Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.0 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹18.3 L+₹33,884 (1.89%)Rejected-AOC CHELAMATTOM VALLAM KARAYIL HOUSE | KANNUR | KERALA | 670511 | L2 | Rejected-AOC L2 |
Tender Value
₹16.9 L
EMD Value
₹42,356
Closing Date
6 Mar 2024, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
AE LSGD SECTION VATHIKUDY GP
AE LSGD SECTION VATHIKUDY GP
VATHIKUDY G.P 2023 24 PANCHAYATH OFFICE CONSTRUCTION - SECOND STAGE 48
2024_LSGD_664375_1
04/AE/LIDEW/VTY/24-25
Open Tender
Civil Works - Buildings
Item Rate
45 days
VATHIKUDY GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹42,356
Yes
20 Mar 2024
27 Feb 2024
6 Mar 2024
27 Feb 2024
6 Mar 2024
27 Feb 2024
Amount
Office building
50.6.2.2:Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete
5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15<sup>0</sup> landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size).
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.9.7:Centering and shuttering including strutting, etc. and removal of form for:Stairs, (excluding landings ) except spiral - staircases)
5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
50.9.1.1:Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia & length (hold fast lugs or dash fastener shall be paid for separately), using good quality Anjili wood /jack wood
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
GEORGE JOSEPH
Bidder Name
GEORGE JOSEPH
GIMMY PAULOSE
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .