Loading…
Loading…
Tender Value
₹15.2 L
EMD Value
₹15,154
Closing Date
30 Sept 2026, 6:00 pm3d left
Executive Engineer, P. H. Works Division, GWSSB, Mehsana
Demolition and Dismentaling of Top Dome of RCC SUMP 10.00 lacs liter Capacity & Reconstructing 10.00 lacs liter Capacity sump fabricated Dome At :- Lanava Sub Hw, At Lanava Ta:Chanasma, Dist: Patan Under Modhera Group RWSS.
344845
8/2026-27
Open
Water Supply/ Sanitation Works
Works
Mehsana
8 documents required · 6 mandatory · 2 optional
₹900
Executive Engineer, P. H. Works Division, GWSSB Mehsana
₹15,154
15 Sept 2026
15 Sept 2026
15 Sept 2026
30 Sept 2026
15 Sept 2026
Estimated Cost : Rs.
Gujarat Water Supply & Sewerage Board
Zone-2, AHMEDABAD
Bid Documents for Design, Build & Operate Contract for
BREAK UP FOR INTERIM PAYMENTS ...............................................
Volume-III, Price Bid, Page No.-
Name of Work:- “Demolition and Dismentaling of Top Dome of RCC SUMP 10.00 lacs
liter Capacity & Reconstructing 10.00 lacs liter Capacity sump fabricated Dome At :-
Lanava Sub Hw, At Lanava Ta:Chanasma, Dist: Patan Under Modhera Group
(1) The bidder shall quote his firm and fixed price for the entire work under this
Contract, defined in more details in various sections of this bid document.
(2) The rates and prices shall be submitted in the electronic formats given by n-
procure which is called Schedule-B. Rates and prices received in any other
formats will be rejected and the Bids will be disqualified.
(3) It will be entirely at the discretion of the Employer to accept or reject the
bidder’s proposal, without giving any reasons whatsoever and the bidder shall
not be permitted to withdraw his bid on this account.
be free supplied from the by client.
(5) In Schedule-B the Bidder shall quote prices for the items on lump sum / unit
rate as called for against the BOQ item.
in Schedule-B only will be considered for price evaluation & shall form a part
of the Contract Agreement.
and evaluation.
(8) The Bidder shall quote his prices for Operation & Maintenance in Schedule-C.
Bidder shall give year wise break up of cost for 5 years O&M in Schedule-C/1 to
Schedule-C/5 separately for Schedule-C. The total shall be inline to the price
quoted in Schedule-C. The total shall be carried forward to Schedule-B for
comparison and evaluation.
(9) Wherever for a particular item the quantities have been specified payment
shall be on unit rate basis and unit variation in quantity will be paid with pro
(10) Each item is to be individually priced online and the amounts shall be added
of prices shall be left blank except where the item description requires the
item to be priced on "as applicable” basis. The item shall not be priced if it is
“not applicable” to the bidder’s design, in which case the bidder shall add the
words “NOT APPLICABLE”. The wording in the item description is for subject
matter guidance only; clause references are indicative only and all other
relevant clauses shall also be referred to. The prices shall allow for all the
works covered under the bid and all liabilities and contractual obligations
whether separately specified or not. Items against which no prices are quoted
shall not be separately paid for and the bidder shall be deemed to have
covered the cost of execution of such items (according to the requirements of
the bid document) in the prices quoted for other items.
executed for satisfactory working/safety of the system as specified, will not be
separately paid for by the Employer when executed and shall be deemed to be
Volume-III, Price Bid, Page No.-
already covered by other items and rates listed in the price sheets No extra
payment shall be given for any item which is required to complete and perform
the pendency of the Contract. In case of any discrepancy noted in the various
corrections if any will be considered for financial evaluation of the bid.
(13) Schedule ‘D gives the basis of interim payment for construction of civil works.
(14) The bidder shall be deemed to have allowed in his price for provision,
maintenance and final removal of all temporary works of whatsoever nature
required for construction including temporary bunds, diverting water,
pumping, de-watering etc. for the proper execution of works. The rates shall
also be deemed to include any works and setting out that may be required to
be carried out for laying out of all the works involved.
(15) Prices shall be filled online only.
Contract, the Specifications and other sections of these bid documents and
these documents are to be taken as mutually explanatory of one another.
(17) The bidder shall interpret the data furnished and carry out any additional
survey work, or investigation work required at his own cost.
(18) The prices quoted shall also include the cost of materials utilized for testing.
(19) The bidder should acquaint himself with the site conditions including the
access to Work site. The successful bidder shall have to make suitable access
to work sites at his own cost. These accesses will be used by the other
contractors working for GWSSB.
and the prices shall include all the equipments / materials / accessories and
services required as per the specifications. The bidder shall fill in the price
schedule furnished.
(21) The amount to be quoted for O & M / year shall be as per Volume-II, General
Conditions of Contract, Clause No. 1, and Security Deposit.
(22) 1% of the value of work will be deducted from the Running bill against labour
cess which is non-refundable.
(23) Third Party Inspection / CSC agency will be deployed by GWSSB and charges of
the same will be borne by GWSSB.
(24) Any expenditure incurred by inspection/ CSC agency for the work misinformed
by the contractor and charges of inspection/ CSC agency without any work due
to misinformation shall be recovered from the contractor.
(25) The rates quoted shall be exclusive of GST, but inclusive of all other taxes,
duties which shall not be paid extra. While GST will be paid for admissible part
of actual work done at the approved tender rates and tender conditions of
price variations. GST shall be paid as per prevailing rates at the time of
payment. The TDS shall be deducted at source as per provision of IT rules and
(26) The rates should be quoted exclusive of GST but inclusive of all other taxes as
per Volume-1 (B), General Conditions of Contract, Clause No.
(27) The process requires that the bidder shall quote his price for the work
shall remain firm and fix during the entire period of performance of the
Volume-III, Price Bid, Page No.-
contract except price variation allowed for supply of MS/DI/PVC/GI pipe as per
Volume-II Clause No. 59, General Conditions of Contract.
(28) Payment shall be made for the components for which lump sump prices are
quoted, as per the schedule of payment. Total cost will be worked out on the
basis of work done of individual items and rates quoted against those
particular items only.
(29) Royalties: The contractor shall be liable to pay the royalty of the quarried
materials/ minerals used in the construction of works at the rates specified in
the Narmada Water Resources, Water Supply & Kalpsar Dept. Resolution No.
GEN-2010-595- (6)- M.I.Cell ( K-1) Dt. 29-4-2011 ( Gujarati Version Copy
enclosed) and shall be recovered from the running bills of the work from time
to time and remaining amount if any shall be recovered from the final bill
before releasing the security deposit of the work. The contractor shall furnish
the statement showing the quantity of quarried materials / minerals from
whom purchased ( with full address of the seller) and copies of the bills for
purchase to the Executive Engineer of the in charge of the work. The
contractor shall also furnish such additional information as regards royalty
payment to the competent authority.
(30) Agency shall have to take Insurance policy and intimate to GWSSB along with
the evidence within time limit. In case of non compliance entire responsibility
shall be rest with the agency and required amount shall be recovered from any
due amount of the agency.
(31) GWSSB can recover penalty amount from the agency for not taking the
insurance. Though the penalty amount is recovered, responsibility of the
agency for taking insurance shall be continued and will not be escaped from
the responsibility.
(32) The contractor shall apply fair means of stock maintenance and shall adopt
accounting standard as may be prescribed under GST Act as applicable in the
state of Gujarat. For arriving at the difference in procurement prices due to
introduction of GST it will be open for the Board to ask for original invoices,
lorry receipt, weigh bridge slips, payment details and such other documents as
may be required for the purpose.
(33) The claim of contractor regarding GST shall have to be backed by
documentary evidence substantiating the actual payment of tax duly certified
by the competent tax authority. The final decision regarding the quantum of
claim amount to be recovered or reimbursed shall be of the competent
authority of the GWSSB and shall be binding on the contractor.
Signature of contractor Executive Engineer
P. H. Works Division
Volume-III, Price Bid, Page No.-
Bidders are required to fill up all the blank spaces in this Bid Form.
THE EXECUTIVE ENGINEER,
PUBLIC HEALTH WORKS DIVISION,
SUB: “Demolition and Dismentaling of Top Dome of RCC SUMP 10.00 lacs liter
Capacity & Reconstructing 10.00 lacs liter Capacity sump fabricated Dome At :-
Lanava Sub Hw, At Lanava Ta:Chanasma, Dist: Patan Under Modhera Group RWSS”
The bidder shall quote his firm and fixed price for the entire work under this Contract, defined in
more details in various sections of this bid document.
1. Having visited the site and examined the Bid Documents, Drawings, Conditions of Contract,
including Addenda/Amendments to the above, for the execution of the above Contract, we the
undersigned offer to design, Engineer, procure, construct, complete, commission, operate and
maintain the whole of the said works for 2 years from the date of commissioning including
defects liability period as given in Conditions of Contract and in conformity with the drawings,
Documents, including Addenda Nos.__________ (insert numbers) for Lump sum fixed price of
Construction including free trial run for three months or such other sum as may be ascertained
in accordance with the conditions.
2. I/We agree that
a) if we fail to provide required facilities to the Employer’s representative or any other
person/Agency by the Employer to perform on his behalf for carrying out the inspection and
testing of materials and workmanship.
b) if we incorporate into the Works, materials before they are tested and approved by the
Engineer’s representative.
c) if we fail to deliver pure water of required quantity according to the conditions/stipulations
of the Contract, the Engineer will be at liberty to take any action including termination of
Contract and impose at his absolute discretion any penalties, and/or reject the work.
3. We undertake, if our Bid is accepted, to complete and deliver the works in accordance with
the Contract within 15 months, inclusive of monsoons, from the date or receipt of Letter of
Acceptance issued to us by you.
4. We agree to abide by this Bid for a period of 180 days from the Last date of submission of
the bill and it shall remain binding upon us and may be accepted at any time before the expiry
of that period.
5. In the event of our Bid being accepted, we agree to enter into a formal Contract Agreement
with you incorporating the conditions of Contract there to annex but until such agreement is
prepared this Bid together with your written acceptance thereof shall constitute a binding
Contract between us.
6. We agree, if our Bid is accepted, to furnish performance /Security in the forms and of value
specified in the Clause 1 of Volume-II, “General Conditions of Contract”.
Volume-III, Price Bid, Page No.-
7. We have independently considered the amounts of liquidated damages shown in Appendix to
Bid and agree that they represent a fair estimate of the damages likely to be suffered by you
in the event of the work not being completed by us in time.
8. We understand that you are not bound to accept the lowest or any Bid you may receive.
(Name of the Person)
Company Seal _____________________
Duly authorized to sign Bid for and on behalf of (fill in block capitals)
Witness Signature ___________________________
Volume-III, Price Bid, Page No.-
Name of Work:- “Demolition and Dismentaling of Top Dome of RCC SUMP 10.00 lacs
liter Capacity & Reconstructing 10.00 lacs liter Capacity sump fabricated Dome At :-
Lanava Sub Hw, At Lanava Ta:Chanasma, Dist: Patan Under Modhera Group RWSS’’
The bidder shall quote his firm and fixed price for the entire work under this Contract,
defined in more details in various sections of this bid document.
Schedule showing the approximately the materials to be supplied to the contractor from
government stores for the work to be executed and the rate at which they are to be charged.
Rate at which the
Sr. material will be charged Place of
Particular Qty.
No. to the contractor Delivery
1. The contractor submitting the Tender shall see that the rate in Schedule-A are filled in by
the Engineer in Charge at the time of issue tender.
2. The contractor while submitting the tender shall provide his own arrangement at his own
cost for loading, unloading, and transporting safety to the site of work the cement stipulated in
3. Binding wire of 15 gauge of thinner gauge required for placing the reinforcement in
position shall be provided at his own cost.
4. All the materials required for the items other than labour in Schedule-A but available with
the dept. will be issued on request to the contractor. (for use in this contract only) at prevailing
market rates or departmental issue rates whichever is higher.
5. All the surplus materials supplied by the dept. As mentioned in schedule-A should be
handed over to the Department by the contractor at the Govt. stores as directed.
6. The materials mentioned in schedule-A shall have to be checked for their correctness and
soundness by the contractor before taking the delivery of the materials from the Government.
7. Necessary cement will be purchased by the agency at their own cost from open market.
8. The persons of firm submitting the Tender should see that rates in the above schedule are
filled up by the Executive Engineer, on the issue of form prior to the submission of the Tender.
9. Carting of above materials should be done by contractor at his own cost.
10. Contractor should return the balance materials in good and acceptable condition,
otherwise recovery at the double rates will be affected in view of Clause 12.4.
Signature of Executive Engineer Deputy Executive Engineer
contractor Public Works Division P.H.Sanitary Unit
Mehsana Modhera
Volume-III, Price Bid, Page No.-
Name of Work:-Demolition and Dismentaling of Top Dome of RCC SUMP 10.00 lacs liter
Capacity & Reconstructing 10.00 lacs liter Capacity sump fabricated Dome At :- Lanava
Sub Hw, At Lanava Ta:Chanasma, Dist: Patan Under Modhera Group RWSS
Qty. Unit Description of Item Rate Per Amount
Demolition & Dismentilling of Lanva HW sump
10.00 Lac liter Capacity dome Garbage with help of
crane and removing serviciable and unservicible
material from sump with transportation charges
Hiring of Hydra / Crane with driver (8 hours
6.00 Day 6412.47 Day
working in DAY)
Providing road crane of specified lifting capacity
with specified jib length revolving type for material
handling,assembly & erection of girders/slab/RCC
150 MT capacity
76.00 Trip Conveyance of material (wihout Crane) 1166.00 Trip
Providing corrugated G.I. sheet of class-3 roofing fixed with
glavanished iron J or L Hooks, Bolts and nuts 8mm diameter
523.23 sqm with bitumen and G.I. limpet washer or G.I. limpet washer. 726.92 sqm
filled with white lead complete excluding the cost of purlins,
Rafters and Trusses.(1) 0.80 mm thick sheet
Steel work, welded in built up sections framed
work including cutting, hoisting, fixing in position
and applying a priming coat of read lead paint.
6.80 MT (A)In beams and joists, channels angles Tees, flats, 77504.00 MT
with connecting plates or angle cleats as in main
and cross beams. Hip and jack rafters, purlins
conneted to common rafters and the like
Labour charges for lowering laying, fixing, various
6.80 MT size of M. S. section such as joints channel, angles 8523.00 MT
plates etc. complete. (With Fabrication)
Providing and casting in situ C.C. in grade M-15
(porportions as per mixdesign or as per Table 9 of
IS456 2000 in masses by weigh batching ) using
5.76 cmt granite, quartzite trap metal of size 6 mm to 20 mm 4906.00 cmt
for RCC work, including scaffolding centering, form
work, needle vibrated consolidation, curing comp.
up to 6 meter depth or height (excluding cost of
Volume-III, Price Bid, Page No.-
reinforcement and neat finishing) with centering
and shuttering etc. comp. for structure for other
than water retaining Footing for column or
foundation (with form work)
Labour charges for cleaning of sump / GL cistern
with cleaning and removing algea calcinations,
sludge, dirt deposition from bottom and as wellas
from wallof sump with necessary tools and plants
required including labours etc. with dis-infection by
clorine powder as required. etc. comp Lanava Sump
Dewatering by pumping set of required capacity
including temporary platform carting pumping at
site and fixing the same in position including all
accessories and fuel and labour etc. complate
(10 HP X 1 Dewatering set ) 18.32 HP/Hrs X 1 X 10 =
Providing & Fixing Chain link 2 10x10 gauge
72.00 sqm 254.24 sqm
152.00 sqm Applyig Priming coat 36.50 sqm
152.00 sqm Oil Paint Two Coat SR No 19002 P-159 91.26 sqm
Cement Plaster 20mm Thick in c.m 1:2 using water
proofing compound of approved quality including sqm
431.75 sqm finishing etc
I / We am / are willing to carry out the work at______________________________% above / Below
percent (should be written in figure and words) of the estimated rates mentioned above amount of my
/ our tender works out as under.
Estimated amount put to tender : Estimated amount put to Tender :
Deduct________% above Add________% above
Signature of Executive Engineer Deputy Executive Engineer
contractor Public Works Division P.H.Sanitary Unit
Mehsana Modhera
Volume-III, Price Bid, Page No.-
1. As mentioned in the Conditions of contract, the Contract being a lump sum type
turnkey Contract on EPC basis, the provision of measurement will be applicable only
for the assessment of value of work done for inclusion in any interim certificate for
part payment to the Contractor.
2. The Schedule specifies the procedure for all such assessment of the items specified in
3. Each item of Schedule-B has been divided into broad components. The Employer's
Representative shall assess the value of each component as indicated in paragraph
4. Percentages are indicated against each component of each items specified in Schedule
B, based on the Employer's best appreciation of the value of the component as related
to the total costs of the concerned item as whole. A head titled (any other item(s)) is
included in each breakdown of schedule and the tenderer shall at the time of
tendering indicate any additional items which he considers necessary but cannot be
covered by any of the heads indicated in the breakup.
5. The percentage breakup as indicated in the Schedule may differ from that
corresponding to the tenderer’s scheme and design and he should take this into
account while quoting his lump sum prices for the items specified in Schedule-B.
6. The contractor shall, after approval of his detailed designs and drawings furnish to the
Employer's Representative an initial bill of quantities to all major items, to be
reviewed and updated periodically with the Employer's Representative. This bill of
quantities will be used for assessment of percentage progress of the component at any
stage. By measurement jointly taken by the Employer's Representative and the
Contractor, mutually agreed and entered in the measurement books in the form and
by the method approved by the Employer's Representative, and signed jointly by both
Signature of contractor Executive Engineer
P. H. Works Division
Volume-III, Price Bid, Page No.-
Item No:1 Demolition including stacking of serviceble materilas and disposal of unserviceable
material with all lead and lift.
(i) R.C.C. work
1.The demolition shall consist of demolition of one or more parts of the building as specified or
shown in the drawings. Demolition implies taking up or down or breaking up. This shall consist of
demolishing whole or part of work including all relevant item as specified or shown in the drawings.
2. The demolition shall always be planned before hand and shall be done in reverse order of the one
in which the structure was constructed. This scheme shall be got approved from the Engineer- in-
charge before starting the work. This however will not absolve the Contractor from the
responsibility of proper and safe demolition.
3.Necessary dropping, shoring and under pinning shall be provided for the safety of the adjoining
work or property, which is to be left intact, before dismantling and demolishing is taken up and the
work shall be carried out in such a way that no damages is caused to the adjoining property.
4.Wherever required, temporary enclosures or partitions shall also be provider. Necessary
precautions shall be taken to keep the dust nuisance down as and where necessary.
5.Dismantling shall be commenced in a systematic manner. All materials which are likely to be
damaged by dropping from a height or demolishing roof, masonry etc. shall be carefully dismantled
first. The dismantled articles shall be properly stacked as directed.
6.All materials obtained from demolition shall be the taken away by contractor and an amount as
specified in Schedule-C shall be deducted from 1st bill of contractor.
7.Any serviceable materials, obtained during dismantling or demolition shall be separated out and
stacked properly as directed, with all lead and lift. All unserviceable materials, rubbish etc. shall be
taken away as directed by the Engineer-in- charge.
8.On completion of work, the site shall be cleared of all debris rubbish and cleaned as directed.
9.The rate shall be for all specified components as Cum as per Schedule ‘B’.
SPECIAL CONDITION FOR WORK
Volume-III, Price Bid, Page No.-
(૧) SUMPના Demolition દર યાન કોઇ અ માત ના થાય તે માટ તકદાર ના ભાગ પે લેવાના તમામ
િનણય ઠકદારલેવાના રહશે. Demolition દર યાન કોઇ ુ સાન (માનવીય ુ સાન અથવા material ુ
(૨) Demolition દર યાન જો કોઇ અ માત થાય અને જો કોઇ વળતર કુ વવા ુ થાય તો તે વળતર
(4) SUMP ના ડ મોલીશન દર યાન નીકળે લ કો ટના ભંગારને હડ વકસની બહાર યો ય જ યાએ
Item No:2 Hiring of Hydra / Crane with driver (8 hours working in DAY)
1. Scope of Work & Operations
Equipment Type: Mobile Hydra Crane / Next-Gen Pick and Carry Crane.
Capacity Options: 12-Ton, 15-Ton, 20-Ton, or 25-Ton (Specify required capacity).
Shift Duration: Standard 8-hour working day (Excluding a mandatory 30-minute to 1-hour lunch
Timing: Standard Day Shift hours (e.g., 08:00 AM to 04:00 PM or 09:00 AM to 05:00 PM).
Operator: One skilled, certified, and licensed crane operator included per shift.
.Slotted Boom & Rope:
Compensation for precision handing & auto levelling loads.
Vertical Height:
Attained 15m with 3 part hydraulic +1 part power assist boom.17 meter with flylib(optional).
30 t Capacity, hook block 4 sheaves.3.4 t capacity hook block swivel hook control pedals for telescoping and
auxiliary winch 3 working lights external lamp winch drum mirror sun visor cab floor mat. Rated lifting
capacities crane is set on firm ground horizontally, Those above bold lines are based on crane strength and
those below on its stability.Rated lifting capacities below bold lines do not exceed 75% of tipping load,
Standard number of part line for each boom length is as shown below load per line should not surpass
32.8kn (3,350 kg) for main winch and 33.3 kn(3400 kg)for auxiliary winch boom length 10.5 m To 33.0M. Free
fall operation should be performed without any load on the hook.
1.Work should be carried out as per site requirement and site shown by site in charge.
2. Work should be carried out in mocking proper alignment and proper work as per instruction by site in
Volume-III, Price Bid, Page No.-
3.The Payment shall be paid on Days Basis.
Item No:3 Conveyance of material (wihout Crane).
1. Scope of Work
This specification covers the loading, unloading, hauling, transporting, stack-piling, and balancing of
civil/structural materials over specified leads and lifts.
Applicability: Applies strictly when site constraints, material dimensions, or contract conditions
dictate that a mechanical crane cannot or should not be utilized.Materials Covered: Sand, aggregate,
bricks, cement, excavated earth, reinforcement steel (short bars), pipes, and masonry blocks.
Transportation Modes: Manual head-loads, wheelbarrows, handcarts, tractor-trailers, tippers, or
non-crane commercial truck
2. Operational Methodology
A. Loading and Unloading
Manual or Gravity-Assisted: All loading at the source point and unloading at the delivery site must be
done manually, through manual tipping mechanism, or utilizing ramps.
Material Care: Rough dumping or dropping materials from heights that compromise structural
integrity (e.g., breaking bricks, denting pipes, segregating aggregate) is strictly prohibited.
Stacking: Unloaded materials must be neatly stacked in clean, specified layouts as directed by the
Engineer-in-Charge.
B. Hauling and Transit
Covering Rules: Finely grained materials (such as dry sand, earth, or cement) must be completely
covered with tarpaulin sheets during transit to prevent air pollution and material loss.
Overloading: Vehicles must not be loaded past their legal RTO (Regional Transport Office) carrying
3. Quantitative Constraints (Lead & Lift)
Specifications for conveyance are strictly categorized based on distance (Lead) and vertical elevation (Lift):
Standard Horizontal Lead: Typically broken down into zones (e.g., initial lead up to 50 meters,
subsequent leads measured in blocks of 50m, or long-range haulage measured per kilometer).
Standard Vertical Lift: Calculated in increments of 1.5 meters (5 feet) for manual head-loads. Higher
lifts without cranes must utilize secure, engineered scaffolding, ladders, or pedestrian ramps.
Volume-III, Price Bid, Page No.-
4. Quality Control & Safety Requirements
Loss Control: No extra payment is made for material wastage during transit. The contractor is
responsible for transferring 100% of the recorded quantity.
Labour Welfare: When manual lifting is required, labourers must be provided with adequate
protective gear (heavy-duty gloves, safety boots, and helmets).
Site Clearance: Transport pathways must be kept clear of debris to avoid injuries or slips during
manual carriage.
5. Mode of Measurement and Payment
1. The Payment shall be paid on Trip Basis
Item No:4 Providing corrugated G.I. sheet of class-3 roofing fixed with glavanished iron J or L
Hooks, Bolts and nuts 8mm diameter with bitumen and G.I. limpet washer or G.I. limpet
washer. filled with white lead complete excluding the cost of purlins, Rafters and Trusses.(1)
0.80 mm thick sheet
'Galvanized plain sheets, corrugated sheets and coils shall be reasonably flat and free from bare
spots, pin holes, tears and other harmful defects. However, imperfections such as rough/non-
uniform coating, minor dents, water/passivation marks, etc, may be present at certain portions
which are not harmful for intended use.'
. DIMENSIONS AND TOLERANCES OF CORRUGATED SHEETS ".
Sizes ofCorrugated Sheets .".
Length: The length ofthe corrugated sheets shall be as follows: I 800, 2 200. 2 500,2 800. 3 000 and
050 mm. NOTI: _..Sheets ofother lengthsmayalso be suppliedsubject III the mutual a
Sheets of sizes othcrthan those specified above may be supplied, if agreed to between thc
contracting parties
The payment shall be made on Sqmt. Basis
Item No:5 Steel work, welded in built up sections framed work including cutting, hoisting,
fixing in position and applying a priming coat of read lead paint. (A)In beams and joists,
channels angles Tees, flats, with connecting plates or angle cleats as in main and cross beams.
Hip and jack rafters, purlins conneted to common rafters and the like.
1. All the Structural steel and other material necessary to carry out the work will be purchased by the
CONTRACTOR at his own cost.
Volume-III, Price Bid, Page No.-
General All workmanship and finish shall be of the best quality and shall conform to the best approved
method of fabrication. All materials shall be finished straight and shall be machined/ground smooth true
and square where so specified. All holes and edges shall be free of burns. Shearing and chipping shall be
neatly and accurately done and all portions of work exposed to view shall be neatly finished. Unless
otherwise directed/ approved, reference may be made to relevant IS codes for providing standard
fabrication tolerance. Material at the shops shall be kept clean and protected from weather. 1.4.2
Connections (a) Shop/field connections shall be as per fabrication drawings. (b) In case of bolted
connections, taper washers or flat washers or spring washers shall be used with bolts as necessary. In case
of high strength friction grip bolts, hardened washers be used under the nuts or the bolt heads whichever
are turned to tighten the bolts. The length of the bolt shall be such that atleast one thread of the bolt
projects beyond the nut, except in case of high strength friction grip bolts where this projection shall be
atleast three times the pitch of the thread. (c) In all cases where bearing is critical, the unthreaded portion
of bolt shall bear on the members assembled. A washer of adequate thickness may be provided to exclude
the threads from the bearing thickness, if a longer grip bolt has to be used for this purpose. (d) All
connections and splices shall be designed for full strength of members or loads indicated on OWNER's
design drawings. Column splices shall be designed for the full tensile strength of the minimum cross section
at the splice. (e) All types of required anchor bolts chemical or mechanical, nuts, washers, electrodes,
screws etc. shall be supplied/ brought to site 10% in excess of the requirement in each category and size.
Rates shall be not be considered separately. It shall be included in design and drawings accordingly rate
shall be quoted in the BOQ/price bid. (f) All members likely to collect rain water shall have drain holes
Cutting, punching, drilling, welding and fabrication tolerances shall be generally as per relevant IS codes.
1.4.5 Rolling And Forming Plates, channels, R.S.J. etc., for circular bins, bunkers, hoppers, gantry girders,
etc., shall be accurately laid off and rolled or formed to required profile/ shape as called for on the
drawings. Adjacent sections shall be match-marked to facilitate accurate assembly, welding and erection in
Welding : (a) Welding procedure shall be submitted to OWNER for approval. Welding shall be entrusted to
only qualified and experienced welders who shall be periodically tested and graded as per IS 817, IS:
(Part 1) and IS: 7318 (Part 1). (b) The electrodes required for metal arc welding shall conform to IS: 814. (c)
While fabricating plated beams and built up members, all shop splices in each component part shall be
made before such component part is welded to other parts of the members. Wherever weld reinforcement
interferes with proper fit up between components to be assembled for welding, these welds shall be
ground flush prior to assembly. (d) Approval of the welding procedure by the OWNER shall not relieve the
CONTRACTOR of his responsibility for correct and sound welding without undue distortion in the finished
structure. (e) No welding shall be done when the surface of the members is wet nor during periods of high
wind. (f) Each layer of a multiple layer weld except root and surfaces runs may be moderately peened with
Volume-III, Price Bid, Page No.-
light blows from a blunt tool. Care shall be exercised to prevent scaling or flaking of weld and base metal
from over peening. (g) No welding shall be done on base metal at a temperature below –50 C. Base metal
shall be preheated to the temperature as per relevant IS codes. (h) Electrodes other than low-hydrogen
electrodes shall not be permitted for thicknesses of 32 mm and above. (i) Welding shall be done by electric
arc welding. Gas welding will not be permitted. All necessary arrangement for electric arc welding shall be
done by the CONTRACTOR including stand-by generator sets for uninterrupted welding.
The payment shall be made on MT. Basis
Item No:6 Labour charges for lowering laying, fixing, various size of M. S. section such as
joints channel, angles plates etc. complete. (With Fabrication)
Pipe and fittings shall be lifted from manufacturing site to site of work at his own cost.
During transportation any damage shall be occure to pipes for fittings the replacement of
pipes or fittings given by the contractor at-least own cost.
Before laying the pipes it shall be brushed throughout the length so that dust or soil can
be removed. The fittings should also be brushed. The pipes shall be laid in trenches in
The jointing material such as coupling & Solution etc. to be supplied by the contractor.
All the specials such as bends, tees, reducers etc. shall be fixed as per instruction of
engineer-in-charge in the pipeline. The pipe shall be hydraulically tested during the testing
no leakage shall be observed. If leakage observed, it shall be set right by the contractor at
its own cost as per the instruction of Engineer-in-charge.30% payment shall be made after
hydraulic testing of pipe line.
Payment shall be made on MT basis
Item No:7 Providing and casting in situ C.C. in grade M-15 (porportions as per mixdesign or as
per Table 9 of IS456 2000 in masses by weigh batching ) using granite, quartzite trap metal of
size 6 mm to 20 mm for RCC work, including scaffolding centering, form work, needle
vibrated consolidation, curing comp. up to 6 meter depth or height (excluding cost of
reinforcement and neat finishing) with centering and shuttering etc. comp. for structure for
other than water retaining Footing for column or foundation (with form work)
As far as possible the preparation of various ingredients of concrete shall be determined on the bases of
preliminary tests as per ISS using the actual materials to be used on site. However in absence of such
preliminary tests the volumetric proportion of 1:2:4 may be adopted i.e. one part of cement, two parts of
sand and four parts of kapachi, water just sufficient to attain desired workability may be added. However
the aim while proportioning should be to fix the proportion of aggregation and water cement ratio shall be
always sufficiently low enough to get
Volume-III, Price Bid, Page No.-
desired strength.
3.2.1 Coarse aggregate shall consist of tough angular black trap kapachi. The kapachi shall be obtained from
approved source only. Normally at least two stock piles of different size of 12 to 20 mm and 25 mm to
mm shall be maintained. It will however, be preferably to maintain third stock pile of 6 mm to 12 mm also
for better control on mix of concrete.
3.2.2 The maximum size of coarse aggregate to be used shall be as large as possible within the limits of
requirements, based on size of member and spacing of reinforcement. But aggregate exceeding 40 mm shall
not be used in concrete for ESR and Sumps.
3.2.3 Depending up on the size of member, spacing of reinforcement and degree of workability desired, the
coarse aggregates from different stockpiles may be mixed in a suitable proportion to get a uniform mix that
does not segregate.
3.2.4 The coarse aggregate shall not contain dust, clay or other such harmful material. If directed by the
Engineer the same shall be washed with water and dried before being used.
3.3.0 Fine Aggregates:
Fine aggregates shall consist of coarse, angular river sand free dirt and other harmful organic materials. If
directed the same shall be screened and washed before being used. Sand brought from approved source
shall only be used.
Contractor shall provide a temporary store with double lock arrangement for storage of this cement on
work site without extra cost. Cement shall be stored in such a way that it is not affected by moisture.
Water to be used in concrete work shall be potable, free from injurious elements such as chloride or sulfate
etc. and shall be obtained from approved source only. Contractor shall make his own arrangements to
obtain and store sufficient quantity of water at all times.
3.6.0 Reinforcement Steel:
The reinforcing bars to be provided with CRS Steel & shall confirm to the Tender specifications and relevant
IS specifications. In spite of producing test certificates by Contractor for the proper quality of reinforcing
bars, the quality of steel could also be tested by checking coating firm at plant site for bend test before
doing coating and that if the reinforcing bar fails in bend test, then it shall not be provided with FBEC and in
that case, cost of conveyance of such steel to plant and removing from plant shall be of the Contractors. The
rechecking quality of Steel, for bend test will be done by the coating agency in the presence of contractor
provided the contractor choose to remain present.
Reinforcing bars to be used shall be fresh from rolling rails as far as possible. If the bars are very much
rusted in quality before providing FBEC, such bars shall have a loss of weight at contractor’s risk.
To ascertain the loss in weight of reinforcing bars on account of removal of rust during coating, random
weightment before and after coating shall be done and that loss in weight shall be borne by the contractor.
Volume-III, Price Bid, Page No.-
3.7.0 Coating Bars with CRS:
The CRS coating shall be done confirming relevant IS code.
3.8.0 The coated reinforcement bars shall be tested at plant by the contractor. Test reports shall be jointly
signed by authorized representatives of Contractor and the coating agency. The tests on coated bars shall
be as per I.S. for the following tests.
The frequency of tests shall be for the thickness of coating minimum ;two bars of each size from each
production shifts.
3.8.1 In spite of above tests and test certificates produced by the contractor and coating agency, the
Department/ Owner reserves the rights to carry out independent tests at coating plant for cross checking.
The contractor’s agreement with coating agency shall include the provisions for Department’s/ Owner’s
cross checking and that if the coating quality is not approved by the Department/ Owner the decision of the
Department/ Owner to reject or repair the coating shall be final and binding on all parties.
3.8.2 Holidays in coating shall not be more than two holidays per linear foot (six holidays per meter) of
3.9.0 HANDLING:
3.9.1 The coated bars shall be carefully handled in order not to drop them, not to rub them on hard surface
or against another coated bar while conveying, stacking, placing or stacking of fabricated bars and that for
this purpose wooden packing batons shall be used at spacing of not more than 60 cms.
The coated bars shall be tied to make bundles with PVC wire so as to avoid damages to coating.
3.9.2 The coated bars shall be stacked with separation gap between ground and bars with wooden batons
between rows of bars or bundles of such tied bars. Such wooden or padded contact shall be at spacing of
not more than 60 cms.
3.9.3 The cut ends of bars shall be touched up with special touch up materials of specifications as provided
by coating agency. There shall be minimum time gap to repair the cut ends and damaged portions with
touch up materials and that failure to do so may cause complete rejection of the coated bars. The cut ends
and damaged portions shall be touched up with repair patch-up material within four hours time gap. All
damages to coating in handling etc. shall be repaired irrespective of their size. This stipulation supersedes
provision of I.S. Code.
3.9.3 No payment will be made for coated bars which are not used in the work and that if they were paid
either on account of coating of the reject able part of bars or doing extra fabrication etc., the amount paid
will be recovered from contractor. The contractor will be paid for the same quantity of steel bars used in the
work and paid under relevant item.
3.9.4 While bending the bars, the pins of workbenches shall be provided with PVC or Plastic sleeves. It is
preferable that contractor install bar bending machines suitable for FBE coated bars and that each bending
operation is done in a time of not less than 90 secs.
Volume-III, Price Bid, Page No.-
3.9.5 The coated steel shall not be directly exposed to sun rays and rains and shall be protected with
opaque polythene sheets or such other approved materials. While doing concreting, the workmen or
trolleys shall not directly.
3.9.6 Movement on coated bars shall not be allowed but can move on wooden planks placed on the bars by
In spite of all test certificates, if the coated bars are roughly handled by contractor either during transport,
fabrication, stacking, placing and concreting etc. or handled in such a manner as to damage the coating for
area or portion more than reasonable, the Engineer-in-Charge or Department/Owner reserve the right to
reject the CRS coated bars and that if rejected then such rejected bars shall be removed by contractor from
work site within three days. The decision of Engineer-in-charge will be final as to reject the bars with
damage coating or to allow repairing the coating, or to get it recoated at contractor’s cost.
Form work shall consist of steel plates or smooth timber planks to be joined by nuts, bolts, nails or pegs so
as to have a reasonably water tight joints. Sufficient number of vertical and horizontal supports shall be
providing when completed. Formwork shall be sufficiently sturdy & strong to absorb all stresses and
movements. Before concrete is placed in position the formwork and steel shall be got checked through
Engineer-in-charge of work. Advance intimation shall be given to the Engineer-incharge for this purpose.
The ultimate responsibility for safety and of lives of workmen and that of forms etc. from beginning of work
till its completions shall always rest with the contractor proper ladders and plant forms for easy access shall
be provided by the contractor without extra cost.
The faces of formwork coming in contact with concrete shall be cleaned and two coats of approved mould
oil applied before fixing reinforcement. All rubbish, particularly chippings, shavings, sawdust, wire pieces
dust etc. shall be removed from the interior of the forms before the concrete is placed. Where directed,
cleaning of forms shall be done by blasting with a jet of compressed air at no extra cost.
Forms intended for reuse shall be treated with care. Forms that have deteriorated shall not be used. Before
reuse, all forms shall be thoroughly scraped, cleaned, nails removed, holes suitably plugged, joints repaired
and warped lumber replaced to the satisfaction of the Engineer In charge. The Contractor shall equip
himself with enough shuttering to allow for wastage so as to complete the job in time.
Permanent formwork shall be checked for its durability and compatibility with adjoining concrete before it is
used in the structure. It shall be properly anchored to the concrete.
Wire ties passing through beams, columns and walls shall not be allowed. In their place bolts passing
through sleeves shall be used. Formwork spacers left in situ shall not impair the desired appearance or
durability of the structure by causing swelling, rust staining or allowing the passage of moisture.
For liquid retaining structures, sleeves shall not be provided for through bolts nor shall through bolts be
removed if provided. The bolts, in the latter case, shall be cut at 25 mm depth from the surface and the hole
made good by cement mortar of the same proportion as the concrete just after striking the formwork.
The striking time for formwork shall be determined based on the following requirements:
(a) Development of adequate concrete strength;
(b) Permissible deflection at time of striking form work;
Volume-III, Price Bid, Page No.-
(c) Curing procedure employed - its efficiency and effectiveness;
(d) Subsequent surface treatment to be done;
(e) Prevention of thermal cracking at re-entrant angles;
(f) Ambient temperatures; and
(g) Aggressiveness of the environment (unless immediate adequate steps are taken to prevent damage to
Under normal circumstances (generally where temperatures are above 20oC) forms may be struck after
expiry of the time period given in IS: 456 unless approved otherwise by the Engineer In charge. For Portland
Pozzolana/slag cement the stripping time shall be suitably modified as approved by the Engineer In charge.
It is the Contractor's responsibility to ensure that forms are not struck until the concrete has developed
sufficient strength to support itself, does not undergo excessive deformation and resist surface damage and
any stresses arising during the construction period.
5.0 MIXING, TRANSPORTATION AND LAYING:
5.1 For important works like ESR and sumps mixing of concrete shall be invariably done in approved
machine mixer only. The mix obtained from the mixer shall be a uniform mass consisting of all aggregates
coated with cement paste.
5.2 Fresh concrete shall be transported horizontally in ghamellas or wheel barrows. Vertical transportation
shall be done either by manual labour or using mechanical vertical lifts. When chutes are used for
transportation, care should be exercised to avoid segregation and concrete may be remixed at bottom of
chutes to get uniform mix. Before any concrete is placed in position all loose materials such as dirt, chips of
stones, wood, steel etc. should be removed. Inner side of forms should be coated with thin layer of oil to get
a good finished surface.
Concrete should not be dumped from above in which case aggregate will segregates, but placed gently from
a height not exceeding 1.5 meter. Compaction of concrete shall be done by vibrators till cream appears at
top. Over vibration shall be avoided to avoid segregation.
After concrete is set in position it shall be kept continuously wet with water for 7 days either by using gunny
begs (column and walls) by ponding (slab) or as directed by spraying of water.
Unless otherwise specified the rate shall include finishing the exposed surface to get good finished surface
6.0 Mode of payment:
Mode of payment Cum Basic.
Item No: 8 Labour charges for cleaning of sump / GL cistern with cleaning and removing algea
calcinations, sludge, dirt deposition from bottom and as wellas from wallof sump with
necessary tools and plants required including labours etc. with dis-infection by clorine powder
as required. etc. comp Lanava Sump.
As per daily wages Paid as per latest Labour Commission Rate
Volume-III, Price Bid, Page No.-
Labour injuries contractor all Responsibility
Mode of Payment wages Basic. No Basis
Item No:9 Dewatering by pumping set of required capacity including temporary platform
carting pumping at site and fixing the same in position including all accessories and fuel and
labour etc. complete.
1.Dewatering by pumping set of required capacity including temporary platform carting pumping at site and
fixing the same in position including all accessories, and fuel and labour etc. complete.
2. Payment shall be made of Hr basis.
Item No:10 Providing & Fixing Chain link 2 10x10 gauge (Galvanised))
1. Materials & Dimensions
Mesh Size: 2 inches × 2 inches (50 mm × 50 mm) clear opening.
Wire Gauge: 10 Gauge (Standard Wire Gauge / SWG).
Wire Diameter: 3.25 mm.
Material Base: Low-carbon steel wire.
Zinc Coating: Hot-dip galvanized (minimum 230 g/m² according to IS 4826 / ASTM A641).
Mesh Edge: Knuckled-knuckled or twisted-knuckled edges to prevent unraveling.
2. Framework & Supports
Line Posts: MS Angles (50×50×6 mm) or GI Pipes (50 mm nominal bore).
Post Spacing: Installed at a maximum of 2.5 to 3.0 meters center-to-center.
Strainer Posts: Heavier sections (e.g., 65×65×6 mm) at corners, ends, and every 15-meter
Foundation: Posts embedded minimum 600 mm deep in M15 grade concrete blocks
Anti-Corrosion: Two coats of red oxide primer and two coats of synthetic enamel paint for
non-galvanized framing.
3. Tensioning & Fixing
Tension Wires: 3 horizontal rows of 8-gauge (4.0 mm) galvanized tie wire (top, middle,
Volume-III, Price Bid, Page No.-
Stretching: Fabric mechanically tensioned to eliminate sagging or warping.
Binding: Secured to posts and tension wires using 12-gauge (2.64 mm) GI binding wire at
300 mm intervals.
Terminal Fixings: 25×5 mm MS flat iron stretcher bars bolted to the end posts to lock the
4. Measurement & Compliance
Unit of Measurement: Square meters (m²) of the net area of mesh erected.
Tolerances: Mesh size: ±3 mm; Wire diameter: ±0.05 mm.
5. Measurement & Compliance
Payment shall be made of sqm basis
Item No:11 Applyig Priming coat
1. Scope of Work
Execution: Cleaning, preparing, and applying an anti-corrosive primer coat on metal
surfaces before fencing installation.
Application: Structural MS angles, flats, pipes, and welded joints used for the chain-link
2. Material Specifications
Primer Type: Ready-mixed Red Oxide Zinc Chromate primer or Zinc Phosphate primer
conforming to IS
Procurement: Brought to the site in original, sealed containers from approved
Thinning: Only approved thinners (mineral turpentine) allowed, not exceeding 10% by
3. Surface Preparation
Cleaning: Removal of all rust, scale, grease, moisture, and dirt using steel wire brushes,
scrapers, or sandblasting.
Dryness: Surfaces must be completely dry and free from moisture before application.
Welds: All welded areas must be chipped, ground smooth, and cleaned of slag.
Volume-III, Price Bid, Page No.-
4. Application Process
Method: Applied evenly by brush or airless spray. Brush application must use uniform criss-
Timing: Primer must be applied immediately after surface cleaning to prevent flash rusting
(within 4 hours).
Coverage: Uniform film thickness (Minimum 30 microns Dry Film Thickness / DFT).
Drying Time: Allowed to air-cure for at least 24 hours before the application of
subsequent synthetic enamel coats.
5. Measurement & Compliance
Unit of Measurement: Square meters (m²) or metric tons (MT) depending on the contract
schedule of rates (SoR).
Inspection: No runs, sags, brush marks, or holidays (uncoated spots) permitted.
Payment shall be made of sqm basis
Item No:12 Oil Paint Two Coat SR No 19002 P-159
· Red-oxide – zinc chrome primer shall conform to IS:2074.
· Synthetic enamel paint shall conform to IS:
· Aluminum paint shall conform to IS:2339.
All the materials shall be of the best quality from an approved manufacturer. Contractor shall
obtain prior approval of the GWSSB for the brand of manufacture and the color/shade. All the
materials shall be brought to the site in sealed containers.
Painting work shall be carried out only on thoroughly dry surfaces. Painting shall be applied either
by brushing or by spraying. Contractor shall procure the appropriate quality of paint for this
purpose as recommended by the manufacturer. The workmanship shall generally conform to the
requirement of IS:1477 (Part 2).
The type of paint, number of costs etc. shall be as specified in the respective items of work.
Primer and finish paint shall be compatible with each other to avoid cracking and wrinkling.
Primer and finish paint shall be from the same manufacturer. All the surfaces shall be thoroughly
cleaned of oil, grease, dirt, rust and scale. The methods to be adopted using solvents, wire
brushing, power tool cleaning etc., shall be as per IS:1477 (Part – I) and as indicated in the item of
Volume-III, Price Bid, Page No.-
work. It is essential to ensure that immediately after preparation of the surfaces; the first coat of
red oxide-zinc chrome primer shall be applied by brushing and working it well to ensure a
continuous film without holidays. After the first coat becomes hard dry, a second coat of primer
shall be applied by brushing to obtain a film free from `holidays. After the second coat of primer
is hard dry, the entire surface shall be wet rubbed cutting down to a smooth uniform surface.
When the surface becomes dry, the undercoat of synthetic enamel paint of optimum thickness
shall be applied by brushing with minimum of brush marks. The coat shall be allowed to hard-dry.
The under coat shall then be wet rubbed cutting down to a smooth finish, taking adequate care to
ensure that at no place the undercoat is completely removed. The surface shall then be allowed
to dry. The first finishing coat of paint shall be applied by brushing and allowed to hard-dry. The
gloss from the entire surface shall then be gently removed and the surface dusted off. The second
finishing coat shall then be applied by brushing. At least 24 hours shall elapse between the
applications of successive coats. Each coat shall vary slightly in shade and this shall be got
approved by the GWSSB.
Anodized Aluminum sheets shall be 1.00mm thick with anodic film thickness of 0.025 mm.
Galvanized mild steel sheets shall be 1.00mm thick with zinc coating of 800 gms/sq.m.
Bitumen felt shall be either Hessian base self finished bitumen felt Type-3 Grade I conforming to
IS:1322 or glass fiber base self finished felt Type-2 Grade 1 conforming to IS:7193.
The type of the flashing and method of fixing shall be as specified.
Flashing shall be of the correct shape and size as indicated in the construction Drawings to be
prepared by the Contractor and they shall be properly fixed to ensure their effectiveness.
Flashing shall be of long lengths so as to provide minimum number of joints. The minimum overlap
at joints shall be 100mm.
Fixing of the flashing shall be either by bolting with bitumen washers or by tucking into the groove
75 mm wide x 65 mm deep in masonry/concrete along with cement mortar 1:4 filleting as
indicated in the Drawings to be prepared by the Contractor. Curing of the mortar shall be carried
out for a minimum period of 4 days.
Bitumen felt flashing of the type as specified shall be provided with 2 coats of bituminous paint at
the rate of 0.10 liter/m2after the installation
Volume-III, Price Bid, Page No.-
Payment shall be made of sqm basis
Item No:13: Cement Plaster 20mm Thick in c.m 1:2 using water proofing compound of
approved quality including finishing etc
Execution: Mixing, applying, and curing a 20 mm thick cement plaster coat in a 1:2 ratio
on designated brick, stone, or concrete surfaces.
Special Treatment: Integral mixing of an approved waterproofing compound to prevent
2. Material Specifications
Cement: Ordinary Portland Cement (OPC) 43 or 53 grade conforming to IS 269 / IS
Fine Aggregate (Sand): Clean, sharp, well-graded river or manufactured sand (M-Sand)
conforming to IS 383, free from clay, loam, or organic matter.
Waterproofing Compound: Integral liquid or powder waterproofing compound (e.g., Dr.
Fixit, Fosroc, or equivalent) conforming to IS
Water: Clean, potable water free from harmful salts, oils, and organic acids.
Mortar Preparation (Ratio 1:2)Proportioning:
1 part cement to 2 parts dry sand measured accurately by volume using gauge boxes.
Dry Mixing: Cement and sand mixed thoroughly on a watertight platform until the
color is uniform.
Waterproofing Dosage: The compound is added strictly per manufacturer
specifications (typically 200 ml or 500 g per 50 kg bag of cement).
Wet Mixing: The compound is pre-blended into the measured water. Water is added
gradually to the dry mix, turning it over until a workable, homogenous mortar is
Time Limit: Mixed mortar must be consumed within 30 minutes of adding water
4. Surface Preparation
The prepared surfaces shall be wetted to control surface suction and to provide moisture to aid in
proper curing of the paint. Cement paint shall be applied with a brush with stiff bristles. The
primer coat shall be a thinned coat of cement paint. The quantity of thinner shall be as per
manufacturer's instructions. The coats shall be vigorously scrubbed to work the paint into any
voids for providing a continuous paint film free from pinholes for effective water proofing in
addition to decoration. Cement paint shall be brushed in uniform thickness and the covering
capacity for two coats on plastered surfaces shall be 3 to 4 kg/m2. A minimum of 2 coats of the
Volume-III, Price Bid, Page No.-
same color shall be applied. At least 24 hours shall be left after the first coat to become
sufficiently hard before the second coat is applied. The painted surfaces shall be thoroughly cured
by sprinkling with water using a fog spray at least 2 to 3 times a day. Curing shall commence after
about 12 hours when the paint hardens. Curing shall be continued for at least 2 days after the
application of final coat. The operations for brushing each coat shall be as detailed above.
5. Application & Finishing
Thickness: Applied in a total thickness of 20 mm. For vertical surfaces, this is typically
done in two layers (12 mm base coat + 8 mm finishing coat) to prevent sagging.
Plumb & Alignment: Plaster patches (screeds) applied at intervals to ensure the final
surface is perfectly level, plumb, and true.
Finishing: The surface is finished smooth using a wooden float or trowel. No extra dry
cement is allowed to be rubbed on the surface for finishing.
Grooves: V-grooves or drip courses cut cleanly where specified (e.g., at junctions or
projections) while the plaster is fresh.
6. Curing & Quality Control
Curing: Plaster kept continuously damp by watering/sprinkling for a minimum period of
days to prevent shrinkage cracks.
Measurement: Paid on a square-meter (m²) basis of the net plastered area. Deductions for
openings made as per IS 1200 rules.
Inspection: Final surface must be free from cracks, hollowness, peeling, or uneven trowel
7. Mode Of the payment:
Payment shall be made of sqm basis
Volume-III, Price Bid, Page No.-
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Circular 1_3-A Certificat Paripatra.pdf.pdf
pdf • 1.11 MB
Circular 1_Badhakam Shramyogi.PDF
pdf • 0.74 MB
Circular 1_DMO_2631_21-Apr-2023_872.pdf
pdf • 0.24 MB
Circular 1_Insaurance1.jpg
jpg • 1.82 MB
Circular 1_Insaurance2.jpg
jpg • 1.98 MB
Circular 1_Labour Fee Circular.pdf
pdf • 0.09 MB
Circular 1_Mat.Test.GR.pdf
pdf • 0.13 MB
Circular 1_SIGN BOARD.pdf
pdf • 0.30 MB
Circular 1_SPECIAL CLAUSE.pdf
pdf • 0.67 MB
Circular 2_DTP circular p-1.pdf
pdf • 2.15 MB
Circular 2_DTP circular p-2.pdf 2.pdf
pdf • 1.41 MB
Circular 2_DTP circularp-3.pdf
pdf • 1.39 MB
Circular 2_DTP circularp-4.pdf
pdf • 2.43 MB
Circular 3_DTP circular p-5.pdf
pdf • 2.82 MB
Circular 3_DTP circular p-6.pdf
pdf • 2.23 MB
Circular 3_DTP circular p-7.pdf
pdf • 2.55 MB
gst latest.pdf
DMO_2941_01-Apr-2026_744.pdf
volume 1 Tech Bid.pdf
Lanva Top Dome_VOL I B GCC.pdf
Dome VOL III Price bid and Specification.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .