Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 LAccepted-AOC | L1 | Accepted-AOC accepted | |
| 2 | L2₹3.2 L+₹6,554.09 (2.10%)Rejected-AOC KOOTTUPURAKKAL | L2 | Rejected-AOC rejected | |
| 3 | L3₹3.4 L+₹30,727.34 (9.84%)Rejected-AOC | L3 | Rejected-AOC rejected | |
| 4 | L4₹3.5 L+₹40,649.72 (13.0%)Rejected-AOC | L4 | Rejected-AOC rejected | |
| 5 | L5₹3.5 L+₹41,143.25 (13.2%)Rejected-AOC THIRUVILWAMALA PO THRISSUR PIN 680588 | THRISSUR | THRISSUR | KERALA | 680588 | L5 | Rejected-AOC rejected |
Tender Value
₹4.9 L
EMD Value
₹12,300
Closing Date
16 Aug 2021, 5:00 pmClosed
Assistant Executive Engineer
Assistant Executive Engineer Cheerakkuzhy Irrigation Project Subdivision Pazhayannur
Cheerakuzhy Scheme- Flood damages Urgent removal of silt from the canal bed between of Ch. 0/000 km to Ch. 6/000 km for the year 2021 - 22
2021_Irrig_433558_1
03/AEE /CIP /2021-22
Open Tender
Civil Works - Others
Item Rate
270 days
Cheerakuzhy
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,200
₹12,300
9 Oct 2021
6 Aug 2021
27 Aug 2021
6 Aug 2021
16 Aug 2021
6 Aug 2021
Amount
1 Annual Maintenance
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
od4898/2021_2022/IA : Earth work in surface excavation not exceeding 15cm in depth but exceeding 1.5m in width as well as 10sqm on plan including disposal of excavated earth up to 50m and lift up to 1.5m, disposed soil to be levelled and neatly dressed: All kinds of soil.
Repairing of aqueduct hand rail@ch3/100km & ch3/600km
10.26.1 : Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approves steel primer.M.S. tube
4.1.3 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
MUHAMMEDBASHEER.KA
M A ABDULLAKUTTY
ABDUL SAMAD
M K Siddic
LIJO FRANCIS
PRAKASAN K V
AJI T PHILIP
V C JOY
ROY MON K E
MUHAMMED ALI K.M
Bidder Name
shanto jose
M K Siddic
MUHAMMEDBASHEER.KA
M A ABDULLAKUTTY
ABDUL SAMAD
V C JOY
PRAKASAN K V
ROY MON K E
MUHAMMED ALI K.M
AJI T PHILIP
LIJO FRANCIS
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .