of each and every material brought to site with
Contractor shall arrange to get joint inspection of the procured paint material along
with the concern Engineer-in-charge after the same is inward in GIPCL and the copy
Tender for “Painting of Quarters and Infrastructure Building Doors and Windows at Colony for one year (2026-27)”
Bid No. SLPP/Civil/Colony/Painting/2026
of bill / material challan of the same shall be get stamped and signed by Security
personnel present at gate. Further, this bill / challan shall be submitted to Engineer-
in-charge with the Invoices or day to day basis. Contractor shall also prepare &
submit material reconciliation with every bill in format approved by GIPCL. GIPCL
may verify the reconciliation of paint materials with respect to work executed based
on manufacturer’s consumption factor (practical coverage). Any major variation
shall not be acceptable.
Contractor shall keep up to date material inward records and consumption record
of his materials. Contractor shall follow manufacturer’s recommendation for
required mix proportion of material at site. The material should be applied in
accordance with specifications / manufacturer recommendations including surface
preparation, mixing, placing, applying, curing, etc… complete as directed by
Engineer-in-charge.
Contractor shall deploy & provide sufficient nos. of manpower with supervisors for
supervision of work, providing & fixing metallic scaffolding, ladders, arrangement of
platform for working at height, safety belts, fall arrestors with safety life line, safety
net (at required places as directed by Engineer-in-charge), safety shoes, goggles,
dust masks, helmets, hand gloves, etc… with standard applicable tools & tackles,
sufficient nos. of lighting equipments, power cables of sufficient length with
extension board according to site requirement & fulfilling electrical safety norms,
sufficient cleaning equipments and any other incidental activities or works which are
not envisaged but likely to be carried out for satisfactory & timely completion of
entire scope of work as directed by Engineer-in-charge.
The scope of work also includes removal of all debris, unwanted materials, scrape
materials, empty containers, etc including loading, unloading, shifting and disposal
outside the plant premises as per applicable GPCB norms which shall be bound to
Contractor and GIPCL will be indemnify.
Where any specifications of manufacturer are repugnant to or at variance with any
provisions and/or specifications mentioned in this document, then unless a different
intention appears, the provision and/or specifications mentioned in this document
shall prevail to the extent of such repugnancy of variance.
Third party testing:- If required by GIPCL, Contractor shall arrange third party
testing of paint materials supplied at GIPCL-SLPP for jointly collected random
sample/s of paint material as directed by Engineer-in-charge. All cost towards
testing shall be borne by the contractor. The testing laboratory shall be as decided
1.4 DISPOSAL OF EMPTY PAINT BARRELS
Contractor shall be responsible for removal and disposal of all the empty drums as
per prevailing GPCB norms outside GIPCL premises. GIPCL will not be held
responsible for any subsequent consequences regarding improper disposal of
empty drums/barrels by the contractor. Contractor shall be required to submit
written undertaking along with the final bill that all the empty paint/primer/thinner
drums are disposed off at outside plant premises at designated location as per
prevailing Government guideline and contractor shall indemnify, keep harmless the
GIPCL against any future liabilities or consequences in this regard. Contractor’s
final bill shall be processed only after disposal of all such empty drums, containers,
other scrapes, etc… to outside premises in accordance with prevailing GPCB norms
Tender for “Painting of Quarters and Infrastructure Building Doors and Windows at Colony for one year (2026-27)”
Bid No. SLPP/Civil/Colony/Painting/2026
based on submission of letter of undertaking by the contractor and certificate from
Engineer-in-charge along with final bill.
1.5 GENERAL SCOPE OF CONTRACTOR
1. All tools & tackles, equipments, grinder machine, scaffoldings, materials, labour,
vehicles, etc… to execute the contract will be in the scope of the contractor. The
contractor should ensure for healthiness/working conditions of tools, tackles &
2. All consumable items like paint materials, thinner, turpentine, red oxide, cloth,
cotton waste, etc. will be in the scope of the contractor.
3. The Contractor shall have to make necessary arrangement for storage of
materials including safe storage of paint materials, tools & tackles, scaffolding
materials, equipments at their own cost .
4. Contractor has to make their own sub-store for storing the material at site in
systematic proper manner as directed by Engineer-in-charge. Contractor shall
be responsible for safe storage and security of all materials tools & tackles,
scaffolding materials, equipment and can depute full time guard for the security
of the materials to avoid pilferage, loss, damage and theft at their own cost.
5. All safety/PPEs required during work at site are to be arranged by the contractor.
6. The Contractor shall have to provide necessary facilities including
accommodation for their labour at their own cost
7. Bidder has to maintain record of each and every materials brought to site with
material and gate entry.
8. The contractor has to arrange transportation for lifting/shifting the materials at
9. Bidder has to submit quality plan prepared jointly with authorized representative
of approved manufacturer.
10. Bidder Shall carryout the work as per specification within stipulated time frame
for particular painting job and the works shall conform to high standards of
workmanship, quality, proper line, level and as directed by Engineer-in-charge.
9. Bidder shall nominate supervisors for work supervision & safety supervision to
receive day to day painting work requirements from Engineer-in-charge.
Supervisors will co ordinate with user department to ascertain their exact
requirement and location of work. They will be responsible for mobilization of
manpower, materials, safety PPEs, safety arrangements at site, tools & tackles
and other required resources to carry out the work as per requirement and also
responsible to take field measurements jointly with GIPCL Engineer by
mentioning SoR item no. & exact work location in measurement register on daily
basis and shall submit the register to the Engineer-in-charge for their verification
1.6 PLANNING & MONITORING OF WORK PROGRESS
1. After award of the work, Contractor shall have meeting with GIPCL for planning
of various Buildings to be painted.
2. Contractor shall mobilize the resources at site within 15 days from the date of
LoI or work order whichever is earlier. If contractor failed to carry out work with
desired progress and if contractor failed to mobilize sufficient resources
(manpower & materials) after written communication, GIPCL may execute the
job through other agency at the risk and cost of the contractor with additional
10% overhead charges including GST.
Tender for “Painting of Quarters and Infrastructure Building Doors and Windows at Colony for one year (2026-27)”
Bid No. SLPP/Civil/Colony/Painting/2026
3. The owner of contractor / proprietor / partner should be present for periodic
progress review meeting & for further planning at office of GIPCL Surat Lignite
Power Plant as desired by Engineer-in-charge (monthly basis).
It is not the intent to specify herein all the works in the scope of this contract. The
scope also includes all works necessary, which are not specifically mentioned here
but required, for completion of entire scope of work in all respect within time bound
period and are deemed to be included in the scope of the CONTRACTOR. All works
shall conform to the specification. The works shall conform to high standards of
quality and workmanship.
2. PRICE & RATES
This is SoR based tender and final item rates will be derived based on final offered
lowest price received through e-Reverse Auction on gross total price (including 18%
GST). Prorata reduction will be applied in the quoted price for all the items of SoRs
after price discovery through e-Reverse Auction. The item rates so derived shall be
inclusive of cost of all approved quality paint materials, thinner, skilled and/or
unskilled labour, supervisors, insurance, safety PPEs, staging, scaffolding,
transportation, mobilization-demobilization cost, loading-unloading & proper
storage, security & safety, equipment, machinery, consumables all the required
tools & tackles etc…, idle charges of labours, operators, drivers, machineries,
equipments during unavailability of front or due to unavoidable circumstances or
any reasons whatsoever, safety equipments & PPEs, Royalties, Rents, Excise duty,
Sales Tax, Stamp Duties, Central or State Government or Local body or Municipal
Taxes or Duties, Turn over Tax or any other duty / tax (Item rates are without GST
but GST @18% is considered in Total Estimated SoR Value ), levied by the Central,
State Government or other Public bodies etc…and such other costs that are not
specifically mentioned herein but will be incurred by the contractor for the
satisfactory and timely completion of the work. The whole item rates shall be
deemed to include for everything mentioned in the specification, all leads & lifts,
contractor’s overheads & profits for due performance of the work under this contract
and such other costs that are not specifically mentioned herein but will be incurred
by the contractor for the satisfactory and timely completion of the work. The rates
shall also include cost for mobilization / demobilization of manpower, equipments,
materials, etc... as per work requirement.
The rates shall be firm for entire contract period and also during extension thereof,
if required and shall not be subject to any escalation in prices, idle charges for
labour, machinery, overhead expenses etc. No price escalation / idle charges shall
be due to any reason whatsoever.
The prices / item rates so derived based on final recovery of lowest offer from Bidder
shall remain firm till completion of the contract period and any agreed extensions
thereafter and shall not be subject to any other escalation, idle charges for labour,
machinery, equipments, overhead expenses etc. No price escalation / idle charges
shall be payable due to delay in work by contractor or due to non-availability of work
front by GIPCL or any reason whatsoever.
Contractor shall at his expense comply with all labour and industrial laws and such
other acts and statutes as amended from time to time as may be applicable to this
contract in respect to pay etc. On account of any default in respect of all liabilities
and in case of non compliance of the above, the company can withhold their
payments till all legal liabilities are discharged.
Tender for “Painting of Quarters and Infrastructure Building Doors and Windows at Colony for one year (2026-27)”
Bid No. SLPP/Civil/Colony/Painting/2026
The offer price shall be considering mobilization of all required manpower, tools &
tackles, materials, equipment, vehicles, consumables, etc… for timely and
satisfactory completion of all scope of work.
The value and/or quantum of work may be increased or decreased depending upon
day to day requirement. However, item rates remains unchanged and the payment
shall be made as per the actual quantity executed as informed & certified by GIPCL
representatives.
3. CONTRACT PERIOD
Contract period will be one year from the date of commencement (mobilization
period will be 15 days from the date of issue of LoI or Work Order whichever earlier)
or from the date of commencement as mentioned in work order.
The contractor period is including peak monsoon season. Exposed/unconfined
Structural painting may not be allowed during monsoon season and contractor
should mobilized resources accordingly to complete the entire scope of work in
available working contract period.
Contractor shall have no any right for time extension or compensation or price
escalation on account of some delay in handing over of particular front by the GIPCL
due to unavoidable circumstances. However, GIPCL, at sole discretion, may grant
only time extension at the same rates, terms & conditions against the justifications
submitted by the contractor in writing.
GIPCL reserve the right to short close the contract at any time by giving one month
notice period without assigning any reason whatsoever.
4. TERMS OF PAYMENT
A. Conditions of Payment:
The contractor shall raise in duplicate (one original in physical form and soft copy
in MS Excel format) every month in respect of the work performed or completed
during the month along with the documents as hereinafter provided. On receipt of
the invoice complete in all respects and with all the said documents, the payment
in respect of the same shall be made within 21 days of such receipt of a complete
invoice as per the following terms of payment:
(i) 100% of monthly RA bill along with 100% taxes shall be released against
the work executed duly certified by GIPCL. Income Tax (IT) will be deducted
at source from monthly RA bills as per the rules in force.
(ii) Security deposit at 10% of total contract value (excluding GST) shall be
submitted as per clause no.: 1 of Section-C
(iii) GST shall be paid along with bills after fulfillment of following terms.
(a) Submission of copy of registration certificate issued by GST Authority
(to be furnished only once).
(b) Citing GIPCL’s GST no. along with contractor’s GST registration no.
and the date of issue of registration certificate on invoices.
(c) Citing GIPCL’s GST no. along with contractor’s GST registration no.
and the date of issue of registration certificate on invoices
(d) Claim of GST amount with percentage (%) separately shown on the
Tender for “Painting of Quarters and Infrastructure Building Doors and Windows at Colony for one year (2026-27)”
Bid No. SLPP/Civil/Colony/Painting/2026
(e) The contractor shall be required to submit the proof of payment of GST
of previous month/quarter, as may be applicable as & when demanded
by GIPCL/Owner/company.
(f) Contractor shall inform the Owner in the event of its registration
certificate is cancelled or discontinued for whatsoever reason.
(g) The contractor shall also mention on their invoice the HSN/SAC code
as applicable under the GST laws under which GST is levied and a self
certified authentic third party evidence (www.cbic-gst.gov.in) shall be
adduced to that effect by the contractor
(iv) At the time of submission of the first monthly RA Bill, the Contractor shall
submit a certificate from Engineer-in-charge regarding availability of tools &
tackles, equipments, vehicles etc at site. The Contractor shall also furnish
the checklist as per ANNEXURE-A enclosed with the Section-F of tender
document along with the RA bill of respective month.
(v) While making running account payment, the following deductions may be
made by GIPCL, if applicable:
(1) Cost of materials issued, if any, by GIPCL and to the extent consumed
(2) Security deposit recoverable if any.
(3) Advance on materials / work progress advance payments, if any.
(4) Penalty for delayed execution of work, recovery of charges for the work
done by other contractor due to delay or any other reason, if applicable
(5) Any other dues recoverable by GIPCL from the contractor under the
(6) Any applicable taxes under any law for the time being in force, eg. TDS,
(vi) The contractor, along with monthly RA/final bill shall submit copy of P.F.
Challan, wages register, attendance sheet & ECR statement indicating the
employee and employer's P.F contribution with respect of employees
employed by him for the contract at GIPCL site along with format for
submission of these documents provided in Section-F (Annexure-A).
(vii) The Contractor shall submit his Final Bill within a period of three months of
the expiration or earlier termination of the contract or any extensions that
may be granted by GIPCL to the Contractor. GIPCL shall not entertain any
bill for any work item after expiration of period of three months.
(viii) The Contractor shall include all his claims in the Final Bill submitted by him
and accordingly the final bill submitted by the Contractor shall be deemed to
be inclusive of all and whatsoever the claims that the Contractor may have
from GIPCL. The Contractor shall not be entitled to claim any amounts which
are not mentioned in the Final Bill and the Contractor shall be deemed to
have waived any claims not mentioned in the Final Bill and shall not be
entitled to recover the same from GIPCL subsequent to the submission of
the Final Bill on any account and GIPCL shall stand absolved of all its
liabilities in respect of any such claims not raised by the Contractor in his
B. Validity and Uniformity of Rates
The rates shall be valid for a period of one year of the Contract Period and
agreed extension.
5. SUBMISSION OF TECHNICAL DOCUMENTS TO THE ENGR-IN-CHARGE
Contractor shall submit following documents with each bill to the Engineer-in-charge
for verification purpose of the bill:-
Tender for “Painting of Quarters and Infrastructure Building Doors and Windows at Colony for one year (2026-27)”
Bid No. SLPP/Civil/Colony/Painting/2026
(i) Measurement sheet (as per mode of measurement) along with joint record
of work done in the form of joint inspection report duly signed by authorized
representative of contractor and GIPCL Engineer.
(ii) Measurement sheets (both in soft copy and in physical form) of work done.
(iii) Contractor’s material incoming challans stamped & signed by security at
The bill will not be entertained without submission of above documents.
6. SUBMISSION OF STATUTORY COMPLIANCES WITH FINAL BILL
Contractor shall submit each bill of work carried out along with following documents.
(i) Copy of statutory compliance like labour license (if applicable), wages payment
register, EC Policy, PF paid Challan with ECR, TRRN confirmation by
EPFO/Bank, Bank statement, etc… along wage certificate pertaining to
respective bill period / previous month of bill period with Annexure-A provided
(ii) Notarized Indemnity Bond in case of Final bill.
(iii) No claim - No arbitration certificate as per Performa (Annexure-D in Section-
F), after the final bill amount is certified by GIPCL for payment and the same is
made known to the contractor by GIPCL & accepted by the contractor.
Bill submitted without any of the above documents shall not be processed for
7. MEASUREMENT & DAILY REPORTS
All the items shall be measured as finished work as per the item nomenclature and
in accordance with IS practice. For any dispute regarding measurement, the
decision of Engineer-in-charge shall final and binding to the contractor.
The contractor shall be required to furnish satisfactory job completion report and
joint record of measurement to GIPCL. Preparation & submission of report should
be on daily basis. In the RA bills, payment shall be released, based on the joint
measurement record of the works.
For timely compilation of measurements and billing;
7.1 Contractor should maintain one computer with printer for keeping daily records
and maintain the data.
7.2 Contractor shall be required to furnish job completion/measurement report to
GIPCL whenever required. The monthly/RA bill payment shall be released
based on the certified measurement reports of the works.
7.3 Inspection of work will be done by Engineer-in-charge or his authorized
representative. If the work is not found satisfactory, Engineer-in-charge
reserves the right to take suitable action and shall be binding to the contractor
Wherever any dispute regarding mode of measurement arise, the decision of the
Engineer-in-charge shall be final and binding to the contractor.
Tender for “Painting of Quarters and Infrastructure Building Doors and Windows at Colony for one year (2026-27)”
Bid No. SLPP/Civil/Colony/Painting/2026
7.1 JOINT MEASUREMENT RECORDING & MODE OF MEASUREMENT
All the works shall be paid based on joint measurements of all the works actually
executed at site. Actual measurements of executed works as per scope shall be
carried out jointly with GIPCL’s Engineer-in-charge concern and contractor’s
representative.
In order to carry out joint measurement recording at site, contractor shall provide
following facilities & arrangements at site for GIPCL’s Engineer-in-charge.
(1) Proper approachable safe scaffolding with ladders, standard hand rails &
(2) Arrangements of required safety PPEs like but not limited to standard approved
double harness safety belts, safety goggles, fall arrestors, safety net, hand
(3) Contractor shall also provide one Engineer along with two or three assistant
helpers to GIPCL’s concern Engineer-in-charge during joint measurement
recording. Contractor’s Engineer & helpers shall assist and follow the
instructions of GIPCL’s concern Engineer-in-charge for safe measurement
recording of every completed scope of works.
(4) Necessary standard & calibrated valid measuring devices like but not limited to
measuring tape, Alco meter & other required tools & tackles.
(5) Any other site specific arrangements or requirements as directed by Engineer-
in-charge concern.
The payment will be done according to actual work carried out as per joint
measurement by contractor & GIPCL Engineer-in-charge for unit of quantity as
specified in respective items, up to three decimal place.
Measurements shall be in accordance with the unit of measurements specified in
schedule of quantity up to three decimal place. Payment will be made for actual
work done as per field measurements certified by Engineer-in-charge.
The measurement shall be in item wise unit mentioned in Schedule of Quantity for
finished product of work done as per detailed technical specifications mentioned in
schedule of quantity. The measurement shall be in square meter of finished items
as specified in each item of SoR (Section-E).
Wherever any dispute regarding mode of measurement arise, the decision of the
Engineer in-charge shall be final and binding to you.
Detail mode of measurement is as under :-
(i) Outside surface: - Based on sq.mtr. of painting surface. Only single time
sq. mtr. of actual painting surface of the building shall be payable. No co-
efficient shall be applied even if in the case of sand face plaster area also
(ii) Inside surface: - Same as outside.
(iii) Window shutter/Ventilator/Fly proof shutter painting: - Area shall be
measured on sq. mtr. of actual painting surface shall be payable. No co-
efficient shall be applied.
(iv) Panel door/Flush door/Rolling shutter Painting :- Area shall be
measured on sq. mtr. of actual painting surface shall be payable. No co-
efficient shall be applied.
Tender for “Painting of Quarters and Infrastructure Building Doors and Windows at Colony for one year (2026-27)”
Bid No. SLPP/Civil/Colony/Painting/2026
(v) M.S.Grill Painting:- Area shall be measured Grill size i.e. if size of one Grill
is 0.60 x 1.20mt and painted both side of total grill area, Payment will be
made considering grill out to out size (i.e. 1x.0.60x1.20mt). No co-efficient
shall be applied.
(vi) Door/Window/Ventilator’s MS frame painting :- Area shall be measured
on sq. mtr. of actual painting surface shall be payable. No co-efficient shall
(vii) M.S.Railing Painting:- It shall be measured in Rmt only length of railing
(viii) Melamine polish:- Actual treated area Shall be measured in sq.mt.
Wherever any dispute regarding mode of measurement arise, the decision of the
Engineer in-charge shall be final and binding to you.
The measurement will be as per specified in respective item description.
The actual quantities may vary with specified quantities. All bidders are requested
to visit the site before quoting the bid.
8. MOBILIZATION AND EXECUTION
a) Contractor shall mobilize the resources at site within 15 days from the time
the intimation given by GIPCL.
b) Contractor shall provide site supervisors who will be responsible for
supervision and execution of job in specified time with respect to quality,
specifications, site preparations, safety, co ordination with GIPCL, joint
measurements, etc... The supervisor shall coordinate with the Engineer-in-
charge of GIPCL for proper execution of the job.
c) The resources required for execution of above jobs will vary from time to
time, hence contractor shall mobilize the resources accordingly.
d) Contractor shall provide accommodation for the persons deployed by him
for the work at his own cost.
9. QUANTITY OF WORK
The estimated quantities of work required to be carried out by the contractor are as
given in the Section-E (Schedule of Rate & Quantity). The quantities specified in
each item are estimated and shall vary according to the exigencies of work at site
up to any extent. However, the rates quoted by Bidder shall remain firm throughout
the contract period irrespective of any variation in estimated quantities. Contract
value will remained firm. Contractor shall have no claim, whatsoever, on grounds of
loss of anticipated profit etc. on account of the same. Contractors shall engage
required nos. of labors along with required tools & tackles, equipments, materials
as per work load and emergency situations throughout the contract period to
perform his contractual duties.
In case, contract quantity/amount exhausted before completion of contract period,
GIPCL reserve the rights to increase the quantities or contract amount for
successful completion of entire contract period. Contractor shall responsible to
complete the particular job up to entire satisfaction of Engineer-in-charge. The item
rates remain firm & unchanged till completion of the contract and any agreed
extensions thereafter and shall not be subject to any escalation, idle charges for
labor, machinery, overhead expenses etc… for any reason whatsoever. The
quantum of work of individual item may be up to any extent depending upon
Tender for “Painting of Quarters and Infrastructure Building Doors and Windows at Colony for one year (2026-27)”
Bid No. SLPP/Civil/Colony/Painting/2026
requirement. However, item rate remains unchanged. Under this contract,
contractor has to execute all work as per the Plant requirement.
10. GENERAL CONDITIONS OF CONTRACT
General Conditions of Contract (Section-C) and detail specification prepared by the
company will be applicable for this contract. The same is enclosed herewith.
Bidders are advised to go through the same.
Where any portion of the general conditions of contract is repugnant to or at
variance with any provisions of the special conditions of contract, then unless a
different intention appears, the provision of the special conditions of contract shall
prevail to the extent of such repugnancy of variance.
11. DEFECT LIABILITY PERIOD
The defect liability period of whole work shall be twelve months after completion of
contract as certified by Engineer-in-charge. During defect liability period, if any
defect arises in jobs which have been already executed, shall be rectified by the
contractor at free of cost within seven days on receiving the intimation from
Engineer-in-charge failing which GIPCL may take suitable action and also engaged
third party to carry out rectification work at the risk and cost of the contractor.
Any delay beyond seven days of intimation for rectification will result to equivalent
delay in refunding of security deposit.
Tender for “Painting of Quarters and Infrastructure Building Doors and Windows at Colony for one year (2026-27)”
Bid No. SLPP/Civil/Colony/Painting/2026
PRICE BID FORMAT
(To be quoted online only through website: https://tender.nprocure.com)
Description SoR Amount Above/Below Contractor's Total
(1) including GST (3) percentage to Quoted
(Rs.) (in Rs.) be filled by Amount in
(2) bidder (equal, (Rs.)
Surat Lignite Power Plant - 28,19,173.99 Equal
4X125 MW, - Painting of Above
quarters & infrastructure Below
buildings incl. doors and
windows in Colony for one
year of contract period
(2026-27) as per SoR
(including 18% GST
NOTE: Bidders have to quote their offer in % (+, - or equal) on above total
estimated SoR value in online Price Bid only. The quoted percentage rate on
above SoR item rates shall be inclusive of all approved quality materials,
labour cost, equipments, supervision, consumables, tools, tackles, profit &
overheads, all taxes & duties (GST 18% is considered on total estimated SoR
At estimated SoR value (including GST)
______%age above the estimated SoR value (including GST)
______%age below the estimated SoR value (including GST
Note:- (1) Percentage rate offer/bid price on SoR value (including 18% GST) shall be quoted through online
(n)-Procure only. Hard copy of price bid shall not be considered/accepted.
(2) Evaluation of tender will be done on gross total quoted amount (including 18% GST).
SEAL & SIGNATURE OF TENDERER : __________________________________
NAME OF AUTHORISED PERSON : __________________________________
Tender for “Painting of Quarters and Infrastructure Building Doors and Windows at Colony for one year (2026-27)”
Bid No. SLPP/Civil/Colony/Painting/2026
SCHEDULE OF QUANTITIES & RATES
Sr. Item Description Unit Estimated Estimated
No Quantity Item Rate
1 Providing and painting interior surfaces with two
coats of Oil Bound Distemper paint of approved
of Bergur or Asian manufacture, color and shade
including cleaning of existing painted surface,
removing dirt, dust, loose paint, filling cracks with
approved crack filler, filling undulations with POP
for making uniform surface (at required place
only), scaffolding etc. complete at all elevation
with all materials, labour, tools & tackles, safety
tools & tackles, including shifting of racks,
cupboards, tables etc. for painting of wall and
repositioning of the same after completing the
work, etc… all complete as directed by Engineer-
in-charge .For payment actual treated area shall
be measured. No coefficient sahll be applicable. SM 20000.00 50.96
2 Providing and applying two coats of white
washing paint on existing surface of approved
manufacture with mixing of "Fevicol" or
equivalent approved adhesive @ 200gm per
10kg lime & Blue, on existing painted surfaces
including cleaning of existing surface using wire
brush, removing all dirt and dust, preparing
surface for applying painting evenly, scaffolding
at all elevation with all materials, labour, tools &
tackles, safety tools & tackles etc… all complete
as directed by Engineer-in-charge.
3 Providing and painting two coats of synthetic
enamel paint (approved make and shade of
Bergur or Asian) on wood/iron/wall surface
including cleaning of existing painted surface,
removing all rust, dirt, dust, loose paint, providing
required scaffolding, with all materials, labour,
tools & tackles, safety tools & tackles at all height
including cost of scaffolding, etc. all complete as
per instructions of Engineer-in-charge. For
payment area shall be measured as per
mentioned mode of measurement. No coefficient
shall be applicable. SM 4000.00 90.92
4 Same as above item no.3 but Including one coat
of red oxide primer.
5 Providing and painting two coats of synthetic
enamel paint (approved make and shade) over
one coat of primer on MS railing fabricated from
32NB MS/GI pipe of 1 mtr high vertical at every
approx. 1 mtr. and 4 nos 15NB horizontal pipe
including cleaning of existing painted surface,
removing all rust, dirt, dust, loose paint, providing
required scaffolding, with all materials, labour,
tools & tackles, safety tools & tackles at all height
including cost of scaffolding, etc. all complete as
per instructions of Engineer-in-charge. For
payment lenght of railing shall be measured in
Tender for “Painting of Quarters and Infrastructure Building Doors and Windows at Colony for one year (2026-27)”
Bid No. SLPP/Civil/Colony/Painting/2026
Sr. Item Description Unit Estimated Estimated Estimated
No Quantity Item Rate Amount
6 Providing and applying melamine polish (ASIAN
MAKE) in two coats over a sealer coat. Surface to
be applied polish shall be sand papered thoroughly
to remove dust grease oil spots, and minor
variations in the surface. Use 50% matt finish and
50% glossy melamine polish. only treated surface
area will be measured for payment and no
measurement shall be carried out in rft/rmt. SM 1200.00 413.85
7 Providing and applying to exterior surfaces two
coats of exterior emulsion paint of "Berger -
Walmasta" or "Asian" make ACE exterior emulsion
paint of approved color and shed over a coat of
exterior sealer on existing painted surfaces as per
manufacturer's recommendations including
cleaning of existing surface using wire brush,
removing all dirt, dust, filling of cracks with
approved crack filler, preparing surface for applying
painting evenly, scaffolding etc. complete at all
elevation as directed by Engineer-in-charge with all
materials, labour, tools & tackles, safety tools &
tackles etc… all complete. For payment actual
treated area shall be measured and no coefficient
shall be applicable. SM 1500.00 86.40
8 Providing and painting interior surface with two
coats of acrylic emulsion paint of approved
manufacture, colour and shade including cleaning
of existing painted surface, removing dirt, dust
loose paint, filling cracks with crack filler, filling
undulation with POP for making uniform surface (at
required place only), tools, tackles, safety tools and
tackles, scaffolding etc. complete at all elevation as
directed by Engineer in charge (Rates are including
shifting of racks/cupboard tables etc. for painting
wall and resifting to the same location after
completing the work). For payment actual treated
area shall be measured and no coefficient shall be
applicable. SM 500.00 91.07
9 Providing and painting interior surface with two
coats of "Berger - Silky Luxury Emulsion" or "Asian
- Royal Luxury Emulsion" paint of approved colour
and shade as per manufacturer's recommendation
including cleaning of existing painted surface,
removing dirt, dust, loose paint, filling cracks with
approved crack filler, filling undulation with POP for
making uniform surface (at required place only),
applying approved primer as per manufacturer's
recommendations with tools, tackles, safety tools &
tackles, scaffolding etc. complete at all elevation as
directed by Engineer in charge. (Rates are
including shifting of racks/cupboard tables etc. for
painting wall and resifting to the same location after
completing the work). For payment actual treated
area shall be measured and no coefficient will be
Tender for “Painting of Quarters and Infrastructure Building Doors and Windows at Colony for one year (2026-27)”
Bid No. SLPP/Civil/Colony/Painting/2026
Sr. Item Description Unit Estimated Estimated Estimated
No Quantity Item Rate Amount
10 Providing and painting surface with two coats of oil
paint (approved make) for road side concrete curb
blocks in two alternate black and white colour
including surface cleaning with wire brush. Size of
kerb stone is 400x200x100mm.
11 Providing and cleaning of existing painted surface
including removing of dirt, dust loose paint, filling
cracks with crack filler, filling undulation with Birla
White Putty for making uniform surface and
prepare the base surface for painting work (at
required place only), tools, tackles, safety tools and
tackles, scaffolding etc. complete at all elevation as
directed by Engineer in charge. For payment actual
treated area shall be measured and no coefficient
shall be applicable. SM 3000.00 51.20
12 Providing and painting of false ceiling surface with
two coats of acrylic emulsion paint including one
coat of primer of approved manufacture, colour and
shade including cleaning of existing painted
surface, removing dirt, dust loose paint, filling
undulation with POP for making uniform surface (at
required place only), tools, tackles, safety tools and
tackles, scaffolding etc. complete at all elevation as
directed by Engineer in charge. (Rates are
including shifting of racks/cupboard tables etc. for
painting of false ceiling and resifting to the same
location after completing the work). For payment
actual treated area shall be measured and no
coefficient shall be applicable.
13 Providing and painting interior surfaces with One
coat of Oil Bound Distemper paint of approved
manufacture, color and shade including cleaning of
existing painted surface, removing dirt, dust, loose
paint (at required place only), scaffolding etc.
complete at all elevation with all materials, labour,
tools & tackles, safety tools & tackles, including
shifting of racks, cupboards, tables etc. for painting
of wall and repositioning of the same after
completing the work, etc… all complete as directed
by Engineer-in-charge. For payment actual treated
area shall be measured and no coefficient shall be
14 Providing and applying two coat of "Geru"/''Chuna''
on tree of any dia size including surface
preparation, scaffolding, as directed by Engineer in
charge. SM 250.00 16.51
Tender for “Painting of Quarters and Infrastructure Building Doors and Windows at Colony for one year (2026-27)”
Bid No. SLPP/Civil/Colony/Painting/2026
Sr. Item Description Unit Estimated Estimated Estimated
No Quantity Item Rate Amount
without GST (Rs.)
15 Providing and applying one coat of minimum
micron DFT High Build ZP Primer and two coats of
High Gloss Synthetic Enamel paint, each coat of
minimum 25 micron DFT of approved colour shade
on structural steel/pipes including preparation of
surface by thoroughly cleaning of oil, dirt, dust, rust
& scale by wire brushing, power tool cleaning,
mechanical scrapers, etc... & final surface cleaning
with cotton waste before application of primer (in
case of application of primer is delayed due to any
reason, the surface preparation shall be redone at
no extra cost to GIPCL), including providing
approved MS pipe scaffolding with clamps, safety
nets, cherry packers, covering the surrounding
areas with plastic sheet/tarpaulin wherever
required, etc... as directed by Engineer-in-charge
and as per manufacturer's detail technical
specifications with all materials, labour, tools &
tackles, standard safety tools & tackles, standard
safety PPEs, etc…. complete at all elevations for
misc. structures. SM 100.00 99.47
16 Providing and applying to exterior surfaces two
coats of "Asian - Apex Weather proof exterior
emulsion" or "Berger - Weather coat" exterior
emulsion paint of approved color and shed over a
coat of exterior sealer on existing painted surfaces
as per manufacturer's recommendations, including
cleaning of existing surface using wire brush,
removing all dirt and dust, filling cracks with
approved crack filler, preparing surface for applying
painting evenly, scaffolding etc. complete at all
elevation as directed by Engineer-in-charge with all
materials, labour, tools and tackles, safety tools &
tackles etc… all complete. SM 100.00 99.20
Total SoR Amount without GST (Rs.) 23,89,130.
GST Amount @ 18%
Total SoR Amount with GST (Rs.)
Note: The Percentage rates shall be quoted online only in electronic format which should
be inclusive of cost of all material, labour, supervision, equipments, consumables,
transportation, loading, unloading, all tools & tackles, safety, all taxes and duties as
per item description (including applicable 18% GST).
Tender for “Painting of Quarters and Infrastructure Building Doors and Windows at Colony for one year (2026-27)”
Bid No. SLPP/Civil/Colony/Painting/2026
LIST OF ANNEXURES & FORMS
CHECKLIST FOR PASSING THE BILLS
For the month of :
1) Work Order / P.O. No. & :
2) Nature of work :
3) Duration of Work Order : From to
4) Maxi. No. of manpower per day : M F Total
deployed in the month.
5) Details of Labour License : Valid up to for
6) Details of E.C Policy : Valid up to for
7) Documents attached for verification : Wage & Attendance Sheets.
for the previous month. Yes/No
P.F Challan Yes/No
8) Documents attached for verification : Bonus Payment Register
(in case of Final Bill) Yes/No
: Leave wage register Yes/No
9) Security Deposit / Retention Money : Yes / No if yes, Rs.
Date : Signature of Contractor
with official stamp
Tender for “Painting of Quarters and Infrastructure Building Doors and Windows at Colony for one year (2026-27)”
Bid No. SLPP/Civil/Colony/Painting/2026
PROFORMA FOR CONTRACT SECURITY-CUM-PERFORMANCE GUARANTEE BY
SELLER / CONTRACTOR
(To be executed on non-judicial stamped paper of approximate value)
1. WHEREAS Gujarat Industries Power Company Limited having its office at PO: Ranoli,
Dist. Vadodara – 391 350, Gujarat State, India (hereinafter referred to as “The
Company/Owner” which expressions shall unless repugnant to the subject or context
includes its legal representatives, successors and assigns) has entered into a contract
with M/s. ……………………………….. ………………………….(hereinafter referred to
as “Contractor(s)/ Seller(s)” which expression shall unless repugnant to the subject or
context includes their legal representatives, successors and assigns ) for
…………………………….on the terms and conditions as set out inter alia, in the
Company’s contract No./ work order No.……………………………………………..date
…………and various documents forming part thereof hereinafter referred to as the
“said contract” which expression include all amendments, modifications and/ or
variations thereto and where as the Contractor(s)/ Seller(s) has agreed for due
execution of the entire contract and guarantees its performance including any parts
executed through any other agencies/ subcontractors
AND WHEREAS one of the conditions of the “said contract” is that
“contractor(s)/seller(s) shall furnish to the owner a Bank Guarantee from a bank
for….% (……….percent) of the total value of the “said contract” against due and faithful
performance of the “said contract” including performance guarantee obligations of the
contractor(s)/seller(s) for execution/ supplies made under the “said contract.”
2. We …………………………….Bank having its branch office at ……….……..do hereby
agree and undertake to pay the amount due and payable under this guarantee without
any demur merely on a demand from the Company stating that in the opinion of the
Company, which is final & binding, the amount claimed is due by reason of default
made by the Contractor(s)/ Seller(s) in performing any of the terms & conditions of the
said Contract including defect liability obligations, in fulfilling the performance
guarantee obligation or loss or damage caused to or would be caused to or suffered
by the Company by reason of any breach by the said Contractor (s)/ Seller(s) of any of
the terms & conditions of the contract. Any such demand made on the Bank by the
owner shall be conclusive as regards the amount due and payable by the Bank under
this guarantee. However our liability under this guarantee shall be restricted to Rs.----
3. We undertake to pay to the Company any money so demanded not withstanding any
dispute or disputes raised by the contractor(s)/ Seller(s) in any suit or proceeding
pending before any office, court or tribunal relating thereto our liability under this
present guarantee being absolute and unequivocal. The payment so made by us under
this bond shall be a valid discharge of our liability for payment there under. Our liability
to pay is not dependent or conditional on the owner proceeding against the
Contractor(s)/ Seller(s).
4. The guarantee herein contained shall not be determined or affected or suspended by
the liquidation or winding up, dissolution or change of constitution or insolvency of the
said Contractor(s)/ Seller(s) but shall in all respect and for all purposes be binding and
operative until payment of all money due or liabilities under the said contract(s)/
Order(s) are fulfilled.
Tender for “Painting of Quarters and Infrastructure Building Doors and Windows at Colony for one year (2026-27)”
Bid No. SLPP/Civil/Colony/Painting/2026
5. This guarantee will remain valid up ____________________ days or ______________
whichever is earlier. The Bank undertakes not to revoke this guarantee during its
currency without previous consent of the OWNER/PURCHASER and further agrees
that if this guarantee is extended for a period as mutually agreed between contractor
& owner/purchaser, the guarantee shall be valid for a period so extended provided
that a written request for such extension is received before the expiry of validity of
6. We ……………Bank further agree with the Company that the company shall have the
fullest liberty without our consent and without affecting in any manner our obligations
hereunder to vary any of the terms and conditions of the said Contract(s)/ Order(s) or
to extend the time of performance by the said Contractor(s) Seller(s) from time to time
or to postpone for any time or from time to time any of the powers exercisable by the
Company against the said Contractor(s)/ Seller(s) and to forbear or enforce any of the
terms and conditions relating to the said Contract(s)/ Order(s) and we shall not be
relieved from our liability by reason of any such variation, or extension being granted
to the said Contractor (s) / Seller(s) or for any forbearance, act or omission on the part
of the Company or any indulgence by the Company to the said Contractor(s)/ Seller(s)
or by any such matter or thing whatsoever which under the law relating to sureties
would, but for this provision, have affect of so relieving us.
7. Notwithstanding anything contained herein before, our liability shall not exceed
Rs…………….(Rupees…………only) and shall remain in force till..……..Unless a
demand or claim under this Guarantee is made on us within three months from the
date of expiry we shall be discharged from all the liabilities under this guarantee.
Corporate Seal of the Bank
By its constitutional Attorney
Signature of duly Authorized person
On behalf of the Bank
With Seal & Signature code
Tender for “Painting of Quarters and Infrastructure Building Doors and Windows at Colony for one year (2026-27)”
Bid No. SLPP/Civil/Colony/Painting/2026
PROFORMA FOR BANK GUARANTEE FOR EARNEST MONEY DEPOSIT
(To be executed on non-judicial stamped paper of approximate value)
1. WHEREAS M/s.Gujarat Industries Power Company Limited having its Corporate Office at PO:
Ranoli, Dist. Vadodara – 391 350, Gujarat State, India (hereinafter called “The Company
Owner” which expression shall unless repugnant to the subject or context includes its legal
representatives, successors and assigns) has issued tender paper vide its Tender
No…………………………for ------------------------ (hereinafter called “the said tender”)to
M/s.……………………………(hereinafter called the said Tenderer(s)” which expression shall
unless repugnant to the subject or context includes their legal representatives, successors
and assigns and as per terms and conditions of the said tender, the tenderer shall submit a
Bank guarantee for Rs.………. (Rupees……………..only) towards earnest money in lieu of
2. We ……………………………..Bank having its branch office at
……… do hereby undertake to pay the amount due and payable under this guarantee without
any demur, merely on a demand from the Company stating that in the opinion of the company
which is final and binding, the amount claimed is due because of any withdrawal of the tender
or any material alteration to the tender after the opening of the tender by way of any loss or
damage caused to or would be caused or suffered by the Company by reason of any breach
by the said tenderer(s) of any of the terms and conditions contained in the said tender or
failure to accept the letter of Intent Agreement or that the amount covered under this
Guarantee is forfeited. Any such demand made on the Bank by the owner shall be conclusive
as regards the amount due and payable by the Bank under this guarantee, However, our
liability under this guarantee shall be restricted to an amount not exceeding
Rs………………..(Rupees………………..only).
3. We undertake to pay to the Company any money so demanded not withstanding any dispute
or disputes raised by the tenderer (s) in any suit or proceeding pending before any office,
court or tribunal relating thereto our liability under this present guarantee being absolute and
unequivocal. The payment so made by us under this bond shall be a valid discharge of our
liability for payment there under. Our liability to pay is not dependent or conditional on the
owner proceeding against the tenderer.
4. The guarantee herein contained shall not be determined or affected or suspended by the
liquidation or winding up, dissolution or change of constitution or insolvency of the said
tenderer(s) but shall in all respect and for all purposes be binding and operative until payment
of all money due or liabilities under the said contract(s)/ Order(s) are fulfilled.
5. We ……………..Bank Ltd. further agree that the guarantee herein contained shall remain in
full force and effect during the period that would be taken for the finalization of the said tender
and that it shall continue to be enforceable till the said tender is finally decided and order
placed on the successful tenderer(s) and or till all the dues of the company under or by virtue
of the said tender have been fully paid and its claims satisfied or discharged or till a duly
authorized officer of the company certifies that the terms and conditions of the said tender
have been fully and properly carried out by the said tenderer (s) and accordingly discharges
6. That the Owner Company will have full liberty without reference to us and without affecting
this guarantee to postpone for any time or from time to time the exercise of any of the power
of the owner under the tender.
Tender for “Painting of Quarters and Infrastructure Building Doors and Windows at Colony for one year (2026-27)”
Bid No. SLPP/Civil/Colony/Painting/2026
7. Notwithstanding anything contained herein before, our liability shall not exceed
Rs…………………. (Rupees…………………………only) and shall remain in force
till…………….. (Date to be filled up shall be 180 days from the date of submission of Bid).
Corporate Seal of the Bank
By its constitutional Attorney
Signature of duly Authorized person
On behalf of the Bank
With Seal & Signature code
Tender for “Painting of Quarters and Infrastructure Building Doors and Windows at Colony for one year (2026-27)”
Bid No. SLPP/Civil/Colony/Painting/2026
PERFORMA CERTIFICATE
(No claim, No arbitration)
Chief General Manager (Thermal)
Gujarat Industries Power Company Limited,
Surat Lignite Power Plant,
Village: Nani Naroli, Ta. Mangrol,
Dist. Surat – 394110 (Gujarat).
We hereby confirm with free consent as under:-
1. The measurements certified in final bill is full and final. We accept all the certified measurements
and no claim related to the measurement is left.
2. The payment certified in that or above referred LoI / contract is full and final. We accept this, and
no claim related to payment is left.
3. The rates of the LoI / contract and its amendments are firm till completion of contract and
extension period. We shall not claim any escalation against these rates.
4. Along with the contract referred, the ARBITRATION CLAUSE also perishes i.e. we will not resort
to arbitration.
5. No extra items are left to be settled.
6. We do not have any claims against any item related to the LoI than those items certified in the
7. We are accepting the recoveries or hold amount from our bills, if any, made by GIPCL against
non-compliance or as decided by GIPCL within terms & conditions of contract.
8. We have paid royalties, taxes for all the materials procured by us, for carrying out the works for
above LoI and we indemnify GIPCL from any liability arising thereof.
9. In case of any disputes arising in future related to payment of royalties, all liabilities of settlement
of dispute and its payment if any, will be borne by us.
10. We have paid wages to all the workmen who were deployed by us for carrying out above referred
work as per prevailing Minimum wages act. We have also fulfilled all requirements of the P.F.
Act. We have maintained all records necessary as per the statutory requirements. We hereby
indemnify GIPCL from any disputes arising in future related to payment of labours, Provident
Fund, etc.. and confirm that all liabilities of settlements of disputes and their payment is our
responsibility.
The above confirmation will come into effect as soon as payment from final bill after due recoveries
will be received by us.
Signature, Stamp and date.
Tender for “Painting of Quarters and Infrastructure Building Doors and Windows at Colony for one year (2026-27)”
Bid No. SLPP/Civil/Colony/Painting/2026
List of qualifying staff to be submitted with physical documents
Sr. No. Name of Supervisor Qualification Experience
Contractor / Authorized Representative’s
Signature, Company’s / Organization’s Seal & Date
Note: Form-A of Bid without price shall be submitted with Part-I
List of Tools & Tackles to be submitted with physical documents
Sr. No. Description Nos. Status
Contractor / Authorized Representative’s
Signature, Company’s / Organization’s Seal & Date
Note: Form-B of Bid without price shall be submitted with Part-I
Tender for “Painting of Quarters and Infrastructure Building Doors and Windows at Colony for one year (2026-27)”
Bid No. SLPP/Civil/Colony/Painting/2026
Schedule of Deviation from Technical Specification and Commercial Terms and
All the deviations from the terms & conditions of contract shall be filled by BIDDER clause by
clause in this schedule.
Sr. No SECTION CLAUSE AS PER DEVIATION
The bidder here by certifies that the above mentioned are the only deviations from OWNER’s
Tender enquiry. The bidder further confirms that in the events any other data and information
presented in the BIDDER’s proposal and accompanying documents are at variance with specific
requirements laid out in the OWNER’s Tender Document, then the latter shall govern and will be
binding on the BIDDER for quoted price.
Tender for “Painting of Quarters and Infrastructure Building Doors and Windows at Colony for one year (2026-27)”
Bid No. SLPP/Civil/Colony/Painting/2026
Declaration Cum Undertaking for Safety Laws and Regulations Compliance
(To be submitted on Company’s Letter Head)
I ______________________ on behalf of ………Name of Party/Company………..hereby confirm, agree and
undertake that all the Statutory and Safety Laws and Regulations of the applicable Authority/ies shall be strictly
followed for all types of works at the site during the period of the Contract, if awarded to me.
Signed and Stamped by the
Authorized Signatory
Declaration for Contractual Disputes/ Litigations
(To be submitted on Company’s Letter Head)
Please Tick (√) whichever is correct option
______________________ on behalf of ………Name of Party/Company………..hereby confirm
that I /We have
a. Not invoked legal recourse e.g. litigation against any Govt, of Gujarat Undertakings / Depts. /
Authorities and Govt. of Gujarat supported companies / undertakings / organizations for the last three
(03) years. There are no ongoing/pending legal matter(s) with any of the Govt. of Gujarat
Undertakings / GoG supported Companies, including GIPCL.
b. Invoked legal recourse e.g. litigation against any Govt, of Gujarat Undertakings / Depts. /
Authorities and Govt. of Gujarat supported companies / undertakings / organizations for the last
three( 03) years.
If “b” is applicable, please submit the details for the same.
The above is true, as on date, to the best of my knowledge. Any breach/ false statement in this
regard shall amount to disqualification of the Bid being submitted herein.
Signed and Stamped by the
Authorized Signatory
Tender for “Painting of Quarters and Infrastructure Building Doors and Windows at Colony for one year (2026-27)”
Bid No. SLPP/Civil/Colony/Painting/2026
PROCEDURE FOR MAKING ONLINE PAYMENT OF EMD/SD/TENDER FEE
1. For making online payment, first go to the website: www.gipcl.com
2. Then, click on the caption/link as can see like:
“Click here for Making Online Payment of Advance for Ash, DM water etc.”
(The link is visible as horizontal highlighted below Tenders - News & Update Section.
3. After clicking the link the new page will open. On this page, No need to enter User Name
and Password. Directly click on “ Payment Form” given below the sign in option.
4. After clicking the “Payment Form”, the vendor has to enter the details asked which will
be self explanatory. It is desired that all the information may be filled correctly so that the
payment made can be tracked.
If the some required fields are not known/available, vendor may write “Not Available” and
then proceed. E.g. some information like Party code is not available to vendor or GST No.
not available with vendor.
Optional Note: Although mentioned as above can be proceeded with “Not available”, It will
be appreciated that regular vendors may obtain the party code from Materials Deptt. or
Concerned Person , so that the vendor can be identified. The same party code may be
used for future transactions also.
After entering the details, click on SUBMIT Button.
5. The vendor/Party will be redirected to Payment Gateway.
By selecting the desired payment mode, payment can be made:
6. After making the payment, the receipt will be generated which has to be shared with
Concerned Person of GIPCL.
Important Note: Please note that for making online payment through the above gateway,
the charges* as below will be applicable, which has to be borne by Vendor/Party making
Payment Mode Charges
Net Banking Rs.9 + GST
Credit Card 0.75% + GST
International Card 3.00% + GST
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BG Format.pdf
Tender Document for Painting in colony.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .