Loading…
Loading…
Tender Value
₹5.9 L
EMD Value
₹11,720
Closing Date
17 Aug 2026, 3:00 pmClosed
Executive Engineer PWD RNB DH PORA
Executive Engineer PWD RNB DH PORA
Road from Shublipora to teeli Mohalla Dodwan ( Balance work)
2026_PWDJK_319816_2
32 Of RnB/D.H. Pora/2026-27/2696-2704 Dtd 06/08/2026
Open Tender
Civil Works
Percentage
180 days
Executive Engineer PWD RNB DH PORA
Please refer Tender documents.
5 documents required · 5 mandatory
₹300
Acc no 0470010200000099
₹11,720
6 Aug 2026
6 Aug 2026
18 Aug 2026
7 Aug 2026
17 Aug 2026
7 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | 1 | Cum | 0.2 | ₹0.2 |
| 2 | Disposal of excavated earth by mechanical means for an average lead of 1KM | 1 | Cum | 0.6 | ₹0.6 |
| 3 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m in -All kinds of soil. | - | sqm | 1 | - |
| 4 | Filling available excavated earth in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 1 | Cum | 0.4 | ₹0.4 |
| 5 | Providing and laying of 450 mm dia (NP2) RCC pipes in proper position, grade including providong of required quantity of RBM over and under pipes as cusion including cost and carriages of pipes, RBM, loading, unloading complete. | - | Rm | 0.8 | - |
| 6 | supply and filling of River Bed Material ( RBM) with specifed grading including sorting, watering and spreading in uniform layers and consolidation each deposited layer with vibratory roller including all carriages up to site of work complete | - | Cum | 0.6 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.50 MB
BOQ_1060624.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .