| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹46.3 LAdmitted-Finance | -2.11% | ₹46.3 L | L1 | Admitted-Finance |
| 2 | L2₹46.4 L+₹15,593.56 (0.34%)Admitted-Finance | -1.78% | ₹46.4 L+₹15,593.56 (0.34%) | L2 | Admitted-Finance |
| 3 | L3₹46.8 L+₹52,923.60 (1.14%)Admitted-Finance | -0.99% | ₹46.8 L+₹52,923.60 (1.14%) | L3 | Admitted-Finance |
Tender Value
₹47.3 L
EMD Value
₹95,000
Closing Date
1 Jun 2026, 5:00 pmClosed
GM (CIVIL)
Main Administrative Building Sector-6 Noida
M/o Village (C/o Toilet and Aanganwadi Room Uchch Prathmik Vidyalay Village Gejha in Sector-93) Noida
2026_NOIDA_1150113_1
08/GM(C)/ SM (WC-8)/ET/2026-27
Open Tender
Civil Works - Others
Fixed-rate
180 days
Noida
Please refer to tender documents
3 documents required · 3 mandatory
₹2,124
Noida
₹95,000
23 Jun 2026
18 May 2026
2 Jun 2026
18 May 2026
1 Jun 2026
18 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 97 | Cum | 144.95 | ₹14,060.15 |
| 2 | Earth work in embankment in ordinary soil embankment to be in 20 cm layers breacking clods, watering, rolling each layer with 1/2 Tonne roller on wooden roller or steel rammer, rolling every third and top most layer with power or minimum 8 tonne including 1.5 m lift and all lead including cartage of earth by mechnical transportation and all T&P labour etc. required for proper completion of work. earth shall be arranged by the contractor at his own cost. | 97 | Cum | 363.05 | ₹35,215.85 |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, Consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 97 | Cum | 93 | ₹9,021 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:5:10 (1 cement : 5 coarse sand (zone-III): 10 graded stone aggregate 40 mm nominal size) cum | 30 | Cum | 5,491.35 | ₹1,64,740.5 |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically treated bars of Grade Fe-500D or More | 6,385 | kg | 82.81 | ₹5,28,741.85 |
| 6 | providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrte work using cement content as per approved design mix manufactured in fully autometic batching plant and transported to site of work in transit mixer for are leads having continuous agitated mixer manufactured as per mix design of specified grade for rienforced cement concrete work including pumping of R.M.C from transit mixer to site of laying excluding the post of centering shuttering finishing and reinforcement including cost of admixtures in recommended proportions as per I.S : 9103 to accelerate/ retard setting of concrete improve workablity without impairing streght and durability as per direction of the engineer-in- charge (note:- cement content considered in this item is @ 330 kg/cum. excess/less cement used as per design mix is payable/ recoverable separately) all works upto plinth level | 12 | Cum | 7,912.3 | ₹94,947.6 |
| 7 | Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, ncluding pumping of R.M.C. from transit mixer to site of laying , excluding the cost of centering, shuttering finishing and reinforcement, including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer-in-charge. (Note :- Cement content considered in this item is @ 330 kg/ cum.Excess/less cement used as per design mix is payable/recoverable separately). All works above plinth level upto floor V level | 31 | Cum | 8,654.75 | ₹2,68,297.25 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete | 15 | Sqm | 181.64 | ₹2,724.6 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for : Columns, Pillars, Piers, Abutments, Posts and Struts | 61 | Sqm | 426.85 | ₹26,037.85 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for : Lintels, beams, plinth beams, girders, bressumers and cantilevers | 65 | Sqm | 320.65 | ₹20,842.25 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
TD08.pdf
Tender Documents • 2.38 MB
BOQ_2153433.xls
BOQ • 0.35 MB
Capability.xls
Additional Documents • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .