Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹11.9 L
EMD Value
₹24,000
Closing Date
16 Dec 2025, 2:00 pmClosed
EE NH Div PWD Lohaghat
EE NH Div PWD Lohaghat
Construction of Retaining wall at Chainage 183.920 of NH-09 under FDR (N)(2025-2026).
2025_MoRTH_888334_1
2001/Tender Dt 02.12.2025
Open Tender
Civil Works - Others
Item Rate
122 days
Lohaghat
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹24,000
24 Dec 2025
3 Dec 2025
17 Dec 2025
3 Dec 2025
16 Dec 2025
3 Dec 2025
Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction. Including All Material, Labour & T&P etc Complete in all Respect.
Concrete with cement, coarse sand and 40 mm gauge stone ballast in proportion 1:4:8 in foundations and floors including supply of all material, labour and T&P etc. required for proper completion of the work. as per drawings and technical specifications Clause 802, 803, 1202 & 1203. Including All Material, Labour & T&P etc Complete in all Respect.
Random rubble stone masonry in cement mortar (1:5) for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 . Including All Material, Labour & T&P etc Complete in all Respect.
Providing weep holes in Brick masonry /Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications. Including All Material, Labour & T&P etc Complete in all Respect.
Hand Packed stone filling in back of wallls including cost of all materials, royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications) Including All Material, Labour & T&P etc Complete in all Respect.
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 P.C.C. grade M 20 Nominal mix (1:2:4) (For height upto 5 m)
Construction of Parapet. Including All Material, Labour & T&P etc Complete in all Respect.
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 0.24 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.65 MB
BOQ_933698.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .