Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.1 LAccepted-AOC | ₹9.1 L | 1 | Accepted-AOC agreement executed |
| 2 | 2₹9.2 LRejected-Finance | ₹9.2 L | 2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | oruvil construction company L1 | NAZER PERINCHEERI L2 |
|---|---|---|---|---|---|
| 1.00CONSTRUCTION OF TOILET BLOCK | |||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 15.68 | cum | 298 ₹4,672.34 | 330 ₹5,174.07 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil | 7.39 | cum | 215.3 ₹1,591.50 | 202.44 ₹1,496.44 |
| 1.00 | OD270341/2024-2025:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with
good quality blasted rubble including packing to compactness to lines and levels cost and
conveyance of all materials labour charges etc. complete as per direction of Departmental
officers at site | 15.68 | cum | 2,904 ₹45,531.82 | 2,730.17 ₹42,806.34 |
| 1.00 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 8.18 | cum | 7,249 ₹59,289.57 | 7,300 ₹59,706.70 |
| 1.00 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 8.04 | cum | 260 ₹2,089.10 | 244.56 ₹1,965.04 |
| 1.01 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) | 3.47 | cum | 6,857 ₹23,780.08 | 7,200 ₹24,969.60 |
| 1.01 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 44.03 | sqm | 820 ₹36,107.06 | 771.6 ₹33,975.86 |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size | 2.3 | cum | 9,142 ₹21,063.17 | 8,593.55 ₹19,799.54 |
| 1.01 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 9.77 | sqm | 653.88 ₹6,391.02 | 614.64 ₹6,007.49 |
Tender Value
Refer Docs
EMD Value
₹27,000
Closing Date
8 Jan 2025, 4:00 pmClosed
ASSISTANT ENGINEER
O/o Assistant Engineer,Peruvallur GP,Parambilpeedika P.O
CONSTRUCTION OF TOILET BLOCK AT GLPS OLAKARA (Proj No.322/25)
2024_DP_721560_7
Ten/03/2024/AE/LIDEW/PVLR
Open Tender
Civil Works - Buildings
365 days
PERUVALLUR GRAMA PANCHAYAT
Please refer tender documents
8 documents required · 8 mandatory
₹2,760
Yes
₹27,000
Yes
17 Mar 2026
1 Jan 2025
9 Jan 2025
1 Jan 2025
8 Jan 2025
1 Jan 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1144277.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid