Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.3 CrAdmitted-Finance | -15.75% | ₹3.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.5 Cr+₹18.1 L (5.51%)Admitted-Finance | -11.11% | ₹3.5 Cr+₹18.1 L (5.51%) | L2 | Admitted-Finance |
| 3 | L3₹3.6 Cr+₹34.6 L (10.5%)Admitted-Finance | -6.91% | ₹3.6 Cr+₹34.6 L (10.5%) | L3 | Admitted-Finance |
| 4 | L4₹3.7 Cr+₹41.6 L (12.6%)Admitted-Finance | -5.11% | ₹3.7 Cr+₹41.6 L (12.6%) | L4 | Admitted-Finance |
| 5 | Not Admitted-Fee/PreQual/Technical SF 10 2ND FLOOR CROSS RIVER MALL SHAHDARA DELHI 110032 | DELHI | SHAHDARA | DELHI | 110032 | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹3.9 Cr
EMD Value
₹7.8 L
Closing Date
29 Oct 2024, 5:00 pmClosed
Sr Manager E/M-I
Noida Authority Office Sector 39 Noida
Construction Of 33 KV HT Line and Conversion of 33/11 KV Overhead Line into Underground System In Different Location of Noida (Sector 108 FN CB22, Sector 53 FN 3 to A block Sector 34, Sector 53 FN 5 to C and B block Sector 34).
2024_NOIDA_958563_1
18/DGM(E/M)/S M.(E and M)-I/2024-25
Open Tender
Electrical Works
Fixed-rate
180 days
Noida
Please refer to tender document
3 documents required · 3 mandatory
₹5,310
Noida
₹7.8 L
18 Dec 2024
16 Oct 2024
4 Nov 2024
16 Oct 2024
29 Oct 2024
16 Oct 2024
eProcurement System Government of Uttar Pradesh Created By: SATYENDRA KUMAR Created Date/Time: 18-Dec-2024 10:21 AM Tender Title: Construction Of 33 KV HT Line and Conversion of 33/11 KV Overhead Line into Underground System In Different Location of Noida (Sector 108 FN CB22, Sector 53 FN 3 to A block Sector 34, Sector 53 FN 5 to C and B block Sector 34). Tender ID: 2024_NOIDA_958563_1
Tender Inviting Authority: Senior Manager (E/M)-I
Name of Work:-: Construction Of 33 KV HT Line and Conversion of 33/11 KV Overhead Line into Underground System In Different Location of Noida (Sector 108 FN CB22, Sector 53 FN 3 to A block Sector 34, Sector 53 FN 5 to C&B block Sector 34).
Job No: - 18/GM(E/M)/Sr. Manager/(E/M)-I/E.T./2024-25
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words (Iteration 0)
1.00 M/s Phool Kumar Saxena (GSTN-09CQIPS1880A1ZQ) BID ID -4690407 39099384.64 -11.11 34755443.01 Three Crore Fourty Seven Lakh Fifty Five Thousand Four Hundred and Fourty Three
2.00 M/S S.P. & CO (GSTN-09APJPS6368F1ZA) BID ID -4691742 39099384.64 -6.91 36397617.16 Three Crore Sixty Three Lakh Ninty Seven Thousand Six Hundred and Seventeen
3.00 ELECSA INFRATECH PRIVATE LIMITED (GSTN-NA) BID ID -4692282 39099384.64 -5.11 37101406.08 Three Crore Seventy One Lakh One Thousand Four Hundred and Six
4.00 Sukhmani Builders (GSTN-NA) BID ID -4691875 39099384.64 -15.75 32941231.56 Three Crore Twenty Nine Lakh Fourty One Thousand Two Hundred and Thirty One
Lowest Amount Quoted BY: Sukhmani Builders(32941231.56)
BOQ Summary Details Tender Title: Construction Of 33 KV HT Line and Conversion of 33/11 KV Overhead Line into Underground System In Different Location of Noida (Sector 108 FN CB22, Sector 53 FN 3 to A block Sector 34, Sector 53 FN 5 to C and B block Sector 34). Tender ID: 2024_NOIDA_958563_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 Sukhmani Builders (BID ID -4691875) 32941231.56 L1
2 M/s Phool Kumar Saxena (BID ID -4690407) 34755443.01 L2
4 ELECSA INFRATECH PRIVATE LIMITED (BID ID -4692282) 37101406.08 L4
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.13 MB
BOQ_1666001.xls
BOQ • 0.28 MB
Cap.xls
Additional Documents • 0.04 MB
TD.pdf
Tender Documents • 4.89 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .