| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.2 CrAccepted-AOC VILL CHASRA NO 1 BARPETA P O SATRAKANARA P S BHAGBAR DIST BARPETA ASSAM PIN 781308 | BARPETA | BARPETA | ASSAM | 781308 | ₹16.2 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹16.2 Cr+₹5,000 (<0.01%)Rejected-AOC | ₹16.2 Cr+₹5,000 (<0.01%) | L2 | Rejected-AOC L2 |
| 3 | L3₹16.2 Cr+₹5,000 (<0.01%)Rejected-AOC 2ND FLOOR GANESH MARKET BEHARBARI CHARIALI GUWAHATI ASSAM | DHUBRI | ASSAM | 783371 | ₹16.2 Cr+₹5,000 (<0.01%) | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | JITU MONI SUT L2 | SAFIKUL ISLAM L2 | RAHIM BADSHA L1 |
|---|---|---|---|---|---|---|
| 1.00 | 1. Civil, Sanitary amd Plumbing Works
Treatment of soil under existing floors using chemical emul sion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor:
2.35.3.1 With Chlorpyriphos/Lindane E.C. 20% with 1% concentration | 2,291 | Sqm | 260 ₹5,95,660 Lowest | 260 ₹5,95,660 Lowest | 260 ₹5,95,660 Lowest |
| 2.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
4.1.8 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size
derived from natural sources) | 204.92 | Sqm | 8,900 ₹18,23,788 Lowest | 8,900 ₹18,23,788 Lowest | 8,900 ₹18,23,788 Lowest |
| 3.00 | Centering and shuttering including strutting, propping etc. and removal of form for
5.9.5 Lintels, beams, plinth beams, girders, bressumers and cantilevers | 2,479.9 | Sqm | 700 ₹17,35,930 Lowest | 700 ₹17,35,930 Lowest | 700 ₹17,35,930 Lowest |
| 4.00 | 5.9.6 Columns, Pillars, Piers, Abutments, Posts and Struts | 760.85 | Sqm | 850 ₹6,46,722.5 Lowest | 850 ₹6,46,722.5 Lowest | 850 ₹6,46,722.5 Lowest |
| 5.00 | 5.9.3 Suspended floors, roofs, landings, balconies and access platform | 3,037.34 | Sqm | 800 ₹24,29,872 Lowest | 800 ₹24,29,872 Lowest | 800 ₹24,29,872 Lowest |
| 6.00 | 5.9.7 Stairs, (excluding landings) except spiral-staircases | 81.23 | Sqm | 700 ₹56,861 Lowest | 700 ₹56,861 Lowest | 700 ₹56,861 Lowest |
| 7.00 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage
for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete
5.33.1.2 All works upto Plinth Level | 208.66 | Cum | 9,500 ₹19,82,270 Lowest | 9,500 ₹19,82,270 Lowest | 9,500 ₹19,82,270 Lowest |
| 8.00 | 5.33.2.2 All works above plinth level upto floor V level | 808.12 | Cum | 10,800 ₹87,27,696 Lowest | 10,800 ₹87,27,696 Lowest | 10,800 ₹87,27,696 Lowest |
| 9.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
5.22.6 Thermo-Mechanically Treated bars of grade Fe-500D or more. | 9,803.74 | Cum | 95 ₹9,31,355.3 Lowest | 95 ₹9,31,355.3 Lowest | 95 ₹9,31,355.3 Lowest |
| 10.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.
5.22A.6 Thermo-Mechanically Treated bars of grade Fe-500D or more. | 1,65,134.96 | Cum | 95 ₹1,56,87,821.2 Lowest | 95 ₹1,56,87,821.2 Lowest | 95 ₹1,56,87,821.2 Lowest |
Tender Value
₹16.2 Cr
EMD Value
₹32.5 L
Closing Date
13 Mar 2026, 12:30 pmClosed
Sri J.M. Basumatary
O/o the Addl. Chief Engineer-cum-Director, PWD, BTC, Kokrajhar.
Development of State Guest House at Kokrajhar, BTC under Grant to BTC for Infrastructure Development Fund for the Financial Year 2022-23 (Balance Work).
2026_BTC_51494_1
No.28/ACE/Infra/BTC/2025-26/03
Open Tender
Civil Works - Building
Item Rate
365 days
Kokrajhar
Refer to SBD
4 documents required · 4 mandatory
₹20,000
₹32.5 L
Yes
14 May 2026
26 Feb 2026
13 Mar 2026
26 Feb 2026
13 Mar 2026
26 Feb 2026
26 Feb 2026 - 13 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1. Civil, Sanitary amd Plumbing Works
Treatment of soil under existing floors using chemical emul sion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor:
2.35.3.1 With Chlorpyriphos/Lindane E.C. 20% with 1% concentration | - | Sqm | - | - |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
4.1.8 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size
derived from natural sources) | 1 | Sqm | - | - |
| 3 | Centering and shuttering including strutting, propping etc. and removal of form for
5.9.5 Lintels, beams, plinth beams, girders, bressumers and cantilevers | - | Sqm | - | - |
| 4 | 5.9.6 Columns, Pillars, Piers, Abutments, Posts and Struts | - | Sqm | - | - |
| 5 | 5.9.3 Suspended floors, roofs, landings, balconies and access platform | - | Sqm | - | - |
| 6 | 5.9.7 Stairs, (excluding landings) except spiral-staircases | - | Sqm | - | - |
| 7 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage
for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete
5.33.1.2 All works upto Plinth Level | 1 | Cum | - | - |
| 8 | 5.33.2.2 All works above plinth level upto floor V level | - | Cum | - | - |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
5.22.6 Thermo-Mechanically Treated bars of grade Fe-500D or more. | 1 | Cum | - | - |
| 10 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.
5.22A.6 Thermo-Mechanically Treated bars of grade Fe-500D or more. | 0.29 | Cum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.33 MB
SBD.pdf
Tender Documents • 2.47 MB
FOB.pdf
Additional Documents • 0.25 MB
BOQ_81755.xls
BOQ • 0.48 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .