Loading…
Loading…
Tender Value
₹27.7 L
EMD Value
₹27,718
Closing Date
12 May 2026, 5:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Executive Engineer, Capital Project Division No.3, Gandhinagar
Repairing and Rewinding of various size of submerged (SCF) type Motor /Pump set
301259
Notice No. SK-1 Of 2026-27. (2nd Attempet)
Open
Civil - All
Gandhinagar
5 documents required · 5 mandatory
₹1,500
Executive Engineer, Capital Project Division No.3, Gandhinagar
₹27,718
4 May 2026
4 May 2026
4 May 2026
12 May 2026
4 May 2026
Name of Work :-2215-Water supply and sanitation. - 101- Gandhinagar water supply scheme.
Repairing and rewinding of different size S.C.F. pumps and motors at charedi water supply head works in G.T.S.
BILL OF QUAINTITIES
MEMORANDUM SHOWING THE ITEM OF WORKS TO BE CARRIED OUT
Item Description of Item Quantity Unit Rate In figures Amount
Repairing and Rewinding of 300 H.P. (SCF)
submerged centrifugal pump set by
Repapering/ Replacing following parts and
putting the pump set in to working order. . (1)
Motor Rewinding charges.
(2) "O" ring Set.
(3) Upper and lower bearing.
Item Description of Item Quantity Unit Rate In figures Amount
(4) Cable Sealing, Gromet.
(5) Mechanical seal Upper and lower.
(6)Thermostate and Moisture sensor.
(8) Oil 20W 40 Castrol CRV
Item Description of Item Quantity Unit Rate In figures Amount
(9) Labour charge for pump set dismantling
and fitting etc.
(10) Impeller repairing and balancing.
(11) Installation charge with transportation,
labour charges for pump set lifting and
lowering with tools, tackles etc.
(12) Supply and fitting of guide pipe of size
2.5" by welding new support and fitting the
pipe in one line with necessary safety
equipment required to go down in trolley the
welder with helper.
Item Description of Item Quantity Unit Rate In figures Amount
Repairing and Rewinding of 180 H.P. (SCF)
submerged centrifugal pump set by
Repapering/ Replacing following parts and
putting the pump set in to working order. . (1)
Motor Rewinding charges.
(2) "O" ring Set.
(3) Upper and lower bearing.
(4) Cable Sealing, Gromet.
(5) Mechanical seal Upper and lower.
Item Description of Item Quantity Unit Rate In figures Amount
(6)Thermostate and Moisture sensor.
(8) Oil 20W 40 Castrol CRV
(9) Labour charge for pump set dismantling
and fitting etc.
(10) Impeller repairing and balancing.
Item Description of Item Quantity Unit Rate In figures Amount
(11) Installation charge with trasportation,
labour charges for pump set lifting and
lowering with tools, tackles etc.
(12) Supply and fitting of guide pipe of size
2.5" by welding new support and fitting the
pipe in one line with necessary safety
equipment required to go down in trolley the
welder with helper.
Rupees Twenty seven lakhs seventy one thousand seven hundred eighty one and paise eighty eight
Executive Engineer,
Capital Project Division No.3
Item Description of Item Quantity Unit Rate In figures Amount
I/We am/are willing to carry out the above work @ ____________ % below/above percent (should be written in figures
and words) of the estimated rates mentioned above Amount of my/our tender works out as under.
Estimated cost put to tender Rs. 27,71,781=88 Estimated cost put to tender Rs. 27,71,781=88
Deduct ___________% below Add__________% above
In words In Words
Note 1 The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge for
which no extra payment shall be made.
Note 2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
Note 3 GST and Income tax TDS will be deducted at a source while making payments of bills
Note 4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-10/2017
Cement Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where there is a change as per actual
mix design the cost of difference of cement consumption have been deducted from the rate of original item at the rate of input rate
mentioned in all the tender.
Executive Engineer,
Capital Project Division No.3
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
File No.1 E-Tendering Notice.pdf
File No.2 SBD.pdf
File No.3 BOQ.pdf
File No.4 Specification.pdf
File No.5 Condition G.R.pdf
File No.6 Electrical Book.pdf
Download all tender documents and submit your bid