Loading…
Loading…
Tender Value
₹2.5 L
EMD Value
₹4,980
Closing Date
2 Sept 2026, 4:00 pm
EXECUTIVE ENGINEER RNB DIVISION URI
EXECUTIVE ENGINEER RNB DIVISION URI
Construction of Protection wall at Khan Mohalla link Road Zehampora near House of Abdul Qayoom Khan and Shafiq Ahmad Khan
2026_PWDJK_320799_2
enit No 56 of 2026-27
Open Tender
Civil Works
Percentage
URI
Crash Barrier at Pringle Limber Road
2 documents required · 2 mandatory
₹200
EXECUTIVE ENGINEER RNB DIVISION URI
₹4,980
13 Aug 2026
13 Aug 2026
3 Sept 2026
13 Aug 2026
2 Sept 2026
13 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | - | Cum | 256.85 | - |
| 2 | Providing and laying of stone soling hand packed including all cost and carriage complete job as per direction of Engineer Incharge at Site. | - | Cum | 1,100 | - |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | - | Cum | 5,202.9 | - |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | - | Cum | 5,733.6 | - |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | - | Sqm | 286.35 | - |
| 6 | Carriage of materials by Mechanical Transport including loading, unloading and stacking complete job: | - | - | - | - |
| 7 | Sand avg lead upto 25 km | - | Cum | 465.14 | - |
| 8 | Stone aggregate avg lead upto 30 km | - | Cum | 520.34 | - |
| 9 | Taking of Geo Tag Photographs of size 125mmx250mm before execution, during execution and after execution of work (04 No. Each Pre, Post, After execution) to be submitted with the bill complete job. (Geo Tag Photographs showing Name of Work, Location and Longitude/ Latitude).(Pre, Post, After execution). | - | No | 100 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.59 MB
BOQ_1067788.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].