| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹2.2 LAccepted-Finance GEETA DEVI | ₹2.2 L | L-1 | Accepted-Finance Lowest-1 |
| 2 | L-2₹2.2 L+₹3,532.05 (1.61%)Rejected-Finance | ₹2.2 L+₹3,532.05 (1.61%) | L-2 | Rejected-Finance Lowest-2 |
| Sl No | Description | Qty | Unit | daleep thakur L2 | GEETA DEVI L1 |
|---|---|---|---|---|---|
| 1.00 | Excavation in foundation and trenches etc. in earth work in all kind of soils such as pick work jumper work,saturated soil including blasting soft/hard rock, chiseling soft/hard rock where blasting is prohibited in all lifts including trimming and dressing of sides, levelling of bed, stacking the excavated soil clear from the edge of excavation and then returning the excavated soil in 15cm. layers when required into plinths,side of foundations etc including consolidating each deposited layer by ramming , watering and then disposing of all surplus excavated soil as directed in all leads & lifts and shoring strutting, timbering where ever required as per direction & best satisfaction of the Engineer-in-Charge. | 10.91 | Cum | 495 ₹5,400.45 | 490 ₹5,345.9 Lowest |
| 2.00 | Providing & laying cement concrete 1:3:6 (1 cement : 3 sand : 6 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of form work in foundation and plinth including carriage of material with in all leads and lifts as per the direction and satisfaction of Engineer-in-Charge. | 2.75 | Cum | 9,500 ₹26,125 | 9,200 ₹25,300 Lowest |
| 3.00Providing and laying cement concrete 1:1.5:3 (1 cement: 1.5 sand: 3 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work & reinforcement for reinforced concrete work in:- | |||||
| 3.01 | Foundation and plinth including carriage of material with in all leads and lifts as per the direction and satisfaction of Engineer-in-Charge. | 2.7 | Cum | 10,500 ₹28,350 | 9,800 ₹26,460 Lowest |
| 3.02 | Walls (any thickness but not less than 0.10m thickness) including attached butteresses, pillaster plinth and string courses etc. from top of foundation level upto floor two level i/c carriage of material with in all leads and lifts as per the direction and satisfaction of Engineer-in-Charge. | 3.98 | Cum | 10,800 ₹42,984 | 9,800 ₹39,004 Lowest |
| 4.00Providing form work with steel plates 3.15 mm thick welded with angles iron in frame 30x30x5 mm so as to give a fair finish including centering shuttering struting and propping etc. with wooden battens and ballies height of propping and centering below supporting floor to ceiling not exceeding 4 meters and removal of the same for in-situ- reinforced concrete and plain concrete:- | |||||
| 4.01 | Flat surfaces such as soffits of suspended floor, roofs, landing and the like etc. upto 200 mm thickness i/c carriage of material complete in all respect as per the directions and best satisfaction of the Engineer-in-Charge. | 1.7 | Sqm | 570 ₹969 Lowest | 600 ₹1,020 |
| 4.02 | Vertical surface such as walls (any thickness) partitions and the like including attached pillasters, buttresses, etc. plinth and string courses complete job in all respect with in all leads and lifts as per the direction and best satisfaction of Engineer-in-Charge. | 46.82 | Sqm | 590 ₹27,623.8 Lowest | 640 ₹29,964.8 |
| 5.00Providing & laying cement concrete 1:2:4 (1 cement : 2 sand : 4 graded stone aggregate 20 mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in :- | |||||
| 5.01 | Suspended floor, roofs, landings shelves and their supports balconies, beams, girders, bressumers and cantilevers etc in all leads and lifts of any shape complete in all respect as per the directions and best satisfaction of the Engineer-in-Charge. | 0.27 | Cum | 9,800 ₹2,646 | 9,400 ₹2,538 Lowest |
Tender Value
₹2.2 L
EMD Value
₹4,500
Closing Date
6 May 2026, 10:00 amClosed
EE
Executive Engineer JS Division Baggi Distt. Mandi H.P.
as per BOQ
2026_HPIPH_135165_1
EE-JSD-BGI/2026- 2274-2324 dt. 25/04/2026
Open Tender
Civil Works
Item Rate
90 days
Baggi
as per NIT
6 documents required · 6 mandatory
₹350
₹4,500
18 Jul 2026
28 Apr 2026
6 May 2026
28 Apr 2026
6 May 2026
28 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation and trenches etc. in earth work in all kind of soils such as pick work jumper work,saturated soil including blasting soft/hard rock, chiseling soft/hard rock where blasting is prohibited in all lifts including trimming and dressing of sides, levelling of bed, stacking the excavated soil clear from the edge of excavation and then returning the excavated soil in 15cm. layers when required into plinths,side of foundations etc including consolidating each deposited layer by ramming , watering and then disposing of all surplus excavated soil as directed in all leads & lifts and shoring strutting, timbering where ever required as per direction & best satisfaction of the Engineer-in-Charge. | 10.91 | Cum | - | - |
| 2 | Providing & laying cement concrete 1:3:6 (1 cement : 3 sand : 6 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of form work in foundation and plinth including carriage of material with in all leads and lifts as per the direction and satisfaction of Engineer-in-Charge. | 2.75 | Cum | - | - |
| 3Providing and laying cement concrete 1:1.5:3 (1 cement: 1.5 sand: 3 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work & reinforcement for reinforced concrete work in:- | |||||
| 3.01 | Foundation and plinth including carriage of material with in all leads and lifts as per the direction and satisfaction of Engineer-in-Charge. | 2.7 | Cum | - | - |
| 3.02 | Walls (any thickness but not less than 0.10m thickness) including attached butteresses, pillaster plinth and string courses etc. from top of foundation level upto floor two level i/c carriage of material with in all leads and lifts as per the direction and satisfaction of Engineer-in-Charge. | 3.98 | Cum | - | - |
| 4Providing form work with steel plates 3.15 mm thick welded with angles iron in frame 30x30x5 mm so as to give a fair finish including centering shuttering struting and propping etc. with wooden battens and ballies height of propping and centering below supporting floor to ceiling not exceeding 4 meters and removal of the same for in-situ- reinforced concrete and plain concrete:- | |||||
| 4.01 | Flat surfaces such as soffits of suspended floor, roofs, landing and the like etc. upto 200 mm thickness i/c carriage of material complete in all respect as per the directions and best satisfaction of the Engineer-in-Charge. | 1.7 | Sqm | - | - |
| 4.02 | Vertical surface such as walls (any thickness) partitions and the like including attached pillasters, buttresses, etc. plinth and string courses complete job in all respect with in all leads and lifts as per the direction and best satisfaction of Engineer-in-Charge. | 46.82 | Sqm | - | - |
| 5Providing & laying cement concrete 1:2:4 (1 cement : 2 sand : 4 graded stone aggregate 20 mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in :- | |||||
| 5.01 | Suspended floor, roofs, landings shelves and their supports balconies, beams, girders, bressumers and cantilevers etc in all leads and lifts of any shape complete in all respect as per the directions and best satisfaction of the Engineer-in-Charge. | 0.27 | Cum | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
FORM6_17.pdf
Tender Documents • 0.45 MB
TC.pdf
Tender Documents • 0.15 MB
BOQ_200143.xls
BOQ • 2.66 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .