Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Qualified |
| 2 | Accepted-Technical | Accepted-Technical Qualified |
| 3 | Accepted-Technical WARD NO 26 P O JAJPUR PIN 755019 DIST JAJPUR | JAJPUR | JAJPUR | ODISHA | 755019 | Accepted-Technical Qualified |
| 4 | Accepted-Technical | Accepted-Technical Qualified |
| 5 | Rejected-Technical AT MAHAPATRABALANDA PO MAHAPATRABALANDA PS MAHULPALI DIST SAMBALPUR PIN 768228 | SAMBALPUR | ODISHA | 768228 | Rejected-Technical Disqualified EI Lic not furnished |
Tender Value
₹55.1 L
EMD Value
₹55,080
Closing Date
24 Sept 2026, 5:00 pmClosed
Divisional Officer
RURAL WORKS DIVISION NO.II, KEONJHAR
Construction of SC Building at Bamebari under Joda Block in the Dist. of Keonjhar
2026_CERWI_140709_1
NCB 07 OF 2026-27
National Competitive Bid
Civil Works - Buildings
Percentage
15 days
Bambari
3 documents required · 3 mandatory
₹10,000
₹55,080
Yes
16 Oct 2026
11 Sept 2026
25 Sept 2026
11 Sept 2026
24 Sept 2026
11 Sept 2026
11 Sept 2026 - 23 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CIVIL WORKS : - Earth work in excavation of foundation in hard soil or gravelly soil within 50 m initial lead and initial lift, including dressing and levelling the bed etc. complete | 90.17 | cum | 282.9 | ₹25,509.09 |
| 2 | Filling in foundation and plinth with excavated earth including watering and ramming as per the direction of Engineer-in-Charge. | 90.17 | cum | 188.6 | ₹17,006.06 |
| 3 | Supplying and filling foundation and plinth with sand wall watered and rammed with cost conveyance and royality, taxes of all materials and labour (T&P) etc. complete. | 91.77 | cum | 1,401.2 | ₹1,28,588.12 |
| 4 | Cement Concrete (1:3:6) in Foundation using 4 cm size bhg metal including watering, curing with cost, conveyance, royalty and taxes of all materials and cost of all labour (T&P) etc. complete as per the direction of Engineer-in-Charge. | 19.04 | cum | 6,488.8 | ₹1,23,546.75 |
| 5 | Cement Concrete (1:2:4) using 12mm size CBHG Chips including watering, curing with cost, conveyance, royalty and taxes of all materials and cost of all labour (T&P) etc. complete as per the direction of Engineer-in-Charge. | 0.82 | cum | 9,774.4 | ₹8,015.01 |
| 6 | R.C.C. M20 using 20 mm & down size b.h.g.c.b chips including watering, curing with cost, conveyance, taxes and cost of all labour (T&P) etc. complete as per the direction of Engineer-in-Charge. (Foundation footing) | 14.95 | cum | 8,684.8 | ₹1,29,837.76 |
| 7 | Plinth Beam | 7.32 | cum | 9,616.12 | ₹70,390 |
| 8 | Column and Beams ( GF ) | 8.58 | cum | 18,401.6 | ₹1,57,885.73 |
| 9 | Column and Beams ( FF ) | 7.12 | cum | 20,533.3 | ₹1,46,197.1 |
| 10 | Column and Beams ( 2ndF ) | 1.16 | cum | 23,069.3 | ₹26,760.39 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 1.36 MB
Tendernotice_1.pdf
PDF • 0.23 MB
BOQ_609019.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .