Loading…
Loading…
Tender Value
₹1.6 Cr
EMD Value
₹1.6 L
Closing Date
26 Jun 2026, 3:15 pm
GUNTUR MUNICIPAL CORPORATION
Guntur
Providing CC Road and Construction of CC Drains from srinagar 1st line venkateswara swamy temple to sarada colony 1st line vai Mallikharjuna peta main road In Div No 50 Under AE-12 Section. (RECALL)
946756
ET NO.37/2025-26 Item No.20
OPEN - NCB
Similar Work
GUNTUR
1 document required · 1 mandatory
₹5,521
₹1.6 L
12 Jun 2026
12 Jun 2026
12 Jun 2026
Excavation for roadway in soil by Mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections as per Technical Specification Clause 302.3 MORD / 301 MORTH.
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH (RBR-STCL-5)
Earthwork excavation in Ordinary soil by Mechanical Means upto 3 m depth for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH (RBR-FNDN-1(B)) - 1 Cum
Carting away the surplus excavated earth from the work site with a lead of 3 km beyond initial lead including loading, unloading and conveyance but excluding stacking charges etc., complete - 1 Cum.
Filling of Stone Crusher Dust for foundation trenches including cost and conveyance off all materials and all labour charges ramming,watering etc, as per drawing and technical specification in Clause 305.3.9 MORD & 304 MORTH
Providing concrete for plain/reinforced concrete (M10) in open foundations using 20 mm Graded hard stone aggregate , mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.
Providing concrete for plain/reinforced concrete (M20) in open foundations using 20 mm Graded hard stone aggregate , mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.
Providing concrete for plain/reinforced concrete (M20) in open foundations using 20 mm Graded hard stone aggregate , mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.
Providing concrete for plain/reinforced concrete (M20) in open foundations using 20 mm Graded hard stone aggregate , mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.FOR DRAIN BED&WALLS
VRCC M-20 Design mix (Cement: fineaggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shutteing for culvert slabs
Providing High Yield Strength Deformed (HYSD) Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors. ( APSS No.126)
Centering Charges for RCC vertical walls of plane surface including all type of labour charges (Open drains) for 600 mm and above.
Construction of granular sub-base (GSB) by providing Well graded material for Grading III mixing in a Mechanical Mix Plant at OMC carriage mixed material to work site spreading in uniform layers with motor grader on prepared surface and compacting with 80-100 kN Vibratory Roller to achieve the desired density, complete as per Technical Specification of MORTH.
Providing, laying, spreading and compacting graded HBG Crushed stone aggregate to Wet mix macadam specification including cost, seigniorage of all material and including premixing the material with water at OMC in mechanical mixer Plant carriage of mixed material by tipper to site, laying in uniform layers with paver in base course on well prepared surface and compacting with Vibratory roller of 8 to 10 to achieve the desired density etc., as directed by the Engineer-in-Charge and as per MORTH & H Specification for finished item of work. (RBR-SBBS-11)
Laying of Plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 / 53 grade at cement as per Clause 1501.2.2 (M30 Grade) at 400 kg per cum, coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.28 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, near approaches to bridge / culvert and construction joints, and curing of concrete slabs for 14- days and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.
Bailing out water from the pipe line trenches with oil engine driven pump sets, including hire charges, fuel charges and wages for Driver and Helper.
Cost supply and delivery of Taps materials of best quality including loading un loading transportation etc completed as per ss 1/2" HDPE Pipes
1/2" GI Couplings
1/2" X 2" GI Nipples
1/2" X 6" GI Nipples
1/2" X 9" GI Nipples
Engaging of Plumber and Helper for fixing of broken taps including all labour Charges Plumbers
Providing House Service connections by providing clamps for tapping from HDPE mains with 1/2"HDPE Pipe regulating brass ferrule 1/2" and other fixtures including all taxes transportation and other levies and duties excluding GST & Seignorages etc,on HDPE Mains including all loabour charges etc complete
Manufacture as per BIS:12592 (Part 1&2) Supply & Delivery of manhole covers and frames with ISI marking anywhere in A.P., F.O.R. destination including, loading, un-loading & stacking at site but excluding all taxes.
Provision for Seignorage Charges
Towards Merit 2% on Seignorage Charges
Towards Consideration amount 100% Seignorage Charges
Towards DMF 30% on Seignorage Charges
Provision for NAC @ 0.10%
Provision for GST @ 18%
Provision for TPQA @ 0.739 %
Unforeseen item
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Item No 20.xlsx
TENDER_DOCUMENT • 0.07 MB
NIT1.doc
TENDER_DOCUMENT • 0.10 MB
Schedule-A2.xlsx
TENDER_DOCUMENT • 0.06 MB
Self Declaration.docx
TENDER_DOCUMENT • 0.03 MB
Tender Document.doc
TENDER_DOCUMENT • 0.44 MB
Download all tender documents and submit your bid