Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹16.0 LAdmitted-Fee/PreQual/Technical/Finance | -14.55% | ₹16.0 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹17.8 L+₹1.8 L (11.2%)Admitted-Fee/PreQual/Technical/Finance | -5.00% | ₹17.8 L+₹1.8 L (11.2%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹18.8 L
EMD Value
₹37,500
Closing Date
17 Mar 2026, 12:30 pmClosed
COMMISSIONER MUNICIPAL CORPORATION JODHPUR
MUNICIPAL CORPORATION JODHPUR
CONSTRUCTION OF NEW TOILET NEAR RAVAN KA CHABUTRA IN NAGAR NIGAM JODHPUR
2026_DLB_542006_3
NIT 6791 DATE 23.02.2026
Open Tender
Civil Works
Percentage
180 days
NEAR FIRE STATION OFFICE BASNI
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
COMMISSIONER MUNICIPAL CORPORATION JODHPUR
₹37,500
Yes
17 Mar 2026
25 Feb 2026
17 Mar 2026
25 Feb 2026
17 Mar 2026
25 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground/ Road top level
Depth upto 1.5 m | 57.98 | cum | 229.5 | ₹13,306.41 |
| 2 | Carriage of Materials by mechanical transport including loading, unloading and stacking :: Earth work 5 km | 40 | cum | 254.76 | ₹10,190.4 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size). | 10.2 | cum | 4,575 | ₹46,665 |
| 4 | Random rubble masonry with hard stone in foundation and plinth Cement mortar 1:6 (1 cement : 6 coarse sand) | 32.96 | cum | 4,860 | ₹1,60,185.6 |
| 5 | Coursed rubble masonry (second sort) with hard stone in foundation & plinth with : Cement mortar 1:6 (1 cement : 6 coarse sand) | 46.04 | cum | 5,640 | ₹2,59,665.6 |
| 6 | Extra for coursed rubble masonry with hard stone (first or second sort) in superstructure above plinth level and upto two stories | 46.04 | cum | 970 | ₹44,658.8 |
| 7 | Half brick masonry with FPS bricks of class designation 75 in superstructure above plinth level upto two stories. Cement mortar 1:4 (1 cement :4 coarse sand) | 36.29 | sqm | 767 | ₹27,834.43 |
| 8 | Centring and shuttering with plywood or steel sheet upto two stories or height upto 7.5 metre above plinth level including strutting, propping etc. and removal of form for :
Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. | 8.57 | sqm | 367 | ₹3,145.19 |
| 9 | Lintels, beams, plinth beams, girders, bressumers and cantilevers. | 13.65 | sqm | 426 | ₹5,814.9 |
| 10 | Suspended floors, roofs, landings, balconies and access platform. | 53.98 | sqm | 456 | ₹24,614.88 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 9.61 MB
BOQ_966330.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .