| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.9 LAdmitted-Finance GROUND FLOOR THAKUR COMPLEX BASANTPUR | BASANTPUR | SHIMLA | HIMACHAL PRADESH | 171018 | ₹6.9 L | L1 | Admitted-Finance |
| 2 | L2₹7.1 L+₹18,866.20 (2.74%)Admitted-Finance | ₹7.1 L+₹18,866.20 (2.74%) | L2 | Admitted-Finance |
| 3 | L3₹7.3 L+₹41,638.20 (6.06%)Admitted-Finance | ₹7.3 L+₹41,638.20 (6.06%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Rakesh Kumar L1 | Nikhil sharma govt.contractor L2 | MAYANK JASWAL GOVT CONTRACTOR L3 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundations, trenches etc., in earth work, lift upto 1.50 Metres stacking the eacavated soil not more than 3 metres clear from the edge of the excavation and then returning the stacked soil in 15cm. layers, when required in to plinths sides of foundations etc., consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed with in a lead of 20 metres complete in all respect as per the direction and to the entire statisfaction of Engineer-in-Charge with in all leads and lifts. | 38.22 | Cum | 600 ₹22,932 Lowest | 610 ₹23,314.2 | 660 ₹25,225.2 |
| 2.00 | Providing and laying cement concrete 1:3:6 (1:cement:3 sand:6 graded stone aggregate 20 mm nominal size) and curing complete excluding cost of form work in foundation and plinth i/c carriage of material complete in all respect within all leads and lifts as per direction and to the entire satisfaction of Engineer-in-Charge. | 2.38 | Cum | 8,500 ₹20,230 Lowest | 8,600 ₹20,468 | 8,650 ₹20,587 |
| 2.10 | Providing form work with steel plates 3.15 mm thick welded with angles iron in frame 30 x 30 x 5 mm so as to give a fair finish including centering shuttering struting and propping etc. with wooden battens and ballies height of propping and centering below supporting floor two ceiling not exceeding 4 meters and removal of the same for in-situ- reinforced concrete and plain concrete in: Vertical surface such as wall (any thickness) partition and the like i/c attached pillasters, butresses plinth and string course complete in all respect including all leads and lifts as per direction and to the entire satisfaction of Engineer-in-Charge. | 61.2 | Sqm | 450 ₹27,540 Lowest | 500 ₹30,600 | 510 ₹31,212 |
| 3.00 | Providing and Laying cement concrete work 1:1/12:3(1cement:1/12 sand: 3 graded stone aggregate 20mm nominal size)and curing complete excluding cost of form work and reinforcement for reinforced concrete work:- | 21.51 | Cum | 11,000 ₹2,36,610 Lowest | 11,100 ₹2,38,761 | 11,600 ₹2,49,516 |
| 4.00 | Providing and laying mild steel /tor steel reinforcement for RCC work i/c bending binding and placing in position complete including cost of binding wire up to all floor level complete in all respect as per direction and to the entire satisfaction of Engineer-in-Charge within all leads and lifts. | 980 | Kg | 100 ₹98,000 Lowest | 102 ₹99,960 | 105 ₹1,02,900 |
| 5.00Supplying hoisting and streching and holding in position to specifed profile GI wire ropes for suspension bridge including guy ropes. | ||||||
| 5.10 | Suspension cable 32mm dia | 62 | Rmt | 2,500 ₹1,55,000 Lowest | 2,550 ₹1,58,100 | 2,560 ₹1,58,720 |
| 5.20 | Suspension cable 12 mm dia | 11 | Rmt | 1,500 ₹16,500 Lowest | 1,550 ₹17,050 | 1,600 ₹17,600 |
| 6.00 | Providing and fixing in position steel pully with shaft complete in all respect as per direction and to the entire satisfaction of Engineer-in-Charge within all leads and lifts. | 4 | No. | 6,500 ₹26,000 Lowest | 6,550 ₹26,200 | 6,700 ₹26,800 |
| 7.00Providing and fixing of M.S U clamps for holding the pipe complete in all respect as per direction and to the entire satisfaction of Engineer-in-Charge within all leads and lifts. | ||||||
Tender Value
₹5.0 L
EMD Value
₹9,980
Closing Date
20 Aug 2026, 11:00 amClosed
EE
JSD DHARAMSHALA
Construction of Khad crossing over Manjhi Khad Near Shani Dev Mandir Thed
2026_HPIPH_141085_1
NO. EE-JSD-EA-I-2026- 4536-4635dt -12.08.2026
Open Tender
Civil Works
Item Rate
90 days
DHARAMSHALA
Please refer Tender documents.
6 documents required · 6 mandatory
₹350
₹9,980
21 Aug 2026
12 Aug 2026
20 Aug 2026
12 Aug 2026
20 Aug 2026
14 Aug 2026
12 Aug 2026 - 14 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundations, trenches etc., in earth work, lift upto 1.50 Metres stacking the eacavated soil not more than 3 metres clear from the edge of the excavation and then returning the stacked soil in 15cm. layers, when required in to plinths sides of foundations etc., consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed with in a lead of 20 metres complete in all respect as per the direction and to the entire statisfaction of Engineer-in-Charge with in all leads and lifts. | 38.22 | Cum | - | - |
| 2 | Providing and laying cement concrete 1:3:6 (1:cement:3 sand:6 graded stone aggregate 20 mm nominal size) and curing complete excluding cost of form work in foundation and plinth i/c carriage of material complete in all respect within all leads and lifts as per direction and to the entire satisfaction of Engineer-in-Charge. | 2.38 | Cum | - | - |
| 2.1 | Providing form work with steel plates 3.15 mm thick welded with angles iron in frame 30 x 30 x 5 mm so as to give a fair finish including centering shuttering struting and propping etc. with wooden battens and ballies height of propping and centering below supporting floor two ceiling not exceeding 4 meters and removal of the same for in-situ- reinforced concrete and plain concrete in: Vertical surface such as wall (any thickness) partition and the like i/c attached pillasters, butresses plinth and string course complete in all respect including all leads and lifts as per direction and to the entire satisfaction of Engineer-in-Charge. | 61.2 | Sqm | - | - |
| 3 | Providing and Laying cement concrete work 1:1/12:3(1cement:1/12 sand: 3 graded stone aggregate 20mm nominal size)and curing complete excluding cost of form work and reinforcement for reinforced concrete work:- | 21.51 | Cum | - | - |
| 4 | Providing and laying mild steel /tor steel reinforcement for RCC work i/c bending binding and placing in position complete including cost of binding wire up to all floor level complete in all respect as per direction and to the entire satisfaction of Engineer-in-Charge within all leads and lifts. | 980 | Kg | - | - |
| 5Supplying hoisting and streching and holding in position to specifed profile GI wire ropes for suspension bridge including guy ropes. | |||||
| 5.1 | Suspension cable 32mm dia | 62 | Rmt | - | - |
| 5.2 | Suspension cable 12 mm dia | 11 | Rmt | - | - |
| 6 | Providing and fixing in position steel pully with shaft complete in all respect as per direction and to the entire satisfaction of Engineer-in-Charge within all leads and lifts. | 4 | No. | - | - |
| 7Providing and fixing of M.S U clamps for holding the pipe complete in all respect as per direction and to the entire satisfaction of Engineer-in-Charge within all leads and lifts. | |||||
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
for68.pdf
Tender Documents • 0.88 MB
terms.pdf
Tender Documents • 0.27 MB
BOQ_209412.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .