Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.4 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹9.4 L+₹536 (0.06%)Admitted-Finance GOA | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | LAXMAN S. NAIK L2 | VIRAJ V SHIRODKAR L1 |
|---|---|---|---|---|---|
| 1.00 | Horizontal Pump-Motor- Three phase AC Induction motor Make: Kirloskar 170 HP 1450 RPM. Dissembly and assembly of electric motor 170 HP. Cleaning the winding with solvant and varnishing. Painting the motor. Replacing with new bearing and grease. Wrapping the insulation wherever necessary and refit. Lifting and lowering the motor out of pump house with chain pulley. Heating & commissioning in all respect. (Cost of bearings not included, consumables cost included) | 3 | NO | 30,000 ₹90,000 Lowest | 31,485 ₹94,455 |
| 1.10 | Bearings for Motor 6319 ZZ C3 | 2 | NO | 18,600 ₹37,200 Lowest | 19,166 ₹38,332 |
| 2.00 | Dissembly and assembly of Kirloskar 170 HP Removal of pump impellor and shifting to workshop for machining sleeve inclusive of transportation. Fitment of bearings. Replacing with new grease. Changing gland packing. Cleaning and painting the pump inclusive of oil paper, cleaning cloth, nuts and bolts etc. (Cost of bearings not included, consumables cost included) | 4 | NO | 32,000 ₹1,28,000 | 31,485 ₹1,25,940 Lowest |
| 2.10 | Bearings for Pump 6319 ZZ C3 | 8 | NO | 18,282 ₹1,46,256 Lowest | 19,187 ₹1,53,496 |
| 2.20 | Sleeve for Pump | 8 | NO | 18,500 ₹1,48,000 | 15,743 ₹1,25,944 Lowest |
| 2.30 | Copuling pin bush for Pump | 4 | SET | 5,000 ₹20,000 Lowest | 5,248 ₹20,992 |
| 3.00 | Shifting of Horizontal Pump & Motor Three phase AC Induction motor Kirloskar pump and motor 170 HP from Godown at RL 44.15 to Foundation 01 at RL43.65, Foundation 02 at RL 39.65, foundation 3 at RL 37.65 for installtion and removing back and shifting to godown manually with the help of Labours, tripod stand ,5 tonne chain block etc complete as directed by the engineer incharge. | 4 | No | 18,000 ₹72,000 Lowest | 20,465 ₹81,860 |
| 4.00 | Laser alignment of motors inclusive of shims etc. complete under supervision of Mechanical engineer nd as per the directons of Engineer In Charge. | 4 | No | 17,000 ₹68,000 | 15,743 ₹62,972 Lowest |
| 5.00 | Cleaning of starter of control pannel including cleaning of bushes, contactors and megger testing. (Pump No 1,2). Motor termination leads to be checked and providing Thick copper washer required for better contact as cable is heating. Dressing of cables, Checking power contacts of power contactor. Replacement of power contactor if contacts are worn out.. Main Panel control wiring to be checked. Checking of local push button stations of motor starters. Checking earth connections of all equipments. | 3 | No | 18,000 ₹54,000 Lowest | 18,891 ₹56,673 |
| 6.00 | Vibration monitoring of pump & motor.(3 visits) including generating and submitting of reports hard copy etc complete.) | 3 | Per visit | 4,200 ₹12,600 | 4,198 ₹12,594 Lowest |
Tender Value
₹10.6 L
EMD Value
₹21,172
Closing Date
18 Nov 2026, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, WDX, WRD
Works Division X, WRD, Pajimol, Sanguem, Goa
Operation and Maintenance to Electrical Panel board and centrifugal pumps at Naikaband Lift Irrigation Scheme at Vaddem Reh. for the Year 2026-27.
2026_WRD_32952_1
WDX/Accts./2026-27/e-16sr03
Open Tender
Miscellaneous Works
Item Rate
Works Division X, WRD, Pajimol, Sanguem
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
₹21,172
20 Nov 2026
5 Nov 2026
19 Nov 2026
5 Nov 2026
18 Nov 2026
5 Nov 2026
180 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | GST % |
|---|---|---|---|---|---|---|
| 1 | Horizontal Pump-Motor- Three phase AC Induction motor Make: Kirloskar 170 HP 1450 RPM. Dissembly and assembly of electric motor 170 HP. Cleaning the winding with solvant and varnishing. Painting the motor. Replacing with new bearing and grease. Wrapping the insulation wherever necessary and refit. Lifting and lowering the motor out of pump house with chain pulley. Heating & commissioning in all respect. (Cost of bearings not included, consumables cost included) | 3 | NO | - | - | 569% |
| 1.1 | Bearings for Motor 6319 ZZ C3 | 2 | NO | - | - | 569% |
| 2 | Dissembly and assembly of Kirloskar 170 HP Removal of pump impellor and shifting to workshop for machining sleeve inclusive of transportation. Fitment of bearings. Replacing with new grease. Changing gland packing. Cleaning and painting the pump inclusive of oil paper, cleaning cloth, nuts and bolts etc. (Cost of bearings not included, consumables cost included) | 4 | NO | - | - | 569% |
| 2.1 | Bearings for Pump 6319 ZZ C3 | 8 | NO | - | - | 569% |
| 2.2 | Sleeve for Pump | 8 | NO | - | - | 569% |
| 2.3 | Copuling pin bush for Pump | 4 | SET | - | - | 569% |
| 3 | Shifting of Horizontal Pump & Motor Three phase AC Induction motor Kirloskar pump and motor 170 HP from Godown at RL 44.15 to Foundation 01 at RL43.65, Foundation 02 at RL 39.65, foundation 3 at RL 37.65 for installtion and removing back and shifting to godown manually with the help of Labours, tripod stand ,5 tonne chain block etc complete as directed by the engineer incharge. | 4 | No | - | - | 569% |
| 4 | Laser alignment of motors inclusive of shims etc. complete under supervision of Mechanical engineer nd as per the directons of Engineer In Charge. | 4 | No | - | - | 569% |
| 5 | Cleaning of starter of control pannel including cleaning of bushes, contactors and megger testing. (Pump No 1,2). Motor termination leads to be checked and providing Thick copper washer required for better contact as cable is heating. Dressing of cables, Checking power contacts of power contactor. Replacement of power contactor if contacts are worn out.. Main Panel control wiring to be checked. Checking of local push button stations of motor starters. Checking earth connections of all equipments. | 3 | No | - | - | 569% |
| 6 | Vibration monitoring of pump & motor.(3 visits) including generating and submitting of reports hard copy etc complete.) | 3 | Per visit | - | - | 569% |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
Tendernotice_2.pdf
PDF • 1.03 MB
BOQ_33334.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .