Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
17 Aug 2026, 5:00 pmClosed
Deputy Municipal Commissioner, North Zone
Laying of Systematic drainage line at Modi Compound,Radheshyam ni chali And Diffrent places And Different Chalis OF Ghatak-3 in Saijpur Ward of North-Zone.
332895
E- TENDER NOTICE NO-06/ 2026-27
Open
Civil Works
Works
Ahmedabad
4 documents required · 4 mandatory
₹900
Municipal Commissioner, Ahmedabad
₹10,000
8 Aug 2026
8 Aug 2026
8 Aug 2026
17 Aug 2026
8 Aug 2026
Sr. Department No. of work Total Amount
only as on Dt.-18.08.2026 Up to 17.00 hrs. in O/o Asst. Manager (North Zone). The technical bid shall be
opened online on Dt.- 21.08.2026 at 11.00 hrs. Any change / correction / corrigendum in respect of above
work shall be placed on line. Contractors are requested to see the website before 24 hours of submission of
Assistant Manager (North zone), Ahmedabad Municipal Corporation
North Zone Office Building, Memco-Saijpur road, Ahmedabad
Deputy Municipal Commisioner
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
AHMEDABAD MUNICIPAL CORPORATION
"Rajiv Gandhi Bhavan", Memco - Saijpur Raod, Ahmedabad-25.
MEMORANDUM OF WORK
Municipal Commissioner invites online e-tenders from interested contractors for Laying of
Systematic drainage line at Modi Compound,Radheshyam ni chali And Diffrent places And
Different Chalis OF Ghatak-3 in Saijpur Ward of North-Zone.
1 Name of work Laying of Systematic drainage line at Modi
Compound,Radheshyam ni chali And Diffrent places
And Different Chalis OF Ghatak-3 in Saijpur Ward of
2 Time Limit 12 MONTHS
3 Tender Validity Period 120 Days (Excluding Monsoon)
4 Eligibility Criteria Register “E2” class in PWD in Govt. R&B/CPWD/AMC or
equivalent register with any other state Govt. or
5 Estimated Cost put to tender Rs. 10,00,000.00/-
6 Tender fees Rs.900.00 Demand Draft in favour of Municipal
(Non refundable) Commissioner, Ahmedabad)
7 Contractor's Class “E2” class
8 1% Earnest Money Deposit Rs.10000.00/- (Demand Draft or Bank Guarantee in favor of
Municipal Commissioner, AMDAVAD/) To be submitted as
prescribed in 8.0 below. Demand Draft or Bank Guarantee
shall be from Nationalized Bank / Scheduled Bank and valid
for 120 days.(As per AMC finance dept. circular No-5
Dt.5/5/07 & F.D. Circular No. 29 Dt. 7/08/2010) & attached
ANNEXURE - 1 finance dept. circular No – 10, Dt. 05.08.2024
9 Submission of EMD and In separate sealed cover each for EMD and Tender Fees
Tender Fees along with Tender as described in the invitation of tender
and submitted to Assistant Manager (NORTH zone) , Rajiv
Gandhi Bhavan, Memco-Saijpur Road, AMDAVAD To be
Submitted Physically As per N.I.T
10 Date of Opening of Technical Technical Bid will be opened online as per N.I.T. in the office
bid of Addl. City Engineer (North Zone), Rajiv Gandhi Bhavan,
Memco – Saijpur Road, AMDAVAD Municipal Corporation,
11 Security Deposit 5% of the Sanctioned Tender Amount in form of Bank
Guarantee / Demand Draft / Local MICR Cheque.(As per
12 Mode of sending the Tender Price bid should be submitted by online e-tender only and
Documents Technical bid should be submitted physically also in sealed
envelope systems By RPAD/Speed post/ Hand Delivery in
sealed covers in Duplicate (One Original & One Duplicate)
Each part shall be separately duly sign & seal by contractor .
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
13 liquidated damages 0.1% of contract price per day from the date of delay.
Maximum limit of liquidated damages for delay in
completion of work will be 10% of the Contract Price
rounded of to the neared thousand.
14 Deduction of Retention 2% of the value of work done will be deducted from each RA
Money from each RA Bill bill. It will be released along with release of payment of
15 Place of Arbitration AMDAVAD
16 Language of Arbitration English
17 Amount to be deducted from Welfare cess as per act 1996 @ 1 % of bill amount
each bill for labour welfare
fund (non-refundable)
18 Contractor's Name
19 Contractor's Address
20 Contractor'sRegister Number
Renewal Year Class
21 Contractor's Bank Name
22 Branch Address
23 Bank Account Number
26 Contractor's E-Mail:
27 Supervisor Clause Contractor Should Provide One Supervisor per Tender. Failure
of Providing Supervisor contractor shall be levied penalty of
Rs.1000/- per day
1. me.me.yth.yum.btk ltuk^t<e Vrhgtœ Jtuzoltk Rsluh MxtV îtht ftuLx[tfxh/yusLmelu
Jtuxmyuv/xujeVtulef btægb&e y&Jt YcY juFe<btk Vrhgtœ ytvJtbtk ytJNu.mœh Vrhgtœle
ftbdehe yum.yuj.yu. le mbg bgtoœtbtk fhJtle hnuNu.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
2. ftbdehe vwKo > ctœ <ult Vtuxtud{tV,mxeoVefux ylu ftbdehe vwKo > le òK yum.yuj.yu. mbg
bgtoœtbtk Jtuzolt MxtVlu fhJtle hnuNu.
3. stu ytvlu ytvuj Vrhgtœ yum.yuj.yu. mbg bgtoœtbtk vwKo lne &tg <tu yt mtbuj ftuÐf bwscle
vulÕxe le hfb ytvltk cej btk&e Jmwj fhJtbtk ytJNu.
4. ytvlu mtukvJtbtk ytJuj me.me.yth.yum. Vrhgtœtu ltu hevtuxo yXJtzef ^tuhKu rlg< Vtubuoxbtk
«btKe< fhe Jtuzo yturVmu hsw fhJtltu hnuNu.
5. ftuLx[tfxh îtht yhsœth lu Vtul fgto ctœ mœh Vrhgtœ yLg Jtuzo fu yLg rzvtxobuLx fu
y.Bgw.ftuvtuohuNl lt ftgoûtuºt btk l ytJ<e ntuR <ule òK Jtuzo MxtVo lu <tðftrjf fhJtle hnuNu.
me.me.yth.yum Vrhgtœ mbg bgtoœt btk rlftj l &Jtlt mkstudtu btk fhJtle &<e 5uluÕxe le rJd<
Sr. Department Category Problem SLA Penalty
1 Engineering Water>>Engineering Inadequate water or low inflow 240
pressure - Eng Hours
2 Engineering Water>>Engineering Leakage In Pipe Line - Eng 48
3 Engineering Water>>Engineering Water quality-Polluted water - 24
4 Engineering Water>>Engineering No Water - Eng 240
5 Engineering Drainage>>Engineering Drain Blockage or Choking on 48
TP road - Eng Hours
6 Engineering Drainage>>Engineering Overflowing of main line and 48
distribution line on road - Eng Hours
7 Engineering Drainage>>Engineering No Drainage Manhole cover - 24
8 Engineering Drainage>>Engineering Frequent Breakdown & Blockage 96
of Drain - Eng Hours
9 Engineering Road Pot holes on the Road 24
10 Engineering Road Patch work Relaying of a portion 72
11 Engineering Road Deep Pit - Large settlement of 48
12 Engineering Road Removal of waste-Dust Lying on 72
both side of the road after re Hours
13 Engineering Footpath Footpath Repairing Required 168
14 Engineering Public Building No Water Supply In A Public 24
15 Engineering Public Building Public Toilets and Urinals - 360
Repairing of Doors, Windows, Hours
Tiles or Sheets
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
16 Engineering Public Building Other Maintenance 168
17 Engineering Drainage>>Engineering Contractor Had not disposed off 48
the Manhole Silt Properly - Eng Hours
18 Engineering Drainage>>Engineering Raising the Manhole Cover & 168
Catch Pit Up To the Road Level - Hours
19 Engineering Drainage>>Engineering Lowering the Manhole cover & 168
Catch pit - Eng Hours
20 Engineering Drainage>>Engineering Public Toilets and Urinals - 72
Drainage Line Blockage or Hours
21 Engineering Drainage>>Engineering Public Toilets and Urinals - 168
Drainage Line Breakage Hours
22 Engineering Water>>Engineering Public Toilets and Urinals - Non- 168
Availability of Water/Cleaning of Hours
Water Tank/Broken Tank Cover
Conditional tenders will not be accepted. Municipal Commissioner reserves the rights to reject any
or all the tenders without assigning any reasons there of.
Seal and Signature of the Bidder Add.C.E.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
To be notarized by Notary
TENDER DECLARATION FORM
Dy. CITY ENGINEER (NORTH ZONE-5)
"Rajiv Gandhi Bhavan", Memco - Saijpur Raod, AMDAVAD-25.
Name of Work:- Laying of Systematic drainage line at Modi Compound,Radheshyam ni chali
And Diffrent places And Different Chalis OF Ghatak-3 in Saijpur Ward of North-Zone.
I/We the undersigned have carefully gone through and clearly understood the Tender documents of
above mentioned project comprising of Notice Inviting tenders, Articles of Agreement, Scope of work,
Definition of terms, notes Instructions/Information to Bidder, Condition of Contract, special condition of
contract, Appendices, Specifications, Bill of Quantities, Statements (1 to 6) furnished by AMDAVAD
MUNICIPAL CORPORATION.
I/We do hereby offer to execute and complete the whole of the work within the time specified all in
accordance with the specification, designs, drawing and instruction in writing referred to in the said
document and with such materials as mentioned for, at the respective rates which I/we have quoted in the
Price Bid or at such other rates as may be fixed under the provisions of these conditions.
In the event of this tender being accepted I/We agree to enter into an agreement and when required,
execute the contract, according to your form 1 of agreement as or in default where of I/we bound
myself/ourselves to forfeit the "Earnest Money Deposit."
I/We understand that if I/We shall not enter in agreement within fifteen days or as decided by AMC from
the date of receipt of letter of acceptance, you will forfeit the earnest money paid by me/us and take
necessary action as deemed fit.
I/We have enclosed a Demand Draft / Bank Guarantee as an “Earnest Money Deposit", for the sum as
mentioned in NIT, the full value of which is to be absolutely forfeited to the Employer If I/We fail to
commence the work specified. Otherwise the Employer shall retain the said sum, as on account of such
Security Deposit as provided for in the aforesaid documents.
I/We agree not to employ sub-contractors other than those that may be approved in accordance with
conditions in the aforesaid documents.
I/We understand that Municipal Commissioner is not bound to accept the lowest or any tender, which are
received. I / We also understand & agree that Municipal Commissioner Reserves the right to allot number of
tenders to successful bidders at his sole discretion in case if I / We am/are lowest in more than one tender.
I/We am/are bound to execute the job if the work order is issued within 120 days from the date of opening
I am bound to execute the work by maintaining all Quality aspects/parameters mentioned in the tender
terms and conditions. I am also bound to submit all supporting Genuine Original documents and if any
discrepancy found in such documents as well as in the executed Work with respect to Quality/Quantity at
any stage of work or even after completion of work, it will be solely my Responsibility. I am bound to prove
originality of all documents submitted by me and if any Documents found false/fake then Municipal
Commissioner/AMC has right to take any action/penalty/punishment against me.
I am also bound that if I/we, indulged into any malpractice and/or used any inferior quality and/or the
construction of road is found to be of an inferior quality under this contract than in such case Municipal
Commissioner/AMC has right to debar/ blacklist for three years.
I/We agree to pay the Government income-Tax, GST/Sales-Tax (Central and State), Octroi duties, Royalty on
material (i.e. Aggregate, Sand etc.) And any other taxes prevailing and from time to time on such items on
which the same are leviable and the rates quoted by me/us are inclusive of the same.
Yours faithfully Date: Seal and Sign of
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
AHMEDABAD MUNICIPAL CORPORATION
Invitation for Bid (IFB)
1. The AHMEDABAD MUNICIPAL CORPORATION,( hereinafter called “the Employer”) invites
sealed Tender document from reputed and qualified bidders for the construction of Works detailed in
the Table below:-
Sr. Name of Works Approximate Earnest Money Completion
No. value of works (Rs.) Deposit (Rs.) Period
1 Laying of Systematic Rs. 10,00,000.00/- Rs. 10000.00 12- MONTHS
drainage line at Modi
Compound,Radheshyam
ni chali And Diffrent
places And Different
Chalis OF Ghatak-3 in
Saijpur Ward of North-
2. Interested bidders shall download the tender documents from AMC’s website
www.amc.nprocure.com/ www.nprocure.com., https://tender.nprocure.com/
3. Tender (a complete set of bidding document) fee shall be As per N.I.T in the form of Demand
Draft / Pay Order from any Nationalized Bank in favor of MUNICIPAL COMMISSIONER,
Ahmedabad, payable at Ahmedabad, which shall be non refundable. The Details of Tender fees
shall be submit with scan copy at the time of Quoting price bid of the tender and Physically
to be submitted along with technical bid Vol.-1 with other enclosure.
4. All bids must be accompanied by Earnest Money Deposit of the amount specified for the Works
in the above Table payable at Ahmedabad and drawn in favor of MUNICIPAL
COMMISSIONER, Ahmedabad, payable at Ahmedabad,. Earnest Money Deposit will have to
be specified in Clause 2 of Financial Condition.
5. Physical submission must be delivered to Asst. Manager (Admin) North Zone, Rajiv Gandhi
Bhavan, Memco – Saijpur Road, Ahmedabad As per N.I.T
6. The Bids will be opened on As per N.I.T at the office of Addl.City Engineer (N/Z) , 1st Floor,
Rajiv Gandhi Bhavan, Ahmedabad Municipal Corporation, Memco-Saijpur road, Ahmedabad-
25. in the presence of bidders or their representatives who choose to attend. In the event of the
specified date of bid submission/opening being declared a holiday for the Employer, the bids shall
be received /opened on the next working day at the same place and the same time.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
Finance dept. circular No - 10 Dt.05.08.2024
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
TERMS & CONDITIONS
( A ) INSTRUCTIONS TO BIDDERS (ITB)
( B ) GENERAL TERMS & CONDITIONS
( C ) FINACIAL TERMS & CONDITIONS
( D ) MAIN CONDITION / FEATURES OF THE WORK
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( A ) INSTRUCTIONS TO BIDDERS (ITB)
1. Procedure for Submission of Tender
a).The Bidder should quote the price bid in e- tender form before last date of online submission as per
N.I.T and all other details as asked in the tender.
b).The bidder shall submit the following Tender documents physically in hard copy in two separate
envelope (marked as “original” and other marked as “Duplicate”) in schedule time by RPAD/
Speed Post/ Hand Delivery in duplicate. This envelope shall be sealed in an outer envelope. The
Bid envelopes shall be marked as follows:-
Tender Document Vol.
Registration certificate of class
Power of Attorney
Personal Details
Enclosures as asked in tender
Technical specifications duly sign by contractor.
c).The envelope shall be addressed to the Employer at the following address:
Assistant Manager, North Zone,
1st Floor, Rajiv Gandhi Bhavan,
Memco-Saijpur Road,
d).Bear the following identification:
“TO BE OPENED ONLY IN PRESENCE OF THE EVALUATION COMMITTEE”
e). Indicate the name and address of the bidder.
If the outer envelope is not sealed and marked as above, the Employer will assume no
responsibility for the misplacement or premature opening of the bid.
f).All information has to be typed or hand written legibly. All pages of the Bid have to be initialed
g).ALL INFORMATION HAS TO BE SUBMITTED IN THE PRESCRIBED FORMAT ONLY.
Projects for which incomplete information has been provided will not be considered for
evaluation. The Bidder may attach separate sheets if so required. However, the final bound
document submitted, has to be submitted in vertical A4 size (210 mm X 297 mm) except Form of
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
2. Assessment of Submission
2.1The Employer will open the physically submitted document of all the bids received for the
package (except those received late) containing the sealed Tender volume and other enclosures
then announce the names of bidders in the presence of bidders or their representatives who
choose to attend on the date and time mentioned in the IFB. In the event of specified date of bid
opening being declared as a holiday for the Employer, the Tender will be opened at the
appointed time and location on the next working day.
2.2 In Physical submission, Bidders detailed and tender fee, E.M.D. shall be opened first. The
Employer at the opening will announce bidder’s names, , the presence/or absence of EMD, the
amount and validity of EMD furnished with each bid, is valid registration and such other details,
as the Employer may consider appropriate.
2.3 The Employer will determine whether the bid is accompanied by the required EMD.
2.4 If the EMD furnished does not conform to the amount and validity period as specified in the
Invitation for Bid and has not been furnished in the form, the bid shall be rejected by the
Employer as non-responsive and the Tender volume will be returned to the bidder.
2.5 Subject to confirmation of the EMD by the issuing bank, the Tender volume accompanied with
valid EMD will be taken up for further evaluation. In case, the Bank does not confirm the EMD,
the bid shall be rejected as non-responsive and no further evaluation carried out.
2.6 The tender volume will further be examined to determine whether the bid has been properly
signed, meets the eligibility and qualification criteria, has the required available bid capacity, is
accompanied by the requisite certificates, undertaking and other relevant information specified in
the bid documents and is substantially responsive to the requirement of the bidding documents
and provides any clarification for ascertaining the correctness of the information/details.
2.7 The Employer shall prepare besides the record of bid opening, minutes of the Bid opening,
including the information disclosed to those present in accordance with Sub Clause 3.2 thereof.
2.8 The bidders or their representatives who are present shall sign attendance sheet evidencing their
2.9 If the Tender volume is not substantially responsive, it will be rejected by the Employer and will
not subsequently be made responsive by correction or modification or withdrawal of the
nonconforming deviation or reservation.
3. Evaluation and Comparison of Tender volume
The Employer will evaluate and compare only those Tender volumes which are determined to be
substantially responsive in accordance with Clause 2 and qualified for award of Contract in
accordance with Clause 5(General Terms and Condition).
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
4. Procedure for Tender Opening
Received copies of tender in physical form with in schedule time, will be open on schedule date
and time. In the event of specified date of bid opening being declared bidders who qualify the
criteria then bidder bid will be considered for opening of price bid.(Following clause no. 5 of
5.1 The Employer will award the Contract to the bidder whose bid has been determined to be
substantially responsive to the bidding documents and who has offered the lowest Evaluated Bid
Price, provided that such bidder has been determined to be (i) eligible in accordance with the
provisions of Clause 3(General Terms and Condition); and (ii) qualified in accordance with the
provisions of Clause 5(General Terms and Condition).
6. Notification of Award
6.1 Prior to expiration of the period of bid validity prescribed by the Employer, the Employer will
notify the successful bidder by cable/fax and confirmed by registered letter that his bid has been
accepted. This letter shall name the sum which the Employer will pay the Contractor in
consideration of the execution, completion and maintenance of the Works by the Contractor as
prescribed by the Contract.
6.2 The notification of award will constitute the formation of the Contract.
7. As per City Engineer Circular (WRM) no. 6 2011/12 DT: 24/06/2011. A successful Bidder
has to deposit security deposit / Bank Guarantee with in 15 days after receiving letter of
Indent. Time limit of work will commence from the date of issue of work order.
8. Clarification of Bids
8.1 To assist in the examination, evaluation and comparison of bids, the Employer may, at his
discretion, ask any bidder for authentication the correctness of the information/details furnished
by him in his bid. Such request by the Employer and the response by bidder shall be in writing or
8.2 Subject to above clause, no bidders shall contact the Employer on any matter relating to his bid
from the time of bid opening to the time contract is awarded.
8.3 Any effort by the bidder to influence the Employer in the Employer’s bid evaluation, bid
comparison or contract award decisions may result in the rejection of his bid.
9.1 Information relating to the examination, clarification, evaluation and comparison of bids and
recommendations for the award of a contract shall not be disclosed to bidders or any other
persons not officially concerned with such process until the award to the successful bidder has
been announced. Any effort by a bidder to influence the Employer's processing of bids or award
decisions may result in the rejection of his bid.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
10.1 The bidder is advised to visit and examine the Site of Works and its surroundings and obtain for
itself on its own responsibility all information that may be necessary for preparing the bid and
entering into a contract for construction of the Works. The costs of visiting the Site shall be at
the bidder’s own expense.
10.2 The bidder and any of its personnel or agents will be granted permission by the Employer to
enter its premises and lands for the purpose of such inspection, but only upon the express
condition that the bidder, its personnel and agents, will release and indemnify the Employer and
its personnel and agents from and against all liability in respect thereof and will be responsible
for death or personal injury, loss of or damage to property and any other loss, damage, costs and
expenses incurred as a result of the inspection.
Seal and Signature of the Bidder Add.C.E.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( B ) GENERAL TERMS & CONDITIONS
1. Scope of Bid
1.1 The Ahmedabad Municipal Corporation hereinafter called "the Employer" invites Tender
document for the construction of works (as defined in these documents, hereinafter referred to as
"the Works") detailed in the table given in the IFB.
1.2 The Works consist of:
Laying of Systematic drainage line at Modi Compound,Radheshyam ni chali And Diffrent
places And Different Chalis OF Ghatak-3 in Saijpur Ward of North-Zone.
2. Source of Funds
2.1 The expenditure on these Works will be met by AHMEDABAD MUNICIPAL
3. Eligible Bidders
3.1 This invitation for bids is open to bidders who has necessary bid capacity and who meet the
following requirements:
A bidder shall not be under a declaration of ineligibility for corrupt or fraudulent practice.
The bidders shall have a registration with State PWD, and/or CPWD for Required class and
or equivalent with specialization in road works. If contractor is not registered with AMC in
the relevant class, on award of contract he shall be required to register himself with AMC
within 3 month's time.
Bidders shall provide such evidence of their continued eligibility satisfactory to the Employer, as the
Employer shall reasonably request.
4. Eligible Material, Equipment and Services
4.1 At the Employer's request, the bidder having offered the lowest evaluated financial bid may be
required to provide evidence of the origin of materials, equipment, and services to the satisfaction of
4.2 For purposes of Sub Clause 4.1, "origin" means the place where the materials are mined, grown,
produced or manufactured; similarly for equipments and from where the services are provided.
5. Qualification of the Bidder
To be qualified for award of Contract, bidders shall:
a) Submit a written power of attorney authorizing the signatory of the bid to commit the
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
General information
All individual firms must complete the information in this form. Nationality information shall be
provided for all owner(s) or applicant(s) that are partnership or individually owned firms.
1 Name of firm:
2 Head office address:
3 Local office address (if any):
4 Telephone/ Contact:
5 E-mail address:
6 Place of incorporation/registration:
7 Year of incorporation/registration:
Additional information regarding litigation, debarment, arbitration, etc.
5.3 Disqualification
Even though the Bidders may meet the above criteria, they are subject to be disqualified for any of
the following reasons:
a) Misleading or false representation in the forms, statements and attachments submitted and
included in document.
b) Record of poor performance such as abandoning the work, rescinding of contract for which the
reasons are attributable to the non-performance of the contractor, consistent history of litigation
awarded against the applicant or financial failure due to bankruptcy.
c) Has been identified by the Employer as poor performer in implementation of ongoing AMC
5.4 Debarment/Black listing
Notwithstanding the above, the Employer may debar or blacklist any of the bidder(s) for their
misleading or false representations in the forms statements etc. for the period to be decided by the
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
6. One Bid per Bidder
6.1 Each bidder shall submit only one bid per contract package either by himself or as a partner in a
joint venture. A bidder who submits or participates in more than one bid for a contract package will
be disqualified.
7. Bidding Documents
The bidder is expected to examine carefully the contents of all the above bid documents. Failures to
comply with the requirements of bid documents will be at the bidder's own risk. Pursuant to Clause
16, bids which are not substantially responsive to the requirements of the bidding documents will be
8. Language of Bid
The bid, and all correspondence and documents related to the bid exchanged between the bidder and
the Employer shall be written in the English language. Supporting documents and printed literature
furnished by the bidder may be in another language provided they are accompanied by an accurate
translation of the relevant passages in the English language, in which case, for purposes of
interpretation of the bid, the English translation shall prevail.
9.1. Unless stated otherwise in the bidding documents, the Contract shall be for the whole works as
described in bidding documents, based on the percentage rate amount in the Bill of Quantities
submitted online by the bidder.
9.2. The bidder shall fill (in e-tender) in percentage rate above or below and total amount (both in
9.2. The bidder shall fill (in e-tender) in percentage rate above or below and total amount (both in
figures and words) for overall items of the Works provided in the Bill of Quantities
10. Bid Validity
10.1 Bids shall remain valid as per Instruction to Bidders (ITB) after that deadline date for bid
submission specified in Clause. The Employer as non-responsive shall reject a bid valid for a
shorter period.
10.2 In exceptional circumstances, prior to expiry of the original bid validity period, the Employer
may request the bidders to extend the period of validity for a specified additional period. The
request and the responses thereto shall be made in writing or by fax. A bidder may refuse the
request without forfeiting his bid security. A bidder agreeing to the request will not be required
or permitted to modify his bid but will be required to extend the validity of his Bid Security for
the period of the extension, and in compliance with Clause 2 ( Financial Terms & Conditions)
in all respects.
11. Format and Signing of Bid
11.1 The bidder shall prepare two copies of the documents comprising the bid as described in
Instructions to Bidders.
11.2 The bid shall be typed or written in indelible ink and shall be signed by a person or persons
duly authorized to sign on behalf of the bidder.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
11.3 The bid shall contain no alterations, omissions or additions, except those to comply with
instructions issued by the Employer, or as necessary to correct errors made by the bidder, in
which case the person or persons signing the bid shall initial all such corrections.
11.4 All witnesses and sureties shall be persons of status and probity and their full names,
Occupations and addresses shall be printed below their signatures.
12. Deadline for Submission of Bids
Bids must be received by the Employer at the address specified above not later than the time and
date specified in the IFB.
Any bid received by the Employer after the deadline for submission of bids will be returned
unopened to the bidder.
14. Signing of Agreement
At the same time that the Employer notifies the successful bidder that his bid has been accepted, the
Employer will direct him to submit the Performance Security and attend the Employer's office on a
date determined by the Employer for signing the Form of Agreement.
15. The selection process will lay high emphasis on the ability and competency of contractors to do
high quality work within the given time schedule.
16. The onus of providing, all necessary company / project related information, in appropriate
manner and medium, so as to demonstrate the competency of the bidder and to allow proper
evaluation, will rest entirely on the Bidder.
17. All clause shall be operative from the date of issue of work order and up to the expiry of original
and extended time limit.
18. Legal Condition:-
Corrupt or Fraudulent Practices
The Employer will reject a proposal for award if he determines that the Bidder recommended for
award has engaged in corrupt or fraudulent practices in competing for the contract in question.
The Employer will declare the firm ineligible, either indefinitely or for a stated period of time, to
be awarded a contract by AHMEDABAD MUNICIPAL CORPORATION if it at any time
determines that the firm has engaged in corrupt or fraudulent practices in competing for the
contract, or during execution.
“corrupt practice” means behavior on the part of officials in the public or private
sectors by which they improperly and unlawfully enrich themselves and/or those close
to them, or induce others to do so, by misusing the position in which they are placed,
and it includes the offering, giving, receiving, or soliciting of anything of value to
influence the action of any such official in the procurement process or in contract
“fraudulent practice” means a misrepresentation of facts in order to influence a
Procurement process or the execution of a contract to the detriment of the Borrower,
and includes collusive practice among bidders (prior to or after bid submission)
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
designed to establish bid prices at artificial non-competitive levels and to deprive the
Borrower of the benefits of free and open competition.
Municipal Commissioner reserves the rights to reduce/increase the scope of work and contract
without assigning any reason thereof.
If Ahmedabad Municipal Corporation is convinced that the Bidder has resorted to material
misrepresentation or provided fraudulent information / statement, the said Bidder will be liable
for disqualification / rejection at any stage.
Proof for fulfillment of eligibility criteria should be submitted along with Tender volume. If the
Tender volume is submitted without valid documents and without proof of eligibility criteria it
will be rejected.
Those who do not meet with the eligibility criteria need not submit the Tender document.
Tenders, which do not fulfill all or any of condition or are submitted incomplete in any respect or
are conditional tenders, will be rejected.
Contractor shall be responsible to obey all Labour Laws, Environmental and Safety Laws.(the
existing laws as well as framed from time to time). Any penalties laid due to violation of such
laws shall be directly deducted from the contractor's outstanding.
19. Administrative Conditions:-
Safety and Signage
Contractor has to arrange for the complete safety of the persons working for project, users of the
road i.e. public and vehicles also. All the arrangements of traffic drums, metal / fiber cones,
traffic blinkers, traffic signs as per design, safety tapes etc. to be arranged at site. Necessary
florescent marking on traffic signs to be provided so that it should be visible at night. During
night working hours safety in charge personnel shall be provided with florescent jackets.
The Contractor has to make all the necessary arrangements for making all the temporary
diversions for proper working at site including traffic signages, safety cones, traffic
blinkers, barricading tapes, red and green flags etc for making easy smooth and safe
conditions for the traffic. The Contractor shall and must provide above at his own cost.
Liaison with local authority for electrical connections for the AMC
The contractor is responsible for liaison with local authority for change in supply connection or
new connection on behalf of AMC. It includes filling the necessary application to power Supply
Company, follow up and getting the supply, filling the necessary test reports to the power supply
company. All official fees including security deposits and other expenses shall be of initially
paid by the contractor.
Contractor shall not sub-let the work without permission of the authority.
Seal and Signature of the Bidder Add.C.E.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
AMDAVAD MUNICIPAL CORPORATION
TERMS & CONDITION
(C) FINACIAL CONDITION
1. Cost and Currencies of Bidding:-
The bidder shall bear all costs associated with the preparation and submission of his bid and the
Employer will in no case be responsible or liable for those costs.
Currencies of Bid and Payment
The rates and the prices shall be quoted by the bidder entirely in Indian Rupees
All payments including advances, if any, shall be made in Indian Rupees.
2. Earnest Money Deposit:-
2.1 Bank guarantees (and other instruments having fixed validity) issued as surety for the bid shall
be valid for 28 days beyond the validity of the bid.
2.2 The EMD of the unsuccessful bidders, except for L1, L2 and L3 bidders, will be returned as
promptly as possible as but not later than 28 days after the expiration of the period of bid validity.
2.3 The EMD of the successful bidder, along with second and third lowest tenders, will be returned
when the bidder has furnished the required performance security and signed
2.4 Earnest Money Deposit may be forfeited
a) if the bidder withdraws his bid during the period of bid validity;
b) in the case of a successful bidder, if the bidder fails within the specified time limit to
i) Furnish the required Performance Security or
ii) Sign the Agreement.
3. (A) Security Deposit :-
Within 15 (Fifteen) days of the date of receipt of the Letter of Acceptance/Work Order, the
successful bidder shall deliver to the Employer, a Initial Security Deposit in the form of a Bank
Guarantee for an amount equivalent to 5% (Five percent) of the Contract Price .
The Security Deposit to be provided by the successful bidder in the form of a bank guarantee
as per format shall be issued from any Nationalized or RBI approved foreign bank having net
worth of more than Rs.500 Crore of Indian Operation and acceptable to Employer.
(C) Retention :-
a).Retention @ 2% of the value of work done will be deducted from each RA bill. It will be
released along with release of payment of Final Bill.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
4. Approved Bank: - As per AMC finance Department Circular No-10, Dt.01.06.2022
5. No advance for machinery or materials will be given.
6. Mobilization advance will not be given.
7. Quantities in B.O.Q. may vary up to any extent and contractor shall not claim any extra rate for
8. Penalty: - Compensation for (0.10%) zero point one percentage of Delay contract price for
uncompleted work per day subject to a maximum up to ten percentage of contract price or as
decided by Municipal Commissioner.
9. Tax, Duties on Materials
All charge on account of Octroi ,excise duties, terminal tax, sales tax. Service tax, VAT etc. on
material procurement or any other component for the works from any source shall be borne by
the contractors.
All duties, taxes, Service Tax and other levies payable by the Contractor under the Contract, or
for any other cause as of the date 28 days prior to the deadline for submission of the bids, shall
be included in the rates and prices and the total bid price submitted by the bidder and the
evaluation and comparison of bids by the Employer shall be made accordingly.
Seal and Signature of the Bidder Add.C.E.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
AHMEDABAD MUNICIPAL CORPORATION
Tender form B-1
FORM B-1 OF GUJARAT STATE ROADS AND BUILDING DEPARTMENT /
WATER RESOURCES DEPARTMENT may be referred.(only English version)
Note binding on the contractors
01. The terms and conditions of contract mentioned in the Clause no 1 to 77 of Form B-1 of
Gujarat State Road and Building Department / Water Resources Department shall be
applicable. Binding on the contractors unless specifically mentioned about it hereunder in
clause no.15 to
02. Please read “Ahmedabad Municipal Corporation “instead of “Government / Government of
Gujarat “wherever written.
03. Please read “ Ahmedabad Municipal Corporation “ instead of “ Government of Gujarat State
Public Works Department/Public Works Department/ Government “ wherever written.
04. Please read “City Engineer" instead of “Superintending Engineer “or Executive Engineer
wherever written.
05. “Ahmedabad Municipal Corporation “herein called as “AMC “
06. “Governor for the state of Gujarat “shall be read as “Municipal Commissioner / Ahmedabad
Municipal Corporation”
07. The contents / details / information mentioned in the relevant point under the heading
08. The contents / details / information mentioned in the relevant point under the heading
“NOTICE INVITING TENDERS” may be read as under-
Point No 1 may be read as: Tenders are invited by Municipal Commissioner ,AMC for the work of
Laying of Systematic drainage line at Modi Compound,Radheshyam ni chali And Diffrent
places And Different Chalis OF Ghatak-3 in Saijpur Ward of North-Zone..
OF AHMEDABAD CITY Point No.3 : The class of contractor shall be as per
Memorandum of Works in Brief.
The Cl. No. 14.2, 21, 38, 60, 69, 73, 74, 75 shall be read as deleted.
09. The contents / details / information mentioned in the relevant point under the heading
“ADDITIONAL INSTRUCTIONS TO PERSONS TENDERING” shall be read as
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
Point No .2.1 may be read as per the details mentioned in the tender notice
10. DECLARATION FORM & DECLARATION CERTIFICATE are given separately in
Tender Document and it shall be applicable.
11. TENDER FOR WORKS to be read as given in tender documents / Tender Form.
12. MEMORANDUM to be read as per the details given in tender notice
13. The contents / details / information mentioned in the following CLAUSE under the
heading “TERMS AND CONDITION OF CONTRACT” shall be read as under-
Clause 1: Security Deposit: to be read as per the details given separately elsewhere
in the tender documents.
Clause 2: Liquidated Damages for delay: to be read as per the details given
separately elsewhere in the tender documents.
14. Clause No. 14.2, 21, 38, 60, 69, 73, 74, 75 shall be read as deleted in the form B-1.
Seal and Signature of the Bidder Add.C.E.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
AMDAVAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL CONDITION
1. After sanction of tender a Letter of Intent shall be issued to contractor and in response to
that letter, contractor shall have to arrange for Security Deposit within 15 days. If S.D is
given within 10days of issuance of Letter of Intent, time limit shall be counted from that
date. If S.D is given after 15 days of issuance of letter of intent, contractor shall be finned
Rs. 200/- per day of delay and shall be deducted from contractor’s bill. In this case time
limit shall start latest by the 10th day of letter of intent, Security Deposit of 5% of tender
amount shall be deposited by pay order, demand draft, cheque of nationalized bank
/scheduled bank by pay order, demand draft, cheque of nationalized bank/scheduled bank
only. Contractor shall have to sign contract paper with AMC.
2. In case of earnest money cheque bounce back, contractor’s tender shall treated as
cancelled and the contractor shall not be given any tender, offer, quotation work in AMC for
3. Conditional tender shall not be accepted
4. Tender validity period is 120 days from the date of opening of tender
5. Muni. Commissioner shall have right to accept, reject the tender as well as the rate at
which tender to be accepted and awarded.
6. Specification of tender items shall be as per PWD manual in general/AMC’s norms and B-1
form conditions shall be applicable. In case of controversy, Add.C.E’s decision shall be final.
7. Contractor shall have to deposit Earnest Money deposit with tender.
8. Work shall be allotted as per contractors registration class.
9. Contractor shall have to work in such a system that there shall be no damage to any service
line of electric, telephone, gas, any type of service cable ,drainage or water lines etc. In case
of damage to service line, the whole responsibility of accident shall be on contractor’s
shoulder. It will be responsibility of contractor to safe guard the labours against any
accident or damage of lives. In case of police complain, Contractor shall be held responsible
for negligence. In case of soil /land collapse, contractor shall be held responsible for not
supporting the soil suffering with strutting, shuttering Contractor shall safeguard the labour
before allowing the labour to enter in excavated or other site. In case of accident to labours,
contractor shall be held responsible for police complain against him. AMC’s staff shall be
responsible for any accident at the site of the work.
10. Contractor shall take insurance of his all labour. and supervisory staff
11. Only registered contractor shall quote the tender , If the contractor is registered with
government then they shall have to apply to registration in AMC within 90 days from the
date of work order.
12. AMC’S general condition and Form -B-1 shall be binding to the contractor B-1 Form is put up
on AMC’s web site.
13. Payment of running bill , final bill shall be as per policy of AMC in force at time of payment
14. Any time of litigation shall be in court of AMDAVAD city jurisdiction only.
15. As per site conditions/requirement of site, there shall be increase or decrease in tender
item quantities. In such case contractor shall not have right to any price rise. In case of
decrease in any tender item quantity, contractor shall not ask for compensation.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
16. If any construction material brought to site by contractor , is not as per specification, or
any inferior quality material brought to site, then such rejected material shall be removed
from the site within 24 hours, otherwise AMC can throw away such material at any place
and recover the amount for such removal work from contractor bill. In this case contractor
shall not be entitled for compensation.
17. Cost of testing of material shall be done by the contractor. He shall provide vehicle for
taking material/staff from site to testing laboratory/ manufacturing site and contractor shall
be bear the cost of transportation of staff and material.
18. Contractor shall work as per labour Act. Contractor shall not be given any payment if
labour act rules are not followed or insurance of labour is not taken for work
19. Contractor shall deposit the material on site in such a way that it should not become
obstruction to any one in any way
20. All type of taxes(e.g. sales tax, surcharge, vat etc) to be by the contractor.
21. If asked by AMC Engineering staff, contractor shall take photograph of site of work/before
start of work, during work and after the completion of work, with digital camera and
deposit to AMC office or transfer photograph from camera to AMC computer. No additional
cost shall be paid.
22. In case of cancellation/rejection of tender, contractor shall not be entitled for any
compensation Or right
23. In case of extra item, rate shall be taken from SOR of the year of tender preparation. If
item is not available in SOR, then market rate shall be derived by the Eng. dept by rate
analysis. Contractor shall not ask for the rates as per his rate analysis. This should be clearly
understood and taken in to consideration while quoting the tender by the contractor.
24. During execution of work, contractor shall take safety measures like protection by ropes,
drums, danger sign boards, plastic strips, bamboos, wooden poles etc as per requirement &
instruction of Engg.- in- charge. In case of accident due to lack of protection, contractor
shall responsible for police complains, compensation etc AMC staff shall not be held
responsible for contractors negligency.
25. If instructed by AMC officials, contractor shall have to keep daily progress register and get
is signed by Ass. city Engineer. Contractor shall maintain record of daily No. of labours,
employed, work done, rectification work carried out by contractor after Eng.-in-charge
inspection & the compliance of the same. If such rectification work is not done by
contractor within 24 days the contractor shall be finned Rs. 250/- day of delay & shall be
recovered from the contractors bill
26. Contractor is not entitled for any type of compensation or right for the cancellation of
tender or tender items by any means.
27. If work is not completed within specified time limit penalty shall be recovered from bills as
per tender condition.
28. Deduction from bills shall be done as per rules prevailing or the rules which shall come in to
force, by State or Central Govt.
29. 1% amount shall be deducted for labour welfare fund as per state Govt order.
30. Quantity in item is tentative. It is likely to be change.(increase or decrease) as per site
requirement during execution of work.
31. All above conditions shall over rule the conditions given in Form B-1
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
32. Contractor shall have to register the work as per labour act & as per building safety act,
1906 with ,Dy.Director building safety act, Shram bhavan, 5th floor labour commissioner
office, Khanpur, AMDAVAD.
33. Befor quoting tender, contractor shall have to take complete information of the work after
seeing site and from the concerned Asst. Engineer or Asst. city engineer.
34. In case of the bank detail are not given then EMD return procedure shall be delayed.
35. Before quoting the tender contractor should know that, he has seen the site & understood
the item of works, site conditions. He should be in a position to provide labours at the time
of festivals like Holi, Diwali, Navratri, Marriage season, rainy season or any other time of the
year Contractor can not say that he has no labours due to festivals.
36. In case progress is delayed, contractor shall be penalized 0.10% of Tender amount per day
for work done after time limit, maximum up to 10% for remaining value of work.
37. As per Cicular No- 41 Dt.09.11.2021 E Form Certificate Required.
38. Contractor has to follow Finance Circular NO-38, Date:- 21.11.2022
39. As per AMC’s Finance department Crcular No.38, Dt.21/11/022 and approval of
competent authority, rate of all the items are taken without GST and prevailing GST
will be payable Seperately..
40. All the relevant prevailing AMC circulars/ its time to time revisions are applicable for
this work and all the bidders are bound to follow the same, so the bidder must check
before applying for the tender.
I have read all above conditions carefully and ready to work as per above conditions.
Seal and Signature of the Bidder Add.C.E.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
ybœtJtœ BgwÂlÂmvj ftuvtuohuNl
bntldh muJtmœl- W•th Ítul
y.Bgw.ftu. W•th Ítul Ítulj ytuVem,
W•th Ítul xuLzh ltuxem lk- 21/2023-24 btk ytJhe juJtguj ftbtule ÂJd<tu
1. Wvhtuf< xuLzhtu su <u Jdobtk btLg hSMx[uNl ^htJ<t ftuLx[tfxh©eytuyu ChJt.
2. xuLzhle rlg< xuLzh Ve <&t R.yub.ze. ck^ fJhbtkk Wvh lt mhltbu ÁcÁ / hSMxh yu.ze./ MvezvtuMx/ fwhegh&e rlg<
mbgbtk btufjJtlt hnuNu.
3. ftuLx[tfxh©eytuyu xuLzhle mt&u BGþrlrmvj btLg hSMx[uNlle/ dJobuLx hSMx[uNlle ftuve, (xuLzh ftuve <&t yLg vwhtJt mt&u)
yawf mtbuj fhJtle hnuNu ylu fJh Wvh xuLzh lkch <&t ftuLxufx lkch sYh MvÐ œNtoJJtltu hnuNu.ck^ fhJh Wvh xuLzh
ltuxem lkch, xuLzh lkch, ftblwk ltb <&t, ftuLx[[tfxhle mkM&tlwk ltb <&t ftuLxufx lkc< yJ~g œNtoJJtlt hnuNu. su
ftuLx[tfxh©eytuyu hSMx[uNl heLgw fhtJuj l ntug <u ftuLx[tfxh©eyu xuLzh ChJt lnek.
4. ftuLx[tfxhtuyu xuuLzhbt cukfl wltb, Ft<t lkch, btRfh lkch ylu mhltb wMvÐ yûthtubtk jFJw.
5. xuLzh Ve vu ytuzoh / zebtLz z[tVx&e aqfJJtlehnuNu. œhuf xuLzh œeX yjd xuLzh xuLzhVe ChJtle hnuNu.
6. ytuAe hfble xuLzh Ve, R.yub.ze. fu xuLzh Ve, R.yub.ze. ÂJltlt xuLzhtu hœct<j (fuLmj) dKtNu.
7. xuLzh mt&u BþfJtbtk ytJ<e yluoMxble, xuLzhle hfblt 1% «btKu cukf duhLxe / zebtLz z[tVx / vu ytuzoh / jtufj btRfh auf&e
s MJefthJtbtk ytJNu. œhuf xuLzh œeX yjd R.yub.ze. ChJtle hnuNu. R.yub.ze. hfb Yt. yuf fhtuz mwDele ykœtS<
hfblt ftb btxu htufzt, jtufj btRfh auf, rzbtLz z[tVx, vu ytuzoh fu cukf duhkxelt MJYvbtk <&t Yt. yuf fhtuz&e Wvhle
ykœtS< hfblt ftb btxu R.yub.ze.le hfb btºt rzbtLz z[tVx, vu ytuzoh fu ckuf duhkxelt MJYvbtk ytvJtle hnuNu.
8. cukf duhuLxe btºt ybœtJtœ Nnuhle s MJefthJtbtk ytJNu.
9. xuLzh Ve <&t R.yub.ze.le hfblt ze.ze./ aufle vtA¤ ftuLx[tfxh©eyu vtu<tle mkM&tlwk ltb <&t btuctRj lkch yJ~g
10. Nh<e xuLzhtu hœ ct<j dKtNu.
11. stu xuLzhbtk MvÐ WÕjuF fhtguj ntug <tu atubtmtlu fthKu Ft<tfeg MËalt yLJgu ßgthu ßgthu ftb ck^ htFJtLþk &tg <u mbglu
ftble BþÆ<btk bshu ytvJtbtk ytJNu. vhkðþ yt yLJgu ftuE CtJ J^thtu ytvJtbtk ytJNu lne. sule ltuk^ xuLzhhu juJe.
12. xuuLzhtu ftuEvK fthK ytÃgt rmJtg MJefthJt fu lrnk MJefthJt <ule mkÃËKo m•tt BGþrlrmvj frbNlh©ele hnuNu.
13. xuLzhbtk stu ftuR mwDtht JDtht ntug <tu <u ykd xuLzh Ch<t vnujt AuÕju œJmu rlg< JucmtRx y&Jt fauheyu sYhe <vtm fhelu
s xuLzh btufjJw.
14. mefgtuhexe zevtuÍex/ vVtuboLm duhuLxele hfb Yt. yuf fhtuz mwDele ykœtS< hfblt ftb btxu htufzt, jtufj btRfh auf, rzbtLz
z[tVx, vu ytuzoh fu cukf duhkxelt MJYvbtk <&t Yt. yuf fhtuz&e Wvhle ykœtS< hfblt ftb btxu mefgtuhexe zevtuÍex/ vhVtuboLm
duhkxele hfb btºt rzbtLz z[tVx, vu ytuzoh fu ckufduhkxelt MJYvbtk ytvJtle hnuNu.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
15. ytuljtRl yul-«tufgwh JucmtRx vh&e ChJtlt &<t xuLzhbtk ftuLx[tfxh/ yusLmeyu xuLzhle ntzo ftuvebtk CtJ Cgto Jdhle
mne mefft fhe mcbex fhJtle hnuNu. stu <ubtk CtJ Chuj nNu <tu <uJt xuLzh hœ fhJtbtk ytJNu.
16. mœh xuLzhle ytRxbtult CtJtu ltKt Ft<tlt mhfgwjh lk.38, <t.21/11/2022 <&t mûtb m•ttle b¤uj bkswhe bwsc
GST rmJtg dKºtebtk juJtbt ytJuj <&t «Jo<btl rlgb bwsc GST awfJJt vtºt &Nu su&e <btb cezomu <u bwsc dK<he
fhe xuLzhtu ChJtlt hnuNu.
17. mœh xuLzh yk<od<lt ftb mkjøl y.Bgw.ftu.btk v{Jo<btl <btb rlgbtu/mhfgwjhtu jtdw vzNu <ubs JF<tu JF< <h
mw^thtytu vK jtdw vzNu. sule ltuk^ jR xuLzhtu ChJtlt hnuNu.
18. ybœtJtœ Bgwrlrmvj frbNlh©ele <t.16.02.23 le bkswhe bwsc “ «J<obtl S.yum.xe. J^thtltu awfJJtbtk ytJNu”
zebtLz z[tVx / auf “Bgwrlrmvj frb§h©e, ybœtJtœ” lt ltbltu fZtJJtu.
xuLzhhle mne ylu rm¬tu zu.mexe Rsluh-5(W.Ítul)
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
yufhthlwk Vtubo
1) nwk/ybu yt&e yufhth fhwk Awk/fheyu Aeyu fu yt xuLzh hsw fh<tkk vnujtkk buk/ybu M&¤le bwjtft< je^e
Au ylu ftblu jd<t btjmtbtl, bswhe ylu ceS ctc<tulu jd<e M&trlf vrhrM&r<le ò<-
btne<e bu¤Je Au.
2) nwk/ybu yt&e yufhth fhwk Awk/fheyu Aeyu fu yt ftuLx[tfxhtule Nh<tu rJd<tu ylu xuLzhlu jd<t
œM<tJustu ft¤SvwJof yÇgtm fgtuo Au ylu <u bwsc <ultu ybj fhJt mkkb< Awk/Aeyu.
ftuLx[tfxhle mne ylu rmfft
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
AMDAVAD MUNICIPAL CORPORATION
Section II - CONDITIONS OF PARTICULAR APPLICATION
1. The selection process will lay high emphasis on the ability and competency of contractors to do
high quality work within the given time schedule.
2. The onus of providing, all necessary company / project related information, in appropriate
manner and medium, so as to demonstrate the competency of the bidder and to allow proper
evaluation, will rest entirely on the Bidder.
3. All information has to be typed or hand written legibly. All pages of the Bid have to be Initialed
4. ALL INFORMATION HAS TO BE SUBMITTED IN THE PRESCRIBED FORMAT ONLY.
Projects for which incomplete information has been provided will not be considered for
evaluation. The Bidder may attach separate sheets if so required. However, the final bound
document submitted, has to be submitted in vertical A4 size (210 mm X 297 mm) except Vol. V.
5. The scope of work, project description mentioned in the document is indicative and is likely to
change during detail design. Project brief, along-with the schematic drawings and colored
photographs, is provided to assist the bidder in understanding the fundamental and specific
requirements of the project.
6. Conditional tenders will not be accepted.
7. AMC’s decision for selection or rejection of the offers shall be final and binding to all.
8. Bidder should provide information as mentioned in the prescribed forms.
Information other than that related to this work shall not be considered for evaluation.
9. If AMDAVAD Municipal Corporation is convinced that the Bidder has resorted to material
misrepresentation or provided fraudulent information / statement, the said Bidder will be liable
for disqualification / rejection at any stage.
10. Proof for fulfillment of eligibility criteria should be submitted along with Tender volume. If the
Tender volume is submitted without valid documents and without proof of eligibility criteria
will be rejected.
11. Those who do not meet with the eligibility criteria need not submit the Tender document.
12. Tenders, which do not fulfill all or any of condition or are submitted incomplete in any respect
or are conditional tenders, will be rejected.
13. Municipal Commissioner reserves the rights to reduce/ increase the scope of work and contract
without assigning any reason thereof.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
14. DEFECTS: For completion of any work/ part thereof, contractor will be required to request in
writing, to get completion certificate from Additional City Engineer . Date of completion for
start of defect liability period will be considered as the date mentioned in the completion
The contractor shall be required to make good all the damages / defects identified and
conveyed to him, during the entire defect liability period. The method and time limit of
rectification will be decided by the Engineer in charge. If he fails to carry out rectification as
per the instructions, the same will be carried out at his cost and it shall be recovered from the
amount retained.
15. All the material and other test expenses shall be borne by the contractor. Contractor shall have
to provide vehicle and other communication facilities to visit plant and testing laboratory.
16. Contractor shall have to make his own arrangements for water and electricity for the purpose of
construction work at site at his own expense.
17. If the contractor fails to execute the said works within prescribed time limit, the said work will
be carried out at the risk and cost by other contractors with 20 % supervision charges as may be
decided by the Additional City Engineer.
18. Safety and Signage
Contactor has to arrange for the complete safety of the persons working for project, users of
the road i.e. public and vehicles also. All the arrangements of traffic drums, metal / fiber cones,
traffic blinkers, traffic signs as per design, safety tapes etc. to be arranged at site. Necessary
florescent marking on traffic signs to be provided so that it should be visible at night. During
night working hours safety in charge personnel shall be provided with florescent jackets.
The Contractor has to make all the necessary arrangements for making all the temporary
diversions for proper working at site including traffic signage, safety cones, traffic blinkers,
barricading tapes, red and green flags/lights etc for making easy smooth and safe conditions
for the traffic. The Contractor shall and must provide above at his own cost. If the Contractor
fails to comply this clause, Rs. 500/- per day shall be recovered from his bill.
19. Tax, Duties on Materials
All charge on account of Octroi, excise duties, terminal tax, sales tax. Service tax, VAT,
govt.duties etc. on material procurement or any other component for the works from any
source shall be borne by the contractors.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
20. Submission of project schedule:
Contractor has to submit the following documents along with the qualification data of the
tender failing in which shall lead to rejection of the tender.
Contractor shall submit the detailed Project schedule showing break up for the various tasks to
be performed in order of their occurrence during the project in Microsoft Project/Prima Vera
21. For Flakiness and Elongation Index norms adopted by AMC shall be made applicable.
22. For non-bituminous, bituminous and concrete works, the black trap aggregates of required size
shall be procured from quarry situated in Sevaliya / Timba region or equivalent. Prior approval
of source/ material by Additional City Engineer shall be required.
23. Contractor shall be responsible to obey all Labour Laws, Environmental and Safety Laws.(the existing
laws as well as framed from time to time). Any penalties laid due to violation of such laws shall be
directly deducted from the contractor's outstanding. .
24. As per St. Committee's resolution 0.5% testing charges shall be deducted from each R.A.Bill and
the amount of actual Testing charges shall be adjusted in the final bill.
25. Special Clause: As per construction works welfare cess Act – 1996 non-refundable one percent of
tender amount shall be deducted against works welfare cess.
Seal and Signature of the Bidder Add.C.E.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
AMDAVAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL SPECIFICATION
Time limit for the work shall be 09 Months after the order to start the works. Progress of work should be in proportion to
The contractor shall be remain responsible for Workmen’s compensation if any accident. The contractor shall arrange for
barricading at night and arrangement of Pagi at night to direct the traffic. He shall be responsible for any damage to public.
If any incident happen, during the execution of work. In case of dispute for unseen or overlooked items the decision of the
Dy. City Engineer shall be final. The contractor shall have to give site clean of all rubbish during the work and at the time of
completion of work and hand over the site with final finishing of the work as directed. All the rejected materials shall be
removed from site within 24 hours by contractor at this risk and cost. Debris shall have to cart daily from site.
For mixing mortar either for masonry or for plaster or for any other purpose contractor shall have to prepare through of
bigger size and mix the mortar in the required proportion. In on case he shall be allowed to mix the mortar either on
floor or any finished surfaces. The contractor shall have to make his own arrangement for water required for the work.
If any extra item crops up during the progress of work the same shall be carried out by the contractor and he shall be paid
at the rate fixed by Add.C.E. as per the rate analysis based on latest SOR or if item is not available in SOR than based on
current market rates. In case of extra item decision of Add. City Engg. shall remain final regarding rate.
If in the interest of the Corporation it is necessary to change either any site or the design of the propose work the
contractor shall carry out the same at his quoted rates without charges any extra and the contractor will have to carry out
the works and he will be paid at the rate quoted by him. No claim for extra rate for subsequent changes in site and design is
The cubical contents of the cement bag shall be taken as 1-20 cft. Per bag and the contractors shall have to prepare the
measures boxes according to this measure.
Octroi exemption passes shall not be given for any materials required for the work. Contractor will be fully responsible for
compliance of the various provisions under contract Act. 1970 and the Rules framed the to under.
The tender for the work shall remain open for a period (120) days from the date of opening of the tenders for this work and
that the tenderer shall not be allowed to withdraw on modify the offer on his own during the period. If any tenderer
withdraw or makes any modifications or addition in the terms and conditions of his tender not acceptable to the Municipal
Corporation the Municipal Corporation shall without prejudice to any right or remedy be at liberty to forfeit in full the said
earnest money and black list the contractor.
If the work is not carried out within the specified time limit. from the date of order to start the work the penalty of Rs.- (As
per Form - B1) per day of delay shall be recovered from the immediate bills payable to the contractor. Contractor has to
make his own arrangement for procurement of steel and cement.
Contractors should note the following conditions carefully:-
1. Conditional tender shall not be accepted.
2. All tenders are to be submitted in duplicate without which the tenders are liable to be rejected.
3. In case of tender downloaded from website, tender fee & EMD should be submitted in form of demand draft or in cash.
4. Condition of Form - B1 Standard Specification of material & code of practice will be applicable. Form B1 can be is
available in website. Specification shall be as per ' R& B Dept. - Govt. of Gujarat booklets of Building Works & and Road
Works Specifications published by Gujarat Book Depot, Sector-21. Gandhinagar.
CONTRACTOR'S SIGNATURE Add.C.E.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
AMDAVAD MUNICLPAL CORPORATION
MAHANAGAR SEVA SADAN
Clause : 1 Contractor shall not employ any child having age 5 to 15 years as it is prohibited by Child Labour
Prohibition and Regulation Act 1986. Hon'ble Supreme Court has given certain guide lines and as per the
guide lines. If child labour is employed on the site work, the contractor shall have to deposit Rs.
(Rupees Tw enty thousand only) in the child labour welfare fund. If the employer refuses to deposit then
action will be taken for contempt of Supreme Court Judgement and also will be prosecuted by concerned
authority. Because of the breach of any provision of child labour prohibition and regulation Act 1986 by the
Contractor & Municipal Corporation becomes liable to pay any amount then the Municipal Corporation shall
recover the said amount from the contractor.
Clause : 2 The Standing Committee has decided to deduct 1/2% amount from each running bill as per its
Reso. No. 1783 Date 06--02-97, but the Municipal Corporation Board has recently decided that the actual
testing charge is taken and the remaining amount is refundable at the time of final bill (As per Muni. Board
Reso. No. 123 dated 25-02-97)
Clause : 3 Contractor has to follow prevailing Labour act and has to maintain labour register acordingly,and
has to follow other govt.rules.
Clause : 4 Quantity taken in tender are tentative and may differ as per execution of work. No claim shall be
entertain regarding QUANTITIES.
* MODIFICATION OF DOCUMENTS
Modification of specifications and correction/corrigendum in respect of the work if required will be made by
A.M.C. The same shall be placed on A.M.C website which may be downloaded by the tendrers enclosed
along with the tender duly signed. These shall form a part of tender. The tenderer shall not add or amend
the text of any of the documents except in so far as may be necessary to comply with any addendum.
* ADDENDAUM/CORRIGENDUM .
Addendum or corrigendum conveying any change or correction in respect of the work shall form the part of
the contract documents. The full consideration shall be given to such addendum or corrigendum or
correction before submission tender duly filled in by the contractor. Therefore, the contractor shall have to
watch such addendum or corrigendum or correction published by A.M.C through its website
www.egovamc.com., https://tender.nprocure.com/ Tenderes shall verify the number of addendum issued
and enclose the same with the tender documents,failing which the tender shall be liable for rejection and no
any complaint in respect to this shall be entertained under any circumstances.
CONTRACTOR'S SIGNATURE Add.C.E.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
TECHNICAL SPECIFICATIONS
SPECIFICATIONS OF MATERIALS
1.1. Water shall not be salty or brackish and shall be clean, reasonably clear and free
objectionable quantities of silt and traces of oil and injurious alkalis, salts, organic matter and
other deleterious material which will either weaken the mortar or concrete or cause
efflorescence or attack the steel in R.C.C Container for transport, storage and handling of
water shall be clean. Water shall conform to the standards specified in I.S.456-1978.
1.2. If required by the Engineer-in-charge it shall be tested by comparison with distilled water.
Comparison shall be made by means of standard cement tests for soundness, time of setting
and mortar strength as specified in I.S.269-1976. Any indication of unsoundness, change in
time of setting by 30 minutes or more or decrease of more than 10 per cent in strength of
mortar prepared with water sample when compared with the results obtained with mortar
prepared with distilled water shall be sufficient cause for rejection of water under test.
1.3. Water for curing mortar, concrete or masonry should not be too acidic or too alkaline. It shall
be free of elements which significantly affect the hydration reaction or otherwise interfere
with the hardening of concrete during curing or those which produce objectionable stains or
other unsightly deposits on concrete or mortar surfaces.
1.4. Hard and bitter water shall not be used for curing.
1.5. Portable water will be generally found suitable for curing mortar or concrete.
3.1 Cement shall be ordinary Portland slag cement as per I.S. 269-1976 or Portland slag cement
as per I.S. 455-1976.
M-4. White Cement :
4.1 The white cement shall conform to I.S. 80412-E
M-5. Coloured Cement:
5.1 Coloured cement shall be with white or gray Portland cement as specified in the item of the
5.2 The pigments used for coloured cement shall be of approved quality and shall not exceed
10% of cement used in the Mix. The mixture of pigment shall be properly grounded to have a
uniform colour and shade. The pigments shall have such properties to provide for durability
under exposure to sunlight and weather.
5.3 The pigment shall have the property such that it is neither by the cement nor detrimental to it.
6.1. Sand shall be natural sand, clean, well graded, hard strong durable and gritty particle free
from injurious amounts of dust clay, kankar nodules, soft or flaky particles shale, alkali, salts
organic matter, loam, mica or another deleterious substance and shall be got approved from
the Engineer-in-charge. The sand shall not contain more than 8 percent of silt as determined
by field test. If necessary the sand shall be washed to make it clean.
6.2. Coarse Sand : The fineness modulus of coarse sand shall not be less than 2.5 and shall not
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
The sieve analysis of coarse shall be as under:
I.S.Sieve Percentage by I.S.Sieve Percentage by
Designation Passing Sieve Designation Passing Sieve
6.3 Fine Sand:The fineness modulus shall not exceed 1.0. The sieve analysis of fine sand shall
I.S.Sieve Percentage by I.S.Sieve Percentage by
Designation Passing Sieve Designation Passing Sieve
M-8. Stone Grit:
8.1. Grit shall consist of crushed or broken stone and be hard strong, dense, durable, clean, of
proper gradation and free from skin or coating likely to prevent adhesion of mortar Grit shall
generally be cubical in shape and as far as possible flaky elongated pieces shall be avoided. It
shall generally comply with the provisions of I.S. 383-1970. Unless special stone of
particular quarries is mentioned, grit shall be obtained from the best black trap or equivalent
hard stone as approved by the Engineer-in-charge. The grit shall have no deleterious reaction
8.2. The grit shall conform to the following gradation as per sieve analysis:
I.S.Sieve Percentage by I.S.Sieve Percentage by
Designation through Sieve Designation through Sieve
8.3. The crushing strength of grit will be such as to allow the concrete in which it is used to used
to built up the specified strength of concrete.
8.4. The necessary tests for grit shall carried out as per the requirements of I.S.2386(Parts I to
VII) 1963, as per instructions of the Engineer-in-charge. The necessity of test will be decided
by the Engineer-in-charge. The necessity of test will be decided by the Engineer-in-charge.
Sand: Sand Shall conform to specification M-6.
10.1. Proportion of Mix : 10.2.1. Mortar shall consist of such proportions of slaked lime and sand
as may be specified in the item. The slaked lime and sand be measured by volume.
10.2. Preparation of Mortar :
10.3.1. Lime mortar shall be prepared by wet process as per I.S. 1625-1971. Power driven mill shall
be used for preparation of lime mortar. The slaked lime shall be placed in the mill in an even
layer and ground for the 180 revolutions with a sufficient water. Water shall be added as
required during grinding (care being taken not to add more water) that will bring the mixed
material to a consistency of stiff paste. Thoroughly wetted sand shall then be added evenly
and the mixture ground for another 180 revolutions.
10.3. Storage : 10.4.1 Mortar shall always be kept damp, protected form sum and rain till used up
covering it by tarpaulin or open sheds.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
10.5. Use : 10.5.1 All mortar shall be used as soon as possible after grinding it should be used on
the day on which it is prepared. But in no case mortar made earlier than 36 hours shall be
permitted for use.
CONTRACTOR'S SIGN AND SEAL.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
TECHNICAL SPECIFICATIONS
Name Of Work:- Laying of Systematic drainage line at Modi Compound,Radheshyam ni chali
And Diffrent places And Different Chalis OF Ghatak-3 in Saijpur Ward of North-Zone.
Item No. 1 Excavation for pipe line trenches for water supply, sewerage lne, manhole etc. all
with shoring and struting if required as per required gradient and line including safety
provisions using site rails and stacking excavated stuff including up to all required lead
cleaning the site etc complete for all lifts and strata as specified.
In all sorts of soil and soft murrum
0 to 1.5 meter depth.
1.5 to 3 meter depth.
3.00 mt to 4.50 mt depth
4.50 mt to 6.00 mt depth
The rate shall be for a unit of cubic meter.
Item No.2 Extra rate over item of excavation of earth if excavation is to be done in wet
condition without resorting to pumping but incl. of bailing out of water.
The rate shall be for a unit of cubic meter.
Item No.3 Extra rate over item of excavation of earth for excavation of asphalt pavement /
RCC of thickness up to 0.20 meter including demolishing the asphalt carpet, metal,
soiling/cutting Reinforcement etc.comp. with stacking the material as directed.
up to 0.20 meter thickness (By Manual)
Up to 0.30 meter (By any type of Breaker Machine or R.C.C.Cutter machine including cost of
operator, fuel, & transportation etc complete.
0.30 meter & above (By any type of Breaker Machine or R.C.C.Cutter machine including cost of
operator, fuel, & transportation etc complete.
The rate shall be for a unit of smt meter.
Item No.4 Refilling the pipeline trencheds incl. ramming, watering, consolodating desposal of
surplus stuff as directed within a radius of 3 km.
Refilling as directed .
'--do-- with selected soil brought from outside including all lead
The rate shall be for a unit of cubic meter.
Item No.05 Conveyance charge of earth, lime, murrum, building rubbish, manure, garbage,
sludge, excavated rock, fly ash, aggregates of any kind executed outside the road site.
Rate also includes spreading & levelling etc complete. Internal conveyance above 50 mt
done within the work site is not payable.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
Conveyance charge of earth lime murrum, building rubbish, manu garbage, sludge,
excavated rock fly ash aggregates of any kind etc. comp, lead up to 10 km.
All the surplus earth etc. shall be carried away immediately from the site of work to a place
within 10km. distance or as directed and ordered by the Engineer, so as not to cause any
inconvenience to the public traffic finding which in view of public safety and traffic
convenience. The corporation shall carry out the work by any other agency at the contractor’s
risk and cost. If the instructions are not completed within 7 days from the date of order to cart
the surplus materials and clear the site, the said work shall be carried out by the Municipal
Corporation at the risk and cost of the contractor and no claim or dispute shall be entertained
in this respect.
If the filling in trenches after settlement of the earth filling in trenches is to be done and the
same shall be carried out by the contractor without asking any extra rate. The contractor shall
have to cart the surplus earth after the trenches we will watered and refilled with the sand.
The rate of carting including carting of brickbats, metal, rubble vegetable and garbage, if
necessary to clear the road surface.
Mode of payment shall be in Cmt. basis.
Item No. 6 Providing and supplying ISI marked only standard length Stonewate pipes in
standard lengths of following class and diameter including all taxes, insurance,
transportiton, fright charges, octroi, inspection charges, loading, unloading, conveyance
to departmental stores, stacking etc. complete (IS - 651 - 1989)
The rate shall be per meter basis.
Lowering, laying and jointing stone ware pipes of following diameters with cement
joints in C.M.1:1 proportion in proper position , grade and alignment at all level as
directed by Engineer-in- charge including conveyance from stone to site of work,
Jointing material etc.comp.
The rate shall be per meter basis.
Providing And Jointing Stoneware Pipes Incl. Excavation Up to 2 Mt. Refilling,
Transporting Pipes To Work Site, Unloading, Lowering In Trench, jointing material
Such As Cement, sand, Hemp Bitumen As Directed, Incl. Watering The Trenches Spreading
And Carting away Of Surplus material as directed by engineer in charge.
The pipe shall be of best quality stoneware pipes. The pipes shall be of approved quality
make and shall be brought on site after approval. (The pipes shall be laid in grade as per
instruction.)Contractor shall have to procure bills for standard pipes.
The joints shall be done in cement proportion 1:1 (1 part cement: 1 part sand) using spun
yarn dipped in hot asphalt and caulking tools. The hydraulic pressure test shall be given to
the contractor for testing pipes and jointing. No trenches shall be filled without the approval
of the engineer in charge.
The rate of the pipe work are including of excavation and refilling. The excavation etc. shall
be done as follows:
Excavation: The sewer trench shall be excavated to the alignment and gradient shown on the
plan and section. In all sorts of soil including old masonary, asphalt roads and wet
excavation. The sewer excavation shall be commenced at the down stream end of the sewer
and be continued up to the gradient as directed. The trench shall not open more than 60 mts.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
in advance of the completed sewer only when directed by the engineer in charge looking to
the progress of the work in obtaining the formation of the bottom of the trenches the usual
methods of using sign rails and boning roads shall be adopted during the whole of the
process. The centre line of uniform height shall be carried clearly on each rail. The depth of
the excavation and invert of the sewer shall be checked by means of boning road of approved
length and also by straight edge. The bed of the trench shall be well rammed before starting
laying of sewer lines and cement concrete and masonary work.
Where trenches are deep in bad grounds the sides shall be supported by suitable timbering of
shorting work looking to the nature of the soil near big or important structure, the sides of the
trenches shall be closely and securely timbered, if any settlement of the buildings in
anticipated the timbering shall be left in the ground. The various materials excavated shall be
separately stacked so that in refilling that may be relayed on the same order as before and
least possible damage shall be done carpet on the public roads and private properties. Surface
covering consisting of asphalt carpet shall be kept on side and preserved for reinstatement.
The excavated earth shall not be heaped near the trenches so as to caused unnecessary
obstruction along the trenches during inspection trenches etc. shall be tunneled under only as
necessary. The side of the trenches shall be nearly vertical and plumb and red light shall be
placed at each end at intervals and instructions and further protected by rope fence.
Necessary caution boards shall also be created and as directed by the engineer in charge.
Wherever possible material excavated from the trenches of whatever kind shall not be placed
nearer than three meters from the outer edge of the excavated trenches. The utmost shall have
to be taken in refilling the trenches so that no damage may be done no sewer, no lump shall
be allowed to be put around the sewer. The ramming of the filling shall be done and well
The surplus earth shall be removed directed within 30 meters lead. The measurements of the
work shall be exact length and width of the trenches as specified or as per City Engineer
instruction and depth shall be measured vertical as per section up to invert or the pipeline.
The City Engineer reserves the right of extra excavation on either side if considers necessary
for the safety of the work.
The bottom and sides of the trench shall be dressed in level and plumb in all directed before
any concrete is in dia. In case the excavation is done deeper than required no filling shall be
allowed to bring the formation to proper level but contractor shall have to lay cement or lime
concrete of filing or other acceptable materials as directed by the City Engineer at contractor
own cost so as to come to proper formation. In case bad formations are met with the work
shall have to be done as per instruction of City Engineer. Necessary arrangements for
watering trenches must be provided by contractor and without proper watering trenches will
not be allowed to be filed to further Contractor shall have to make arrangement for access to
invert of the sewer and for inspection of the work as ordered by the engineer. If it is required
to shift or after the alignment section of diameter of the pipe the contractor shall carry out the
altered work at the rates quoted by him for the original work for items and contractor shall
not claim any expenses due to the changes made.
In no case work shall be done at night or no Sundays & other holidays and during the recess
time except in and other holiday the case of bad grounds such as running sand where the
work must be executed vigorous day night without interruption when so ordered by the
engineer. All existing water pipe storm drains sewer line railway track, electric cables etc.
which do not in the opinion of engineer required to be changed in location shall be supported
and protected from injury by the contractor. The contractor shall be liable to pay all damages
to water-pipe, drains electric and telephone cable and to private property during the execution
of this contract and the same will be recovered from the running bills or the deposit of work
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
change location of any existing sewers drains etc. not otherwise from in these specification
the contractor shall do the work of making such change and the work shall be paid for as
extra work. All places utility etc. shall be kept accessible for use.
No extra payment shall be made for land sides and side stops done without prior approval of
the engineer in charge.
The excavation of trenches shall be done foot wider on each side of the pipe than the inside
diameter of the sewer in case of depth excavation exceeding 3 meters above invert, one feet
wider excavated on either side for the upper depth above 3 meters shall be allowed and paid
for. Wherever natural soil demands winder excavation the mentioned above the same shall be
given after approval of City Engineer. The rate for excavation for easy jointing and caulking
nothing extra shall be paid for this. Refilling of trenches shall be done only after the grade of
line and hydraulic test practicable of the lines are checked and approved of and order given
by the Engineer in charge. The refilling shall be accompanied by through watering for layers
of 0.50 mtrs. Further refilling shall be done thereafter and process should be repeated till
trenches are completely refilled. Temping and ramming with rammers shall have to be done
at all place of important work where ordered by Engineer in charge. After order to refill the
trench is give the trenches shall have to be refilled within 4 days with complete watering. If
the contractor fails to do watering satisfactory corporation shall get it done at the risk and
cost of the contractor with or without giving any notice and the expenses incurred in doing so
recovered from the contractor either in cost or from his payment through bills.
The rate shall be per meter basis.
Item No.7 Providing and supplying ISI Standard R.C.C. pipes (of sulphate resisting Cement
)in standard lengths of following class and diameter suitable for rubber ring joints (
socket and spigot) including all taxes, insurance, transportation, treight charges , octroi,
inspection charges, loading, unloading, conveyance to departmental stores, stacking etc.
complete (Note one coller should be supplied with each full length plain ended RCC
pipe cost included in rates below one rubber ring should be supplied with each full
length socketed pipe cost included in rates below)RCC pipe Horizontal cast)
Class NP3 Test pressure 0.7 Kg/Sq.Cm
The rate shall be for a unit of Rmt meter
Lowering, laying and jointing R.C.C. pipes in C.M.1:1 1/2 of following diameters in
proper position , grade and alignment at all level as directed by Engineer-in- charge
including conveyance from stone to site of work, labour giving hydraulic testing as per
The rate shall be for a unit of Rmt meter
Manufacturing,Testing,Supplying,Loading,Transporting To Work Site, Unloading,
Lowering In Trenches, Laying And Jointing R.C.C.,Np-3 Class Pipes With socket and
spigot joints as per IS 458-2003 Including EPDM Rubber ring as per IS 5382-1985 etc.comp.
As Directed by engineering in charge..
300 mm internal diameter , 450 mm dia, 500 mm dia, 600 mm dia,
The rate shall be for a unit of Rmt meter.
Item No.8 Constructing Chamber of following size including excavation, refilling,
BBCC (1:5:10) for foundation, C.C.Channel (1:2:4), finished 15 mm thick cement
plaster inside in CM 1:3, finishing with cement slurry, Brick masonary in CM 1:5
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
& excluding the cost of chamber seat cover etc..completed. (Slab Type Chamber of size
0.60 X 0.45 mt. size, 0.60 X 0.75 mt. size, 0.75 X 0.75 mt. size)
This shall be done as per specification mentioned in Items No.
The brickbats shall be of new bricks, hared well burnt and broken to 40 mm nominal size.
These shall be free from earth and shall be got app. use. Sand shall be clear coarse, sharp and
free from earth and other impurities. Mixing shall be done on brick or stone platform or of
brickbats to mortar shall be measured in heaps by brick height irregular measure. If ordered
by Add. C.E. Concrete shall be laid in layers of 15 cms. and well consolidated maintained by
the contractor for before commencing the brick work. over boxes, concrete shall be well
watered for 15 days. The mix shall be done in prop. of 1 : 5 :
Cement shall confirm to M-3, sand shall confirm to M-6, coarse agg. shall confirm to M-13,
water shall confirm M-1.
The prop. of the cement of sand coarse agg. shall be 1 : 5 : 10 i.e. 1 part of cement, 5 part of
sand and 10 parts of coarse agg. by colmn. and the work shall be carried out as per inst. of
Engineer in charge and as per C.3.
Brick work cement mortar:
Bricks shall be table brick confirming of approved kiln specifications as laid sown n PWD
Hand book NO. 2. These shall be well burnt and free from all defects and shall be got
approved by the Engineer in charge before the work is started.
Cement to be used for mortar shall comply with ISS & PWE Hand book specifications,
cement mortar in the brick work shall be 1 part of cement of parts of sand. Every brick well
sacked in water is required to be laid I full & closed joints of cement mortar the thickness of
which shall not exceed 1.25 cms. If on removal of centering any open joint shall be found,
these shall be pointed immediately. Special care shall taken to make the face of brick work
smooth brick work shall be toothed or shall racked back in coarse.
All intrados of curves shall be worked from temple strictly made to dimensions as per 1974-
75 latest plan and section approved by Add. C.E.
Brick work in general shall be of first class workmanship & shall be executed according to
the plan working proper dimension & as directed by the Office in charge from time to time.
Brick should be thoroughly wetted in water before use.
All brick work to be cleaned & wetted before laying cement mortar shall be prepared in
special iron pals. And mixed bag of 1.25 cft. or 1 cft. as measured as the case may be. All
materials shall be stacked in one side so as not to obstruct traffic in any way. The masonry
should be constructed in proper workmanship like manner with jointing plumb etc. to
confirm with the general specification No. 45 PWD Hand Book. The face work should be
nearly finished. The shall be kept watered for a week at least after the date of completion.
The work in general is to be done as per PWD Hand book specification No. 34 centering
shall not be struck off & removed without permission of C.E. The extrados of the arch shall
be neatly rendered with 1.25 cms. thick mortar of the same quality as in a masonry. If the
depth of R. L. is not sufficient for arch work RCC slab of 1 : 2 : 4 proportion will have to be
provided. The slab shall be as per IRC standard a ring of bars around the openings. The slab
shall have to be provided for the manholes of the depths less than 3 mts. & whenever
required. The Height of the arch from the invert shall be as per instructions of Add. C.E.
All centering shall be prepared & places as directed & shall be struck off & draws with case
as to cause cracks & damages the work. Contractor shall have to remove & improve all
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
disapproved masonry work either settled of damaged the top bottom & sides of the slab shall
be neatly finished with cement mortar of 1 : 4 proportion.
Cement concrete for the bottom portion of manhole shall consist of one part of cement two
parts of sand four parts of black trap metal of other approved material of 0.6 to 2.5 cms size
from well graded as per instruction. The rate includes all necessary materials mixing lifting
placing ramming watering etc. the exposed faces to be neatly finished smooth with cement as
per instructions. The concrete work to kept constantly watered for at least fortnight.
Cement Plaster:
Cement plaster 15 mm thick in side and out side shall be done suing cement mortar of 1 part
of cement & 3 parts of sand in uniform thickness with surfaces truly in plums. The work in
general shall comply with general specifications for plaster No. 64 in PWD hand book. The
plaster surfaces to be kept damp at least for a fortnight. All internal sides of the manholes
including soffit of the arch shall be provided with cement plaster.
Footsteps shall be of FRC the best as specified steps shall be fixed at interval of 37 cm.
vertically & 22 cm. horizontally starting from the invert of the line.
Mode of m/s and payment is on No. basis.
Item No:- 9 ,Constructing Slab Type M.H. Chamber Of The Following Size Including
Excavation, Refilling, Brick Bats Cement Concrete (1:5:10) of thickness 15 C.M., CC
Channel (1:2:4) of thickness 10 C.M., finished 15 mm thick cement plaster inside &
outside (Only for shaft) In Cm 1:3, Finishing With Cement Slurry, P/F 4 Mm Dia
M.S.Steel Hdpe Coated Steps 35 Cm C/C At 35 Cm Staggered Masonary In Cm1:5,
Rcc Slab In Cc1:1.5:3 of thickness 15 C.M.,Including Cantering & Reinforcement
(Single jalli at 15 C.M. c/c bothway 10 mm dia.)But Excluding The Cost Of Manhole
Seat Cover Etc..Completed Of Size 0.75 X 1.00 Meter (Inside Clear, M.H. length
should be parallel to the flow).
Excavation for foundation trenches and pits etc. in all type of hard and soft soil such as
murrum sand, clay, kankar etc. and stacking the same within a lead of 30 mt incl. spreading,
backfilling of trenches and pits with selected excav. material from stack watering
consolidation in layer and disposing the surplus material within a lead of 30 Mt & with lifts
as mentioned below incl. guarding, lighting, fencing the trenches and pits etc. complete
The brickbats shall be of new bricks, hared well burnt and broken to 40 mm nominal size.
These shall be free from earth and shall be got app. use. Sand shall be clear coarse, sharp and
free from earth and other impurities. Mixing shall be done on brick or stone platform or of
brickbats to mortar shall be measured in heaps by brick height irregular measure. If ordered
Concrete shall be laid in layers of 15 cms. and well consolidated maintained by the contractor
for before commencing the brick work. over boxes, concrete shall be well watered for
days. The mix shall be done in prop. of 1 : 5 :
Cement shall confirm to M-3, sand shall confirm to M-6, coarse agg. shall confirm to M-13,
water shall confirm M-1.
The prop. of the cement of sand coarse agg. shall be 1 : 5 : 10 i.e. 1 part of cement, 5 part of
sand and 10 parts of coarse agg. by column. and the work shall be carried out as per inst. of
Engineer in charge and as per C.3.
Brick work cement mortar :
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
Bricks shall be table brick confirming of approved kiln specifications as laid sown n PWD
Hand book NO. 2. These shall be well burnt and free from all defects and shall be got
approved by the Engineer in charge before the work is started.
Cement to be used for mortar shall comply with ISS & PWE Hand book specifications,
cement mortar in the brick work shall be 1 part of cement of parts of sand. Every brick well
sacked in water is required to be laid I full & closed joints of cement mortar the thickness of
which shall not exceed 1.25 cms. If on removal of centering any open joint shall be found,
these shall be pointed immediately. Special care shall taken to make the face of brick work
smooth brick work shall be toothed or shall racked back in coarse.
All in trades of curves shall be worked from temple strictly made to dimensions as per 1974-
75 latest plan and section approved by C.E.
Brick work in general shall be of first class workmanship & shall be executed according to
the plan working proper dimension & as directed by the Office in charge from time to time.
Brick should be thoroughly wetted in water before use. All brick work to be cleaned &
wetted before laying cement mortar shall be prepared in special iron pals. And mixed bag of
1.25 cft. or 1 cft. as measured as the case may be. All materials shall be stacked in one side
so as not to obstruct traffic in any way. The masonry should be constructed in proper
workmanship like manner with jointing plumb etc. to confirm with the general specification
No. 45 PWD Hand Book. The face work should be nearly finished. The shall be kept watered
for a week at least after the date of completion.
Cement concrete work for R.C.C. slab
The R.C.C. work of slab M200 shoud be cast as per design and reinforcement work as per
inst. Of engg. Incharge and as per standard design..TMt. bars confirm to IS code shoud be
The work in general is to be done as per PWD Hand book specification No. 34 centering
shall not be struck off & removed without permission of C.E. RCC slab of M200 proportion
will have to be provided. The slab shall be as per IRC standard a ring of bars around the
All centering shall be prepared & places as directed & shall be struck off & draws with case
as to cause cracks & damages the work. Contractor shall have to remove & improve all
disapproved masonry work either settled of damaged the top bottom & sides of the slab shall
be neatly finished with cement mortar of 1 : 4 proportion.
Cement concrete for the bottom portion of manhole shall consist of one part of cement two
parts of sand four parts of black trap metal of other approved material of 0.6 to 2.5 cms size
from well graded as per instruction. The rate includes all necessary materials mixing lifting
placing ramming watering etc. the exposed faces to be neatly finished smooth with cement as
per instructions. The concrete work to kept constantly watered for at least fortnight.
Cement Plaster :
Cement plaster 20 mm thick shall be done suing cement mortar of 1 part of cement & 3 parts
of sand in uniform thickness with surfaces truly in plums. The work in general shall comply
with general specifications for plaster No. 64 in PWD hand book. The plaster surfaces to be
kept damp at least for a fortnight. All internal sides of the manholes including soffit of the
arch shall be provided with cement plaster.
C. I. Articles :
These shall be made accurately to form & dimensions shown in the drawing casting shall be
sharp clean from cracks flows air bubbles casting shall be coated with Dr. Angles Smith
solution be accepted red not or with anticorrosive paint. No or more than 1% lower than the
weight to the dimensions in the drawing. Contractor shall have to submit two manholes of
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
C.T. materials to the C.E. for reference and these samples shall be returned at the completion
of the work. all rejected materials shall have to be removed form the site of within 24 hours.
C.I. manhole cover with seat shall have 55 cms. inside diameter & shall weight not less than
185 kgs. C.I. manhole to be set in cement mortar with cement concrete of 1 : 2 : 4 prop.
around. C. I. cover shall be marked with year mar AMC. etc. & arrow showing the direction
of flow.foot steps shall be of the best gray cast iron as specified above true to dimensions.
The rate includes mixing the same in position as directed the wt. of the approved CI foot
steps shall be 8 Ibis. RCC steps of approved design and quality shall have to be fixed if so
ordered by C.E. without extra charges. C.I. steps shall be fixed at interval of 37 cm. vertically
& 22 cm. horizontally starting from the invert of the line.
The M/s shall be on No. basis.
Item No:- 10 Rate reduction over item of Constructing Slab Type M.H. Chamber of size
x 0.75 mt for constructing slab @ depth more than 0.60 mt below Ground Level (Max.
unit of DM should be reduced in this item)
The M/s shall be on DM. basis.
Item No:- 11 , Constructing Slab type M.H. Chamber of the following size including
excavation, refilling, brick bats cement concrete (1:5:10) of thickness 15 C.M., CC
Channel (1:2:4) of thickness 10 C.M., finished 15 mm thick cement plaster inside
& outside (Only for shaft) in CM 1:3, finishing with cement slurry, P/F 4 mm dia
M.S.Steel HDPE coated steps 35 cm c/c at 35 cm staggered in masonary CM 1:5, RCC
Slab in CC 1:1.5:3 of thickness 23 C.M., including Cantering & reinforcement (double
jalli at 15 C.M. c/c bothway 12 mm dia.) but excluding the cost of Manhole seat cover
etc..completed. of Size 1.00 X 1.40 meter (Inside Clear, M.H. length should be
parallel to the flow, for pipe dia <=800 mm)
1.0 to 2.00 meter depth, (Slab at Ground level)
2.00 to 3.00 meter depth, (Slab at below 0.6 mt. From G.L.)
3.00 to 4.00 meter depth, (Slab at below 1.00 mt. From G.L.)
5.00 to 6.00 meter depth, (Slab at below 1.00 mt. From G.L.)
7.00 to 8.00 meter depth, (Slab at below 1.00 mt. From G.L.)
The M/s shall be on No. basis.
Item No:-12 Extra rate over item of Constructing Slab Type M.H. Chamber of following
size for constructing M.H. Chamber, per 1.00 Decimetre of additional depth or part
thereof. etc. complete. Of size 1.00 x 1.40 mt. (inside clear) and Depth from
Description as per above
Item No:-13 Rate reduction over item of Constructing Slab Type M.H. Chamber of size
x 1.40 mt for constructing slab @ depth more than 0.60 mt for ( MH 2 to 3 mt depth)
and 1.0 mt for (MH above 3.0 mt depth) below Ground Level (Max.5 unit of DM
should be reduced in this item)
Item No:- 14 Dismantling of existing Arch type manhole up to Arch and then Const. Slab type
manhole of following size incl. excavation, refilling and & finished 15 mm thick
cement plaster inside in CM 1:3, P/F 4 mm dia M.S.Steel HDPE coated steps 35 cm c/c
at 35 cm staggered in masonry CM 1:5, incl. cost of RCC Slab in CC 1:1.5:3,
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
including Cantering & reinforcement as directed by engineer in charge. Rate
includes carting of debris and excavated soil
Excavation for foundation trenches and pits etc. in all type of hard and soft soil such as
murrum sand, clay, kankar etc. and stacking the same within a lead of 30 mt incl. spreading,
backfilling of trenches and pits with selected excav. material from stack watering
consolidation in layer and disposing the surplus material within a lead of 30 Mt & with lifts
as mentioned below incl. guarding, lighting, fencing the trenches and pits etc. complete
The brickbats shall be of new bricks, hared well burnt and broken to 40 mm nominal size.
These shall be free from earth and shall be got app. use. Sand shall be clear coarse, sharp and
free from earth and other impurities. Mixing shall be done on brick or stone platform or of
brickbats to mortar shall be measured in heaps by brick height irregular measure. If ordered
Concrete shall be laid in layers of 15 cms. and well consolidated maintained by the contractor
for before commencing the brick work. over boxes, concrete shall be well watered for
days. The mix shall be done in prop. of 1 : 5 :
Cement shall confirm to M-3, sand shall confirm to M-6, coarse agg. shall confirm to M-13,
water shall confirm M-1.
The prop. of the cement of sand coarse agg. shall be 1 : 5 : 10 i.e. 1 part of cement, 5 part of
sand and 10 parts of coarse agg. by column. and the work shall be carried out as per inst. of
Engineer in charge and as per C.3.
Brick work cement mortar :
Bricks shall be table brick confirming of approved kiln specifications as laid sown n PWD
Hand book NO. 2. These shall be well burnt and free from all defects and shall be got
approved by the Engineer in charge before the work is started.
Cement to be used for mortar shall comply with ISS & PWE Hand book specifications,
cement mortar in the brick work shall be 1 part of cement of parts of sand. Every brick well
sacked in water is required to be laid I full & closed joints of cement mortar the thickness of
which shall not exceed 1.25 cms. If on removal of centering any open joint shall be found,
these shall be pointed immediately. Special care shall taken to make the face of brick work
smooth brick work shall be toothed or shall racked back in coarse.
All in trades of curves shall be worked from temple strictly made to dimensions as per 1974-
75 latest plan and section approved by C.E.
Brick work in general shall be of first class workmanship & shall be executed according to
the plan working proper dimension & as directed by the Office in charge from time to time.
Brick should be thoroughly wetted in water before use. All brick work to be cleaned &
wetted before laying cement mortar shall be prepared in special iron pals. And mixed bag of
1.25 cft. or 1 cft. as measured as the case may be. All materials shall be stacked in one side
so as not to obstruct traffic in any way. The masonry should be constructed in proper
workmanship like manner with jointing plumb etc. to confirm with the general specification
No. 45 PWD Hand Book. The face work should be nearly finished. The shall be kept watered
for a week at least after the date of completion.
Cement concrete work for R.C.C. slab
The R.C.C. work of slab M200 shoud be cast as per design and reinforcement work as per
inst. Of engg. Incharge and as per standard design..TMt. bars confirm to IS code shoud be
The work in general is to be done as per PWD Hand book specification No. 34 centering
shall not be struck off & removed without permission of C.E. RCC slab of M200 proportion
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
will have to be provided. The slab shall be as per IRC standard a ring of bars around the
All centering shall be prepared & places as directed & shall be struck off & draws with case
as to cause cracks & damages the work. Contractor shall have to remove & improve all
disapproved masonry work either settled of damaged the top bottom & sides of the slab shall
be neatly finished with cement mortar of 1 : 4 proportion.
Cement Plaster :
Cement plaster 20 mm thick shall be done suing cement mortar of 1 part of cement & 3 parts
of sand in uniform thickness with surfaces truly in plums. The work in general shall comply
with general specifications for plaster No. 64 in PWD hand book. The plaster surfaces to be
kept damp at least for a fortnight. All internal sides of the manholes including soffit of the
arch shall be provided with cement plaster.
C. I. Articles :
These shall be made accurately to form & dimensions shown in the drawing casting shall be
sharp clean from cracks flows air bubbles casting shall be coated with Dr. Angles Smith
solution be accepted red not or with anticorrosive paint. No or more than 1% lower than the
weight to the dimensions in the drawing. Contractor shall have to submit two manholes of
C.T. materials to the C.E. for reference and these samples shall be returned at the completion
of the work. all rejected materials shall have to be removed form the site of within 24 hours.
C.I. manhole cover with seat shall have 55 cms. inside diameter & shall weight not less than
185 kgs. C.I. manhole to be set in cement mortar with cement concrete of 1 : 2 : 4 prop.
around. C. I. cover shall be marked with year mar AMC. etc. & arrow showing the direction
of flow.foot steps shall be of the best gray cast iron as specified above true to dimensions.
The rate includes mixing the same in position as directed the wt. of the approved CI foot
steps shall be 8 Ibis. RCC steps of approved design and quality shall have to be fixed if so
ordered by C.E. without extra charges. C.I. steps shall be fixed at interval of 37 cm. vertically
& 22 cm. horizontally starting from the invert of the line.
The M/s shall be on No. basis.
Item no.15 :- Making connection to the ex.M.H.in running sewer incl. Dewatering and
other required machinery etc. of following dia pipes at any convenient time. All
damaged work shall be well repaired as per instructions. etc..complete.
Making connection to the ex.M.H.in running sewer incl. Dewatering and other required
machinery etc.for dia pipes at any convenient time. All damaged work shall be well repaired
as per instructions. etc.complete.
Mode of payment shall be in No. basis
Item No.16 :- Cutting the pipes of following dia coming in the new M.H.in running sewer
including cutting bars, including removing debris /silt from the M.H. and carting at a
suitable distance etc..complete as directed. No payment for M.H. work will be made
until pipe is not cut completely in all respect.
Cutting the pipe of dia 150 to 600 mm including cutting the bars,in new pipe at any depth
and finishing smooth to avoid injury for laboures to clean MH.Removing any type debris
from the MH and carting away at a suitable dist.The cutting edge shall be finished smooth
with CM 1:3 and CC 1:2:4.
The M/s shall be on No. Basis.
Item No.17 :- Repairing damaged M.H. and rasing M.H. up to road level incl. removing
damaged brick work and repairing by brick masonry in C.M. 1:5 and plaster in C.M.
1:3 and fixing C.I. steps and existing MH sheet cover, removing the debris from MH
and carting the same as directed.
The M/s shall be on No. Basis.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
Item No.18 :- Repairing damaged I.C./Raising removing damaged brick work and repairing
by brick masonry in C.M. 1:5 and plaster in C.M. 1:3 and fixing C.I. steps and
existing chamber sheet cover, removing the debris from chamber and carting the
same as directed.
Repairing damaged IC including removing damaged brick work and repairing masonry in
C.M. 1:6 and plaster in cm 1:3 and fixing IC cover in C.C. 1:2:,rate also includes removing
debris from IC and carting the same as directed.
The M/s shall be on No. Basis.
Item No.19 :- Providing F.R.C. MH seat cover RCC Precast M.H.Frame & Cover
Manufacture , supply & Delivery at store or at side of work Precast RCC M200 Frame
& Cover Suitable to drainage M.H. and as per type design & Drawing including cost of
reinforcement M.S. Angles or Flat , cutting mold work etc.
F.R.C. Extra Heavy Duty (EHD-35) Manhole Covers & Frames Cover : 728mm ø & 100 mm
thick circular cover, 35.00 MT load design, 100x2mm MS flat allround, 16mm ø plain round bar
for lifting the cover & should be fitted with plastic cups. Frame : 560 mm ø clear opening, outer
size- 888x888x175 mm. On the upper periphery of frame 25 x 3 mm wide MS flat should be well
embed in concrete to protect the edges of frame. FRC E.H.D.-35 manhole cover & frame
described as above
F.R.C. Heavy Duty [HD-20] Machinehole Covers - 560 mm ø clear opening, The dimension of
frame and cover as per mentioned in Amend No.1 to IS 12592 : 2002 table
F.R.C. Medium Duty [MD-10] Machinehole Covers - 560mm ø clear opening, The dimension of
frame and cover as per mentioned in Amend No.1 to IS 12592 : 2002 table 1..
F.R.C. Medium Duty [MD-10] Chamber Covers & Frame- 600 x 450 mm clear opening, The
dimension of frame and cover as per mentioned in Amend No.1 to IS 12592 : 2002 table
F.R.C. Light Duty [LD-2.5] Machinehole Covers & Frames-560mm ø clear opening, The dimension
of frame and cover as per mentioned in Amend No.1 to IS 12592 : 2002 table
Mode of payment shall be in No. basis.
Item No.20:-Carting and Fixing M.H.,Chamber or Catch pit Seat and Cover in line and level
to match existing road level in C.C.1:2:4 and finishing smooth,watering and protecting
for 7 days etc.complete as directed.M.H. seat cover will be supplied by A.M.C.(from any
Fixing M.H. seat cover supplied by corporation including carting from store of A.M.C.
to the place of work site & fixing in C. C. 1 : 2 : 4 finishing etc.complete as directed by
Engineer in charge.
The M/s shall be on No. basis.
Item No.21 :-Providing Kachha of Pakka Dummy in the following dia pipes and removing
the same after completion of the connection work as directed.
Providing kachcha or pakka dummy in the following dia. pipes in such a way that there is no
seepage of water through it and removing the same after the completing of the work as
directed by Engg. in charge of work.
Mode of payment shall be in No. basis.
Item No.22 :- Providing Dead Cantering using good quality Country Wood Planks, wall
Plate of required thickness and size including placing the nece. supports of reqd. size,
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
nailing, fixing with mortar, levelling. All specification for dead centering as per
standard engg. practice etc. comp. as directed.
Mode of payment shall be in Smt basis.
Item No.23 Supplying, labour for break down repairing work for activities like excavation,
disliting, removing debris from trench back filling etc. comp. as directed by Eng.in
a) Mazdoor at day /Night
b) Makadam/ supervision at day / Night
Mode of payment shall be in No basis.
Item No.24:- Barricading the entire break down or excavated area on rental basis using
wooden ballies / M.S.angles at max. 2.00 meter centre to centre, C.G.I. Sheet, reflective
paint / Board out side to avoid accident & for smooth traffic diversion & movement
including cautionary board etc. Item also includes for making temporary sufficient nos
of lighting arrangement through out the work with necessary required arrangement.
..The same shall be removed after completion of work. (Only for break down work
from start to complete)
Mode of payment shall be in Rmt basis
Item No.25:- Fabricating, supply and erecting in position Standard Structural steel sections
conforming to IS 2062 for railing , skywalk, stair, or other works using ISMB, ISA,
ISMC, MS plate, flat, square bars, pipe, square pipe, rectangular sections, square
section, tube, etc. including welding, cutting, wastage, etc. complete. The rate is
inclusive of welding rod, supply & fixing of correct size nut, bolts, washers, including
one primer coat of red lead paint conforming IS:102 Zinc chromate paint conforming
to IS:104 followed by two coat of aluminium paint as per IS:2339 OR enamel paint of
color as selected by engineer incharge, with all contractor's materials, labour, tools &
plants, in bolted/welded construction as directed by Engineer-in Charge. The waste cut
pieces shall not be included in the paying quantity. The work shall be done as per
drawing and specification. The work shall be carried out as per IS:800, IS:816.
Mode of payment shall be in Kg basis
Item No.26:- Supplying cutting, bending, binding and placing in position steel as per plan and
design and as per IS 2502 including cost of steel and binding wire for reservoirs/
structuresonly including lift up to 6 meter height or depth below GL for all diameters
TMT bars Fe-415 grade for alldiameters
Mode of payment shall be in Mt. basis
Item No.27:-Brick work using common burnt clay building bricks having crushing strength
not less than 35 kg./Sq.Cm.in foundation and plinth in Cement Mortar 1:5. (1-Cement :
5 -fine sand)(B) Conventional (upto 10 ton)
Mode of payment shall be in Cmt basis
Item No.28:- Providing 15mm thick cement plaster in single coat on Rough (Similar)side of
single or half brick walls for interior plastering upto floor two level and finished even
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
and smooth in (i) Cement mortar 1:3 (1- cement:3-sand) finishing with a floating coat of
neat cement slurry.
Mode of payment shall be in Smt basis
Item No.29:- Reinstatement of Asphalt road using the same material.
Mode of payment shall be in Smt. basis.
Item No.30:- Providing and casting in situ CC in grade M-20 (proportions as per mix design
or as per table 9 of IS 456 2000 in masses by weigh batching) using granite, quartzite
trap metal of size 6 mm to 20 mm for RCC work, including scaffolding centering, form
work, needle vibrated consolidation, curing comp. up to 6 meter depth or height
(excluding cost of reinforcement and neat finishing) with centrering and shuttering/
deshuttering etc. comp. for structure for other than water retaining
Mode of payment shall be in Cmt. basis.
Item No.31 Labour charger for lowering existing Ventilating column safely with the help of
required capacity of hydra crane or any type of required capacity of crane. Item also
includes welding machine , gas cutter , electric cutter , breaker etc necessary
machineries required for this work with out damage and item also includes carting the
same to the AMC store. etc. comp as directed.
Mode of payment shall be in Nos. basis.
Item No:32 Constructing Bombay Pattern Type Catch Pit of size 0.60 x 0.60 depth up
to 1 mt including excavation, B.B.C.C. (1:5:10), 23 cms thick brick maso. wall in the
prop. of CM (1:6) with 40 mm thick IPS flooring in the prop M15 at bottom and
mm thick cement plaster inside the catch pit in the proportion of CM (1:3) with out
jali etc. comp. as directed.
600mm x 600mm x 1000mm Depth
For detailed specification refer clause No. 24.44.1 of R & B Department booklet for General Technical Specification for building
• Extra Depth of Catch pit size 600mm x 600mm for every additional depth of 100 mm or Part thereof beyond
1000mm depth upto 1500 mm depth
For detailed specification refer clause No.24.46 of R & B Department booklet for General Technical Specification for building
Mode of measurement and payment
The contractor shall be responsible for any loss or damage to the catch pit up to the end of work. He shall also be responsible fo
the cleaning all bituminous material from the catch pit.
The rate shall be for a unit of one No.
Item No:33 CatchPit Jali (Heavy duty) Fixing P/F FRC catch pit jali with frame
600mm x 600mm clear opening etc. comp.. As directed by engineer in charge.
For detailed specification refer clause No. 24.35 of R & B Department booklet forGeneral Technical Specification for building
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
The contractor shall be responsible for any loss or damage to the catch pit up to the end of work. He shall also be responsible fo
the cleaning all bituminous material from the catch pit.
Item No.34:- Providing, laying and jointing in true line and level UPVC pipe (SCH-40) of
following dia. Including fittings of standard make as approved by Engineer-in-charge
Mode of payment shall be in Rmt basis
Item No.35:- Providing, supplying & fixing to wall ceiling and floor 6.0 kg. F/Cm2 working
pressure polythelene pipes of the following outside dia. Low density. Complete with
special flange empression type fittings. Wall clips etc. incl. making good the wall ceilling
Mode of payment shall be in Rmt basis
Item No.36:-Providing and operation dewatering Pump including fuel charges & operator
Charges etc. as directed etc. comp. (Shift for Eight Hour) (For Each Pump Set, No
payment should be allowed for non working condition of machinery )
Mode of payment shall be in Shift basis
Item No.37:- Hiring and operating Mud Pumps incl. Cost of fuel and operator including the
cost of to and fro transportation, laying of the delivery hoses as required, lowering and
lifting the pumps as and when required etc. complete. Set Do As Directed. (No payment
should be allowed for non working condition of machinery)
Mode of payment shall be in H.P/Hr basis
Item No.38:-Hiring and operating the 20 KV 3 Phase Electric Generator for operating
desilting machinery, and lighting and other requirements with Arranging diesel to run
the D.G. Set Do As Directed. 8 Hrs Shift. (No payment should be allowed for non
working condition of machinery )
Mode of payment shall be in Shift basis
Item No.39:- Providing & Supplying JCB Machine on rental basis in case of emergency
situation and break down type work & also during unavoidable condition as per
instruction of engg.incharge , rate includes all nece. shifting, fuel and operating charges
and stacking of useful & non-useful materials separately up to store. (No payment
should be allowed for non working condition of machinery and for pipe line excavation
and laying work)
Mode of payment shall be in Hour basis
Item No.40:- Supplying Pneumatic Breaker Machine for RCC Slab or Asphalt Demolishing
Work on site by using Operator, fuel, power Supply etc. Complete as Directed. (No
payment should be allowed for non working condition of machinery and for pipe line
excavation and M.H. work. Allowed only for break down work)
Mode of payment shall be in Hour basis
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
Item No.41:- Providing & Supplying Hitachi Machine-110 capacity on rental basis in case of
emergency situation and break down type work & also during unavoidable condition as
per instruction of engg. in charge, rate includes all nece. shifting, fuel and operating
charges . (No payment should be allowed for non working condition of machinery)
Mode of payment shall be in Hour basis
Item No.42:- Providing & Supplying Hitachi Machine -200 capacity on rental basis in case of
emergency situation and break down type work & also during unavoidable condition as
per instruction of engg.incharge , rate includes all nece. shifting, fuel and operating
charges . (No payment should be allowed for non working condition of machinery )
Mode of payment shall be in Hour basis
Item No.43:- Providing & Supplaying hydra crance Machine of 12 ton capicity on rental basis
in case of emergancy situation and breakdawn type work & also during unvidable
condition as per instruction of engg incharges rate included all necesarey shifting fuel
and operaing charges (n0 paymant should be allowed for non working condition of
Mode of payment shall be in Per 8 Hrs. basis
I HAVE ALSO GONE THROUGH TECHNICAL SPECIFICATIONS FOR THE ITEMS (AS PER
STANDARD P.W.D. TECHNICAL SPECIFICATION FOR THE ITEMS AND ALSO I HAVE THE
BOOK OF THE SAME) AND AGREE TO ABIDE BY THEM.
IN CASE OF WHERE IS NO TECHNICAL SPECIFICATION FOR THE ANY ITEMS
AVAILABLE, SPECIFICATION GIVEN BY THE ENGINEER-IN-CHARGE SHALL BE FOLLOWED
AND FOR THE SAME I AGREE TO ABIDE BY THEM.
CONTRACTOR'S SIGN AND SEAL.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
AMDAVAD MUNICIPAL CORPORATION
FORM OF BID AND APPENDIX TO BID
FORM 1 - BID SECURITY (BANK GUARANTEE)
(Hereinafter called the Tenderer) is desirous and preferred to tender for works in accordance with
the term and conditions of tender for the work of Laying of Systematic drainage line at Modi
Compound,Radheshyam ni chali And Diffrent places And Different Chalis OF Ghatak-3 in
Saijpur Ward of North-Zone..
1. Therefore. We hereby affirm that -we are guarantors on behalf of the Tenderer up to total
rupees………………..(in words............................................) Rs. (in figures) and we undertake to pay to
Municipal Commissioner, AMDAVAD Municipal Corporation, A'bad. Specified tip to his first written
demand, without demur without delay and without the necessary of a previous of judicial or
administrative procedures and without the necessity of a previous of judicial or administrative
procedures and without the necessity to prove to the Bank the defects or short comings or debits
of the contractor any sum within the limit of Rs.....................................................
2. We further agree that the Guarantee herein contemned shall remain in full force and effect
during the period that would be taken for the acceptance of tender. However unless a demand of
claim under this guarantee is made on its in writing on or before the (Date to be specified will not
be less than 120 days from the stipulated date of receiving the tender) we shall be discharge from
all liabilities under the guarantee thereafter
3. We undertake not to revoke the guarantee during it currency except with the previous
consent of the Municipal Commissioner, AMDAVAD Municipal Corporation, A' bad in
4. We lastly undertake not to revoke the guarantee for any charge in constitution of the
Tenderer or of the Bank.
Signature & Seal of Guarantor ...........................
5. The contractors shall have to furnish income tax clearance certificate before his tender is
accepted and intimate assessment number and ward under which he is assessed.
6. Copies of certificate as regards previous experience, if any, must accompany the tender.
7. List of approved banks As per ANNEXURE –
Seal and Signature of the Bidder Add.C.E.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
FORM -2 PERFORMANCE GUARANTEE BOND
(BANK GUARANTEE)
(Clause 37 of Section I Volume 1)
Awarded a contract dated_ __________________FOR Laying of Systematic drainage line at
Modi Compound,Radheshyam ni chali And Diffrent places And Different Chalis OF Ghatak-3
in Saijpur Ward of North-Zone. Whereas the said M/s
___________________________________________Bank to provided a PERFORMANCE
GUARANTES BOND to the AMC for the work undertakes by M/s.
agreed to provided such a PERFORMANCE GUARANTEE BOND. Now therefore, we the_
______________________Bank provided the following Performance Bank, Guarantee by way of
these Bond to the AMC.
1. The contract value of the contract provided to M/s. _____________________by the AMC in Rs. _
__________. This guarantee in the nature of PERFORMANCE GUARANTEE is provided so as to
ensure and indemnify the AMC for full and proper performance of the contract by
the _______________________________Bank hereby indemnify the AMC for all losses and / or
damages to the road surface which would be laid or resurface by M/s.________________________
and such PERFORMACE GUARANTEE would include any damage to hot mixes, dense bituminous
macadam asphalt, concrete, seal coat, concrete blocks, road markings, signage, steel structures
which may be suffered by the AMC as a result of defective production of mixes, because of poor
workmanship, or at all, by way of this bond, we the _________________________________Bank
agree and promises that in the eventuality of the contractors M/s.
__________________________________________not repairing or remeding the Problem, loss or
damage to the road surface we shall indemnify and pay the AMC such expenses, losses and
damages that may be incurred by the AMC, as a result of the AMC getting the work done itself or
from the other source.
2. We _______________________________ Bank agree and understand that the decision as to
whether any losses or damages to the project have taken place or not and / or whether the work
suffers from poor workmanship or not will be taken by the Commissioner of AMC and on the
Commissioner's decision regarding such losses or damages or defect whatsoever being so notified
by the AMC to us, We shall immediately take steps and ensure that
M/s.__________________________________ faithfully and diligently carry out the necessary
remedial steps to the full satisfaction of the Commissioner of the AMC. The opinion of the
Commissioner as to whether full and complete remedial steps, to the full satisfaction the
Commissioner of the AMC has been taken or not, will be that of the AMC. For the purpose, of
arriving at such decision as aforesaid it will be open to the Commissioner of the AMC in case he so
desires, to delegate this power to subordinate like the city Engineer to take appreciate decision and
the decisions referred to above will be deemed to be properly take and as if taken by the
Commissioner of the AMC. In the eventually of M/s.______________ not taking remedial
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
action to the almost satisfaction of the Commissioner of AMC. The AMC will be entitled to get the
work done itself or from sources. On the Commissioner of the AMC notifying to us the total
expenses incurred for this purpose. We hereby expressly have under taken to pay the AMC the said
amount forth with and in any case not less than 7 days from taken to pay the AMC the said binding
the amount indicted by the Commissioner of the AMC and our obligation to pay such amount will
be continuing of the AMC and our obligation irrespective of any dispute of differences that may
arise between us and M/s. _____________________________ of between the AMC and M/s.
3. The contract value is Rs. __________________________. This PERFORMANCE GURANTEE is
limited to 5% of the said contract value and accordingly it comes to Rs.
_______________________ our liability will be in all cases be limited to Rs._________________.
4. We agree and undertake that this PERFORMANCE GURANTEE will be valid for a period of five
years and one month from the date when the contract work is completed by the
M/s._____________________________________. The Commissioner of the AMC notify such
completion that to us. In case, no such completion it is notified, this performance guarantee will be
a valid from five years from the date of execution of this agreement. The Performance Guarantee
will come into effect from such completion date. In case however, the contract of several parts it
will be opened to the Commissioner to indicate separate completion dates for separate part and to
simultaneously indicate a break up of the contract value equivalent to the separate part. In which
case the PERFORMANCE GUARNATEE to extent of the different completion dates. It is expressly
understood that the considering this period of five years and one month, the date by which the
Corporation, intimate the Bank about the losses, damages or problems as the case may be, shall be
considered as long as such intimation is within a period of five years and one month from the
completion date. We the ___________________ Bank will be liable, irrespective of whether the
remedial actions or lack thereof has taken place after the period of the five years and one month.
5. We _________________________________ Bank agree that the PERFORMANCE GUARANTEE
which is continuing guarantee will be binding, and enforceable against us irrespective of any
difference / disputes between the AMC and M/s. __________________________of between us
and irrespective of any change or variation or execution time or any forbearance or waiver made or
6. In case any disputes arise as to the interpretation or implementation or implementation of this
PERFORMANCE GUARANTEE, the matter shall be referred to the sole arbitration of he
Commissioner of AMC whose decision in the matter will be final. In case any resource to any court
of law is necessitated, the appropriate Civil Court in the AMDAVAD along will have Jurisdiction.
Date: Signature of Contractor
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
FORM-3 FORM OF AGREEMENT
THIS AGREEMENT made the ____ day of _______, 20__ between AMDAVAD Municipal Corporation
………………..(here in after called “the Employer”) of the one part and
(here in after called “the Contractor”) of the other part.
WHEREAS the Employer is desirous that certain works should be executed by the Contractor, viz.
____________________________________________ and has accepted the bid by the contractor
for the execution and completion of such works and the remedying of any defects therein at a
contract price of Rs.______________ (Rupees ____________________________).
NOW THIS AGREEMENT WITNESSETH as follows:
1. In this Agreement, words and expressions shall have the same meanings as are respectively
assigned to them in the Conditions of Contract hereinafter referred to.
2. The following documents shall be deemed to form and be read and construed as part of
this Agreement, viz.:
a) The Letter of Acceptance;
b) The General Conditions
c) The Financial Condition
d) The Technical Specifications;
e) The Priced Bill of Quantities; and
f) Other documents forming part of the contract.
3. In consideration of the payments to be made by the Employer to the Contractor as here in after
mentioned, the Contractor hereby covenants with the Employer to execute and complete the
Works and remedy any defects therein in conformity in all respects with the provisions of the
4. The Employer hereby covenants to pay the Contractor in consideration of the execution and
completion of the Works and the remedying of defects therein the Contract Price or such other
sum as may become payable under the provisions of the Contract at the times and in the manner
prescribed by the Contract. IN WITNESS whereof the parties hereto have caused this Agreement to
be executed the day and year first before written.
Signed, sealed, and delivered by the said Employer and the Contractor in the presence of:
On behalf of AMDAVAD Municipal Corporation On behalf of M/s.
Binding Signature of the Employer:
Binding Signature of the Contractor:
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
*Sample Form for updating - qualification information*
mkœCo: (1) ©b ylu htusdth htsgbkºte©e - lJe rœÕnelt vrhvºt ¢btkf C-III /011/2(82)2015/HQ
(2) fboathe CrJ»g rl^e mkdXl- lJe rœÕnelt vrhvºt ¢btkf CIAU/011(33)2015/HQ/5345
(3) ©b ylu htusdth rJCtd-dtkDeldh vrhvºt ¢btkf: RveyuV/182016/368596/b(3)
Cth< mhfth©elt ©b ylu htusdth bkºttjg-lJe rœÕne ylu fboathe CrJ»g rlr^ mkdXl
(R.ve.yuV.ytu.) lJerœÕneyu <ublt ylw¢bu <t.07/07/2015 ylu <t.21/06/2016lt vºttu&e
mhftherJCtdtu, mhftherldbtu <ubs htsgle mnfthe mkM&tytu ylu ctuzeytubtk ytWxmtumo&e ftb fh<tk
bnufblu mtbtrsf mwhûttlwk Aºt b¤e hnu <u btxu <ublu ftbœth CrJ»g rlr^ ylu vhawhK studJtRytult
yr^rlgb,1952 nuX¤ ytJhe juJt sKtJuj Au.
yt ylwmk^tlu htsg mhfth©e lt mJuo rJCtdtu, ònuhrldbtu, htsgle mnfthe mkM&tytu, MJtg<
mkM&tytu ylu MJhtsgle mkM&tytubtk ytWxmtumeod yusLmeytu îtht ytWxmtumeod&e ftb fh<t, ftuLx[tfx
fboatheytu,htusbœth <&t mhfth©elt ftb btxu rVfm vdthu hFtgujt <uJt «ðguf fboathe fu sublu ftuR vK
yr^rlgb yk<do< mtbtSf mwhûttlt jtCtu b¤<t l&e <uJt fboatheytulu CrJ»g rlr^ Vt¤tu yaqf fvtg
ylu <ublu mtbtrsf mwhûttltu jtC b¤u <u btxu leau bwsclt vdjtk juJt sKtJtguj Au.
1. ftuR vK mkM&t/ yusLme/ ftuLx[tfxhlu ftuR vK mhfthe ftgtuo btxu ftuLx[tfx ytv<t vnujt <uble vtmu
fboathe CrJ»g rlr^ mkdXl yk<do< RMgw &guj «turJzLz Vkz hSMx[uNl Au fu lne <ule Ft<he fhJe.
2. Wvhtuf< fuxudhebtk ytJ<t fboatheytulu ftbœth CrJ»g rl^e ylu vhawhK studJtRytult
yr^rlgb,1952 ylu <u ykk<do< DzJtbtk ytJuj gtusltytule studJtRytu jtdw vzu <u btxu
<tðftrjf vdjtk juJt.
3. Wvhtuf< fuxudhebtkk ytJ<t fboatheytultu CrJ»g rlr^ltu Vt¤tu <&t ltufhe œt<t <hV&e WbuhJtltu
&<tu Vt¤tu yaqf fvtRlu <ublt «turJzLz Vkzlt Ft<tbtk sbt &tg,<ule aftmKe fhelu s vAelt
brnltle awfJKe ytWxmtumekd yusLmelu fhJe.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
R.ve.yuV.ytu. fauhelt yr^f]< yr^fthe©eytult sKtÔgt bwsc ybœtJtœ Bgwrlrmvj
ftuvtuohuNlbtk ftb fh<tk ftuLx[tfxh©eytu, mÃjtgoh©eytu <&t fLmjxLx©eytu rJduhu suJe <btb cnthle
yusLmeytuyu <ublt nM<flt fboathe©eytultu vK R.ve.yuV.btk mbtJuN fhJtltu ylu R.ve.yuV.lt rlgb
bwsc R.ve.yuV. awfJJtu sYhe ylu VhSgt< Au. stu yub fhJtbtk awf &tg <tu r«Lmevtj yuBÃjtugh <hefu
<ublt awfJJtlt ve.yuV. ykdult ltKtk rlg< Ôgts, vulÕxe ylu zubuSm mne< ybœtJtœ Bgwrlrmvj
ftuvtuohuNlu awfJJtle sJtcœthe l &R Nfu <u nu<w&e mkœrCo< vºt ¢btkf 3 yLJgu bnu. Bgwrl. frbNlh©e
XhtJlk.50 <t.06/08/2018&e b¤uj bkswhe R.ve.yuV.yufx jtdw &guj ntug <uJt ybœtJtœ Bgwrlrmvj
ftuvtuohuNlbtk ftb fh<t ntjbtk ftgoh< ntug <uJt ylu yts vAe ftb ytvJtlt &tg <uJt <btb ftuLx[tfxhtulu
ftb ytv<t vqJuo R.ve.yuV.hSMx[uNl fhtJuj ntug <u sYhe Au.<ubs suytulu R.ve.yuV.yufx l&e jtdw vz<tu
<uJt ftuLx[tfxhtuyu htFuj fboathe©eytu btxu R.ve.yuV. yufx <&t htsg mhfth©elt vrhvºtbtk sKtÔgt
bwsc r«Lmevtj yuBÃjtugh <hefu R.ve.yuV.le sJtcœthe ybœtJtœ Bgwrlrmvj ftuvtuohuNlle hnu<e ntuJt&e
CrJ»gbtk R.ve.yuV. yufxlwk vtjl l fhJt&e zebtLz ltuxem <&t ftgœtfeg «r¢gt&e caJt btxu <&t
ftgœtfeg vrhrM&<e WvrM&< l &tg <u nu<w&e htsg mhfth©elt ©b ylu htusdth rJCtdlt yt mt&u mtbuj
fhuj vrhvºt ¢btkf RveyuV/182016/368596/b(3) <t.07/07/2017 ltu awM<vKu ybj fhJtu sYhe
ybœtJtœ Bgwrlrmvj ftuvtuohuNllt <btb Ft<tlt Jztyr^fthe©eytulu <ublt nM<flt Ft<t/
rJCtdbtk fhtJJtle &<e ftuR vK «fthle ftbdehe btxu fhtJJtbtk ytJ<t fJtuxuNl, xuLzh fu ytuVhbtk
R.ve.yuV.yufx bwsc sYhe hSMx[uNl ctc<u yawf ltuk^ fhJtle <&t R.ve.yuV.yufxltu awM< vKu ybj
fhJtle Ftm ltuk^ juJt yºtu&e sKtJJtbtk ytJu Au.
mne: zu.Bgwwrl.frbNlh
ltuku ^:- y.Bgw.ftu lt mhfgwjh lk-41 <t.09/11/2021 bwsc ‘bwÏg bkºte yu«uLxemNev gtuslt’ yk<do< ftuLx[tfxh/xuLzhhu xuLzh
mt&u VhSgt< R-Vtubo mxeoVefux hsw fhJtlwk hnuNu sule yawf ltuk^ juJe.
xuLzhhle mne ylu rm¬tu
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender 143 Drainage Vol-1.pdf
Tender 143 Drainage Vol-2.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].