Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.6 CrAccepted-AOC VILL P O AMARPUR DIST GOMATI TRIPURA 799101 | GOMATI | TRIPURA | 799101 | ₹5.6 Cr | 1 | Accepted-AOC Being 1st Lowest. |
| 2 | 2₹5.6 Cr+₹2.3 L (0.42%)Rejected-AOC NATUN BAZAR PO NATUN BAZAR JATANBARI GOMATI DISTRICT TRIPURA | GOMATI | TRIPURA | ₹5.6 Cr+₹2.3 L (0.42%) | 2 | Rejected-AOC Not being 1st Lowest. |
| 3 | 3₹6.0 Cr+₹37.4 L (6.68%)Rejected-AOC JAIL ROAD DHALESWAR AGARTALA WEST TRIPURA PIN 799007 | WEST TRIPURA | TRIPURA | 799007 | ₹6.0 Cr+₹37.4 L (6.68%) | 3 | Rejected-AOC Not being 1st Lowest. |
| 4 | 4₹6.1 Cr+₹46.2 L (8.26%)Rejected-AOC SIDDHI ASRAM AD NAGAR AGARTALA TRIPURA W PIN 799003 | AGARTALA | WEST TRIPURA | TRIPURA | 799003 | ₹6.1 Cr+₹46.2 L (8.26%) | 4 | Rejected-AOC Not being 1st Lowest. |
| 5 | 5₹6.8 Cr+₹1.2 Cr (21.9%)Rejected-AOC 294241 NAIBEDYA AGARTALA BISHALGARH ROAD BARDOWALI A D NAGAR WEST TRIPURA TRIPURA 799003 | 294241 | ₹6.8 Cr+₹1.2 Cr (21.9%) | 5 | Rejected-AOC Not being 1st Lowest. |
Tender Value
₹7.3 Cr
EMD Value
₹14.6 L
Closing Date
24 Mar 2026, 3:00 pmClosed
The Executive Engineer, Gonda Twisa Div., PWD(G).
O/O The Executive Engineer, Gonda Twisa Division, PWD (G).
Improvement of road from Gonda Twisa- Raishyabari Road to Sadainanda para road (L - 4.218 km) under Dumburnagar RD Block, Gonda Twisa Sub-Division.
2026_CEPWD_71460_1
98/CE/PWD(RnB)/ACE(PnDU)/25-26
Open Tender
Civil Works - Roads
Percentage
365 days
Gonda Twisa
Please refer Tender documents.
7 documents required · 7 mandatory
₹10,000
₹14.6 L
Yes
O/O The EE, Gonda Twisa Division, PWD (G).
21 Aug 2026
11 Mar 2026
24 Mar 2026
11 Mar 2026
24 Mar 2026
18 Mar 2026
11 Mar 2026 - 16 Mar 2026
17 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1S.H: Site Clearance | |||||
| 1.01 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRT&H Technical Specification clause 201.
II. By Mechanical Means
A. In area of non-thorny jungle | 1 | Hectare | 40,047.3 | ₹40,007.25 |
| 1.02 | Dismantling of CI Water Pipe Line
Dismantling of CI water pipe line 600 mm dia including disposal with all lifts and upto a lead of 1000 m and stacking the serviceable and unserviceable material separately under supervision of the concerned department but excluding earth excavation and dismantling of masonry works as per MoRD Technical Specification Clause 202. | 1,490 | Meter | 186 | ₹2,77,140 |
| 1.03 | Dismantling of Brick soling
Dismantling of brick soling, stacking serviceable materials and unserviceable materials separately with all lifts and upto a lead of 1000 m as per MoRD Technical Specification Clause 202.
(II) By Mechanical Means | - | Cum | 420.7 | - |
| 2S.H: Earthwork | |||||
| 2.01 | Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections and transporting to the embankment location with all lifts and lead upto 1000 m as per MoRD Technical Specification Clause 302.3. | - | Cum | 44.1 | - |
| 2.02 | Construction of Embankment with Material Obtained from Roadway Cutting
Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per MoRD Technical Specification Clause 301.5.
(A) For spreading beyond 100 m | - | Cum | 81.1 | - |
| 2.03 | Construction of Subgrade and Earthen Shoulders
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site , spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per MoRD Technical Specification Clause 303.1. | 1 | Cum | 233.8 | ₹233.57 |
| 2.04 | Compacting Original Ground
(ii) Compacting original ground supporting subgrade
Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per MoRD Technical Specification Clause 303.5.2. | 1 | Cum | 30.4 | ₹30.37 |
| 3S.H: Granular Sub-bases, Bases (Non-Bituminous) and Shoulders | |||||
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_72711.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.15 MB
DNIeT.pdf
Tender Documents • 2.91 MB
BOQ_72711.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .