| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC | ₹1.1 Cr | L1 | Accepted-AOC Lowest |
| 2 | L2₹1.1 Cr+₹3.0 L (2.80%)Rejected-Finance | ₹1.1 Cr+₹3.0 L (2.80%) | L2 | Rejected-Finance Second Lowest |
| 3 | Rejected-Technical | - | - | Rejected-Technical L6 |
| 4 | Rejected-Technical | - | - | Rejected-Technical L4 |
| 5 | Rejected-Technical | - | - | Rejected-Technical L3 |
Tender Value
₹1.2 Cr
EMD Value
₹50,000
Closing Date
16 Sept 2020, 6:00 pmClosed
of the Superintending Engineer, Harbour Engineerin
Office of the Superintending Engineer, Harbour Engineering North Circle, Puthiyanirath, Elathur. P .O., Kozhikode-673 303
Upgradation of Coastal Roads in Kannur District - Improvements to Ramakrishna School Nadakkal Kalathil Mukku Road and Construction of Nadakkal bridge in Chokli Grama Panchyath
2020_HED_379443_1
11/HED/NC/2020-21
Open Tender
Civil Works - Roads
Item Rate
210 days
Chokli Panchayath
Please refer Tender documents.
8 documents required · 8 mandatory
₹5,000
Yes
online
₹50,000
Yes
29 Oct 2020
9 Sept 2020
22 Sept 2020
9 Sept 2020
16 Sept 2020
9 Sept 2020
Amount
Appendix A-Slab bridge
12.1.B.1 : Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. <br> Ordinary Soil - Depth upto 3m - Mechanical Means <br>
12.22 : Providing Steel Liner 10mm thick for Curbs and 6 mm thick for Steining of Wells including Fabricating and Setting out as per Detailed Drawing.
od5625/2019_2020 : Driving down M.S liner already fabricated to the required depth including all&lt;br&gt;hire charges of machineries,labour charges etc. complete.&lt;br&gt;cost for 9 meter. (Ref: Finger jetty 2018/397)
12.24.3 : Bored cast-in-situ M35 grade R.C.C. Pile Using Batching Plant, Transit Mixer and Concrete Pump excluding Reinforcement complete as per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m.<br> Pile diameter-1000 mm
od5621/2019_2020 : Chipping and removing top of RCC piles to lines and levels carefully without damaging&lt;br&gt;remaining portion of the pile and removing debris upto a distance of 150 m including all labour charges, hire&lt;br&gt;of equipments etc. complete as per the directions of departmental officers at site Unit -cum Taking output -&lt;br&gt;1.25cum. (Ref: Finger jetty 2018/397; od1058/2018_2019)
12.38.B.2 : Cement Concrete for Reinforced Concrete in Pile Cap complete as per Drawing and Technical Specification<br> R C C Grade M-25 - Using Batching Plant, Transit Mixer and Concrete Pump <br>
13.5.F.P.2 : Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC Grade M25 - With Batching Plant, Transit Mixer and Concrete Pump - Height upto 5m
13.5.G.p.2 : Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC Grade M30 - Height upto 5m - using Batching Plant, Transit Mixer and Concrete Pump
13.6 : Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications
13.14 : Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to IRC: 83 (Part-II) section IX and clause 2005 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications.
13.8 : Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V : 20H towards drawing foce.Complete as per drawing and Technical Specifications
13.9.A : Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification <br> Granular material
Appendix B-Road formation
2.2.2.A : Clearing and Grubbing Road Land<br> Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. <br> (II) By Mechanical Means <br> (A) In area of non-thorny jungle
2.3.A.1 : Cutting of Trees including Cutting of Trunks, Branches and Removal of Stumps Cutting of trees, including cutting of trunks, branches and removal of stumps & roots, refilling, compaction of backfilling and stacking of serviceable material by manual means with all lifts as per Technical Specification Clause 201. A. Lead upto 100 m (i) Girth above 300 mm to 600 mm
3.15.1 : Compacting Original Ground <br> (i) Compacting original ground supporting embankment <br> Loosening, Levelling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Tables 300.1 and 300.2 for embankment construction as per Technical Specification Clause 301.4.1.
3.2 : Preparation of Foundation for EmbankmentScarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical MeansScarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.
4.1.A.1 : Granular Sub-base with Well Graded Material (Table 400.1) <br> (A) By Mix in Place Method <br> Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. <br> (i) For Grading I Material
4.9 : Wet Mix Macadam <br> Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. <br> By Mechanical Means with 1 km lead
5.1.1a : Prime Coat :- Low porosity <br> Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502
5.2.3a : Tack Coat <br>Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.
5.9.1.2a : 20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder - Bitumen S-65 <br> Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508. <br> Case - I By Manual Means <br> (II) Bitumen (S-65)
5.12.A.3.2a : Seal Coat - Manual Means - Type C - Bitumen S-65 <br> Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510 <br> A. By Manual Means :- Case - III : Type C <br> (II) Bitumen (S-65)
11.1.1.1 : Excavation for StructuresEarthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.I.Ordinary soil(i)Upto 3 m depth
11.4.1.1 : Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203I.P.C.C grade M 10(i)Nominal mix 1:3:6
11.4.3.1 : Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203III.P.C.C. grade M 20 (i)Nominal mix (1:2:4)
11.4.5 : Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203V. R.C.C. grade M 25
11.7 : Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202
Filling, DR work and Pipe culvert
od6225/2019_2020 : Improving base using Quarry muck- Construction of granular sub-base by providing local material like quarry waste spreading in uniform layers with motor grader on prepared surface, and compacting with smooth wheel roller to achieve the desired density complete.(ref DAR 51.2.3)
60.7.1 : DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
60.7.2 : DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site.
19.6.5 : Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 ( 1 cement : 2 fine sand) including testing of joints etc. complete:450 mm dia R.C.C. pipe
P MANOHARAN
M.S ABDUL HAKEEM
KTK RAGHUNADH
PINARAYI INDUSTRIAL CO OPERATIVE SOCIETY LTD
GRACE ENTERPRISES
V MUHAMMED BASHEER
Bidder Name
P MANOHARAN
MINEESH K C
M.S ABDUL HAKEEM
PINARAYI INDUSTRIAL CO OPERATIVE SOCIETY LTD
V MUHAMMED BASHEER
KTK RAGHUNADH
GRACE ENTERPRISES
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_538109.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .