Loading…
Loading…
Tender Value
₹51 L
EMD Value
₹51,000
Closing Date
12 Mar 2026, 2:30 pmClosed
Municipal Corporation of Rajahmundry
Rajahmundry
Supply, delivery and dosing of Poly Alluminium Chloride (PAC) in Liquid state to Head Water Works in Rajamahendravaram Municipal Corporation for one year.
909142
364/Mcr/General/2025-26
OPEN - NCB
Similar Work
EAST GODAVARI
15 documents required · 14 mandatory · 1 optional
₹1,806
₹51,000
6 Mar 2026
6 Mar 2026
6 Mar 2026
Treatment of Raw (River) Water with ISI Grade 10% Poly Alluminium Chloride (PAC) Strength of AL2O3 at Head Water Works The Clarifier water shall be maintained turbidity of less than 3 NTU and pH of treated water should be maintained between 7.2 to 7.6 variation is allowed+/- 0.1 on river pH including supply of PAC Solution in Containers and dosaging to raw water and testing of Raw Water and treated water, and submission of Bi-hourly analysis report of the filtration plants of raw water, turbidity in NTU and pH and also supply water. To aim at increasing filtration period and less water is to be used for back washing. Alternative chemicals should be kept in reserve stock. The scope of work includes: 1.Supply the chemical to Head Water Works 2.Unloading the chemical from the tanker to storage tank, 3.Loading the Chemical to the day tanks of the filtration plants 4.Conducting jar test of the Raw Water 5.Addition of calculated chemical to the flash mixers. 6.Testing of turbidity and pH of clarifiers over flow water and filter bed & discharge.
supply and Delivery of Bleaching Powder (ISI Brand) with 33% chlorine including cost and conveyance to work spot and all labour charges etc complete
Treatment of Raw (River) Water with ISI Grade 10% Poly Alluminium Chloride (PAC) Strength of AL2O3 at Head Water Works The Clarifier water shall be maintained turbidity of less than 3 NTU and pH of treated water should be maintained between 7.2 to 7.6 variation is allowed+/- 0.1 on river pH including supply of PAC Solution in Containers and dosaging to raw water and testing of Raw Water and treated water, and submission of Bi-hourly analysis report of the filtration plants of raw water, turbidity in NTU and pH and also supply water. To aim at increasing filtration period and less water is to be used for back washing. Alternative chemicals should be kept in reserve stock. The scope of work includes: 1.Supply the chemical to Head Water Works 2.Unloading the chemical from the tanker to storage tank, 3.Loading the Chemical to the day tanks of the filtration plants 4.Conducting jar test of the Raw Water 5.Addition of calculated chemical to the flash mixers. 6.Testing of turbidity and pH of clarifiers over flow water and filter bed & discharge.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQ 83.xlsx
TENDER_DOCUMENT • 0.01 MB
DOC.DOC
TENDER_DOCUMENT • 0.56 MB
Nit.DOC
TENDER_DOCUMENT • 0.27 MB
Download all tender documents and submit your bid