Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹13.4 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹13.9 L+₹51,725.33 (3.86%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹15.6 L+₹2.2 L (16.2%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹15.7 L+₹2.3 L (17.4%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹16.0 L+₹2.6 L (19.2%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹20.0 L
EMD Value
₹39,940
Closing Date
10 Aug 2026, 5:00 pmClosed
Er Jyotika Sambyal
EXECUTIVE ENGINEER PWD R AND B DIVISION VIJAYPUR
Please refer to BOQ
2026_PWDJK_319217_8
43 of 2026-27 dated 03-08-2026
Open Tender
Civil Works
Percentage
60 days
EXECUTIVE ENGINEER PWD R AND B DIVISION VIJAYPUR
Please refer to tender documents
3 documents required · 3 mandatory
₹600
EXECUTIVE ENGINEER PWD R AND B DIVISION VIJAYPUR
₹39,940
EXECUTIVE ENGINEER PWD R AND B DIVISION VIJAYPUR
18 Aug 2026
3 Aug 2026
11 Aug 2026
3 Aug 2026
10 Aug 2026
3 Aug 2026
4 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 meters lead For thickness of tiles above 25 mm and upto 40 mm. | 49.35 | Sqm. | 89.95 | ₹4,439.03 |
| 2 | Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charg, In cement mortar | 2.21 | Cum | 1,458.45 | ₹3,223.17 |
| 3 | Dismantling old plaster or skirting, raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 meters lead. | 120 | Sqm. | 38.9 | ₹4,668 |
| 4 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and
ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as
directed ( All kinds of soil ) | 27 | Cum | 479.3 | ₹12,941.1 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with, 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 9.2 | Cum | 5,202.9 | ₹47,866.68 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All
works upto plinth level, 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 5.07 | Cum | 7,788.4 | ₹39,487.19 |
| 7 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 15.75 | Cum | 5,733.6 | ₹90,304.2 |
| 8 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with, 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 11.05 | Cum | 9,821.85 | ₹1,08,531.44 |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above or upto plinth level, Thermo-Mechanically Treated bars of grade Fe-500D or more. | 2,418 | Kg. | 123.2 | ₹2,97,897.6 |
| 10Centering and shuttering including strutting, propping etc. and removal of form work for :- | |||||
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.26 MB
BOQ_1056513.xls
BOQ • 0.91 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .