Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 LAccepted-AOC AT UPPER KULI JHARIA P O JHARIA DIST DHANBAD | JHARIA | DHANBAD | L1 | Accepted-AOC Awarded | |
| 2 | L2₹2.4 L+₹3,490 (1.50%)Rejected-Finance AT PHUSBUNGLOW PO BHAGA DIST DHANBAD 828301 | DHANBAD | DHANBAD | JHARKHAND | 828301 | L2 | Rejected-Finance due to higher rate quoted | |
| 3 | L3₹2.4 L+₹5,290 (2.28%)Rejected-Finance H NO 47 GANDHI NAGAR DHANSAR NEAR BHATIA BUILDING SHIV MANDIR DHANBAD DHANBAD 826001 JHARKHAND INDIA | DHANBAD | DHANBAD | JHARKHAND | 826001 | L3 | Rejected-Finance due to higher rate quoted |
Tender Value
₹2.3 L
EMD Value
₹2,916
Closing Date
2 Nov 2024, 5:00 pmClosed
INCHARGE AAW,KA
office of The GM, Kusunda Area
Complete overhauling of Engine assembly, Clutch assembly and Gear box of Hyva Reg.No-JH10AE-0312 of Area Auto workshop, Kusunda Area
2024_BCCL_319775_1
BCCL/KA-VI/TRPT/E-NIT/24-25/15
Open Tender
Miscellaneous Works
Item Rate
20 days
Area Auto Workshop, Godhur
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,916
Yes
14 Nov 2024
24 Oct 2024
4 Nov 2024
24 Oct 2024
2 Nov 2024
24 Oct 2024
Amount
Reapir work of engine, clutch and gear box assy of Hyva.
Jobs to be done: 1.Complete Engine dismantling, dismounting, O/H and fitting.2. Complete engine machining like crank shaft polish, bearing setting, engine block reboring, liner fitting, setting, grinding main and big end journals, threading, crank oil groves & line boring etc.3. Engine cylinder head complete refacing.4. Engine head valve guide seat fitting, raimring & lapping all valves.5. Complete Radiator removing, cleaning, washing, necessary repairing and fitting.6. Complete cooler removing, cleaning, washing and fitting.7. Complete FIP Pump and Nozzle assy O/H/calibration and testing.8. Complete dismantling & fitting clutch plate, pressure plate, fly wheel assy etc. 9. Clutch cylinder removing, new changing and fitting.10. Clutch pressure with fly wheel complete refacing.11. Dismantling & fitting complete gear box assembly, PTO Pump assy and hoses etc. 12. Complete gear box overhauling removing and fitting.13. Gear box main shaft welding and repairing.Spares/ Materials required: Engine piston with pin 01 set, Engine piston ring 01 set, Engine cylinder liner 06 No, Engine main bearing 01 set, Engine connecting bearing 01 set, connecting rod bush 6 No, Engine cam shaft bush 01 set, Engine thrust washer 01 set, Engine Gasket/ OHG full kit 01 set, Engine haed valve kit 01 set, Engine head valve seat ring 01 set, Engine head valve lock 24 no, Engine head valve washer 01 set, Engine oil seal kit 01 no, Oil pump assy complete 01 no, Engine diesel & mobil filter 01 set, Engine air filter/ A C Element 01 set, Radiator hose pipe kit with clamp 01 set, cooler hose pipe with clamp 01 no, FIP Rotor/hydraulic head assembly 01 set, FIP Pump roller with b pin 06 no, FIP Cam plate 01 no, supply pump 01 no, FIP Piston 01 no, FIP Pump repair kit 01 set, Nozzle 06 no, Clutch plate assembly 01 no, Clutch bearing with hub 01 set, Clutch collector ring 01 no, Clutch finger kit 01 set, Clutch T H Cover with oil seal 01 set, Clutch cylinder assy. 02 set, Gear box counter shaft assembly 01 set, Gear box 2nd pinion 01 set, Gear box oil seal packing kit 01 set etc..Repairing work should be completed with all required materials and manpower.
Total impact of GST for the purpose of CTC
Naz Automobile and Tyre Repairing Works
SHRI DURGA AUTOMOBILES
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_331455.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .