Tender Value
Refer Docs
Closing Date
6 Mar 2023, 11:00 amClosed
DFO, Social Forestry Division Jammu
Social Forestry Division Jammu, opposite Nitco Lane Talab Tillo Jammu
Construction of Check Dam at 26 D Purmandal Samba of Social Forestry DivisionJammu under CAMPA for the year 2022-23
2023_FD_206477_1
e-Nit No. 112 of 2022-23
Open Tender
Civil Works
Item Rate
15 days
Purmandal Samba
As per Nit
2 documents required · 2 mandatory
₹500
DFO. Social Forestry division Jammu
Exempted
10 Mar 2023
28 Feb 2023
6 Mar 2023
28 Feb 2023
6 Mar 2023
28 Feb 2023
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:5:10 (1 cement: 5 coarse sand :10 graded stone aggregate 40mm nominal size) (A) Crushed inculding all lead lift carriage complete job
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) inculding all lead lift carriage complete job
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etc upto floor V level, including curing but excluding the cost of centring, shuttering and finishing with1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) inculding all lead lift carriage complete job
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete
Centring and shuttermg including strutting, propping etc. and removal of form for· Foundations: footings, bases of columns etc. for mass concrete
Centring and shuttermg including strutting, propping etc. and removal of form for· Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
MOHD ISHTIAQ
JAVED IQBAL
Madan Lal Sharma
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .