Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.8 LAccepted-AOC | L1 | Accepted-AOC First lowest | |
| 2 | L2₹5.8 L+₹1,414.80 (0.24%)Rejected-AOC PALLIMANCHAYALIL HOUSE PO PADOOR | ALAPPUZHA | KERALA | 686534 | L2 | Rejected-AOC Second lowest |
Tender Value
Refer Docs
EMD Value
₹9,750
Closing Date
24 Aug 2021, 6:00 pmClosed
Assistant Engineer, LSGD Section VenkitanguGP
Assistant Engineer, LSGD Section Venkitangu GP
Pond Side and surrounding pathway concreting
2021_LSGD_434592_1
E15/ AE/ LSGD/ VENK/ 2021-22 Dt 02.08.2021
Open Tender
Civil Works - Water Works
Item Rate
240 days
VenkitanguGramaPanchayath
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,548
Yes
₹9,750
Yes
18 Sept 2021
12 Aug 2021
27 Aug 2021
12 Aug 2021
24 Aug 2021
12 Aug 2021
12 Aug 2021 - 24 Aug 2021
Amount
2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
2.32 : Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.1.5 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
5.9.1 : Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
16.78.2 : Construction of granular sub- base by Providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, Carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in- Charge.With material conforming to Grade-II (size range 53 mm to 0.075 mm ) having CBRValue-25
16.42 : Cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size ) in pavements, laid to required slope and camber in panels as required including consolidation finishing and tamping complete
50.6.2.2 : Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete
13.1.1 : 12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
od1285002/2021_2022 : Clearing kulavazha, deep rooted weeds and other types of floating substances from the kulam in or under water and deposing the same in places away from the periphery of the kulam with all leads and lifts as directed by departmental officers.<br>
50.2.3.1 : Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete
od1263713/2021_2022 : engaging man mazdoor for Cleaning/clearing/assisting/ etc.. for various works
Bidder Name
Ravindran V S
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_617458.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .