Loading…
Loading…
Tender Value
₹28.1 L
EMD Value
₹56,300
Closing Date
27 Jul 2026, 10:00 amDue tomorrow
EE
Executive Engineer JS Division Baggi Distt. Mandi H.P.
as per BoQ
2026_HPIPH_139159_1
EE-JSD-BGI-TA-Tender/2026- 11104-54 dt. 16/7/2026
Open Tender
Civil Works
Item Rate
90 days
Baggi
as per NiT
6 documents required · 6 mandatory
₹2,000
₹56,300
17 Jul 2026
17 Jul 2026
27 Jul 2026
17 Jul 2026
27 Jul 2026
17 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundations, trenches etc., in earth work, lift upto 1.50 Metres stacking the eacavated soil not more than 3 metres clear from the edge of the excavation and then returning the stacked soil in 15cm. layers, when required in to plinths sides of foundations etc., consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed with in a lead of 20 metres unusable material as directed with in all leads & lifts including restoration of unmetalled surfaces to its original condition complete in all respects with in all leads & lifts as per the entire satisfaction & directions of Engineer- in- Charge. (20 meters in pick 90%, jumper work 10%). | 30.32 | Cum | - | - |
| 2 | Providing and laying cement concrete 1:3:6 (1 cement: 3 sand: 6 graded stone aggregate 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth with in all leads and lifts as per the direction and satisfaction of Engineer-in-Charge. | 3.44 | Cum | - | - |
| 3Providing and laying Reinforced cement concrete work 1:1.5:3 (1 cement: 1.5 sand : 3 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in: | |||||
| 3.01 | Foundations, footings bases of columns and the like and the mass concrete. | 8.07 | Cum | - | - |
| 3.02 | Walls ( any thickness but not less than 0.10m thicknes) including attached butteresses, pillaster plinth and string courses etc. from top of foundation level upto floor two level complete with in all leads and lifts as per the direction and satisfaction of Engineer-in-Charge. | - | - | - | - |
| 3.03 | (1) Floor four level to floor five level | 8.49 | Cum | - | - |
| 3.04 | (i) Columns, pillars posts and struts upto floor two level. | 6.04 | Cum | - | - |
| 3.05 | (ii) Floor two level to floor three level | 5.09 | Cum | - | - |
| 3.06 | (iii) Floor three level to floor four level | 14.5 | Cum | - | - |
| 3.07 | Lintels, beams girders bressumers and cantilevers upto floor two level | - | - | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.66 MB
BOQ_206135.xls
BOQ • 4.79 MB
TC.pdf
Tender Documents • 0.16 MB
FORM_6.pdf
Tender Documents • 0.63 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].