Constructing Inleting Structure and gabion wall at ch, 26940 m on Gada Sinjiwada Drain near village Kasbara.
332866
05 of 2026-2027
Open
Miscellaneous Works
Works
Anand
13 documents required · 10 mandatory · 3 optional
₹1,500
Executive Engineer Petlad Irrigation Division Petlad
₹35,000
11 Aug 2026
11 Aug 2026
11 Aug 2026
25 Aug 2026
11 Aug 2026
Bill Of Quantities
Memorandum showing items of works to be carried out
NAME OF WORK Constructing Inleting Structure and gabbino wall at Ch. 26940 m On Gada
: Sinjiwada Drain near village Kasbara
Quantity Estimated rate
SR. accoarding to
but may Item of work Rs. in Rs. in Unit
be more or figs. words quantities
ITEM NO :- 1Excavation for foundation in
all sorts of soil including yellow sandy
gravelly soils ,soft & hard murrum etc. in
dry condition including depositing the Rs. One
excavated stuff in uniform layers in banks Hundred
1 539.00 or as and where directed etc. complete for 107.80 Seven & CUM
lead up to 500m and all lift. (BY Eighty Paise
MACHINERY) Only
ITEM NO :- 2 (A) Providing & Laying in
position "NOMINAL MIX" cement concrete
using cement, sand and crushed aggregate
by mass and machine mix for C.C./R.C.C
work incl. necessary formworks centering,
scaffolding, compaction by vibrator, curing
as directed with all lead & lift etc complete
2 53.00 Without Dewatering and excluding cost of 3754.00 CUM
steel reinforcement. (A) For Foundation
concrete / General purpose (c) C.C. Nominal
Mix, M-15 and MSA-20 mm
ITEM NO :- 2 (B) Providing & Laying in
position "NOMINAL MIX" cement concrete
using cement, sand and crushed aggregate
by mass and machine mix for C.C./R.C.C
work incl. necessary formworks centering,
scaffolding, compaction by vibrator, curing
as directed with all lead & lift etc complete
3 179.00 Without Dewatering and excluding cost of 4296.00 CUM
steel reinforcement. (A) For Foundation
concrete / General purpose (f) C. C.
Nominal Mix, M-20 and MSA-20 mm
ITEM NO :- 3 Providing and fixing in
position ( different diameter ) NP2 R.C.C.
pipe with collar including filling and Rs. Three
caulking the joints with cement mortar 1:1 Thousand
4 20.00 proportion, finishing to design grade and 3091.10 Ninety One RMT
level curing etc. complete for all leads and & Ten Paise
lifts. NP-2 class 1200 mm dia pipe. Only
ITEM NO :- 4 Providing & Placing in
position reinforcement bars including
cutting, bending, welding joints where
5 11.22 necessary, hooking etc. complete as per 7194.00 Qtl
drawing for all lead and lifts.TMT
ITEM NO :- 5 Providing and laying in Rs. Two
position 110 mm dia (6 kgf/sqcm) P.V.C. Hundred
6 15.00 Pipe for weep holes with non corroding jali 262.50 Sixty Two & RMT
in abutments, wing walls, retaining walls Fifty Paise
etc. complete. Only
ITEM NO :- 6 Providing and Placing in
position mechanically woven double twisted,
galvenized without PVC coating "GABIONS"
made of mesh size 10 X 12 cm with Mesh
wire diameter 3.0 mm, including proving
and lying stones with least dimention of
mm and tying with lacing wire of diameter Rs. Two
2.2 mm and arranging the same as Thousand
instructed or as per drawing at the 2822.00 Eight
locations/ structures etc including dressing Hundred
the slope , minor earth fill with all lead and Twenty Two
lift etc complate (a)1.00mt X 1.00mt X Only
1.00mt (stone weight between 10kg to 40kg)
ITEM NO :- 7 Providing & laying Non-woven
Geo fabric filter over the excavated surface Rs. One
as per specification including stitching with Hundred
8 246.00 overlap to design profile as directed etc 102.67 Two & Sixty SM
compllete Seven Paise
ITEM NO :- 8 Back filling the foundation
trenches around the structures etc with
selected excavated stuff including watering, Rs. Thirty
9 329.00 ramming, compacting etc. complete. (By 36.90 Six & Ninety CUM
Machinery) Paise Only
ITEM NO :- 9 Providing drone videography
on the occaion of function or for before/on
going/after completion of construction work Rs. Four
10 1.00 including dubbing , titeling etc. complete 4000.00 Thousand
including cost of cassette/CD Only
Rs. Thirty Four Lacs Fifteen Thousand One Hundred Twelve and Seven Paise Only
I / We am / are willing to carry out the work at………………..% above / below precent.
(Should be written in figure and words) of the estimate reates mentioned above.
Amount of my / our tender works out as under.
Estimated amount put Estimated amout put
to tender Rs……………. to tender Rs.
Deduct …………..% Add………………%
below Rs………… Above Rs……………
Net Rs……………….. Total Rs…………….
In words…………………………….. In words………………
Notes 1 - The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge for
which no extra payment shall be made.
Notes 2 - The labour cess will be deducted as per prevailing rules i.e.1% of the work done.
Notes 3 - GST and Income tax TDS will be deducted at a source while making payments of bills
Note 4 - In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt.G.R.:PRC-10/2017 Cement
Consumption / 16 / CDate: 11/05/2017asstated in S.O.R. there fore in R.C.C. items where there is a change as per actual mix design the
cost of difference of cement consumption have been deducted from the rate of original item at the rate of input rate mentioned in all the
Signeture of Contractor Deputy Executive Engineer
Drain Sub Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender Notice 05 of 2026-27 online.pdf
1 Front Page.pdf
2 Notice Inviting online Tender.pdf
3.SBD-Documen .pdf
4 Item Technical Specification-.pdf
5. except item wise specification.pdf
9.1.Cement Consupmtion.pdf
9.2. BOQ.pdf
9.3. PE.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].