Temple Trustee, SKRST, JAMMAVRAM
JAMMAVARAM VILLAGE, AS PETA MANDAL , SPSR NELLORE DISTRICT (AP)
Re-Construction of Sri Kodanda Rama Swamy Temple at Jammavaram(V), A.S.Peta(M), SPSR Nellore District (AP)., Est.Cost Rs.80.00 Lakhs
892528
01/SKRST/JAMMAVARAM/2025-26, Dt:20-01-2026 of Temple Trustee, Sri Kodanda Rama Swamy Temple at Jammavaram(V), A.S.Peta(M), SPSR Nellore District (AP)
OPEN - NCB
Similar Work
SRI POTTI SRI RAMULU NELLORE
14 documents required · 13 mandatory · 1 optional
₹2,315
₹66,000
24 Jan 2026
24 Jan 2026
24 Jan 2026
Earth work excavation and depositing on bank with intial lead of 10m and initial lift of 2m in loamy cleay soils like block cotton soils hard red earth and ordinary gravelly soils etc.,complete for foundation
Sand filling in foundation with wall watering ramming and including cost and conveyance of sand labour charges, curing etc., complete for Temple & Mandapam & Dwajam
C.C(1:4:8) using 40mm HBG metal including cost and conveyance of all materials to work spot, labour charges, curing etc.,complete for Temple & Mandapam & Dwajam
R.R Masonry in C.M(1:6) using Rough Stone including cost and conveyance of all materials to work spot, labour charges, curing etc.,complete for Temple & Mandapam & Dwajam
Supply and fixing of Hard Granite stone with required ornamentation including cost and conveyance of stone, labour charges for dressing and fixing on position etc.,complete A) Cost and conveyance of stone
B) Rough Dressing a) Upto Sthambhavargam
b) Above Sthambhavargam
C) 5 Line Palamana Dressing a) Chitravanam
b) Upapeetam Padmajagathi
c) Upapeetam Kantam
d) Upapeetam Kapothakam
f) Adistanam Jagathi
g) Adistanam Kumudakam
h) Adistanam Pattika
i) Sthambhavargam
j) Prastharam Uttaram
k) Prastharam Kapothakam
l) Prastharam Vyalam
m) Inside Walls & Roof
D) Cost of Tool making materials like Chisels, charcoal for furnace etc., for 5 line palamana dressing
E) Labour charges for Jointing
Brick work in C.M(1:5) using 2nd class bricks iccluding cost and conveyance of cement and all other materials to work spot, labour charges, curing etc., complete for Steps
Ornamental Brick work in C.M(1:5) using 2nd class bricks iccluding cost and conveyance of cement and all other materials to work spot, labour charges, curing etc., complete Upto Prastharam Level
Supply and fixing of Hard Granite cut stone door frame including cost and conveyance of stone, labour charges for dressing and fixing on position etc.,complete a) Cost and conveyance of stone
b) Labour charges for dressing stone with required ornamentation
c) fixing charges for in position of door frames as per plan upto 7.0 mtrs ht.
Supply and fixing of Granite cut stone Somasutram including cost and conveyance of stone, labour charges for dressing and fixing on position etc.,complete For Somasutram Ordinary
VRCC (1:1 1/2 : 3) using 20mm HBG meal including cost and conveyance of cement and all other materials to work spot labour charges curing etc., complete but excluding cost and conveyance of steel its fabrication charges etc., a) For Footings
b) For Pedastals
c) For Plinth Beam
e) For Roof beams
f) For Roof slab
g) For Kodangai
h) For Raft Foundation
Supply and fixing of TAR Steel including cost and conveyance cutting, cracking bending and tying Grills and placing in position as directed including cost of binding wire fabrication charges etc., complete
Providing Weather Proof Course Plastering with CM (1:3) 20mm thick mixed with Accoproof including cost and conveyance of cement and all other materials to work spot labour charges curing etc., complete
Plastering with CM (1:3) 12mm thick with cement and using fine veriety of sand including cost and conveyance of cement and all other materials to work spot labour charges curing etc., complete
Plastering with CM (1:5) 20mm thick with cement and using fine veriety of sand including cost and conveyance of cement and all other materials to work spot labour charges curing etc., complete
Ornamental Plastering with CM (1:3) 20mm thick and CM (1:2) 12mm thick with required ornamentation rendering nealty with cement and using fine veriety of sand including cost and conveyance of cement and all other materials to work spot labour charges curing etc., complete a) Upto Sthambhavargam Level
b) Above Sthambhavargam Level
f) For Pushpa Pothikas
g) For Ceiling Padmam
Providing Cement Vigrahams using cement, fine sand Iron bars, mesh, brick bats, flat tile pieces etc., complete including cost and conveyance of all materials labour charges, curing etc., complete a) Standing Posture with 2 hands.
b) Sitting posture with 4 hands
c) For Gopannadharies
Supplying and fixing of best teak wood ornamental door shutters with two leaves as per standard temple design including cost of frame and flanks and preparation charges, fixing of shutters in position with locking arrangements etc., complete.
Painting with best Emulsion Paint two coats over primary coat including cost and conveyance of cement and lall other materials to work spot labour charges, curing etc., complete
Providing Best teak wood for Dwajasthambam including cost and of wood labour Charges for shapping and cutting of log errection on cut stone base including cost of meghalalu, Brass bells etc., complete. a) Cost of Teak Wood
b)Loading, Unloading and Conveyance
c) Cutting and Shapping of Dwajam Log
d) Granite Cut Stone Bed
e) Supplying & Fixing of Meghalalu, Upadandam, Palavalli etc., in teak wood and including preparation and fixing etc., Complete
f) Supplying & Fixing of Brass Bells
g) Errection of Dwajam
Providing Brass Sheet covering to Dwajam using 12 to 18 guage sheet including cost and conveyance of all materials such as brass sheet(ISI make) brass nails polished and all labour charges etc., complete as per sketch
Supplying and fixing of Carving Stone Balipeetam as per sketch approved by the Sthapathi including coat and conveyance of stones, all labour charges with fine dressing, polishing with Padmarekulu etc., complete.
Supplying and Fixing of Brass stoopi with stoopi dandam including cost and conveyance of all materials and labour charges etc., complete
Supplying and fixing of scaffolding charges to structure including cost and conveyance of all materials to such as casino poles bamboos flatform nails and coir rope etc., complete. a) Upto 20'0" Ht
b) Above 20'0" Ht and 40'0" Ht
Supply and fixing of Cut stone flooring from Kuppam with 3line dressing f mild including cost and conveyance of all materials to work spot labour charges etc. A) Cost of Stone
3 Line Palamana Dressing
Labour Charges for Jointing
Total No. of Items 70 Nos ( Seventy Items Only)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.01 MB
1 RE CON OF SKRST-JAMMAVARAM-BOQ-SCHEDULE.xls
TENDER_DOCUMENT • 0.06 MB
1 RE CON OF SKRST-JAMMAVARAM-SBD.doc
TENDER_DOCUMENT • 0.62 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .