Executive Engineer, R&B Division, Jamnagar
C.R. to Lalpur Bypass Road Km.0/0 to 3/8 (Pro. MSS Patta in Selected Stretches).
311516
04 of 2026-27
Open
Civil - All
Jamnagar
4 documents required · 4 mandatory
₹1,500
Executive Engineer, R&B Division, Jamnagar
₹42,000
5 Jun 2026
5 Jun 2026
5 Jun 2026
19 Jun 2026
5 Jun 2026
Name of work :- C.R to Lalpur Bypass Road Km 0/0 to 3/8 (Providing MSS Patta in selected stretches)
BILL OF QUANTITIES
(A) Percentage Rate Tender
Item Description of Item (With brief Specification and reference in book of Specifications) Quantity Unit Rate in Amount
1 Providing and laying 20 mm thick average for patchwork Mix seal surface using 640.00 M.T. 3855.17
stone chips @66% by weight, gradation as per MORTH specification and using
bitumin VG 30 grade at rate not less then 50.90KG/MT on BT surface using
stone chips as per MORTH specification including heating the asphalt and
aggregates by hot mix plant and spreading the same bt paver finisher including
consolidation wit vibratory roller and providing, operating plant machineries,
equipments, tools, plants, oil, fire wood, kerosene and all labour charges etc.
complete. upto all lead.
2 Providing and laying 50mm thick B.M. With BT Aggregate VG-30 grade 270.00 M.T. 2870.42
bitumen for Tack coat @ 2.50 kg/10 sqm using crushed stone aggregate
cum/ MT as per MORTH&H Specification & VG-30 grade bitumen for mixing
@34.00 Kg/1 MT i.e. 3.4% of by weight of total mix incl. heating and mixing by
drum mix plant and spreading the same with paver finisher consolidation with
vibratory roller including cost of fuel, hire charges, all necessary equipments,
tools and plant, fire wood, oil, kerosene labour changes etc complete.( Using
contractor's own Machinery) upto all lead.
3 Providing & laying 37.5 mm Thick B.U.S.G (Manually ) Patch work on road site 2700.00 Sqm 206.04
using Bitumin for tack coat at the rate of 2.5Kg/10sqm. on Existing Road
surface & with spreading stone aggregate at the rate of 0.50Cum./10 sqm. with
dry rolling and spraying bitumin over it and spraying bitumin over it at the rate
of 15 kg/10sqm layer. and then spreading over it stone aggregate at the rate of
0.13cum/10 Sqmt of key aggregate on top in accordence with the requirement
of specification incl. cost of stone aggregate bitumin consolidation with
vibratory roller necessary firrwood labour charges machineries equipment tools
etc. complete.upto all lead.
4 Providing and laying compacted WBM of grading II B.T.M.C. Metal including 405.00 Cum 964.55
spreading watering and consolidation by vibratory roller etc. complete.
I/We am/are willing to carry out the work at _______________% above/below Percent
(Should be Written in Figures & Words) of the estimated rates mentioned above. Amount of my/our
Tender works out as under.
# Estimated Amount Put to Tender # Estimated amount put to Tender
Deduct __________ % below Add : _________ % Above
Deputy Executive Engineer Executive Engineer
Jamjodhpur. (R&B) Sub-Division Jamnagar (R&B) Division
Jamnagar. Jamnagar.
1 The Contractor shall exhibit a board with detailed specification and details of work as per directed by the Engineer-in-Charge
for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income Tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-10/2017 Cement
Consumption /16/C Date : 11/05/2017 as stated in S.O.R. therefore in R.C.C. items where there is a change as per actual nix
design the cost of difference of cement consumption have been deducted from the rate of original item at the rate of input rate
mentioned in all the tender.
5 Testing of materials shall be as per statement attached for quantity control. with specification, the materials shall be tested in
GERI for testing charges shall be paid by Executive Engineer, and of amount put to tender after deduction the cost of
materials as per Schedule-'A' shall be recovered from contractor in Running bill as per G.R. of R&B Deptt. No. TNC/1085-4-6,
6 The Contractor shall be state even "NIL" precent of no reduction as offered.
7 One percent of Contract value. for this work shall be recovered from the contract payment as " Labour cess" in terms of the
Gujarat Government Gazette extra ordinary Dated 12-12-2004 implementation of building & other construction worker's
(Regulation of Employment and condition of service Act, 1996)
8 For R.C.C. Item where there is change of grade mix or charge as per actual mix design the difference of cement consumption
shall be deducted from rate of original item at the rate of star rate mentioned in the tender.
9 GST Will be paid extra as per Govt. Emendment.
Deputy Executive Engineer Executive Engineer
Jamjodhpur. (R&B) Sub-Division Jamnagar (R&B) Division
Jamnagar. Jamnagar.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQ.pdf
index.pdf
SBD LALPUR BYE PASS ROAD 20MM 50MM BM 20-2-26.pdf
SPECIFICATION LALPUR BY PASS ROAD .pdf
test.pdf
Performance Bond and Bitumen date.pdf
Annexure - C.R. to Lalpur Bypass Road Km.0.0 to 3.8.pdf
E-Tender-4.pdf
Download all tender documents and submit your bid