| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.6 LAccepted-AOC | ₹7.6 L | L1 | Accepted-AOC L1 |
| 2 | L2₹7.6 LRejected-Finance MANJHGAON WEST SINGHBHUM | MANJHGAON | WEST SINGHBHUM | JHARKHAND | ₹7.6 L | L2 | Rejected-Finance L2 |
| 3 | L3₹7.6 LRejected-Finance AT MAJHGAON DIST WEST SINGHBHUM | MAJHGAON | WEST SINGHBHUM | JHARKHAND | ₹7.6 L | L3 | Rejected-Finance L3 |
| 4 | L4₹8.3 LRejected-Finance CHAIBASA PASHCHIMI SINGHBHUM | ₹8.3 L | L4 | Rejected-Finance L4 |
| 5 | L5₹8.6 LRejected-Finance | ₹8.6 L | L5 | Rejected-Finance L5 |
Tender Value
₹10.0 L
EMD Value
₹19,910
Closing Date
18 Mar 2026, 5:00 pmClosed
DISTRICT ENGINEER
ZILA PARISHAD CHAIBASA
CONSTRUCTION OF PCC ROAD AT GRAM DINDIBURU TOLA BAIBURU BUDHRAM JERAI GHAR TO KUID TAKABURU TK IN PANCHAYAT TARTARIYA BLOCK MANJHGAON WEST SINGHBHUM DISTRICT
2026_ZPWSS_111247_1
ZP/CHAIBASA/08/2025-26 Gr-26
Open Tender
Civil Works
Works
60 days
MANJHGAON
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,250
Yes
₹19,910
Yes
1 Jun 2026
11 Mar 2026
20 Mar 2026
11 Mar 2026
18 Mar 2026
11 Mar 2026
Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area as per Technical specification clause 201.
Loosening, leveling and compacting orinal ground supporting embankment to facilitate placement of first layer of embankment , scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for emabakment construction.as per Technical specification clause 305.3.4 case -II
Construction of sub-grade and earthen shoulders with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2.
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 with Grading-I Material
Providing and laying in position cement concrete of specified grade excluding the cost of centering, shuttering . All work up to plinth level. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size).
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete.
Supplying and laying seperation membrane of impermeable plastic sheeting 125 micron thick all complete job.
Carriage of materials Sand
Cement
S/Chips
53 mm to 26.5 mm @ 27.5 per cent
26.5 mm to 9.5 mm @ 22.5 per cent
9.5 mm to 4.75mm @10 percent
4.75mm below @ 40 percent
Labour Cess 1%
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_150251.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.00 MB
T26.pdf
Tender Documents • 0.98 MB
BOQ_150251.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].