| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.7 CrAdmitted-Finance HIMALAYA HOUSE D 248 SECTOR 10 NOIDA DIST G B NAGAR U P 201301 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | -1.67% | ₹1.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.7 Cr+₹73,048.92 (0.43%)Admitted-Finance NOT AVAILABLE | -1.25% | ₹1.7 Cr+₹73,048.92 (0.43%) | L2 | Admitted-Finance |
| 3 | L3₹1.7 Cr+₹1.2 L (0.68%)Admitted-Finance 0 0 PIPRAICH GORAKHPUR GORAKHPUR UTTAR PRADESH 273152 | GORAKHPUR | UTTAR PRADESH | 273152 | -1.00% | ₹1.7 Cr+₹1.2 L (0.68%) | L3 | Admitted-Finance |
| 4 | L4₹1.7 Cr+₹1.3 L (0.73%)Admitted-Finance 106 NEHRU NAGAR ROORKEE DISTRICT HARIDWAR | HARIDWAR | UTTARAKHAND | 247656 | -0.95% | ₹1.7 Cr+₹1.3 L (0.73%) | L4 | Admitted-Finance |
| 5 | L5₹1.8 Cr+₹4.8 L (2.79%)Admitted-Finance A 121 LOHIA NAGAR GHAZIABAD UTTAR PRADESH PIN 201001 | GHAZIABAD | GHAZIABAD | UTTAR PRADESH | 201001 | +1.07% | ₹1.8 Cr+₹4.8 L (2.79%) | L5 | Admitted-Finance |
Tender Value
₹1.7 Cr
EMD Value
₹4.1 L
Closing Date
3 Jun 2026, 5:00 pmClosed
GENERAL MANAGER (JAL)
Water Works Compound Sector-5 Noida
Strengthening of Water Supply (Strengthening of Ganga Jal UGR Sector-51) Noida.
2026_NOIDA_1155020_1
05/SM(GANGAJAL)/ET/2026-27
Open Tender
Civil Works - Others
Fixed-rate
365 days
NOIDA
Please Refer to Tender Document
3 documents required · 3 mandatory
₹5,310
NOIDA
₹4.1 L
15 Jun 2026
28 May 2026
4 Jun 2026
28 May 2026
3 Jun 2026
28 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 424.55 | Cum | 1,347.16 | ₹5,71,936.78 |
| 2 | Earth work in excavation by mechanical means (hydraulic excavater)/manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 Sqm. on plan) i/c dressing of sides and ramming of bottoms, lift upto 1.5 m, i/c getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. in all kind of soil. The Contractor has to detect different utilities like sewer line, water supply line, electric cable, telephone cable, gas pipe line etc. using utility detecting machine before start of excavation and shall start excavation only after getting permission of Engineer-in-Charge. (DSR-18, I.No.-2.8.1/P-74) | 0.73 | Cum. | 136 | ₹99.28 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources) | 0.36 | Cum. | 6,066.29 | ₹2,183.86 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources) | 259.9 | Cum. | 7,359.68 | ₹19,12,780.83 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass
concrete | 315 | Sqm. | 181.64 | ₹57,216.6 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts | 1,302 | Sqm | 426.85 | ₹5,55,758.7 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access
platform | 3,971.86 | Sqm. | 385.68 | ₹15,31,866.96 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Cold twisted bars | 81,584.97 | Kg. | 65.02 | ₹53,04,654.75 |
| 9 | Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix,manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as permix design of specified grade for reinforced cement concrete work including pumping of R.M.C. from transit mixer to site of laying , excluding the cost of centering, shuttering finishing and reinforcement including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in - charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess/ less cement used as per design mix is payable/ recoverable separately. All work above plinth level upto floor V level | 695.57 | Cum | 8,654.76 | ₹60,19,991.41 |
| 10 | Extra for providing richer mixes at all floor levels. Note:- Excess/ less cement over the specified cement content used is payable/ recoverable separately. Providing M-30 grade concrete instead of M-25 grade BMC/RMC. (Note:- Cement content considered in M-30 is @ 340 kg/cum) | 695.57 | Cum | 65.97 | ₹45,886.75 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
TD05.pdf
Tender Documents • 2.26 MB
BOQ_2163514.xls
BOQ • 0.25 MB
Capability_05.xls
Additional Documents • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .