Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹7.1 LAccepted-Finance PALATHINKAL BHOOTHATHANKETTU P O AE LSGD PALLARIMANGALAM GRAMA PANCHAYATHAI PALLARIMANGALAM | IDUKKI | KERALA | 685501 | l1 | Accepted-Finance eligible for aoc | |
| 2 | l2₹7.3 L+₹23,018.42 (3.26%)Rejected-Finance PULPRAIL HOUSE NELLAD PO | TIRUVANNAMALAI | TAMIL NADU | 604407 | l2 | Rejected-Finance not eligible for aoc | |
| 3 | Rejected-Technical BXMPS0586H | - | Rejected-Technical NOT ELIGIBLE FOR FINANCIAL EVALUATION |
| Sl No | Description | Qty | Unit | SOJAN N GEORGE L3 | Liju Paul L1 | Nikhil T P L2 |
|---|---|---|---|---|---|---|
| 1.00JERUSALEM CHAPPEL ROAD MAINTANANCE 2ND REACH | ||||||
| 1.00 | 75.5.5.A.1pb:Modified Penetration Macadam 50 mm thick using Bitumen S-65 - Packed Bitumen Rates Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | 150.51 | sqm | 315 ₹47,410.65 Lowest | 320 ₹48,163.2 | 315.5 ₹47,485.91 |
| 1.00 | 75.5.5.B.2pb:Modified Penetration Macadam 75 mm thick using Bitumen S-65 - Packed Bitumen Rates Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | 134.68 | sqm | 412 ₹55,488.16 | 410 ₹55,218.8 | 359.19 ₹48,375.71 Lowest |
| 1.00 | 75.5.2.1pb:Tack Coat - With Packed Bitumen Rates Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 2,040 | sqm | 15 ₹30,600 Lowest | 15.5 ₹31,620 | 15.39 ₹31,395.6 |
| 1.00 | 75.5.11.1.A.2pb:Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 - Packed Bitumen Rates Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 By Manual Means Type A (II) Bitumen (S-65) | 2,040 | sqm | 294 ₹5,99,760 | 280 ₹5,71,200 Lowest | 295.08 ₹6,01,963.2 |
Tender Value
₹7.5 L
EMD Value
₹18,867
Closing Date
29 Aug 2025, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ASSISTANT ENGINEER
OFFICE OF ASSISTANT ENGINEER, LSGD (LID AND EW) SECTION, RAYAMANGALAM GP
Rayamangalam GP 133/2025-26-JERUSALEM CHAPPEL ROAD MAINTANANCE 2ND REACH WARD-5-General Civil Work
2025_LSGD_789730_1
ET3/RYM/25-26
Open Tender
Civil Works - Roads
Item Rate
180 days
RAYAMANGALAM GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,665
Yes
₹18,867
Yes
18 Dec 2025
22 Aug 2025
30 Aug 2025
22 Aug 2025
29 Aug 2025
22 Aug 2025
Amount
JERUSALEM CHAPPEL ROAD MAINTANANCE 2ND REACH
75.5.5.A.1pb:Modified Penetration Macadam 50 mm thick using Bitumen S-65 - Packed Bitumen Rates Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506.
75.5.5.B.2pb:Modified Penetration Macadam 75 mm thick using Bitumen S-65 - Packed Bitumen Rates Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506.
75.5.2.1pb:Tack Coat - With Packed Bitumen Rates Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.
75.5.11.1.A.2pb:Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 - Packed Bitumen Rates Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 By Manual Means Type A (II) Bitumen (S-65)
Nikhil T P (BID ID -2315229)
SOJAN N GEORGE (BID ID -2313329)
Bidder Name
Liju Paul
SOJAN N GEORGE
Nikhil T P
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1301140.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .