Tender Value
₹172 Cr
EMD Value
₹50 L
Closing Date
26 Aug 2026, 8:00 pm
Construction of 4th stage tailing pond
9714721
GEM/2026/B/7881523
Two Packet Bid
Junglecleaning1,Junglecleaning2,Junglecleaning3,Junglecleaning4,Excavationwork1,Excavationwork2,Exc
Y.s.r., Andhra Pradesh
Total value wise evaluation
BOQ
6 documents required · 6 mandatory
1 yrs
₹52 Cr
₹52 Cr
10%
Additional manager accounts, KADAPA, Department of Atomic Energy, URANIUM CORPORATION OF INDIA LIMITED, PMO, (Ucil)
₹50 L
6 Aug 2026
6 Aug 2026
26 Aug 2026
| Item No | Item Title | Description | Qty | Unit | Consignee | Delivery (days) |
|---|---|---|---|---|---|---|
| 1 | Junglecleaning1 | Stripping and clearing the site of jungles, bushes, shrubs, wood etc., uprooting of rank vegetation, trees and saplings of girth upto 30 cm measured at a height of 1m above ground level, removal of undesirable materials etc. including removal and disposal of debris at suitable locations with all leads and lifts, as decided by the Engineer-in-Charge. | 70,000 | Sqm | tmplconsignee2 | 450 |
| 2 | Junglecleaning2 | Felling trees of girth (measured at a height of 1m above ground level) including cutting of trunks and branches, removing the roots and stacking of servicable material and disposal of unserviceable material at suitable ocations as decided by the Engineer-in-Charge. Beyond 30 cm girth upto and including 60 cm girth | 200 | each | tmplconsignee2 | 450 |
| 3 | Junglecleaning3 | Felling trees of girth (measured at a height of 1m above ground level) including cutting of trunks and branches, removing the roots and stacking of servicable material and disposal of unserviceable material at suitable ocations as decided by the Engineer-in-Charge. Beyond 60 cm girth upto and including 120 cm girth | 100 | each | tmplconsignee2 | 450 |
| 4 | Junglecleaning4 | Felling trees of girth (measured at a height of 1m above ground level) including cutting of trunks and branches, removing the roots and stacking of servicable material and disposal of unserviceable material at suitable ocations as decided by the Engineer-in-Charge. Beyond 120 cm girth upto and including 240 cm girth | 20 | each | tmplconsignee2 | 450 |
| 5 | Excavationwork1 | Earth work in excavation in development of embankment profile in the following types of soils for all lifts, including taking adequate protection during excavation, drilling and transporting the excavated spoil / material after stripping of top soil as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of Engineer for any lead within acquired area of Tailing Dam & Pond. All kinds of soils including hard and dense soils | 60,000 | Cum | tmplconsignee2 | 450 |
| 6 | Excavationwork2 | Earth work in excavation in development of embankment profile in the following types of soils for all lifts, including taking adequate protection during excavation, drilling and transporting the excavated spoil / material after stripping of top soil as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of Engineer for any lead within acquired area of Tailing Dam & Pond. Ordinary Rock | 17,000 | Cum | tmplconsignee2 | 450 |
| 7 | Excavationwork3 | Earth work in excavation in development of embankment profile in the following types of soils for all lifts, including taking adequate protection during excavation, drilling and transporting the excavated spoil / material after stripping of top soil as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of Engineer for any lead within acquired area of Tailing Dam & Pond.Hard Rock (blasting prohibited) | 8,000 | Cum | tmplconsignee2 | 450 |
| 8 | Excavationwork4 | Earth work in excavation of hillocks within existing pond area in the following types of soils for all lifts, transporting the excavated spoil / material as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of Engineer for any lead and lift within acquired area of Tailing Dam & Pond. All kinds of soils including hard and dense soils | 55,000 | Cum | tmplconsignee2 | 450 |
| 9 | Excavationwork5 | Earth work in excavation of hillocks within existing pond area in the following types of soils for all lifts, transporting the excavated spoil / material as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of Engineer for any lead and lift within acquired area of Tailing Dam & Pond. Ordinary Rock | 11,000 | Cum | tmplconsignee2 | 450 |
| 10 | Excavationwork6 | Earth work in excavation of hillocks within existing pond area in the following types of soils for all lifts, transporting the excavated spoil / material as per specification to the designated area / places, stacking of usable and disposal of excess of unusable material all complete as per drawing, specification and direction of Engineer for any lead and lift within acquired area of Tailing Dam & Pond. Hard Rock (blasting prohibited) | 2,000 | Cum | tmplconsignee2 | 450 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_9714721.pdf
GEM_BID • 0.82 MB
complete_2026-08-05-19-17-05_0a706525992b145b5e1672d57e70902d.pdf
BOQ • 8.69 MB
boqtailingdamraisemain_2026-08-05-19-17-05_8946af5dc420d55946363f6bf3627de6.csv
BOQ • 0.08 MB
1785938158.xlsx
GEM_OTHER • 0.21 MB
Complete_fea768fb-a377-4a55-833d1785939612033_tmplcivil3.pdf
GEM_OTHER • 8.69 MB
gtc.pdf
GEM_OTHER • 0.71 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].