Loading…
Loading…
Tender Value
₹4.9 L
EMD Value
₹6,158
Closing Date
14 Sept 2026, 5:00 pm2d left
Dr. Sunny Rao
Office of the Project Officer,WJ Area
Transportation of one pony belt drivehead and installation of Pony belt drivehead(P0) at 9th Rise Jn. Of D19 TG of XVI(T) seam at 500MH in Moonidih Colliery, W.J. Area
2026_BCCL_364847_1
BCCL/WJA/MND/SUR/2026-27/05
Open Tender
Miscellaneous Works
Percentage
15 days
Moonidih Colliery, WJ Area
Please refer to NIT.
11 documents required · 11 mandatory
₹6,158
3 Sept 2026
3 Sept 2026
16 Sept 2026
3 Sept 2026
14 Sept 2026
3 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Transportation of one pony belt drivehead and installation of Pony belt drivehead(P0) at 9th Rise Jn. Of D-19 T/G of XVI(T) seam at 500MH in Moonidih Colliery, W.J. Area | |||||
| 1.01 | Transportation of Drive frames, gear box,Motor,Starter of pony drivehead,Side guards &Decking plate from Surface To D-18 B/G,9th D/R jn. Via track &Haulages on 5 arm trolleys. Analysis: No. of Arm trolleys required = 5 Manshift required/Arm trolley = 6 unskilled/shift. Cost/Arm trolley = (6*1437.6) =Rs.8625.6/Trolley | 5 | Arm trolley | 8,625.6 | ₹43,128 |
| 1.02 | Transportation of jib drum of pony Drive head from 6th D/R Jn. Of E-9 T/G to D-18 B/G Jn. Of 9th D/R. Via Track & Haulages Analysis:No. of arm trolley required=1 Manshift required/Arm trolley = 8 unskilled/shift for 2 shift(icluding loading & unloading) Cost/Arm trolley = (8*1437.6)*2 =Rs.23001.6/Trolley | 1 | Arm trolley | 23,001.6 | ₹23,001.6 |
| 1.03 | Manual Transportation of jib drum,gear box,motor of pony drivehead from D-18 B/G,9th D/R jn. to D-19 T/G,9th D/R Jn. i.e.Total distance=360m Analysis: Manshift required for manual transportation of one item/60m =10 unskilled manshift/shift Cost/mt/item= 10*1437.60/60 =Rs.239.6/mt/item Total items=3 no.; Therefore cost/mt=(Rs 239.6 *3)=Rs 718.8/mt | 360 | meter | 718.8 | ₹2,58,768 |
| 1.04 | Manual Transportation of Drive frames of pony drivehead from D-18 B/G,9th D/R jn. to D-19 T/G,9th D/R Jn. i.e.Total distance=360m Analysis: Manshift required for manual transportation of pony frames =8 unskilled manshift/shift Cost/shift= 8*1437.6 =Rs11500.8/shift | 3 | shifts | 11,500.8 | ₹34,502.4 |
| 1.05 | Manual Transportation of starter and starting cable of pony drivehead from D-18 B/G,9th D/R jn. to D-19 T/G,9th D/R Jn. i.e.Total distance=360m Analysis: Manshift required for transportation of starter =8 unskilled manshift/shift Cost/shift= 8*1437.6=Rs11500.8/shift | 2 | shifts | 11,500.8 | ₹23,001.6 |
| 1.06 | Installation of Pony Drivehead at D-18 T/G 9th D/R jn. Analysis: Unskilled manshift required/shift=8 cost/shift= 8*1437.6=Rs11500.8/shift | 4 | shift | 11,500.8 | ₹46,003.2 |
| 1.07 | Add CP 15% as per clause 4.17.1 of Civil Eng. Manual & BCCL SOR | 1 | Units | 64,260.72 | ₹64,260.72 |
| 2CMPF | |||||
| 2.01 | CMPF, Pension and admin. Charge of Employee Un Skilled surface | 298 | hd | 275.26 | ₹82,027.48 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.60 MB
BOQ_377764.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .