Loading…
Loading…
Tender Value
₹3.3 L
EMD Value
₹3,306
Closing Date
17 Apr 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Chief Officer, Kutiyana Nagarpalika
CONSTRUCTION OF COMMUNITY HALL AT BHADAR ZAPA KUTIYANA, DIST. PORBANDAR
292462
KutiyanaNP/CommuHall/T44/2-R00
Open
Civil Works - Buildings
Porbandar
3 documents required · 3 mandatory
₹600
Chief Officer, Kutiyana Nagarpalika, Kutiyana
₹3,306
2 Apr 2026
2 Apr 2026
2 Apr 2026
17 Apr 2026
2 Apr 2026
One percent of the Estimated cost of work put to tender shall be recovered from the running bills of the contractor as testing charges,
after deducting the cost of material proposed in scheduled-B at basic rate. One percent labour cess will be deducted from contractor’s
I/ We am/are willing to carry out the work at _____________________% above / below _____________________________%
(should be written in figure and words)
below / above the estimated rates mentioned above amount of my / our tender works out as under :-
Estimated amount put to tender :
SCHEDULE NAME OF WORK AMOUNT
1) All the work shall be carried out as per MOST specification and specification on the division or as directed.
2) Rates quoted includes clearance of site (prior to commencement of work and at its closed) in all respects and held gross for
under all conditions, site moisture weather etc.
3) In RCC item when there is change in grade of concrete mix or change in consumption of cement as per actual mix design
then the difference in consumption of cement shall be deducted from the rate of original item valued at the star rate as
mentioned in tender. However no extra payment shall be made for use of additional Quantity of cement as per actual
concrete mix design. Concrete mix design shall be done in GERI laboratory only.
4) The Contractor shall exhibits a board as per Govt. circular No. 2DK – 3277 / 1657 N Dt. 26–01-73 with detail of specification
and details of work and amount involved at site without any payment as directed by the Engineer in charge.
5) Testing of materials be as per statement attached with the Specifications, the materials shall be tested in G.E.R.I. Bill for
testing shall be paid by the Executive Engineer and 1% of the (one percent) of amount put to tender after shall be
recovered from the running account bills of the works. (As per G.R. (R&B) Dept.., No. TNC/1085/4/C Dtd. 20.12.91.
6) The contractor shall quote even "NIL" if no reduction is proposed.
7) One precent of estimated cost put to tender for this work shall be recovered from the contract payments as "LABOUR CESS".
In terms of the Gujarat Government Gazette Extra ordinary dated 12.12.04. Implementation of building and other
construction workers regulation of equipments and conditions of service Act-1996)
8) Photographs of before work and after work will be submitted by the contractor at the time of each bill submission.
9) GST Will Be Paid Extra as actual Bill Amount.
Signature of contractor Kutiyana Nagarpalika
KUTIYANA NAGARPALIKA
KUTIYANA, DIST. PORBANDAR
Name of Project: CONSTRUCTION OF COMMUNITY HALL AT BHADAR ZAPA KUTIYANA, DIST. PORBANDAR
SCHEDULE - "B-1"
Item Quantities Item Description Estimated Rates Unit Total Amount
Item Quantities Item Description Estimated Rates Unit Total Amount
No. Estimated but in Figure in Words according to
may be more estimated
or less quantities.
1 Excavation for foundation up to 1.5 m depth including
sorting out and stacking of useful materials and
disposing off the excavated stuff up to 50 Meter lead.
Rupees One Hundred Twenty
(A) Loose or soft soil
3.10 128.79 Eight and Seventy Nine Paise cum
2 Excavation for foundation up to 1.5 m depth including
sorting out and stacking of useful materials and
disposing off the excavated stuff up to 50 Meter lead.
Rupees One Hundred Sixty
(B) Dense or Hard soil
6.09 164.82 Four and Eighty Two Paise cum
3 Providing and laying cement concrete 1:3:6 (1 Cement :
3-coarse sand : 6-Hand broken stone aggregate 40 mm.
Nominal size) and curing complete excluding cost of
Rupees Three Thousand One
form work in :(a) Foundation and plinth
Hundred Eighteen and Seven
3.15 3118.07 Paise cum
4 White Stone Bela masonry block in course in
superstructure with stone of approved quality in Lime
Rupees Five Thousand Three
Mortar 1:1.5 (1-Lime putty : 1.5-fine sand) including
Hundred Seventy Nine and
packing the joints etc. complete.
8.59 5379.02 Two Paise cum
5 Providing and laying cement concrete 1:3:6 (1- cement
: 3-coarse sand : 6-crushed stone aggregates 20mm
nominal size) and curing complete including cost of form
Rupees Four Thousand One
work in : (A): COPING/WALL CAPS
Hundred Ninety Two and
0.63 4192.33 Thirty Three Paise cum
Item Quantities Item Description Estimated Rates Unit Total Amount
Item Quantities Item Description Estimated Rates Unit Total Amount
No. Estimated but in Figure in Words according to
may be more estimated
or less quantities.
6 White stone Bela masonry block in course in super
structure with stone of approved quality in cement
Rupees Six Thousand Five
mortar 1:6 (1 cement : 6 course sand) including racking
Hundred Twenty Four and
the joints etc. complete
13.18 6524.01 One Paisa cum
7 Providing laying Controlled cement concrete M-200 and
curing complete including the cost of form work and
Rupees Six Thousand Five
including cost of reinforcement for reinforced concrete
Hundred Fifty Three and
work in :RCC Lintels
1.29 6553.89 Eighty Nine Paise cum
8 Providing laying Controlled cement concrete M-200 and
curing complete including the cost of form work and
Rupees Six Thousand Five
Including cost of reinforcement for reinforced concrete
Hundred Twenty Four and
work in :RCC Slabs & Landings
2.98 6524.60 Sixty Paise cum
9 Providing TMT Bar FE 500D reinforcement for R.C.C.
work including bending, binding and placing in position
complete up to floor two level Rupees Seventy Seven and
328.70 77.29 Twenty Nine Paise Kgs.
10 Providing 10 mm thick cement plaster in single coat on
brick/concrete walls for interior plastering up to floor
two level and finished even and smooth in & Extra over
items for finishing with a floating coat of neat cement
slurry for plastering on ceiling and soffits of stairs up to
floor two level instead of plastering on walls. (ii) Cement Rupees Two Hundred Eight
24.91 mortar 1:4 ( 1 cement : 4 sand) 208.41 and Forty One Paise sqm
11 Providing 15mm thick cement plaster in single coat on
Rough (Similar) side of single or half brick walls for
interior plastering up to floor two level and finished even
and smooth in. & Extra over items for finishing with a
floating coat of neat cement slurry. (ii) Cement mortar Rupees Two Hundred Twenty
51.56 1:4 (1-cement : 4-sand) 221.90 One and Ninety Paise sqm
Item Quantities Item Description Estimated Rates Unit Total Amount
Item Quantities Item Description Estimated Rates Unit Total Amount
No. Estimated but in Figure in Words according to
may be more estimated
or less quantities.
12 Providing 20mm thick cement plaster in single coat on
single or half brick walls for interior plastering up to
floor two level and finished even and smooth in (i)
Rupees Two Hundred Forty
Cement mortar 1:3 (1-cement:3-sand)
92.61 241.48 One and Forty Eight Paise sqm
13 P & L 24" X 24" vitrified 8mm thick tile flooring over
20mm (average) base of cement mortar 1:6 (1-cement
: 6-coarse sand) on new surface or fixing on existing
flooring by adhesive material including dismantling of
existing flooring and jointed with color cement slurry Rupees One Thousand Four
including finished with flush pointing & cleaning the Hundred Seventy Two and
16.00 surface etc. complete for dark shed 1472.91 Ninety One Paise sqm
14 Distempering (Two coats) with oil bound washable
distemper of approved brand and manufacture and of
required shade on wall surfaces to give an even shade,
over and including a priming coat with alkali resistance
primer of approved brand after thoroughly brushing the
surface and other foreign matter and also including
preparing the surface even and sand papered smooth. Rupees Eighty and Thirty
76.47 80.33 Three Paise sqm
15 Finishing wall with weather proof exterior emulsion
paint on wall surface (two coats) to give an required
shape even shade after thoroughly brushing the surface
to remove all dirt, and remains of loose powdered
Rupees One Hundred Twenty
materials. Etc complete
92.61 122.14 Two and Fourteen Paise sqm
16 Providing and fixing M.S. grills of required pattern to
wooden frames of windows etc. with M.S. flats at
required spacings and frame around, square or round
Rupees One Hundred
bars with round headed bolts and nuts or by screws. A)
Fourteen and Forty Four
64.80 114.44 Paise Kgs.
Item Quantities Item Description Estimated Rates Unit Total Amount
Item Quantities Item Description Estimated Rates Unit Total Amount
No. Estimated but in Figure in Words according to
may be more estimated
or less quantities.
17 Painting two coats (including priming coat) on new steel
and other metal surface with enamel paint, brushing,
interior to give an even shade including cleaning the
surface an even shade including cleaning the surface of
Rupees One Hundred Thirty
all dirt, dust and other foreign matter.
4.32 134.73 Four and Seventy Three Paise sqm
18 Providing and fixing window having extruded aluminium
Colour anodized section frame main outer size 63.50 x
38.10 x 1.95 mm,@ Wt 1.094 Kg / Rmt, horizontal two
track member size 61.85 mm x 31.75 mm x 1.20mm @
wt. Of 0.695 Kg/mt, vertical member of size 61.85 mm
x 31.75mm x 1.30 mm @ wt. Of 0.659 Kg/mt with
sliding shutters of horizontal member size 40mm x
18mm x 1.29mm @ wt. Of 0.456Kg/mt, vertical
member of size 40mm x 18mm x 1.29mm @ wt. Of
0.456Kg/mt, @ Wt. 0.457 Kg/mt with 5 mm thick
transparent bronze colour tinted float glass with powder
coated aluminium fittings and fixtures and transparent
Rupees One Thousand Seven
silicon sealant glass fixing to frame as per details etc
Hundred Thirteen and
complete for window.
4.32 1713.70 Seventy Paise sqm
19 Providing and fixing flush door shutters, solid core
construction with frame of first class hardwood with
cross board and face veneer or plywood face panels,
including anodised aluminium butt hinges with
necessary screws. (B) Non-decorative type and block Rupees One Thousand Eight
board core anodised aluminium butt hinges in flush door Hundred Twenty Nine and
2.52 shutters (2) 35 mm thick. 1829.74 Seventy Four Paise sqm
Item Quantities Item Description Estimated Rates Unit Total Amount
Item Quantities Item Description Estimated Rates Unit Total Amount
No. Estimated but in Figure in Words according to
may be more estimated
or less quantities.
20 Providing and laying broken China mosaic flooring for
terrace using 12 mm to 20 mm broken pieces of glazed
tiles to be laid over cement mortar 1:3 to plain or slope
and to be tempered to bring mortar crème out up to
surface using white cement including rounding off
junctions and extending them up to 15cm along the wall Rupees Seven Hundred
clearing with water and oxalic acid etc. as directed Seventy Nine and Seventy
19.89 779.70 Paise sqm
21 Providing and fixing marble slab including engraving
and painting complete. (i) Size 75cm x 60cm x 4cm.
Rupees One Thousand
1.00 1012.65 Twelve and Sixty Five Paise EACH
22 Point wiring for Light/ Bell with 2-1.5 sq.mm & earth
wire of 1.5 sq.mm (Green) both are of ISI marked
KV grade FRLS PVC insulated multi strand copper wires
up to 10 mtr length, in below type of pipe erected with
6A Modular type switch / bell push & accessories and
earth continuity of following type, erected on PVC /
Metallic/ Wooden box, single mounting base frame
covered with textured/ metallic/ white front plate
modules erected on / in wall / ceiling as per pipe
erected, with necessary Lamp holder/ ceiling rose / H.D.
Connector as directed. (a) with medium class Rigid PVC
pipe and accessories erected flushed on wall/ ceiling Rupees Four Hundred Ninety
4.00 complete. Cat.III (MODULAR TYPE) 493.89 Three and Eighty Nine Paise Pt.
Item Quantities Item Description Estimated Rates Unit Total Amount
Item Quantities Item Description Estimated Rates Unit Total Amount
No. Estimated but in Figure in Words according to
may be more estimated
or less quantities.
23 Point wiring for FAN with 2-1.5 sq.mm & earth wire of
1.5 sq.mm (Green) both are of ISI marked 1.1 KV Grade
FRLS PVC insulated multi strand copper wires up to
mtr length, in below type of pipe erected with 6A
Modular type switch and hum free EME step type
electronic fan regulator mounted and accessories with
earth continuity of following type erected on PVC /
Metallic/Wooden box, single mounting base frame
covered with textured/ metallic/ white front plate
modules erected on/ in wall/ ceiling as per pipe erected.
with necessary ceiling rose/ H.D. Connector as directed.
(a) with medium class Rigid PVC pipe and accessories
erected flushed on wall/ ceiling complete. (a) with
medium class Rigid PVC pipe and accessories erected
Rupees Seven Hundred Five
flushed on wall/ceiling complete Cat. III (MODULAR
2.00 705.99 and Ninety Nine Paise Pt.
24 Supplying and erecting LED indoor fittings with LEDs of
wattage 0.2 Watt to 0.5 Watt assembled on single
MCPCB, with housing used as a heat sink shall be made
of thick sheet Steel conforming to IS: 513/CRCA/
aluminium die cast powder coated and high U.V. &
corrosion resistance with diffuser with company
mark/name 160V to 270V, Power Factor more than
0.95, THD < 15%, CCT 3000K to 6500K, Luminaire
efficacy > 85 lumens/watt, LED LED driver efficiency >
85 % (fitting required LM-79 & LM-80 Certificates)
(NOTE: Below description have shown ranges of
Wattage capacity of LED fittings. The Engineer in charge
may select any wattage capacity between the ranges
shown.) (A) Tube Light with integral driver (iv) 22-24
Rupees Four Hundred Thirty
Watts, Surge - 2KV, IP-20, conventional 4 feet Cat-lll
4.00 439.35 Nine and Thirty Five Paise EACH
Item Quantities Item Description Estimated Rates Unit Total Amount
Item Quantities Item Description Estimated Rates Unit Total Amount
No. Estimated but in Figure in Words according to
may be more estimated
or less quantities.
25 Point wiring for Individual Plug with & earth wire of
sq.mm (Green) both are of ISI marked 1.1 KV grade
FRLS PVC insulated multi strand copper wires up to
mtr length, in below type of pipe erected complete with
Modular type switch & 5 pin Plug erected on PVC /
Metallic/ Wooden box covered with appropriate front
plate modules erected on / in wall /ceiling as per pipe
erected with following type of accessories. [I] For 6A
Plug and 6 a switch with 2-1.5 sq.mm Cu.Wire from
nearby switch board/mcb db board (a) with medium
class Rigid PVC pipe and accessories erected flushed on Rupees Five Hundred Twenty
2.00 wall/ceiling complete. Cat-lll 524.19 Four and Nineteen Paise Pt.
26 Providing and erecting Approved make RCCBs
conforming to IS: 12640 and having sensitivity of
mA and Short Circuit withstand capacity of 10 KA and
suitable for operation on 3 phase and neutral 415V,
50Hz. having characteristic of quick action & tripping
with all advance feature & do not incorporate any
electronic component for following Max. rating erected Rupees Three Thousand
1.00 as directed. (i) 25 Amps. FP Cat. III 3030.00 Thirty Only EACH
27 Providing & erecting Approved make Ceiling Fan with
double ball bearing ISI mark with Condenser 230 volt
A.C. 50Hz 1200 mm sweep complete having 3 blades
aluminium body and blade sets having ornamental
design shanks, canopy erected with earthing. [Make
shall be approved by Engineer in Charge] Rupees Two Thousand Seven
2.00 2727.00 Hundred Twenty Seven Only EACH
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
2. Mile Stone Dates and Tender Nivida.pdf
1. SBD.pdf
3. Schedule-B.pdf
7. Qualification Criteria.pdf
5. Details of Work.pdf
8. CIVIL SPECIFICATIONS.pdf
4. TEST REQUIRE FOR CONSTRUCTION MATERIAL.pdf
6. Specification Index.pdf
D - ELECTRIC SPECIFICATION.pdf
9. Vendor Civil work.pdf
B - ROAD WORK SPECIFICATIONS.pdf
C - LED light Specification.pdf
A - BUILDING SPECIFICATIONS.pdf
Download all tender documents and submit your bid