| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 LAccepted-AOC | ₹2.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹2.8 L+₹5,216 (1.92%)Rejected-Finance M K ENGINEERS AND CONTRACTORS PARASSALA TVPM | PARASSALA | THIRUVANANTHAPURAM | KERALA | ₹2.8 L+₹5,216 (1.92%) | L2 | Rejected-Finance L2 |
| 3 | L3₹3.0 L+₹26,882 (9.90%)Rejected-Finance | ₹3.0 L+₹26,882 (9.90%) | L3 | Rejected-Finance L3 |
| 4 | L4₹3.2 L+₹45,562 (16.8%)Rejected-Finance AMARAVILA KERALA | THIRUVANANTHAPURAM | KERALA | 695001 | ₹3.2 L+₹45,562 (16.8%) | L4 | Rejected-Finance L4 |
| Sl No | Description | Qty | Unit | MANOJ KUMAR S (M.K.Engineers And Contractor) L2 | MANU S S L4 | ARUNRAJ R T L1 | ANIL KUMAR P L3 |
|---|---|---|---|---|---|---|---|
| 1.00Compound wall Maintenance | |||||||
| 1.00 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 17.14 | cum | 550 ₹9,424.8 Lowest | 1,874.4 ₹32,119.72 | 1,604.57 ₹27,495.91 | 1,763.51 ₹30,219.51 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 9.24 | cum | 200 ₹1,848 Lowest | 315.99 ₹2,919.75 | 271.01 ₹2,504.13 | 297.85 ₹2,752.13 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 1.32 | cum | 4,500 ₹5,940 Lowest | 6,981.85 ₹9,216.04 | 5,976.47 ₹7,888.94 | 6,568.44 ₹8,670.34 |
| 1.00 | OD112806/2026-2027:Random rubble masonry with hard stone in foundation and plinth up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 17.82 | cum | 5,700 ₹1,01,574 | 6,457.5 ₹1,15,072.65 | 5,693.95 ₹1,01,466.19 Lowest | 6,257.94 ₹1,11,516.49 |
| 1.00 | 50.6.1.1:Solid block masonry using pre cast solid blocks ( factory made) of size 40x20x20cm or nearest available size confirming to IS 2185 part 1 of 1979 for foundation and plinth with thickness 20 cm and above in: CM 1:6 ( 1 cement : 6 coarse sand) etc complete | 8.25 | cum | 7,350 ₹60,637.5 | 5,576.7 ₹46,007.78 | 4,774.16 ₹39,386.82 Lowest | 5,247.04 ₹43,288.08 |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.98 | cum | 8,250 ₹16,335 | 9,230.78 ₹18,276.94 | 7,902.01 ₹15,645.98 Lowest | 8,684.71 ₹17,195.73 |
| 1.01 | 5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 6.6 | sqm | 300 ₹1,980 Lowest | 738.74 ₹4,875.68 | 632.54 ₹4,174.76 | 695.19 ₹4,588.25 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 158.4 | kilogram | 86 ₹13,622.4 | 98.15 ₹15,546.96 | 84.7 ₹13,416.48 Lowest | 93.09 ₹14,745.46 |
| 1.01 | OD70011/2024-2025:Coping work over the compound wall with brick work in CM 1:4 using departmental bricks and plastering with CM 1:4 etc complete as per approved design. | 22 | metre | 1,000 ₹22,000 | 680.19 ₹14,964.18 | 437.86 ₹9,632.92 Lowest | 481.23 ₹10,587.06 |
Tender Value
₹3.7 L
EMD Value
₹9,206
Closing Date
14 Aug 2026, 11:00 amClosed
The Assistant Executive Engineer, PWD Building
O/o the Assistant Executive Engineer, PWD Buildings Sub division, PMG, Thiruvananthapuram.
GENERAL-State Central Library TVPM - Reconstruction of damaged compound wall (Fine arts College Side)-Reconstruction of damaged compound wall (Fine arts College Side)-General Civil Work
2026_PWD_864141_1
PWD/BLDG/TR/11255/2024_5_1_1/1
Open Tender
Civil Works - Buildings
Item Wise
120 days
Thiruvananthapuram
Please refer Tender documents.
10 documents required · 10 mandatory
₹815
Yes
₹9,206
Yes
18 Sept 2026
4 Aug 2026
17 Aug 2026
4 Aug 2026
14 Aug 2026
4 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Compound wall Maintenance | |||||
| 1.001 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 1 | cum | - | - |
| 1.002 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | - | cum | - | - |
| 1.003 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.004 | OD112806/2026-2027:Random rubble masonry with hard stone in foundation and plinth up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | - | cum | - | - |
| 1.005 | 50.6.1.1:Solid block masonry using pre cast solid blocks ( factory made) of size 40x20x20cm or nearest available size confirming to IS 2185 part 1 of 1979 for foundation and plinth with thickness 20 cm and above in: CM 1:6 ( 1 cement : 6 coarse sand) etc complete | - | cum | - | - |
| 1.006 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.007 | 5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 1 | sqm | - | - |
| 1.008 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | - | kilogram | - | - |
| 1.009 | OD70011/2024-2025:Coping work over the compound wall with brick work in CM 1:4 using departmental bricks and plastering with CM 1:4 etc complete as per approved design. | - | metre | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1462025.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.04 MB
BOQ_1462025.xls
BOQ • 0.30 MB
viewsbd.pdf
Tender Documents • 1.63 MB
epayment.pdf
Other Document • 0.05 MB
PreliminaryAgreement.pdf
Other Document • 0.27 MB
declaration.pdf
Tender Documents • 0.00 MB
form_of_tender.pdf
Other Document • 0.18 MB
integrity_pact.pdf
Other Document • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .