Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹69,006Accepted-AOC ENA ISLAMPUR BHAGGATDIH NEAR BHAGGATDIH WEIGHT BRIDGE DHANBAD 828106 JHARKHAND INDIA | DHANBAD | DHANBAD | JHARKHAND | 828106 | L1 | Accepted-AOC ACCEPTED | |
| 2 | L2₹71,000+₹1,994 (2.89%)Rejected-Finance AT BHAGATDIH ISLAMPUR P O JHARIA DIST DHANBAD 828111 | DHANBAD | DHANBAD | JHARKHAND | 828111 | L2 | Rejected-Finance NOT BEING L1 | |
| 3 | L3₹72,000+₹2,994 (4.34%)Rejected-Finance DHANBAD JHARKHAND 828111 INDIA | DHANBAD | DHANBAD | JHARKHAND | 828111 | L3 | Rejected-Finance NOT BEING L1 |
Tender Value
₹69,046
Closing Date
15 Jun 2022, 11:30 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
AREA MANAGER EXCAVATION KUSUNDA AREA
OFFICE OF THE GM KUSUNDA AREA VI
Complete repairing and rewinding of Delco remy 6 pole self starter 50MT 24V and Alternator 140Amp presto lite 24V and circuit repairing head and back light with wiring changing of machine CK300 B0744 Hydraulic Shovel at ADIC Kusunda Area
2022_BCCL_245590_1
BCCL/KA-VI/EXC/E-TEN/22-23/17
Open Tender
Excavation Department Work
Item Rate
6 days
DOCP KUSUNDA AREA VI
Please refer Tender documents.
8 documents required · 8 mandatory
Yes
8 Jul 2022
2 Jun 2022
16 Jun 2022
3 Jun 2022
15 Jun 2022
3 Jun 2022
120 days
Amount
Item Description/ Heading
Jobs to be done: 1. Complete startor rewinding 24V alternator. 2. Rotor rewinding 24V alternator. 3. Alternator kit changing. 4. Alternator rectifier changing. 5. Regulator changing 24V. 6. Bearing changing as per sample. 7. Alternator slipring changing. 8. Armature rewinding of 6 pole delco remy. 9. Solenoid switch changing 6 pole delco remy 24 V. 10. Field coil 6 pole 24V repairing tapping and loop changing. 11. Brush gear changing 6 ple delco remy 24V. 12. Carbon brush changing 6 pole 24V. 13. Drive assy. changing delco remy 6 pole 24 V. 14. Self kit changing delco remy 6 pole 24 V. 15. Main wiring circuit repairing failed parts new changing. 16. LT wire changing 6MM and 8MM. Materials Required:- MCB switch 63 AMPs-03 nos, MCB switch 16 AMPs-02 Nos., plastic tape 3 roll-03 Nos. , steel grip tape-02 Nos, push button switch-01 Nos., wiring clip-4 pkt, 4st switch 24V-01 No., battery cutoff switch 24V-01 No., head light assly 24V-06 Nos., battery cable heavy duty. Repairing work should be completed with all required materials and manpower
Total impact of GST for the purpose of CTC
BIHAR TRADING CO.
Q-TECH SALES AND SERVICE
stage.html
html • 0.04 MB
techsummary_253704.pdf
PDF • 0.19 MB
finsummary_253704.pdf
PDF • 0.19 MB
Aoc27.pdf
PDF • 0.63 MB
finance_253704.pdf
PDF • 0.09 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .