Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹50.0 L
EMD Value
₹50,000
Closing Date
28 Oct 2026, 6:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
EXECUTIVE ENGINEER BODELI (O AND M) DIVISION, MGVCL
Works AdvT. Tender for Erection, Dis. and Maint. of HT/LT and T/c For ALL SCHEME under Chhotaudepur RE S/DN for TEJGADH SDN SCHEME TASP AG and /or Any S/Dn. of BODELI O&M Div. (Ref COST DATA 2024-25) RATE INCL. OF GST
354660
BDL/TECH/TRC/EE/2026/5325 DATE: 12.10.2026
Open
Electrical and Maintenance Works
Works
Chhota Udaipur
2 documents required · 0 mandatory · 2 optional
₹1,475
BANK OF BARODA, ALIPURA
₹50,000
13 Oct 2026
13 Oct 2026
13 Oct 2026
27 Oct 2026
13 Oct 2026
NO No. Quantity 2024-25 Rs.
HT TAPPING FROM THE EXISTING POLE INCLUDING FIXING OF CROSS ARMS, CLAMPS ANTI-
CLIMBING DEVICES, DANGER BOARD,INSULATORS, ETC, COMPLETE AND PAINTING OF
1 9901000001 FABRICATED MATERIALS AND NUMBERING COMPLETE WITH COST OF PAINTS AS PER 30 481.00 567.58
STANDARD SPECIFICATION BUT EXCLUDINGERECTION OF GUY SET AND EARTHING.
ERECTION OF PSC POLES OF 8 *200 KG INCLUDING EXCAVATION OF PIT AND REFILLING OF
EARTH, FIXING OF CROSS ARMS, TOP FITTING CLAMPS ANTI-CLIMBING DEVICES, INSULATORS
ETC. COMPLETE AND PAINTING OF FABRICATED MATERIALS USED ON THE POLES AND
NUMBERING WITH COST OF PAINTS AS PER STANDARD SPECIFICATION BUT
EXCLUDINGERECTION OF GUY SET AND EARTHING.
ERECTION STEEL POLES OF 8 TO 9 & 11 METERS INCLUDING EXCAVATION OF PIT AND
REFILLING OF EARTH, FIXING OF CROSS ARMS, TOP FITTING CLAMPS, ANTICLIMBING DEVICES
DANGER BOARD, INSULATORS, ETC. COMPLETE AND PAINTING OF STEEL POLE, FABRICATED
MATERIALS USED ON ON THE POLE AND NUMBERING WITH COST OF PAINT AS PER STANDARD
SPECIFICATION BUT EXCLUDING ERECTION OF GUT SET AND EARTHING.
ERECTION STEEL POLES OF 13 METERS FOR RAILWAY CROSSING ON BG/MG/NG/LINE FOR
0.400/11/22KV OVERHEAD LINE I.E. INCLUDING EXCAVATION OF PIT AND REFILLING OF EARTH,
FIXING OF CROSS ARMS, TOP FITTING CLAMPS, ANTICLIMBING DEVICES DANGER BOARD,
4 9902010005 INSULATORS, ETC. COMPLETE AND PAINTING OF STEEL POLES, FABRICATED MATERIALS USED 6 2234.00 2636.12
ON THE POLES AND NUMBERING WITH COST OF PAINT AS PER STANDARD SPECIFICATION BUT
EXCLUDING ERECTION OF GUY SET AND EARTHING.
5 9902010006 ERECTION OF SUPPORT POLE - PSC 30 735.00 867.30
6 9902010007 ERECTION OF SUPPORT POLE - RSJ 30 735.00 867.30
ERECTION OF DOUBLE POLE STRUCTURE OF 8 METERS PSC
POLE INCLUDING EXCAVATION OF PITS & REFILLING OF EARTH, FIXING OF CHANNELS,
SUPPORTING ANGLES , CLAMPS, ANTI-CLIMBING DEVICES DANGER BOARDS, INSULATORS, ETC.,
7 9902020001 COMPLETE AND PAINTING OF POLES FABRICATED MATERIALS USED ON THE POLES AND 30 2644.00 3119.92
NUMBERING WITH COST OF PAINTS AS PER STANDARD SPECIFICATION BUT EXCLUDING
ERECTION OF GUY SETS AND EARTHING. ( W/O AB SWITCH ).
ERECTION OF DOUBLE POLE STRUCTURE OF 8 TO 9 METERS STEEL
POLE INCLUDING EXCAVATION OF PITS & REFILLING OF EARTH, FIXING OF CHANNELS,
SUPPORTING ANGLES , CLAMPS, ANTI-CLIMBING DEVICES DANGER BOARDS, INSULATORS, ETC.,
8 9902020007 COMPLETE AND PAINTING OF POLES FABRICATED MATERIALS USED ON THE POLES AND 30 3821.00 4508.78
NUMBERING WITH COST OF PAINTS AS PER STANDARD SPECIFICATION BUT EXCLUDING
ERECTION OF GUY SETS AND EARTHING. ( W/O AB SWITCH ).
ERECTION OF DOUBLE POLE STRACTURE WITH MOUNTING OF AB SWITCH, HG FUSES OF
METERS, 200 KG PSC POLES INCLUDING EXCA-VATION OF PITS AND REFILLING OF EARTH,
FIXING OF CHANNELS,SUPPORTING ANGLES CLAMPS, ANTI-CLIMBING DEVICES DANGER
9 9902020006 BOARD, INSULATORS, DO FUSES, ETC., COMPLETE AND PAINTING OF FABRICATED MATERIALS 30 3179.00 3751.22
USED ON THE POLES AND NUMBERING WITH COST OF PAINTS AS PER STANDARD
SPECIFICATION BUT EXCLUDING ERECTION OF GUY SET AND EARTHING.
ERECTION OF DOUBLE POLE STRACTURE WITH MOUNTING OF
AB SWITCH, HG FUSES, 9 & 11 METERS STEEL POLES INCLUDING EXCAVATION OF PITS AND
REFILING OF EARTH, FIXING OF CHANNELS, SUPPORTING ANGLE CLAMPS, ANTI-CLIMBING
DEVICES , DANGER BOARDS, INSULATORS, ETC., COMPLETE AND PAINTING OF POLES
FABRICATED MATERIALS USED ON THE POLES AND NUMBERING WITH COST OF PAINT AS PER
STANDARD SPECIFICATION BUT EXCLUDING ERECTION OF GUY SET AND EARTHING.
ERECTION OF SINGLE POLE STRACTURE WITH MOUNTING OF HG FUSES, TRANSFORMERS,
LIGHTENING ARRESTERS, DISTRIBUTION BOX ETC. OF 8 METERS 200 KG PSC POLES
INCLUDING EXCAVATION OF PITS AND REFILING OF EARTH, CARTING OF
TRANSFORMERS FROM STORE TO SITE, FIXING OF CHANNELS SUPPORTING
ANGLES, BRACING CROSS ARMS, CLAMPS ANTI-CLIMBING DEVICE DANGER
11 990230016 BOARDS CONDUCTOR AND CABLE WIRING ETC., COMPLETE AND PAINTING OF 3 4537.00 5353.66
FABRICATED MATERIALS USED ON THE POLES AND NUMBERING WITH COST
OF PAINTS AS PER STANDARD SPECIFICATION BUT EXCLUDING ERECTION OF
GUY SETS AND EARTHING.
ERECTION OF DOUBLE POLE STRUCTURE WITH MOUNTING OF
AB SWITCH, HG FUSES, 13 METERS STEEL POLES INCLUDING EXCAVATION OF PITS AND
REFILING OF EARTH, FIXING OF CHANNELS, SUPPORTING ANGLE CLAMPS, ANTI-CLIMBING
12 9902020019 DEVICES , DANGER BOARDSINSULATORS,ETC COMPLETE AND PAINTING OF POLES FABRICATED 30 4736.00 5588.48
MATERIALS USED ON THE POLES AND NUMBERING WITH COST OF PAINTS AS PER STANDARD
SPECIFICATION BUT EXCLUDING ERECTION OF GUY SET AND EARTHING.
ERECTION OF DOUBLE POLE STRACTURE WITH MOUNTING OF HG FUSES, TRANSFORMERS,
LIGHTENING ARRESTERS, DISTRIBUTION BOX ETC. OF 8 METERS 200 KG PSC POLES
INCLUDING EXCAVATION OF PITS AND REFILING OF EARTH, CARTING OF
TRANSFORMERS, FROM STORE TO SITE FIXING OF CHANNELS SUPPORTING
ANGLES, BRACING CROSS ARMS, CLAMPS ANTI-CLIMBING DEVICE DANGER
13 9902030001 BOARDS CONDUCTOR AND CABLE WIRING ETC.,COMPLETE AND PAINTING OF 30 9074.00 10707.32
FABRICATED MATERIALS USED ON THE POLES AND NUMBERING WITH COST
OF PAINTS AS PER STANDARD SPECIFICATION BUT EXCLUDING ERECTION OF
GUY SETS AND EARTHING.
SCHEDULE - B
Works Adve. Tender for Erection, Dis. and Maint. of HT/LT and T/c For ALL SCHEME under Chhotaudepur RE S/DN for TEJGADH SDN SCHEME TASP AG
and /or Any S/Dn. of BODELI O&M Div. (Ref COST DATA 2024-25) RATE INCL. OF GST.
SR Item Code Estimated NEW RATE Amount in
Description of Work (WITH 18%
NO No. Quantity 2024-25 Rs.
ERECTION OF SINGLE POLE STRACTURE WITH MOUNTING OF A B SWITCH, HG FUSE,
TRANSFORMERS, LIGHTENING ARRESTERS, DISTRIBUTION BOX 8 TO 9 & 11 METERS
STEEL POLES INCLUDING EXCAVATION OF PITS AND REFILING OF
EARTH,CARTING OF TRANSFORMERS FROM STORE TO SITE,FIXING OF
CHANNELS, SUPPORTING ANGLES, BRACING, CROSS ARMS,CLAMPS, ANTI
14 99230017 CLIMBING, DEVICES, DANGER BOARDS, CONDUCTOR AND CABLE WIRING 3 5305.00 6259.90
ETC.COMPLETE AND PAINTING OF POLES FABRICATED MATERIALS USED ON
THE POLES AND NUMBERING AS PER STANDARD SPECIFICATION BUT
EXCLUDING ERECTION OF GUY SETS AND EARTHING.
ERECTION OF DOUBLE POLE STRUCTURE WITH MOUNTING OF A B SWITCH, HG FUSE,
TRANSFORMERS, LIGHTENING ARRESTERS, DISTRIBUTION BOX 8 TO 9 & 11 METERS
STEEL POLES INCLUDING EXCAVATION OF PITS AND REFILLING OF
EARTH,CARTING OF TRANSFORMERS FROM STORE TO SITE,FIXING OF
CHANNELS, SUPPORTING ANGLES, BRACING, CROSS ARMS,CLAMPS, ANTI
15 9902030012 CLIMBING, DEVICES, DANGER BOARDS, CONDUCTOR AND CABLE WIRING 6 10609.00 12518.62
ETC.COMPLETE AND PAINTING OF POLES FABRICATED MATERIALS USED ON
THE POLES AND NUMBERING AS PER STANDARD SPECIFICATION BUT
EXCLUDING ERECTION OF GUY SETS AND EARTHING.
ERECTION OF GUY SETS INCLUDING EXCAVATION OF PITS & REFILING OF EARTH, AS PER
STANDARD SPECIFICATION WITH STAY CLAMPS STAY WIRES, ANCHOR ROD, TURN BUCKLE, EYE
BOLT, GUY INSULATOR, CEMENT CONCRETE BLOCK, ETC., BUT EXCLUDING CONCRETING.
CONCRETING/ MUFFING OF POLES GUY ETC., INCLUDING COST OF CEMENT,AND
17 9905010001 METAL (1:2:4) AND WATER ETC., AS PER C.C.M-20 GRADE STANDARD SPECIFICATION . 10 5995.00 7074.10
ERECTION COIL TYPE EARTHING INCLUDING COST OF COIL,COAL SALT, ETC BUT WITHOUT
COST OF G I WIRE AS PER STANDARD SPECIFICATION 10 KG SOLT + 10KG COAL.
SRTINGING OF 34MM2 ,55MM2,AAA CONDUCTOR, FOR 11 KV & L.T. LINE INCLUDING FIXING
OF INSULATORS, BINDING, JUMPERING, ETC.
SRTINGING OF 100 MM2, ACSR/DOG CONDUCTOR, FOR 11 KV & L.T.LINES
INCLUDING FIXING OF INSULATORS, BINDING, JUMPERING, ETC.
Re-stringing of HT & LT line (55mm2 & 34mm2) conductors/ Coated conductor with new double
21 9903000004 pin binding per span 100 103.00 121.54
Re-stringing of 11KV Aerial Bunch Cable (All size) per span with accessory fittings
23 9911000225 Re-Stringing of Dog Conductor with new double pin binding per span 10 137.00 161.66
THE WORK OF STRINGING OF ABC OF FOLLOWING SIZES INCLUDING FITTING OF ALL
ACCESSRIES I.E. SPECIAL DESIGN SUSPENSION / TENASION CLAMP, FIXING OF CROSS ARM, L.T.
24 9903000006 SHACKLE INSULATOR , ETC. FOR FIXING OF MESSAGER WIRE COMPLETE, AS REQUIRED & 5 24057.00 28387.26
DIRECTED BY ENGINEER-IN-CHARGE A: 3 X 50MM2+16MM2+1X 35MM2 B: 3 X
THE WORK OF STRINGING OF ABC OF FOLLOWING SIZES INCLUDING FITTING OF ALL
ACCESSRIES I.E. SPECIAL DESIGN SUSPENSION / TENASION CLAMP, FIXING OF CROSS ARM, L.T.
25 9903000005 SHACKLE INSULATOR , ETC. FOR FIXING OF MESSAGER WIRE COMPLETE, AS REQUIRED & 50 9625.00 11357.50
DIRECTED BY ENGINEER-IN-CHARGE A : 1 X 35MM2 + 1 X 25MM2
THE WORK OF STRINGING OF 11 KV ABC OF FOLLOWING SIZES INCLUDING FITTING OF ALL
ACCESSRIES I.E. SPECIAL DESIGN SUSPENSION / TENASION CLAMP, FIXING OF CROSS ARM,
BINDING TO PIN INSULATOR,PREPARING SHCKLE POINT JUMPERS ETC AS REQUIRED &
DIRECTED BY ENGINEER-IN-CHARGE
EXTRA LABOUR CHAGES FOR ERECTION OF POLE/GIRDER IN HARD MURRUM/SOFT ROCK FOR
SINGLE PSC POLE
28 9906000002 PROVIDING GUARDING TO HT LINE ON ROAD/RAIL CROSSING 60 70.00 82.60
29 9906000001 PROVIDING GUARDING OF LT LINE ON ROAD/RAIL CROSSING 60 70.00 82.60
30 9901000002 LT LINE TAPPING SINGLE PHASE. 60 51.00 60.18
31 9901000003 LT LINE TAPPING THREE PHASE. 40 93.00 109.74
LAYING OF OVER HEAD LT CABLE FOR ROAD CROSSING HT LINE CROSSING AND TELEPHONE
LINE CROSSING ETC (PER SPAN)
Dismentalling of all size (8,9,11,13…mtrs.) of RSJ (girder) Poles including dimentalling of relevant
33 9907000006 channels, cross arms insulators, jumpers, binding, earthing etc. INCLUDING Cr. IN STORE 10 824.50 972.91
Dismentalling of PSC Poles including dimentalling of relevant channels, cross arms insulators,
jumpers, binding, earthing etc. INCLUDING Cr. IN STORE
35 9911000163 Dismentalling of 11 kv AB Cables from line including Cr in store in rural area 1 17766.50 20964.47
Dismentaling of AB cables from line including in stores of following sizes A: 3 X
37 9907000009 Dismentalling of conductor from line. INCLUDING Cr.IN STORE 10 1055.5 1245.49
38 9907000012 Dismentalling of D.P.Structure. INCLUDING Cr. IN STORE (PSC) 20 976.50 1152.27
39 9907000013 Dismentalling of D.P.Structure. INCLUDING Cr. IN STORE (RSC) 1 1410.50 1664.39
INSTALLATION OF ENERGY METER & MMB/SMC BOX WITH ELECTRICAL WIRING ON
TRANSFORMER
PROVIDING SINGLE PHASE SERVICE CONNECTION WITH PVC CABLE FROM TERMINAL POLE TO
METERING POINT INCLUDING FIXING OF METER
PROVIDING THREE PHASE FOUR WIRE SERVICE CONNECTION WITH PVC CABLE FROM
TERMINAL POLE TO METERING POINT INCLUDING FIXING OF METER
SCHEDULE - B
Works Adve. Tender for Erection, Dis. and Maint. of HT/LT and T/c For ALL SCHEME under Chhotaudepur RE S/DN for TEJGADH SDN SCHEME TASP AG
and /or Any S/Dn. of BODELI O&M Div. (Ref COST DATA 2024-25) RATE INCL. OF GST.
SR Item Code Estimated NEW RATE Amount in
Description of Work (WITH 18%
NO No. Quantity 2024-25 Rs.
Excavation of trench 0.5Mtr. Wide and 1 Mtr. Deep for laying of HT/LT underground cable of
size upto 300Sq.mm PILC or XLPE.(The cable should be laid on bed of sand and to cover cable
with half round RCC pipe 6" internal dia and length of one meter along with each bottom and
43 9913000036 top.) The entire trench there after should be refilled with earth dully rammed up to ground level 50 109.00 128.62
As perDrg.No MGVCL/Tech/UG Cable/01/12-13 (Prorata Charges may be recovered for
extra digging)
Excavation of trench 0.75Mtr. Wide and 1 Mtr. Deep for laying of double HT/LT underground
cable of size upto 300Sq.mm PILC or XLPE.(The cable should be laid on bed of sand and to cover
cable with half round RCC pipe 6" internal dia and length of one meter along with each bottom
44 9913000037 and top.)The entire trench there after should be refilled with earth dully rammed up to ground 50 162.00 191.16
level As perDrg.No MGVCL/Tech/UG Cable/02/12-13 (Prorata Charges may be recovered for
extra digging)
Laying/Relaying of cable in Cable trench & from ground level to pole structure for providing
outdoor cable joints.
Laying / Relaying XLPE/PILC cable by digging of pits,
removal of old cable and laying of new cable on sand bad.
Widening & refilling with earth dully rammed the trench
for laying additional No. of cable.
Charges for digging of tar road for laying of cables
over and above digging of pit in normal soil .
Laying of U/G 11KV XLPE cable by Push & Pull method
(MANUAL)thru with HDPE pipe140mm/100mm Diameter,6mm thickness or 6" or 4" diameter GI
49 9913000042 Pipe without damaging surface of the road by horizontal boring / drilling method (Excluding cost 50 337.00 397.66
of HDPE pipe or 6" or 4"GI Pipe) as per Drawing and specification
Laying of U/G 11KV XLPE cable by Push & Pull method (BY Horizontal Directional
MACHINE)thru with HDPE pipe140mm/100mm Diameter,6mm thickness or 6" or 4"
50 9913000043 diameter GI Pipe without damaging surface of the road by horizontal boring / drilling 50 337.00 397.66
method (Excluding cost of HDPE pipe or 6" or 4"GI Pipe) as per Drawing and
specification
51 9902050003 Providing & Fixing of INDOOR CABLE JOINT BOX FOR XLPE CABLE(95 mm sq) 5 4182.00 4934.76
52 9902030025 Providing & Fixing of OUT DOOR CABLE JOINT BOX FOR XLPE CABLE(95 mm sq) 5 3996.00 4715.28
53 9902050004 Providing & Fixing of STRAIGHT CABLE JOINT BOX FOR XLPE CABLE(95 mm sq) 5 5947.00 7017.46
54 9902050003 Providing & Fixing of INDOOR CABLE JOINT BOX FOR XLPE CABLE(150 mm sq) 5 3757.00 4433.26
55 9902030025 Providing & Fixing of OUT DOOR CABLE JOINT BOX FOR XLPE CABLE(150 mm sq) 5 4372.00 5158.96
56 9902050004 Providing & Fixing of STRAIGHT CABLE JOINT BOX FOR XLPE CABLE(150 mm sq) 5 7191.00 8485.38
57 9902050003 Providing & Fixing of INDOOR CABLE JOINT BOX FOR XLPE CABLE(185 mm sq) 5 4367.00 5153.06
58 9902030025 Providing & Fixing of OUT DOOR CABLE JOINT BOX FOR XLPE CABLE(185 mm sq) 5 3995.00 4714.10
59 9902050004 Providing & Fixing of STRAIGHT CABLE JOINT BOX FOR XLPE CABLE(185 mm sq) 5 5672.00 6692.96
Providing & fixing HeatShrinkable type Cable Jointing kit suitable for 11KV1Cx95 sqmm ABCable
60 411000071 for Outdoor Termination application 5 2300.00 2714.00
Supply of HDPE pipe for laying 11KV XLPE cable 110mm nominal diameter & 5.3 to 6 mm
61 9913000015 thickness as per IS:4984 50 296.00 349.28
Supply of half round RCC hume pipe 6" internal dia & length of 1 Mtr.
Supply and Laying of medium grade GI pipe of size 4" dia with necessary Clamps to hold the
63 9913000014 Pipe with Pole/ DP Structure (rates are inclusive of supply & Laying of Pipe & Clamps) 50 459.00 541.62
Supply of sand 0.300x0.500X1.00mtr (Layer at bottom of cable trench approximately
0.15cmt) As perDrg.No MGVCL/Tech/UG Cable/01/12-13
Supply of sand 0.300x0.750X1.00mtr(Layer at bottom of cable trench approximately
0.225cmt) As perDrg.No MGVCL/Tech/UG Cable/02/12-13
Providing & supplying, fixing route marker of C.C.1:2:4, 150mm x 150mmx750mm concrete stone
(MGVCL marked with approved yellow colour) embedded in Earth at least 300mm below the G.L.
66 9913000009 & 450mm above G.L. at distance approx. 100 Mtr. or as directed by engineer incharge.(This 40 143.00 168.74
Includes material & Labour charges for excavation &refilling)
67 9913000009 RE-JUMPERING OF HT/LT LINE FOR SHACKLE POLE 40 98.00 115.64
Replacement of pole mounted 1-Ph/ 3 Ph . Service Connection Box including reconnecting all
connections
69 9911000229 PIN BINDING OF 11KV PIN INSULATOR 40 47.00 55.46
70 9911000230 PIN BINDING OF LT LINE PIN OR SHACKLE INSULATOR 40 47.00 55.46
71 9908000003 REPLACEMENT OF 11 KV DISC INSULATOR 40 171.00 201.78
72 9908000166 REPLACEMENT OF LT PIN /SHACKLE INSULATOR 40 37.00 43.66
73 9908000001 REPLACEMENT OF V CROSS - ARMS 40 244.00 287.92
74 9911000010 Refixing of V cross -arms in proper position 40 73.00 86.14
75 9908000051 REPLACEMENT OF TOP FITTING 40 60.00 70.80
76 9911000226 Refixing of top fitting in proper position 40 49.00 57.82
77 9908000007 REPLACEMENT OF LT CROSS - ARMS 40 79.00 93.22
PROVIDING DO FUSE OR AB SWITCH ON DO (FOR ONE SET) WITH FABRICATION & COLOUR
CODE JUMPER,INCLUDING PROPER ALIGNMENT OF AB SWITCH CONTACTS
NUMBERING THE POLE WITH PAINT BY PREPARING BACK GROUND OF REQUIRED HEIGHT
SURFACE OF ONE COLOUR AND HAVE LETTERING ( 2" & 3" HT ) AS DIRECTED BY IN CHARGE
79 9911000001 ENGINEER .THE TWO COLOUR SHOULD HAVE BEEN SLECTED AS TO HAVE CONTRAST FOR 1400 60.00 70.80
PROPER READABILITY.(REQUIRED COLOUR TO BE PROVIDED BY CONTRACTER)
80 9911000227 PROVIDING (PAINTING/MARKAR ) CONSUMER No ON SMC/MMB - Rural 50 21.53 25.41
81 9902030026 PROVIDING (PAINTING/MARKAR ) CONSUMER No ON SMC/MMB - Urban 11 11.84 13.97
SCHEDULE - B
Works Adve. Tender for Erection, Dis. and Maint. of HT/LT and T/c For ALL SCHEME under Chhotaudepur RE S/DN for TEJGADH SDN SCHEME TASP AG
and /or Any S/Dn. of BODELI O&M Div. (Ref COST DATA 2024-25) RATE INCL. OF GST.
SR Item Code Estimated NEW RATE Amount in
Description of Work (WITH 18%
NO No. Quantity 2024-25 Rs.
REPLACEMENT OF SINGLE PHASE OLD SERVICE BY NEW SERVICE INCL .SHORTFALL REEL
INSULATORS, EGG INSULATORS, NAILS, FIXING FASTNERS ETC.
83 9902040007 ERECTION/PROVIDING LIGHTENING ARRESTOR ON DP STRUCTURE 40 123.00 114.00
84 9908000050 Refitting of L.A. 20 37.00 43.66
REPAIRING/ADJUSTING TENSION OF EXISTING GUY/STAY SET INCLUDING
PROVIDING/REPLACEMENT OF STAY INSULATOR
REPLACEMENT OF OLD DISTRIBUTION BOX 200 KVA & ABOVE WITH MAKING ALL
CONNECTIONS CRIMPING OF LUGS,NEUTRAL ETC
REPLACEMENT OF OLD DISTRIBUTION BOX UP TO 100 KVA & ABOVE WITH MAKING ALL
CONNECTIONS CRIMPING OF LUGS,NEUTRAL ETC
88 9911000054 PROVIDING LINE SPACER BETWEEN LT LINE CONDUCTOR WITH BINDING 100 37.00 43.66
89 9911000072 Burning of Thread of LT/HT line including cost of oil bamboo etc. 10 73.00 86.14
90 9908000451 Replacement of 11KV PIN insulator by new Pin Insulator /Composite Pin Insulator 10 56.00 66.08
91 9908000452 Straightening of tilted PSC/RSJ pole at Pin Point. 10 284.00 335.12
92 9908000453 Straightening of tilted PSC/RSJ pole at Tension Point. 10 329.00 388.22
Straightening of tilted D.P (PSC GIRDER Pole) etc with refilling of stones,mourum etc.
Replacement of old jumpers by new jumper/binding/lugs etc. from L.A. to D.O. Fuse or D.O. Fuse
95 9911000189 Cutting of Tree branches obstructing HT/LT line on one tree 10 60.00 70.80
Cutting of bigger size of Tree branches / Whole tree obstructing HT/LT line
FIXING OF SMC (1-Ph) AT CONSUMER INSTALLATION ( INCLUDING COST OF FASTNERS)
Fixing of SMC (3-Ph.) at consumer installation(Including cost of fastners)
99 9908000023 REPLACEMENT OF METER (1 PH) WITH WIRING - Rural 20 85.05 100.36
100 9908000023 REPLACEMENT OF METER (1 PH) WITH WIRING - Urban 50 58.13 68.59
101 9909000001 CARTING OF PSC POLE AT DESTINATION (Per Pole)( >5 KM ) 20 378.00 446.04
102 9909000006 CARTING OF RSJ POLE TO WORK SITE.(Per 9 & 11 Mtr.) 20 536.00 632.48
ERECTION OF DOUBLE POLE STRACTURE WITH MOUNTING OF HG FUSES, WITHOUT
TRANSFORMERS, LIGHTENING ARRESTERS, DISTRIBUTION BOX ETC. OF
METERS 200 KG PSC POLES INCLUDING EXCAVATION OF PITS AND REFILING OF
EARTH, CARTING OF TRANSFORMERS, FROM STORE TO SITE FIXING OF
CHANNELS SUPPORTING ANGLES, BRACING CROSS ARMS, CLAMPS ANTI-
103 9902030001 CLIMBING DEVICE DANGER BOARDS CONDUCTOR AND CABLE WIRING 35 5201.00 6137.18
ETC.,COMPLETE AND PAINTING OF FABRICATED MATERIALS USED ON THE
POLES AND NUMBERING WITH COST OF PAINTS AS PER STANDARD
SPECIFICATION BUT EXCLUDING ERECTION OF GUY SETS AND EARTHING.
104 9911000271 Painting of steel/MS fabricated materials of PSC/RSJ Pole (HT Line) 10 123.00 145.14
Painting of steel/MS fabricated materials of PSC/RSJ Pole HT pole extension (HT Line)
Painting of all steel/MS fabricated materials on DP structure (without transformer) of PSC/RSJ
pole (Excluding RSJ Pole)
Painting of all steel/MS fabricated materials on DP structure with transformer of PSC/RSJ pole
(Excluding RSJ Pole)
108 9911000275 Painting of steel/RSJ pole-100X116 of 9 to 13 mtr (Excluding fabricated materials) 10 1132.00 1335.76
109 9911000276 Painting of steel/RSJ pole-150X150 of 11 to 13 mtr (Excluding fabricated materials) 10 1456.00 1718.08
Painting of steel/MS fabricated materials of PSC/RSJ pole (LT line-4 wire) (Rs 14 per Wire)
111 9903000009 Un-Bundling of HT ABC 95/70 SQMM 10 9008.00 10629.44
112 9903000008 Stringing of Un-Bundling of HT ABC 95/70 SQMM 10 4504.00 5314.72
113 1501000024 M S BOLTS AND NUTS 65 MM X 16 MM_( 2.5 X 5/8 INCH) 200 108.56 128.10
114 1501000031 M S BOLTS AND NUTS 180 MM X 16 MM_( 7 X 5/8 INCH ) 200 108.56 128.10
115 1501000038 M S BOLTS AND NUTS 300 MM X 16 MM_( 12 X 5/8 INCH) 150 108.56 128.10
116 2615000027 Supply of Wedge Type Tension assembly with IPC 126 747.56 882.12
117 2615000028 Supply of Helical Tie 2 110.46 130.34
118 411000077 Supply of Mid span Joints (Tension Joints) 2 427 503.86
119 411000078 Supply of IPC for Networking or Branching or Looping IPC Type 2 223 347.35 409.87
120 411000078 Supply of IPC for Bare to Covered interconnection IPC - Type 1 4 347.35 409.87
121 411000078 Supply of IPC with with Aluminum Ball for earthing IPC Type 3 80 381.9 450.64
Laying,Testing & commissioning of Specially designed 11 KV AAAC/AL-59
122 9903000016 Medium Voltage Covered conductor as per the technical specifications (with 1 37513 44265.34
accessories)
TOTAL (WITH 18 % GST)
IN SCHDULE ''B'' MENSIONED QUANTIES ARE ESTIMATED. QUANTIIES MAY BE INCREASED OR DECREASED IN EVERY WORKS. BUT ORDER VALUE WILL NOT BE
1 CHANGED & PAYMENT WILL DONE AS PER ACTUL EXCUSION OF WORKS
In case any joint fails within one year due to poor workmanship,it should be replaced free of cost by you else, the charges for the same will be deducted from your bill.
For laying of double circuit, both cables should be covered with separate RCC hume pipe of 6"diameter OR Provided HDPE Pipe for laying 11KV cable. Pipe should be
3 10mm thickness.
If the work of cable would not be started within six hours from verbal instruction of Engineer-in-charge from sub-division, the penalty will be charged @ Rs.200/- per
4 occasion.
SCHEDULE - B
Works Adve. Tender for Erection, Dis. and Maint. of HT/LT and T/c For ALL SCHEME under Chhotaudepur RE S/DN for TEJGADH SDN SCHEME TASP AG
and /or Any S/Dn. of BODELI O&M Div. (Ref COST DATA 2024-25) RATE INCL. OF GST.
SR Item Code Estimated NEW RATE Amount in
Description of Work (WITH 18%
NO No. Quantity 2024-25 Rs.
Contractor must have PUSH-PULL Machine ( HDD) of 10Ton pushback capacity for 200 Mtrs;length.
6 There should be a saparate Labour team for each order.
7 Contractor have to carry out maintenance work of 20 % of total order value issued.
Note: As far as possible there should not be a situation where re carting is required for more than 5 Kms. Poles should be carted from Pole factory nearer to the pole
requirement, However in exceptional circumstances if re carting is required for more than 5 Kms up to 10 Kms then the carting rates specified may be paid with specific
justification of requirement of carting for more than 5 Kms and with prior concen of sdo and prior approval of EE of division”.
9 Time limit for ABove work is 365 days from date of issue work order
10 On receipt of Sub work Order, immediately contact Engineer Inchargeof Concern S/dn for line marking of erection work.
11 Work should be carried out under supervision of authorized MGVCL staff only.
12 T.S wise / Work wise material account of sub works order must be given separately.
The materials requisition (M.R) should be collected from Concern Sub Division office
If work is dealy for non-availABility of any material or objection of line erection work, must be inform in retune to sdo office to Concern
14 S/dn office in writing.
15 For extension of time limit of work order, you have to submit written request letter with valid genuine reason.
16 On completion of work, you have to credit all balance materials to sdn. store
You have to prepare & submit works bill for Above work within 07 days with material inventory sheet & Material
17 account sheet & MR/CR/Gate pass copy & HT/LT/TC erected network sketch
In case of any excess work required while actual execution of work you have to give written intimation to this office and to submiite revise TS along with Bill & No excess
work should be carried out without prior written permission / approval from competent authority.
Above work has to be carried out at concens sdn under BODELI Division as with prior concent of Division office and when required.
20 For non -painting of RSJ Pole 30 % of erection charge decucted from bill amount.
For non -painting of PSC Pole fabrication Rs. 91/- per pole & for PSC DODP Rs. 281/- and for PSC TC DP fabrication Rs 573/- per DP will be deducted from bill.
22 For non painting of Pole numbering Rs. 60/- wil be deducted per pole.
23 For live electric line crossing work, work must be carried out after under your superviser and sdo authorise MGVCL staff Power cut-off and earthing of Line.
Mandatory Use Pole Errection Devices/Machines for Pole Installation AS PER LETTER NO. MGVCL/SE(TECH)/470 DT. 12.06.25
Note: A) The bidder shall quote FIRM PRICES only. The prices quoted will not be subject to any escalation
till completion of work
B) The above prices are inclusive of all taxes, levis duties etc & including GST . GST wil be paid exta as applicable from
time to time on given taxable goods and/or sevices
C) All dismentalled material should be credited to Division store.
D) Work should be carried out as per the quantity mentioned in schedule-B. Variation in the quantity is permissible
according to the quantum of work.
I/We have read and clearly understood the terms, conditions, Schedule ‘B’ and technical specifications put by MGVCL on WEB site.
I/We am/are willing to carry out the work at _________________% (Above/Belove/Estimated) (In words ______________percentage (Above/Below/Estimated)
SIGNATURE OF CONTRACTOR Executive Engineer
(With Rubber Stamp & Date) DIVISION BODELI.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1.On line Tender Notice.pdf
2.RE drawing.pdf
3.Commercial Terms and Conditions - 23062020.pdf
4.Scope of works.pdf
5 POLE ERRECTION coroprate letter .pdf
6. SCHEDULE B COST DATA.pdf
7.DECLARATION IN REGARD TO RELATIONSHIP WITH EMPLOYEE.pdf
8.ONLINE CONDITION.pdf
9. BANK GURANTEE.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .