Loading…
Loading…
Tender Value
₹12.1 L
EMD Value
₹12,200
Closing Date
19 May 2026, 12:00 pmClosed
Executive engineer Panchayat Irrigation Division Valsad
Constructing a checkdam cum causeway at village : Jujva Ta.- Valsad, Dist.-Valsad (Third Trial)
304386
01 of 2026-27
Open
Civil Works
Valsad
8 documents required · 7 mandatory · 1 optional
₹900
Executive Engineer panchayat Irrigation Division ,Valsad
₹12,200
11 May 2026
11 May 2026
11 May 2026
19 May 2026
11 May 2026
Name of work: Constructing a checkdam cum causeway at village : Jujva Ta.- Valsad, Dist.-Valsad
Memorandum Schowing the item of work to be carried out
Qty. Unit Description of Item In figures Amount
Item No. 1:- Dewatering of foundation trenches (Rupees Four
from any depth (Lump sump ) Thousand Only)
Item No. 2:-Excavation for foundation in all sorts
of soil including yellow sandy and gravelly soil
soft & hard murrum etc dry condition including (Rupees Eighty
177.00 CM depositing the excavated stuff in uniform layers 81.50 One and Fifty
table as directed etc complete for lead upto 1.00 Paisa Only)
K.M & all lift (By machinary) (b) Above water
Item No. 3:-Excavation for foundation in soft rock
including depositing the excavated stuff as and
71.50 CM where directed etc complete for lead upto 1.00 154.10
K.M & all lift (By machinary) (b) Above water
Item No. 4:- Providing and laying Plain /
Reinforced cement concrete of cement , sand and
metal (20mm to 25mm size) in following
proportion laid in situ including centering
222.80 CM shuttering , temping , smooth finishing, curing etc. 4110.50
Hundred Ten and
complete As directed for all leads and lifts
Fifty Paisa Only)
(Manually With Conventional Mixer)
Item No.5:- Providing and laying Plain /
Reinforced cement concrete of cement, sand and
metal (20mm to 25mm size) in following (Rupees Four
proportion laid in situ including centering, Thousand Nine
32.80 CM shuttering, temping, smooth finishing, curing etc. 4943.90 Hundred Forty
complete as directed for all leads and lifts Three and Ninety
(Manually With Conventional Mixer).(IV) 1:2:4 Paisa Only)
Item No. 6:- Providing and placing in position
reinforcement bars including cutting, bending
4.40 Qntl welding, joints where necessary, hooking etc. 7194.00
complete as per Drawing for all lead and lifts.
Item No. 7:- Providing and fixing M. S. Gate of
required size including all accessaries as per (Rupees Five
6.40 CM approved design and plan with two coats of oil 5600.00 Thousand Six
painting and one coat of anticorrosive oil paints etc Hundred Only)
Item No. 8:- Providing and laying dry rubble
pitching of various thickness to required grade (Rupees Four
including trimming of earthwork , hand packing the Hundred Fifty
interstices with spauls ,filling earth in interstices Five and Fifty
paneling complete for all leads and lifts.(a) 300 mm Paisa Only)
Item No. 9:- Back filing the foundation trenches
(Rupees Nineteen
around the structures etc. with selected excavated
20.00 CM 19.50 and Fifty Paisa
stuff including watering, ramming, compacting etc.
complete. (By machinary)
Item No. 10:- Providing and fixing marble plate of
2cm thickness including engraving and filling paint
100Sq Hundred Fifty
13.50 for letter as directed. 250.60
.m. and Sixty Paisa
Item No. 11:- Providing and fixing in position sign
board of standard size of 1.20 mt. x 0.90 mt. with
M.S.angle 40mm x 40mm x 6mm with 3mm thick
100Sq Thousand Eleven
1.00 iron plate including fixing in 1:5:10 proportion 3011.30
.m. and Thirty Paisa
concrete block size 40cm x 40cm x 75cm including
painting existing data on the board etc complete as
(Rupees Twelve Lakh Eight Thousand Twenty Eight and Eighty Seven Paisa Only)
I/We am/are Willing to carry out the work at……………………………...…………………% above/below Percent(should be written
in figures and words) of the estimated rates mentioned above.Amount of my/our tender works out as under.
Estimated amount Put ter Rs.
Rs. Add…….% above Rs.
Net Rs. Net Rs.
In words…………………….. In words……………………..
*(Please strike out whichever is not applicable)
Note 1 All works shall be carried out as per Public Works Department Handbook and other specifications of Division or as directed.
GM\Wv! AW]\ H SFD AF\WSFD lJEFUGL 5]l:TSF VG[ l0lJhGGL ALÒ BF; lJUT D]HA VYJF ;}RGF 5|DF6[ SZL VF5JFG]\ ZC[X[P
Note-2 All the columns is Schedule should be filled in ink and the total of the entries in the last column should be struck by the
contractor under his signature.
GM\WvZ VG];}lRDF\ AWF BFGFGL lJUTM ;CLYL EZJL VG[ K[<,F BFGFGL GM\WMGM ;ZJF/M SZL S\8=FS8Z[ 5MTFGL ;CL SZJLP
Note-3 Rates quotes include clearance of site (prior commencement of work and at its close) in all respects and hold good for work
under all conditions, site, moisture, weather etc.
GM\Wv# 8F\S[,F NZDF\4 :Y/GL sSFDGF VFZ\E[ VG[ 5]~ YFI T[ JBT[f NZ[S ZLT[ ;FO;}OL SZJFGM ;DFJ[X YFI K[4 VG[ T[ NZ TDFD 5lZl:YlT4 :Y/4 E[H4 CJFDFG JU[Z[
C[9/ SFD DF8[ VD,DF\ ZC[X[P
Note-4 To be continued on additional sheets, if found necessary.
GM\Wv$ H~Z H6FI JWFZFGF SFU/M HM0L RF,]\ ZFBJ]\P
Note-5 All the Rates are included 1 % Labour Cess & shall be deducted from contractor all bills.
Deputy Executive Engineer, Executive Engineer,
Const. Irri. Khar. Panch. SDn Panchayat Irrigation Division,
Signature of contractor
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1.SBD Jujva.pdf
2.Schedule-B jujva.pdf
3.Nivida- 01 - 2026-27.pdf
4. ANEXURE-II.pdf
5.clause No 4.5.4 and 4.5.5.pdf
6.qualification information 1.1 to1.14 and 3.1 - Copy.pdf
7.Bid Capacity.pdf
8.Dwr jujwa.pdf
1.SBD Jujva.pdf
2.Schedule-B jujva.pdf
3.Nivida- 01 - 2026-27.pdf
4. ANEXURE-II.pdf
5.clause No 4.5.4 and 4.5.5.pdf
6.qualification information 1.1 to1.14 and 3.1 - Copy.pdf
7.Bid Capacity.pdf
8.Dwr jujwa.pdf
Download all tender documents and submit your bid